Gci, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 212 permits filed
3,135 permits since 2000: 2,317 completed, 146 in progress, 398 never finaled, 274 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
Showing the 100 most recent of 3,135.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress | 4 Embarcadero Center | level 16 - 18: finish and guardrail work to (e) stair. | $29,000 |
| Sep 18, 2026 | In progress | 4 Embarcadero Center | 17/fl- interior ti to include non structrual partitions, millwork, doors, ceiling and associated mep. soft demo on seperate permit | $3,822,412 |
| Sep 18, 2026 | In progress | 4 Embarcadero Center | 16/fl- interior ti to include non structrual partitions, millwork, doors, ceiling and associated mep. soft demo on seperate permit | $4,089,680 |
| Sep 18, 2026 | In progress | 4 Embarcadero Center | 18/fl- interior ti to include non structrual partitions, millwork, doors, ceiling and associated mep. soft demo on seperate permit | $4,072,684 |
| Sep 15, 2026 | In progress | 535 Mission St | 27/f: electrical only to relocate receptacles and outlets for phone booths approved under 202608076258. | $6,000 |
| Sep 14, 2026 | In progress | 221 Main St | 12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419. | |
| Sep 14, 2026 | In progress | 1 Front St | interior renovation at 2nd floor, (n) bar, (n) gym and (n) coworking office, (n) ceiling, lighting, millwork and finishes. (n) connecting stair from 1/f to 2/f. | $16,000,000 |
| Sep 4, 2026 | In progress | 444 De Haro St | 2/f: electrical only permit to support pa# 202606082742. new lighting & controls and new power & signal devices throughout the space. | $10,000 |
| Sep 3, 2026 | In progress | 444 De Haro St | soft demo per ab-017. select demo of non-structure partitions, dropped, ceilings, lighting, and associated power/data, existing equipment and finishes | $45,000 |
| Sep 2, 2026 | In progress | 345 California St | 35th fl - remodel men's women's restrooms. remodel pantry/break room. new non-structural partitions. new lighting & ceilings, wall & floor finishes | $675,000 |
| Sep 2, 2026 | In progress | 100 California St | 10th fl, mep submittal to support approved arch permit. new hvac duct work and lighting for new office rooms. ref pa 202608216997 | $28,800 |
| Aug 26, 2026 | In progress | 300 California St | g/f revision to 202605121124: millwork placement adjustment to provide more space for cafe que line, update cafe equipment schedule & specification, finish & transitions, reflect ceiling update w/ removal of 1 arch & adjusted lighting layout, addition of power &data for a/v req, change in trash path | |
| Aug 24, 2026 | In progress | 444 De Haro St | 1/fl- minor demo and interior consturciton of non structural partitions, relcoated doors and new exit signs and restroom upgrades | $30,000 |
| Aug 21, 2026 | In progress | 100 California St | 10th floor: interior tenant improvement to construct new partitions, doors glazing and finishes. mep deferred. | $56,800 |
| Aug 21, 2026 | In progress | 611 Front St | t.i improvement 2nd floor. | $150,000 |
| Aug 20, 2026 | In progress | 555 Mission St | 27th fl - mep for bpa 202604028768 | $800,000 |
| Aug 17, 2026 | In progress | 220 Montgomery St | mechanical revision to pa #202606197885 | |
| Aug 14, 2026 | In progress | 235 Montgomery St | 13th floor: renovation of (e) multi-used restrooms at (e) private office on 13th floor. work includes replacement of fixtures, finishes, lighting, toilet partitions. no layout changes. | $204,750 |
| Aug 12, 2026 | In progress | 4 Embarcadero Center | interior soft demo on floor 16,17 and 18. ab-017 applies | $100,000 |
| Aug 7, 2026 | In progress | 535 Mission St | 27th floor: minor non-structural demolition of new power, life safety & seismic requirements for 4 new phone booths. | $50,000 |
| Aug 5, 2026 | In progress | 3200 California St | revision to approved permit#202510167532: update occ load calculations. | |
| Aug 5, 2026 | Completed | 360 03rd St | ste 400 - revision to pa 202511139521 to removed deferred submittals from street g0.0. no deferred submittals are required | |
| Aug 4, 2026 | In progress | 590 Van Ness Av | 1st fl - structural reinforcement of existing floor. new columns and footings on basement level | $181,068 |
| Aug 4, 2026 | In progress | 535 Mission St | 5th floor: mep deffered under 202606082732. mch: demo & revise existing ductwork & diffusers to accomodate new floor plan layout. finish & install new duct & diffusers to accomodate new layout. elec.: office ti retrofit-lighting fixtures & associated circuiting/controls, poser & signal. | $500,000 |
| Aug 3, 2026 | In progress | 55 Spear St | 37th floor: interior non-structural demolition only. ab017 | $91,700 |
| Jul 30, 2026 | In progress | 555 Mission St | 27th floor: revision to pa #202604028768 in suite 2725: scope revised to be white shell with lighting and fire safety required per code. removing private offices, conference rooms and break areas to previous ti permit. remove break island and pendant light in break area 2758 | |
| Jul 30, 2026 | In progress | 555 Mission St | 22nd fl interior tenant including new partitions, light fixtures, ceilings, millwork, and plumbing fixtures. mep and fire/life safety under separate permit | $446,192 |
| Jul 24, 2026 | In progress | 590 Van Ness Av | 2/f: office t.i. including offices, breakroom, confereence rooms. includes mep. | $1,591,400 |
| Jul 21, 2026 | Completed | 601 California St | suite 800. electrical power, lighting a signal. reference 202604240028. | $75,000 |
| Jul 20, 2026 | In progress | 101 Mission St | new interconnected stair betweem 19 flr & 20 flr. | $450,000 |
| Jul 20, 2026 | In progress | 101 Mission St | 19/f: mep submittal to support approved arch permit. new vav boxes, exhaust fans, lighting, and power throughout. ref: #202605271978 | $684,000 |
| Jul 16, 2026 | In progress | 1960 Folsom St | deferred electrical for pa# 202512010636 | $37,400 |
| Jul 15, 2026 | Completed | 300 Howard St | barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3. | $10,000 |
| Jul 14, 2026 | In progress | 1 Maritime Pz | removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the | $165,418 |
| Jul 14, 2026 | In progress | 220 Montgomery St | ste 350:mech: new vrd condenser unit and new vrv branch selector added to serve 3/f ti, non new fsd's. elec: provide power for mech equipment or a warm shell, no new lighting. | $210,000 |
| Jul 9, 2026 | In progress | 1 Market St | 28th floor: electrical-new power, lighting and signal. ref pa #202604149423. | $27,000 |
| Jul 8, 2026 | In progress | 1960 Folsom St | revision to pa#: 202512010636. reduce scope by deleting wind wallroom and associated equipment. (n) hvac equipment. lan room layout. update finishes and equip anchoring. power updates. revised egress door. | $80,000 |
| Jul 2, 2026 | In progress | 300 Clay St | mep deferred. 5/f: tenant space, construct two new partitions w/ new door, relocated sink within new millwork. re-install relocated door frames and hardware. install associated power, data and modify (e) acoustic ceiling tiles as required for new scope of work. | $142,000 |
| Jun 24, 2026 | In progress | 555 Mission St | 21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mep | $2,012,760 |
| Jun 12, 2026 | In progress | 345 California St | to obtain final inspection for work approved under pa# 202503101898. all work is complete. | |
| Jun 10, 2026 | In progress | 555 Mission St | 24th floor: interior tenant improvement to demo and construct new non-structural partitions, ceilings, finishes and associated mep. | $2,312,760 |
| Jun 9, 2026 | In progress | 1 Market St | 28th fl - mechanical demo of mech systems: install 2 novo vav boxes , new fsd's reference: 202604149423 | $15,000 |
| Jun 8, 2026 | In progress | 8 California St | 6/fl- relocate (e) phone booths to open office area. addition of fire strobes tied to (e) systems deferred.- no mep work | $100,000 |
| Jun 8, 2026 | In progress | 535 Mission St | 5floor; t.i. demo of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. bldg is fully sprinkled. | $721,000 |
| Jun 8, 2026 | In progress | 444 De Haro St | ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permit | $460,000 |
| May 28, 2026 | Completed | 303 02nd St | interior non structural demolition of walls and mill work ab-017 | $8,000 |
| May 27, 2026 | In progress | 101 Mission St | 19/fl- ti to include non structrual partitions, doors, lighting, ceilings, and finishes. renovated restrooms, additional single user restroom and renovated elevator lobbies. mep deferred | $2,307,421 |
| May 26, 2026 | In progress | 1 Front St | interior renovation of ground floor lobby (n) restaurant at ground floor. (n) ceiling, lighting millwork and finishes.food service, mep & lighting under separate permit. | $2,400,000 |
| May 21, 2026 | Completed | 680 Folsom St | ref to pa 202503051624 landlord improvements to penthouse roof deck, restroom & lobbies for indoor & outdoor lighting & power systems. connecting power to new r relocated light fixtures, power outlets & tenant equipment. all work consists of making connections from base building existing and/ | $20,000 |
| May 14, 2026 | In progress | 300 Mission St | ev charging stations w/structural support | $150,000 |
| May 13, 2026 | In progress | 425 Market St | 12th fl;reference:202604219808. mech: duct distribution is being modified per new space plan, (1) new condenser water pump is being added, no new fsds. elec: electric single line riser diagram & panel, two way comm.system power signal. plumbing:no new tank water heater being added. | $250,000 |
| May 12, 2026 | In progress | 555 Mission St | 22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scope | |
| May 12, 2026 | In progress | 300 California St | renovation of building g/f lobby finishes and the adjacent tenant fit out. this includes demo of exterior store front, non-structural interior partitions, and new construction of interior partitions, ceilings, millwork and finishes. no increase in area. no change in occupancy or use | $1,270,000 |
| May 7, 2026 | In progress | 1 Embarcadero Center | electrical power, lighting, and signal ref 202603238043 | $50,000 |
| May 4, 2026 | In progress | 88 Spear St | 1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qwork | $2,797,784 |
| Apr 30, 2026 | Completed | 199 Fremont St | level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7). | $10,000 |
| Apr 30, 2026 | In progress | 1 Embarcadero Center | 8th floor. ref pa 202603238043 mechanical only - new vav boxes, demo pneumatic thermostat & install new ddc | $150,000 |
| Apr 24, 2026 | Completed | 601 California St | 8th fl - office ti minor upgrades to (e) vacant suite: unpdating break area casework, appliances & flooring. new lighting throughout: new cavinet throughtout. updates to power/data. (e) improvements & finishes to otherwise remain, including ceilings. existing occupancy does not change. alterations | $320,000 |
| Apr 21, 2026 | In progress | 425 Market St | demo of non-load bearing partions, doors, glazing, lighting & finishes & new construction | $150,000 |
| Apr 21, 2026 | In progress | 303 02nd St | 7/f: installation of (6) new modular phone booths in open office area. | $15,000 |
| Apr 16, 2026 | Completed | 250 Sutter St | 2/f: air distribution for new floor layout. mech only . ref 202512121666. | $125,000 |
| Apr 14, 2026 | In progress | 55 Spear St | 28th fl - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be apped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbing | $1,000,000 |
| Apr 2, 2026 | In progress | 555 Mission St | 27th floor - architectural only office ti. new partitions & millwork. mep deferred. | $1,200,000 |
| Mar 27, 2026 | Completed | 415 Mission St | 50th fl - electrical & office retrofit lighting fixtures & associated circuiting/controls, power & signal devices & associated wiring; mechanical: demo & revise existing ductwork & under floor diffusers to accommodate new floor plan layout. furnish & install new duct & diffusers ref pa 202508294227 | $149,000 |
| Mar 27, 2026 | Completed | 101 Mission St | 21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical. | $55,000 |
| Mar 25, 2026 | Completed | 100 California St | 10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614 | $20,000 |
| Mar 25, 2026 | Completed | 140 New Montgomery St | 11th office partial remodel/retrofit. lighting fixtures & associated circuiting/contros, power & signal devices and associated wiring, including for phone booths. ref 202510318678 | $15,000 |
| Mar 24, 2026 | Completed | 100 California St | ref bpa:202512313114 - adjust low side air distribution, new cooling, vav box, new transfer air, light fixtures, circuits/controls, power and signal devices new plumbing | $250,000 |
| Mar 23, 2026 | In progress | 1 Embarcadero Center | 8th fl: consists of non-structural demo and construction of interior partitions, doors, finishes, ceilings, lighting, plumbing, mechanical and electrical switches. mep and fire/life safety deferred submittals. valuation based on ti costs only, mep costs deferred. | $2,900,000 |
| Mar 19, 2026 | In progress | 220 Montgomery St | suite 350: mechanical work for t.i. ref pa#202511069032 | $23,000 |
| Mar 17, 2026 | Completed | 303 02nd St | 6/fl-revision 202512121724 to change (e) finishes and remove (e) card readers, revise concrete column mounted tv to be ceiling mounted. update dedicated cooling unit. revise door material and hardware | |
| Mar 12, 2026 | In progress | 221 Main St | 12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th fl | $3,500,000 |
| Mar 6, 2026 | In progress | 535 Mission St | revision to pa 202512091303 for additional phone booth locations | $14,000 |
| Mar 6, 2026 | In progress | 535 Mission St | provide new transfer air grille, new duct & diffusers to serve new floor plan layout. rebalance existing terminal unit, diffusers as required for pressurization ventilation and exhaust req ref 202512091303 | $40,000 |
| Feb 25, 2026 | Completed | 221 Main St | ste 1200 interior demo only - tenant readiness. ab-017 applies | $78,000 |
| Feb 20, 2026 | Completed | 201 03rd St | 2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchors | $25,000 |
| Feb 20, 2026 | Completed | 475 Brannan St | demo existing duct and air distribution as shown on m.i.i.d. install new duct and air distribution as shown (m2.1) ddc controls. air balance. ref pa#2025-1212-1655 | $50,000 |
| Feb 6, 2026 | In progress | 1 Embarcadero Center | 38th fl ref pa #2025-0530-7558: add a gender neutral restroom. relocate one wall to a conference room and add glazing to two office partitions. | |
| Feb 4, 2026 | Completed | 360 03rd St | ste 400 - revision pa 202511139521 to remove mep from deferred submittal on sheet g0.0 | |
| Feb 3, 2026 | In progress | 560 Mission St | rev to pa# 202501027602, ti interior common areas within (e) 31-story business occupancy bldg. revision notated as bulletins d & e, due to (e) field conditions & rfi/submittal responses narrative included itemizing changes in detail. ref pa# 202507100540, 202507150838 & 202509195753. | $50,000 |
| Feb 2, 2026 | Completed | 220 Montgomery St | 3rd fl- deferred electrical for pa #2025-1106-9032 & 2026-0127-4594 | $130,000 |
| Jan 30, 2026 | In progress | 88 Spear St | rev202409040025 and deffered mep: arch changes-operable partition in multipurpose rm and removal of planters in basement lounge.relocate firewater pump to facilitage primign and access from a-rated corridor.reconfig spa and cold plunge rm to add depress slab and vault to make recessed spa.tenant drs | |
| Jan 28, 2026 | Completed | 1 Market St | 37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952 | $15,000 |
| Jan 27, 2026 | Completed | 220 Montgomery St | 3rd fl, ste 350 revision to pa 202511069032 to enlarge large conference and phone room. revise door schedule & finish schedule | |
| Jan 22, 2026 | Completed | 1 Market St | 37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642. | $15,000 |
| Jan 6, 2026 | Completed | 199 Fremont St | to obtain final inspection for work approved under pa # 202311291553. all work is complete. | |
| Dec 31, 2025 | In progress | 221 Main St | demolition of structural deck between level 5 and 6. construct new stair. | $700,000 |
| Dec 31, 2025 | Completed | 100 California St | 10th fl suite 110: demo of (e) ceiling height partitions. construction of full height partitions, doors, glazing & finishes. | $200,000 |
| Dec 31, 2025 | In progress | 140 New Montgomery St | 7th/f interior t.i. elevator lobby, reception area, single offices, conferrence rooms, open office area, welless room, data/server, breakroom, mech, electrical & plumbing | $10,000 |
| Dec 18, 2025 | Completed | 303 02nd St | strengthening of communicating stair between 8th and 7th floor to reduce vibration and stair tread cracking. | $60,000 |
| Dec 12, 2025 | In progress | 88 Spear St | levels 3-11: demolition of non-structural walls & ceilings, and installtion of new finishes. new ceilings & new lighting in elevator lobbies. | $178,758 |
| Dec 12, 2025 | Completed | 1 Market St | 37th fl - signage for fire extinguisher, exit route, room signage | $2,000 |
| Dec 12, 2025 | Completed | 303 02nd St | interior t.i to include new partition, new finishes, a new all gender restroom & meeting rooms. 6/f | $1,200,000 |
| Dec 12, 2025 | Completed | 250 Sutter St | 2/fl- commerical interior ti for soft demo and build out of non structrual work. | $140,000 |
| Dec 12, 2025 | Completed | 475 Brannan St | 1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred | |
| Dec 9, 2025 | In progress | 535 Mission St | 9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen) | $186,000 |
| Dec 9, 2025 | In progress | 221 Main St | 5/fl-(n) interior ti to include mechanical and electrical . structrual for movable wall. includes mep work | $3,927,000 |
| Dec 9, 2025 | Completed | 1 Market St | 37th fl: evacuation signage | $2,000 |
| Dec 9, 2025 | In progress | 88 Spear St | minor revision to pa# 202311281534, 202401174145, 202410032253: to revise layout of accessible parking for path of travel compliance including new da-05 request for vertical actuators to creat accessible route from parking area. | |
| Dec 9, 2025 | In progress | 221 Main St | 6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct | $6,158,186 |