Emery Ojala
- License
- C4986
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C4986 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2025 to May 2026
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc, Skyline Construction
- Architects
- Brian Milford, Sashikala Murthy, Suwanty Mulia
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 22, 2026 | Completed final sign-off Jul 2026 | 160 Spear St | Skyline Construction | 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18.Details
17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. | $300,000 |
| Mar 7, 2025 | Completed final sign-off Aug 2025 | 50 Fremont St | Gci, Inc | new tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred.Details
new tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred. | $600,000 |