Block 3751, lot 157
360 03rd St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2026 | Completed | 360 03rd St | Gci, Inc | ste 400 - revision to pa 202511139521 to removed deferred submittals from street g0.0. no deferred submittals are required | |
| Feb 4, 2026 | Completed | 360 03rd St | Gci, Inc | ste 400 - revision pa 202511139521 to remove mep from deferred submittal on sheet g0.0 | |
| Nov 13, 2025 | Completed | 360 03rd St | Gci, Inc | ste 400 - ti to include constrction of (n) non-structural partition, doors and sidelite, (n) flooring, touch-up paint, (n) millwork and minor ceiling work | $420,000 |
| Dec 11, 2024 | Completed | 360 03rd St | Southland Industries | changing out 2 existing 15 ton computer room air handlers with 2 new liebert computer room handlers. | $190,000 |
| Feb 1, 2024 | In progress | 360 03rd St | Golden Gate Fire Protection Inc | ref to t.i. 202312212901: f/s relocate 2 pendents and delete 1 concealed pendent on 1/f | $1,200 |
| Jan 25, 2024 | Completed | 370 03rd St | Intelligent Technologies & Services Inc | 1st fl: reconfigure the (e) clean agent system & controls along with clean agent nozzles and piping. this will eliminate 11 smokes and pull and abort station. | $24,303 |
| Jan 19, 2024 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 1st fl: 2 ceiling strobes to be added to provode proper coverage. ref pa# 202312212901. | $2,000 |
| Jan 5, 2024 | Completed | 360 03rd St | Peacock Construction | mechanical- relocate ceiling grilles, extending ductwork relocate 1 thermostat. new power and signal devices, title 24. ref pa#202312212901 | $180,000 |
| Dec 21, 2023 | Completed | 360 03rd St | Peacock Construction | scope of work: demo of existing production control room and adjacent audio room, including, associated non structural partitions, doors, ceilings, lighting, accessories and portion of (e) raised floor. new work include construction of audio and proudction control room with non structural partions | $191,780 |
| Nov 21, 2023 | In progress | 360 03rd St | Hp Build | 1st fl ste 101: demolition of existing millwork & finishes. new construction of non-structural demsing wall, lighting & finishes. | $80,000 |
| Oct 6, 2023 | Completed | 360 03rd St | Southland Industries | replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building. | $300,000 |
| May 10, 2023 | Completed | 370 03rd St | Intelligent Technologies & Services Inc | remove 2 heat detectors and add 1 smoke detectors to existing fire alarm system on 1st floor restroom. | $10,375 |
| Apr 17, 2023 | Completed | 360 03rd St | Gci, Inc | 1/f: mechanical & electrical work for t.i. to include demo of existing grille and installation of new grille w/ associated electrical wor, ref pa# 202212077790. | $2,000 |
| Dec 8, 2022 | Expired or cancelled | 360 03rd St | suite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes. | $900,000 | |
| Dec 7, 2022 | Completed | 360 03rd St | Gci, Inc | 1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms. | $350,000 |
| Jun 21, 2022 | Never finaled | 360 03rd St | Pyro-Comm Systems, Inc. | 1/f breakroom: this is a modification to an existing fire alarm system. 1 relay module will be added for card access interface and 1 ceiling strobe to be added to provide coverage. ref permit 202104068014. | $1,000 |
| Feb 2, 2022 | Completed | 360 03rd St | demolition of extg doors, frames and hardware. infill extfg doors and install new doors, frames & hardware at extg wall. | $68,000 | |
| Aug 17, 2021 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 5/f: f/a as-builts to show correct number of call stations being added to the poject under scope of work under 202103237098. | |
| Aug 16, 2021 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | as built for pa# 2021-0415-8614, 5th fl. add (15) and relocate (2) sprinklers per t.i. | |
| Aug 4, 2021 | Completed | 360 03rd St | Intelligent Technologies & Services Inc | as-built plans remove reference to power shutdown. pa #202103317668 origianl approved permit. | |
| Apr 15, 2021 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | 5th floor: add (4) and relocate (2) sprinklers per t.i. ref #: 2020-1022-7136. job #: 21-606. | $2,550 |
| Apr 6, 2021 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | this is a modification of an existing fire alarm system. 3 new monitor modules will be installed to supervise the existing pre-action panel. this is a revision to permit 2020-1210-0751 | |
| Mar 31, 2021 | Completed | 360 03rd St | Intelligent Technologies & Services Inc | supply & install a complete clean agent/pre-action detection & control system in 5th floor mdf room. | $25,872 |
| Mar 23, 2021 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | add to existing fire alarm system: new notification appliance, two (new) twoway comm system call stations instaalled in the 5th floor elevator lobby and connected to master panel 1st floor | $10,000 |
| Feb 8, 2021 | Never finaled | 360 03rd St | Bcci Construction Company | 5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a. | $50,000 |
| Dec 10, 2020 | Never finaled | 360 03rd St | Pyro-Comm Systems, Inc. | fire alarm. 6 relay modules will be added to mdf room to shutdown the computer room crac unit. all new devices will be added to existing facu. | $2,000 |
| Nov 24, 2020 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | new pre-action system for mdf room 5035. add 14 and remove 11 fire sprinklers per tenant improvements. reference 2020.1020.6988 | $7,350 |
| Oct 22, 2020 | Completed | 360 03rd St | Bcci Construction Company | 5/f: t.i. of tenant space (minus (2) equipment rooms). n/a. | $500,000 |
| Oct 20, 2020 | Never finaled | 360 03rd St | Bcci Construction Company | 5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations. | $1,000,000 |
| Nov 1, 2019 | Expired or cancelled | 360 03rd St | ground floor: includes construction of non-structural partitions, light fixtures, glass side lights, doors, finishes. no change in area, occupancy or use. mep, fire alarm, sprinklers, t-24 calcs will be under seperate permit. n/a for maher | $54,566 | |
| Jun 18, 2019 | Expired or cancelled | 360 03rd St | install (1) non-illuminated single-faced wall sign. "nektar" | $13,600 | |
| Apr 29, 2019 | Completed | 360 03rd St | Xl Construction, Corporation | revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req | |
| Feb 21, 2019 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | fire alarm ti - adding 82 speaker strobes, 18 strobes, 2 smk det, 4 return air smoke dets and 6 duct dets to be hooked up to (e) facu ref 201901281353 | $56,000 |
| Feb 20, 2019 | Completed | 360 03rd St | Sabah International Incorporated | provide & install a new engineered total flooding fk-5-1-12 clean agent fire enxtinguishing system. t.i. under #2019/0128/1353 | $111,821 |
| Feb 12, 2019 | Never finaled | 360 03rd St | Eco Fire Sprinklers Inc | on 7th floor add (517) sprinklers in area of work for tenant improvement. also install single interlock pre-action system to cover idf room. permit ref #201901281353 | $285,000 |
| Jan 28, 2019 | Completed | 360 03rd St | Xl Construction, Corporation | 7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work | $7,273,098 |
| Dec 6, 2018 | Completed | 360 03rd St | Xl Construction, Corporation | interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit | $100,000 |
| Nov 6, 2018 | Completed | 360 03rd St | Xl Construction, Corporation | demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be | $5,000 |
| Jun 22, 2018 | Expired or cancelled | 360 03rd St | installation of (2) stem lithium ion battery energy storage system (ess) will be used to offset peak demand charges by discharging directly into the facilities elec. distributtion system. the monitoring and control system detects both when to charge, and when to discharge. ** maher: n/a ** | $30,000 | |
| Feb 12, 2018 | Expired or cancelled | 360 03rd St | Pyro-Comm Systems, Inc. | 6th fl: pyro comm will provide (2) duct detectors & relays for hvac shutdown. maher na | $1,500 |
| Feb 1, 2018 | Completed | 360 03rd St | M C S Construction Services | ground fl - building path of travel upgrades including relocation of restroom fixtures and upgrading accessories in the restrooms & shower room to be accesible | $30,000 |
| Jan 2, 2018 | Never finaled | 360 03rd St | A M A Design Build Incorporated | 6th floor #615 - renovation of room #002 open office (one room only) for new broadcast equipment & freestanding furniture layout. n/a maher ordinance | $340,000 |
| Jun 6, 2017 | Never finaled | 360 03rd St | R L H Fire Protection Inc | 3/f- fire sprinkler t.i., remove (4) pendents and replace drops with upright sprinklers where ceiling are removed. t.i. pa#201705267757. n/a ordinance #155-13 | $1,500 |
| May 26, 2017 | Completed | 360 03rd St | Principal Builders Inc. | 3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na | $68,000 |
| Apr 22, 2016 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 6th fl: new fire alarm devices added to a ti improvement in an existing building to include 2 relay modules, 2 multi voltage relays, 3 duct detector, 2 smoke detectors 4 speaker/strobes ref 2016-0323-2802; maher n/a | $5,500 |
| Apr 14, 2016 | Completed | 360 03rd St | Skyline Construction | 6th flr: mechanical work for ti 2016 0308 1412 - hvac for new rooms maher na | $5,000 |
| Apr 14, 2016 | Completed | 360 03rd St | Skyline Construction | 6th flr: electrical work for ti 2016 0308 1412 maher na | $10,000 |
| Apr 13, 2016 | Completed | 370 03rd St | Golden Gate Fire Protection Inc | 6th floor: fire sprinkler: relocate 7 pendent sprinklers . relocate 4 upright sprinklers. n/a for maher. t.i. #201603232802 | $5,775 |
| Apr 11, 2016 | Completed | 360 03rd St | Skyline Construction | 6th flr: mechanical work for tenant improvement, ref. 201603081412; maher n/a | $3,000 |
| Apr 1, 2016 | Never finaled | 360 03rd St | True North Signs & Graphic Services | 6th floor - install (5) evacuation signs. n/a maher ordinance | $1,750 |
| Mar 23, 2016 | Never finaled | 360 03rd St | Skyline Construction | tenant improvement - new partitions, doors, millwork. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13 | $255,000 |
| Mar 15, 2016 | Completed | 360 03rd St | Skyline Construction | 6th floor, tenant imrprovement new office, modification of non rated non structural partitions. mep & fire life safety under separate permit. maher na | $10,000 |
| Mar 15, 2016 | Completed | 360 03rd St | Skyline Construction | 6th floor, electrical work for ti ref pa 2016-0308-1412. maher na | $5,000 |
| Mar 8, 2016 | Completed | 360 03rd St | Skyline Construction | 6th floor: t.i. to include new non-load bearing partitions. mep under seperate permit. n/a for maher. | $250,000 |
| Feb 29, 2016 | Completed | 360 03rd St | Pioneer Fire Inc. | 4/f: relocate 3 pendents. relocate 1 uprright pendent; ref pa 2016 0105 6388; maher na | $8,789 |
| Feb 22, 2016 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 4th floor: new fire alarm appliances added to t.i. in an extg bldg to include 4 speaker/strobes, 4 strobes. ref app#201601056388. n/a for maher | $4,000 |
| Feb 17, 2016 | Completed | 360 03rd St | A M A Design Build Incorporated | office ti on 6th fl (suite 650): of existing high rise office b occupancy. 6th fl is a multi tennant floor. project consists of new interior partition | $2,000 |
| Feb 12, 2016 | Completed | 360 03rd St | Gci, Inc | ref pa 2016-0105-6388, provided new lighting & branch circuiting to existing panel. maintened some existing power & signal outlets, provide new power branch circuiting raceway systems. | $105,000 |
| Feb 12, 2016 | Completed | 360 03rd St | Gci, Inc | ref pa 2016-0105-6388, install 91) new water source heat pump for server room, duct distribution modifications for new layout rebalance zones, new plumbing | $88,000 |
| Jan 26, 2016 | Completed | 360 03rd St | A M A Design Build Incorporated | suite 650 - addition of supplemental ac unit for after hours use. minor rework of existing ductwork & vav boxes to accommodate new supplemental equipment. no architectural work, no electrical, no plumbing. n/a maher ordinance | $100,000 |
| Jan 21, 2016 | Expired or cancelled | 360 03rd St | Ferrari Color | applying mesh sign on front window. temp 1/30-2/13. maher na | $16,000 |
| Jan 5, 2016 | Completed | 360 03rd St | Gci, Inc | tenant improvement, non structural alterations. walls, elec, lighting, hvac, mep deferred. n/a ordinance #155-13 | $400,000 |
| Dec 21, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | as built revisions to 201510079118 | |
| Dec 1, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 1st floor: new fire alarm devices for new tenant generator added to existing building to include 3 monitor modules. maher not req. ref. pa#201502027215 | $1,500 |
| Nov 12, 2015 | Never finaled | 360 03rd St | Anderson, Rowe & Buckley, Inc. | 6th flr: existing fire sprinkler system apn 201510230651 t.i., 1 add sprk, 1 plugged outlet, 2 relocated spkrs; maher n/a | $2,500 |
| Oct 23, 2015 | Completed | 360 03rd St | A M A Design Build Incorporated | revision to app 2015-0814-4273 for t.i. on 6th floor for new parttions. minor mechanical and electrical work. there is no plbmg work associated scope. enlarge noc room. n/a for maher. life safety deferred. | $25,000 |
| Oct 20, 2015 | Completed | 360 03rd St | Anderson, Rowe & Buckley, Inc. | 6th floor: fire sprinklers for ref pa 2015 0814 4273: relocate 16 heads, add 1 maher na | $8,806 |
| Oct 7, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | new fire alarm devices for a ti in existing building to include 1 relay module, 1 smoke detector, 6 speaker/strobes, 1 strobe maher not req | $4,300 |
| Aug 28, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 3rd floor:new fire alarm devices added to t.i. in an extg bldg to include: relay and 1 multi-voltage relay for av music shutdown. ref app#201507232320. n/a for maher | $1,000 |
| Aug 17, 2015 | Never finaled | 360 03rd St | Allied Heating & Air Conditioning | 5th fl. install transfer fan replace wshp. maher na | $15,541 |
| Aug 14, 2015 | Completed | 360 03rd St | A M A Design Build Incorporated | ti on 6th floor of (e) office building. construction of new partitions and minor mechanical, elelctrical. fire sprinkler & fire alarm work under separate permit. there is no plumbing work associated with scope. n/a for maher. | $500,000 |
| Aug 4, 2015 | Never finaled | 360 03rd St | street space permit | ||
| Jul 23, 2015 | Completed | 360 03rd St | Principal Builders Inc. | 3rd floor: upgrade to hvac and lighting to replace ducts and lighting fixtures. no new architectural work. extg tenant space. n/a for maher. | $129,284 |
| Jul 1, 2015 | Never finaled | 360 03rd St | street space | ||
| Jun 12, 2015 | Completed | 360 03rd St | Paramount Sign Contractors | erect 2 projecting electric signs | $45,000 |
| Jun 3, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 1st floor: new fire alarm devices added to t.i. include: 1 duct detector, 1 realy module, 1 voltage relay and 3 speaker/strobes. ref. t.i. appl. 2015.0326.1978. maher n/a. | $4,300 |
| Jun 2, 2015 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | 4th flr: add 6 fire sprinkler per ti 2015 0429 4929 maher na | $3,084 |
| Jun 2, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 4th flr: new fire alarm device added to ti in an (e) bld to include 1 speaker/strobe. maher na ref #2015.0429.4929 | $2,000 |
| May 26, 2015 | Completed | 360 03rd St | Gci, Inc | revision to ref 201503261978: ada counter, move location, switchen panick door lock with standard lock and pulls. maher not req | |
| May 13, 2015 | Completed | 360 03rd St | Gci, Inc | new fcu and cu, new dx and condensate piping for new fcu ref 201503261979. n/a ordinance #155-13 | $42,000 |
| May 11, 2015 | Never finaled | 360 03rd St | Pioneer Fire Inc. | 1st flr: relocate 1 sprinkler/ relocate (e) horizontal free standing fdc location, install new vertical, recessed fdc. ref pa 2015 0326 1978 maher na | $4,800 |
| May 1, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 1st flr: new fire alarm system for ti: 1 speaker/strobe pa 2015 0429 4929 maher na | $2,000 |
| Apr 29, 2015 | Completed | 360 03rd St | Sc Builders, Inc | 4th flr -ti includes the demo of non structural partitions and building new non structural partitions. all new or revised hvac elec, plumbing, life safety under sep permit. maher not req | $138,600 |
| Apr 15, 2015 | Completed | 360 03rd St | Anderson, Rowe & Buckley, Inc. | ground flr: fire sprinkler - relocate 4 heads, add 2 heads, ref pa 2015 0326 1979 maher - not req'd | $3,100 |
| Apr 15, 2015 | Completed | 360 03rd St | Gci, Inc | ref. to pa#201503261979, improvements to office space plan for floor lighting & power, connecting power to new lighting or relocate power outlets and tenant equipment. no changes made to existing base bldg electrical system. n/a ordinance #155-13 | $30,000 |
| Mar 26, 2015 | Completed | 360 03rd St | Gci, Inc | wine bar/cafe new non stuctural partitions, hvac, electrical, plmg, millwork, ceilings electric stove. store front change. not visible from street (level below). n/a for the maher. ref app#201406118133 | $600,000 |
| Mar 26, 2015 | Never finaled | 360 03rd St | Principal Builders Inc. | revision to app#201402249182 and to document assembly space on proposed plans for office t.i. on floors 3. no additional work. no change of use. n/a for the maher. | $100 |
| Mar 26, 2015 | Completed | 360 03rd St | Gci, Inc | non structural partitons for new fitness studio. suspension training bar mounted to existing concrete slab. new built in closets. bottle filling station. ref 201406118133. n/a maher ordinance # 155-13 | $130,000 |
| Mar 12, 2015 | Completed | 360 03rd St | C B F Inc | remodel of exist. commercial office kitchen space:modifications to exist. partitions, plumbing&electrical;new cabinates. mep permited separatly.n/a maher | $25,000 |
| Feb 2, 2015 | Completed | 360 03rd St | A M A Design Build Incorporated | ste 615. installation of new optional emergency generator located on exterior of bldg at sw side at grade. work includes generator on new concrete pad with active diesel particulate filter. n/a for the maher | $30,000 |
| Feb 2, 2015 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 2nd floor studio b: as-built fire alarm revision to pa #2014-1110-1156. n/a maher ordinance | |
| Dec 3, 2014 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | 4th floor - add and relocate fire sprinklers per t.i. 7 added, 10 relocated. ref. t.i. appl. 2014.1010.8622. maher n/a. | $6,168 |
| Dec 2, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | new fire alarm devices added to tenant improvement to existing building to include power supply, 1 control module, 6 speaker/speaker/strobes | $2,500 |
| Nov 10, 2014 | Completed | 360 03rd St | Sc Builders, Inc | 4th flr: mechanical and electrical for pa #201410108622; maher n/a | $30,000 |
| Nov 10, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 2nd floor studio b: new fire alarm to t.i. include 1 duct detector, 1 smoke detector, 4 relay modules and 4 voltage relays. ref. appl. 2014.1014.8742. maher n/a. | $3,000 |
| Oct 29, 2014 | Completed | 370 03rd St | Skyline Construction | window washing equipment upgrades. compliance with maher ordinance no 155-13 not required. | $250,000 |
| Oct 15, 2014 | Completed | 360 03rd St | Southland Industries | 2nd flr: t.i. 201410148742 -for tv studio converting previously unoccupied studio space to useable space; mechanical/electrical only; maher n/a | $32,000 |
| Oct 14, 2014 | Completed | 360 03rd St | Southland Industries | convert previously unoccupied space to useable space adding hvac and electrical. maher not required. t.i. for tv studio. | $15,000 |
| Oct 10, 2014 | Completed | 360 03rd St | Sc Builders, Inc | 4th flr, ste 400, t.i. includes the demo of non-structural partitions & building new non-structural paritions. all new or revised hvac, elec, plumbing & life safety, work will be design built & submitted separately, bldg is fully sprinklered; maher n/a | $150,000 |
| Sep 5, 2014 | Never finaled | 360 03rd St | Southland Industries | 2nd flr: install 2 vav boxes with hot water reheat/ducting (broadcasting) ;install 1-fan coil unit in rm 231 facility room; maher n/a | $45,000 |
| Jul 2, 2014 | Completed | 360 03rd St | True North Signs & Graphic Services | to reface extg 2 signs. n/a for the maher ordinance #155-13 | $200 |
| Jul 2, 2014 | Completed | 360 03rd St | True North Signs & Graphic Services | to reface extg sign. n/a for the maher ordinance #155-13 | $4,400 |
| Jul 1, 2014 | Completed | 360 03rd St | Principal Builders Inc. | 3rd flr: revision to pa 201402128409 to show existing compliant restrooms on 3rd flr, current permit drawing do not show existing conditions. maher n/a | |
| Jul 1, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 4th floor - as builts for fire alarm, showing correct location of duct detector. related to pa #2014.0404.2503. n/a maher ordinance | |
| Jun 25, 2014 | Completed | 360 03rd St | Golden Gate Fire Protection Inc | 4th floor - add 9 upright sprinklers, wrap 1-1/4 pipe under 16 concrete beams. ref pa #2014.0407.2584. n/a maher ordinance | $4,635 |
| Jun 23, 2014 | Completed | 360 03rd St | Skyline Construction | 4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required | $5,000 |
| Jun 20, 2014 | Completed | 360 03rd St | Turner Construction Co | 5th floor - revision to pa #2013.12.13.4124 electrical only - expanding the area of work. n/a maher ordinance # 155.13 | |
| Jun 11, 2014 | Never finaled | 360 03rd St | change of use. ground floor. existing office space of 2824 sq ft to change to retail space. tenants not selected yet. (n) retail will be 2787 sq ft. remain vancancy under ab-017. maher ord n/a. | ||
| Jun 4, 2014 | Completed | 370 03rd St | Skyline Construction | new guardrail at roof. n/a to ordinance #155-13 | $250,000 |
| May 29, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | phase 2- new fire alarm devices for tenant build out to include: 1 powder supply, 1 monitor module, 13 speaker/strobes and 1 strobe. ref appl # 201404072484. maher n/a. | $5,000 |
| May 28, 2014 | Completed | 360 03rd St | Principal Builders Inc. | structural work to reinforce floor with grinders and concrete overlay on 3rd floor t.i. ref app#201402249182 for t.i. work. n/a for the maher ordinance #155-13 | $35,000 |
| Apr 23, 2014 | Completed | 360 03rd St | R L H Fire Protection Inc | 4th floor fire sprinkler permit - relcoate 14 pendents, 14 uprights & add 18 pendent & 3 uprights. ref t.i. #2014.0407.2584. compliance with ordinance #155-13 not required | $25,186 |
| Apr 10, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | new fire alarm devices for new tenant buildout to include 1 power supply 2 monitor module, 2 dual monitor modules, 6 relay modules, 5 voltage relays, 1 smoke detector, 15 speaker/strobes, 4 strobes. maher not required. | $10,500 |
| Apr 8, 2014 | Completed | 360 03rd St | A M A Design Build Incorporated | the scope of this submittal is limted to the deferred structural submittals of calculation for appl. 201312184460. n/a maher ordinance # 155-13 | |
| Apr 8, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 6th floor (square trade) - new fire alarm devices for tenant build-out to include (1) duct dectector (2) fsp 851 smoke detectors (2) speaker / strobes. ref pa# 201403251618. compliance with ordinance #155-13 not required | $4,000 |
| Apr 7, 2014 | Completed | 360 03rd St | Principal Builders Inc. | t.i. on partial 4th floor tenant space to demo doors and parttions and construct new doors, non -structural partitions, millwork, finishes, mechanical and electrical. fire sprinklers and life safty on seperate permit. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13 | $200,000 |
| Apr 7, 2014 | Never finaled | 360 03rd St | R L H Fire Protection Inc | add/relocate fire sprinklers for tenant improvement. add 105, relocate 32, total 137 heads. n/a ordinance #155-13. | $70,000 |
| Apr 4, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 4th floor fire alarm t.i.: new fire alarm devices for new tenant build out to include 3 speaker/strobes, 1 strobe. ref arch app# 2014-0318-0997. compliance w/ordinance #155-13 not required | $2,000 |
| Apr 2, 2014 | Never finaled | 360 03rd St | street space and mta parking | ||
| Mar 31, 2014 | Completed | 360 03rd St | Golden Gate Fire Protection Inc | 6th floor - relocate 5 upright sprinklers, add 1 upright. ref #201403251618. compliance w/ordinance #155-13 not required | $2,575 |
| Mar 25, 2014 | Completed | 360 03rd St | Skyline Construction | 6th floor:renovation to 6th floor to create new separately demised tenant suite to include non-rated, non structural partitions and ceiling.mep under sep permit.n/a for the maher ordinance #155-13 and n/a for interim controls #428-13 | $192,000 |
| Mar 25, 2014 | Expired or cancelled | 360 03rd St | Skyline Construction | 6th floor: mechanical and electrical work for t.i. ref app#201403251618. n/a for the maher ordinance #155-13. and n/a for the interim #428-13 | $15,000 |
| Mar 20, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 3rd floor phase 2 - new fire alarm devices for new tenant build-out to include: (1) power supply, (1) control module, (4) duct detectors, (32) speaker/strobes, (4) strobes. ref #2014.0224.9182. compliance with ordinance #155-13 not required | $13,000 |
| Mar 20, 2014 | Completed | 360 03rd St | Intelligent Technologies & Services Inc | 10 new smoke detectors & 1 bell. compliance with ordinance #155-13 not required. prer-action detection system. 201312184460 ti / 201403130649 pre-action sys | $3,900 |
| Mar 18, 2014 | Completed | 360 03rd St | Skyline Construction | interior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required | $150,000 |
| Mar 17, 2014 | Expired or cancelled | 370 03rd St | installation of new generator at the 1st floor. ** maher: compliance with ordinance no# 155-13 not required ** | $125,000 | |
| Mar 13, 2014 | Completed | 360 03rd St | Principal Builders Inc. | 3rd floor mech title 24 to install new equipment on partial floor t.i. ref pa #2014.0224.9182. compliance with ordinance #155-13 not required | $540,000 |
| Mar 13, 2014 | Completed | 360 03rd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler sytem tenant improvements, 89 sprinklers 1-2 " total pac 3 pre-act system (pa #201312184460) 6th floor. compliance with ordinance #155-13 not required | $44,500 |
| Mar 13, 2014 | Never finaled | 360 03rd St | Southland Industries | remove & replace (2) 50 ton air cooled chillers with (2) 80 ton air cooled chillers. provide new steel structure, provide roof screen. compliance with maher ordinance #155-13 not required, no disturbance of at least 50 cu yd of soil. | $280,000 |
| Mar 4, 2014 | Never finaled | 360 03rd St | Principal Builders Inc. | to add new lighting on partial 3/f t.i. ref. to pa#201402249182 for t.i. reference. na ordinance #155-13 | $600,000 |
| Feb 25, 2014 | Completed | 360 03rd St | R L H Fire Protection Inc | relocate fire sprinkler heads per tenant improvement pa# 2014-0212-8409 (5 relocate). | $2,570 |
| Feb 24, 2014 | Completed | 360 03rd St | Principal Builders Inc. | 3rd floor t.i. to demo partitions, doors, & millwork & construct new partitoins, doors, finishes & millwork. mep, life safety & fire sprinklers on separate permit. compliance with ordinance #155-13 not required | $1,560,000 |
| Feb 19, 2014 | Completed | 360 03rd St | Golden Gate Fire Protection Inc | 7th floor - relocate 81 pendent sprinklers , relocate 36 upright spirnklers. ref t.i. #2013.1212.4028. compliance with ordinance #155-13 not required. | $64,395 |
| Feb 12, 2014 | Completed | 360 03rd St | Principal Builders Inc. | 3rd floor: t.i. for extg tenant space to demo and add new non-structural partitioning doors and finishes. mep, life safety, sprinklers on separate permits. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13. | $60,000 |
| Feb 6, 2014 | Never finaled | 360 03rd St | Sc Builders, Inc | 4/f- revision to pa#201303061642 adding electrical & lighting in scope. | $5,000 |
| Jan 27, 2014 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | new fire alarm devices for a new tenant build-out. (1) remote power supply, (1) control module, (7) smoke/duct detectors, (28) speaker/strobes, (4) strobes, (2) door holders. t.i. pa#2013-1212-4028. compliance with ordinance no. 155-13 not required. excavation <50 cy. yd. | $15,000 |
| Dec 27, 2013 | Completed | 360 03rd St | Skyline Construction | mechanical and electrical worl on the 7th fl to include new transfer fan, duct work relocation of thermostat and lighting to include new lighting, 2 new fsds.compliance with ord no 155-13 not required | $200,000 |
| Dec 18, 2013 | Completed | 360 03rd St | A M A Design Build Incorporated | 6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required. | $1,078,859 |
| Dec 13, 2013 | Completed | 360 03rd St | Turner Construction Co, Principal Builders Inc. | 5th floor:title 24 lighting at extg tenant suite to replace lighting fixtures in elevator lobby and reception area. no new arch work. | $25,000 |
| Dec 12, 2013 | Completed | 360 03rd St | Skyline Construction | construction of non-structural partitions, doors, frames hardware, millwork, drywall and acoustical ceiling, grid/tile and finishes. mechanical, electrical, plumbing, fire sprinkler and life safety is a deferred submittal. | $3,000,000 |
| Nov 6, 2013 | Never finaled | 360 03rd St | Sc Builders, Inc | 4th floor-t.i includes removal & replacement of suite entry doors. all new or revised hvac, electrical, plumbing & life safety work will be submitted for permit separately. building if fully sprinklered | $7,000 |
| Oct 2, 2013 | Completed | 360 03rd St | Southland Industries | temporary cooling for one day media event on 3rd floor. | $3,000 |
| Sep 3, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | as built revisions to 201306129301. fire alarm, 5/f | |
| Sep 3, 2013 | Never finaled | 360 03rd St | Pyro-Comm Systems, Inc. | revision to as built drawings 201302120060 fire alarm. add 1 sd, 2 ss, 1 cr. jjc | |
| Aug 28, 2013 | Completed | 360 03rd St | Skyline Construction | 6/f - mechanical & electrical for t.i. | $3,000 |
| Aug 22, 2013 | Expired or cancelled | 370 03rd St | add new parapet ar roof, galvanized steel structure with ipe cladding | $200,000 | |
| Aug 14, 2013 | Never finaled | 360 03rd St | Skyline Construction | mechanical and electrical for tenant improvement on the 2nd floor. ref arch pa#201306250449 | $225,000 |
| Aug 6, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | add new fire alarm system to new tenant improvement. 2 duct smoke detectors 3 ceiling strobes, 26 ceiling speaker strobes | $8,000 |
| Aug 6, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | add new fire alarm devices to new corridor and elevator lobby. 1 smoke detector, 4 speaker/strobes, 4 door hold opens | $5,000 |
| Jul 17, 2013 | Never finaled | 360 03rd St | True North Signs & Graphic Services | 5 evacuation signs on 5th floor. | $2,625 |
| Jul 9, 2013 | Completed | 360 03rd St | Golden Gate Fire Protection Inc | 7th floor - add 75 pendent sprinkler heads, add 35 upright sprinkler heads. t.i. #2013.06.20.0098 | $56,650 |
| Jun 28, 2013 | Completed | 370 03rd St | installation of temporary sunshade at roof deck.structural approved under pa# 201305096580 | $25,000 | |
| Jun 26, 2013 | Completed | 360 03rd St | Pribuss Engineering Inc | 5th floor: fire sprinkler t.i add 262 fire sprinklers. relcate 29. ref pa# 201305025984. | $176,515 |
| Jun 20, 2013 | Completed | 360 03rd St | Skyline Construction | selective (ti) demo of partitons, ceilings, and finishes. new partitions, restrooms' upgrades. mep and life safety under separate permit | $25,000 |
| Jun 20, 2013 | Never finaled | 360 03rd St | Skyline Construction | partial floor improvement to include selective demolition, new partitions, restrooms' upgrades. mep and life safety under separate permit | $50,000 |
| Jun 12, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | install new fire alarm devices in new tenant build out on the 5th fl. 6 smoke detectors, 7 duct detectors, 15 strobes, 60 speaker/strobes. t.i ref pa# 201305025984 | $12,000 |
| May 30, 2013 | Never finaled | 360 03rd St | Skyline Construction | 7th floor:partial floor common space improvement on multi-tenant floor to include selective demolition and new partitions, doors and finishes. mep, life safty and fire sprinkler under seperate permit. | $120,000 |
| May 20, 2013 | Completed | 360 03rd St | Pribuss Engineering Inc | ground floor fire sprinkler t.i. - relcoate 5 sprinkler heads, add 6 sprinkler heads, relocate & c.o. 2 sprinkelr heads total 13 heads. ref pa #2013.03.20.2628 | $6,690 |
| May 9, 2013 | Completed | 370 03rd St | Truebeck Construction | add new temporary sun shade structure, 6 vertical poles with vertical fabric sun shades at existing roof deck. new support structural steel at 7th floor. fire alarm under sep. permit | $35,000 |
| May 9, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 1st floor:add new fire alarm devices to 1st floor. tenant buildout kilroy management suite. 1 duct detector, 3 speaker/strobes, 1 strobe. t.i. app#201303202628 | $5,000 |
| May 2, 2013 | Completed | 360 03rd St | Principal Builders Inc. | 5th floor-full floor tenant improvement-selective demo, add new non load bearing partitions, doors & finishes with full m.e.p. life safety & sprinklers on seperate permit | $3,928,689 |
| Apr 23, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | install new fire alarm device in elevator lobby and new corridor on the 4th fl. 2 speaker/strobe, 1 strobe, 3 smoke detectors. t.i pa# 201303051484 | $5,000 |
| Mar 27, 2013 | Never finaled | 360 03rd St | R L H Fire Protection Inc | 1st floor-fire sprinkler permit-relocate 1 pendent | $2,000 |
| Mar 25, 2013 | Never finaled | 360 03rd St | Acco Engineered Systems Inc. Dba Acco En | 6th floor - revisoin to pa #2013.01.08.7454 - added non-infringement statement for life safety system. | |
| Mar 21, 2013 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | 4th floor add & relocate fire sprinkler heads per t.i-add 7 & relocate 11. | $9,252 |
| Mar 20, 2013 | Completed | 370 03rd St | Pribuss Engineering Inc | ground fl. fire sprinkler ti . 14 sprinkler heads | $7,205 |
| Mar 20, 2013 | Completed | 360 03rd St | Truebeck Construction | 1st floor management suite: t.i. for vacant office space on a portion of the ground floor. non rated, non structural walls, new finishes, new lighting. new mechanical and new ceiling. | $95,000 |
| Mar 19, 2013 | Completed | 370 03rd St | Pyro-Comm Systems, Inc. | 1st floor-add 2 weather rpoof speaker/strobes to new showers. ti pa# 2012-1024-2754 | $4,000 |
| Mar 19, 2013 | Completed | 370 03rd St | Truebeck Construction | permit revision to app 2012.0719.5274: add sffd 95 question supplemental questionaire for design and installation of outdoor emergency diesel generator w/integral 800 gallon tank. | |
| Mar 19, 2013 | Completed | 370 03rd St | Truebeck Construction | revision to pa# 2012-1024-2754-add smoke control non infringement statement & smoke control sequence of operations to plans | |
| Mar 6, 2013 | Completed | 360 03rd St | 4th floor-partial floor common space improvement on multi-tenant floor including selective demolition, new partitions, doors, finishes. deferred submittals-m.e.p, fire sprinklers & life safety | $50,000 | |
| Mar 5, 2013 | Completed | 360 03rd St | Sc Builders, Inc | 4th floor: electrical, revision to 201301309122.clarification of t.i. room outlets. room is not an ab-060 t.i. room. arch. drawings are 201301097554 | |
| Feb 28, 2013 | Completed | 370 03rd St | Pyro-Comm Systems, Inc. | roof level-add 3 new weather proof speaker/strobes, 2 speaker strobe, 2 smoke detectors, 3 in duct smokes to roof top terrace. ti pa# 2012-0917-9869 | $6,000 |
| Feb 26, 2013 | Never finaled | 360 03rd St | Pyro-Comm Systems, Inc. | as built revisions to pa#2013-01-15-8048 | $600 |
| Feb 26, 2013 | Completed | 370 03rd St | Pyro-Comm Systems, Inc. | as built revisions to pa# 201301037124. added non infringement statement to drawings for the smoke control system. | |
| Feb 21, 2013 | Completed | 360 03rd St | Ayoob & Peery Plumbing Co Inc | 4/f- add and relocate sprinkler heads per tenant improvements. 122 adds, 26 relocates. ref. pa #2013-0109-7554. | $76,000 |
| Feb 21, 2013 | Completed | 370 03rd St | Pyro-Comm Systems, Inc. | install (n) smoke control panel & relay & monitor modules to provide manual control of the (e) fans & dampers including 2 (n) stairwell fans. the smoke control panel is addressed 360 3rd st. this is the correct address. | $25,000 |
| Feb 20, 2013 | Never finaled | 360 03rd St | Pyro-Comm Systems, Inc. | 4th fl: add new speaker/strobes throughout common open office area, conference room, break rooms. new smoke add to server room & relay to shut down fans. duct smoke/strobes added to new fsd, door hold opens added to reception door. 22 speaker/strobes, 11 strobes, 2 smokes, idd/ ref app 201301097554 | $10,000 |
| Feb 13, 2013 | Expired or cancelled | 360 03rd St | Skyline Construction | 3rd floor:revision to mep permit app#201301087454 sto install new vav box and fsd for elevator lobby and lighting. ref mep 20120108745 and arch 201212055512. smoke detector installation for fsd under separate fire alarm appl. | |
| Feb 13, 2013 | Completed | 360 03rd St | True North Signs & Graphic Services | evacuation sign (plaques) on 1st,4th & 6th floors | $7,500 |
| Feb 12, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | /f lobby: add 3 new speaker/strobes to lobby and corridor area. new door hold opens and relay for control added to lobby doors. app#201212186415 | $5,000 |
| Feb 12, 2013 | Completed | 360 03rd St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 6 upright sprinklers on the 6th fl corridor & lobby. relocate 2 pendents. ti pa#2013-01-30-9088 | $4,120 |
| Feb 4, 2013 | Completed | 370 03rd St | Truebeck Construction | refer to pa# 2012-0917-9869/r1-roof deck. m.e.p & landscape for new roof deck | |
| Feb 1, 2013 | Completed | 370 03rd St | Rudolph Commercial Interiors Inc, Rci | remove reception desk, install non bearing partition & door to create private office, add electrical outlet, path of travel permit #201208217912. | $12,000 |
| Feb 1, 2013 | Completed | 370 03rd St | Superior Automatic Sprinkler | 3rd - 7th floors install (n) branchline restraints (n) end of branchline restraints. also in pump room. bldg. permit # 201207195274 | $10,000 |
| Jan 30, 2013 | Completed | 360 03rd St | Sc Builders, Inc | 4th floor:meps for arch. per app#201301097554 | $875,000 |
| Jan 30, 2013 | Completed | 360 03rd St | Skyline Construction | revision to pa#2012-12-18-6415 to extend elevator lobby by reference to pa#2012-12-18-6415 | |
| Jan 25, 2013 | Completed | 360 03rd St | Golden Gate Fire Protection Inc | 6th floor-fire sprinkler system upgrade, relocate 37 pendent sprinklers-relocate 18 upright heads & add 21 uprights. add 68 pendent sprinklers | $74,160 |
| Jan 17, 2013 | Completed | 360 03rd St | Anderson, Rowe & Buckley, Inc. | sprinkler & standpipe system. remove 3 sprinklers, add 4 sprinklers, relocate one roof hydrant. | $2,000 |
| Jan 15, 2013 | Completed | 360 03rd St | Pyro-Comm Systems, Inc. | 6th floor - install new speaker & strobe 35 in open office area, conference room & break room. (7 new strobe) (1 sd & power supply) t.i. pa #2012.12.05.5512. | $7,000 |
| Jan 9, 2013 | Completed | 360 03rd St | Sc Builders, Inc | 4th floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered | $875,000 |
| Jan 8, 2013 | Never finaled | 360 03rd St | Skyline Construction | 6th floor-t.i-new medium pressure loop, installation of new low air distribution, 5 new fire/smoke dampers, new water source heat pumps, new hot water supply & condensor. ti pa# 2012-1205-5512 | $850,000 |
| Jan 3, 2013 | Completed | 370 03rd St | Pyro-Comm Systems, Inc. | add new speak/strobe to conference room, break room & open office areas. add new smoke & duct detectors to new fsd's. bldg pa# 201210242754 | $7,000 |
| Dec 27, 2012 | Completed | 370 03rd St | Pribuss Engineering Inc | ground floor:fire sprinkler t.i./add 62 heads. | $31,900 |
| Dec 18, 2012 | Completed | 360 03rd St | Skyline Construction | 6th floor:partial floor common space improvement on multi tenant floor selective demo and new non lod bearing partitions.mep and life safety under seperate permit. | $35,000 |
| Dec 12, 2012 | Completed | 370 03rd St | Truebeck Construction | add new elevator "over-run" to (e) penthouse roof. | $50,000 |
| Dec 5, 2012 | Completed | 360 03rd St | Skyline Construction | tenant improvement on the 6th floor to create open office, conference rooms and break area. mep, fire sprinkler, life safety under seperate permit. | $2,200,000 |
| Nov 29, 2012 | Completed | 370 03rd St | Truebeck Construction | ground floor, revision to pa#2012-0703-4041. construction of new wall floors & ceiling elements in two (2) new shower rooms on ground fl including new mech, elect, & plumb. | $110,000 |
| Oct 24, 2012 | Completed | 370 03rd St | Truebeck Construction | renovation of the ground floor; construction of non-structural partitions, ceiling, light fixtures, doors, side lights, plumbing. no change in occupancy or use. fire alarm & sprinkler under separate permit. | $523,277 |
| Oct 22, 2012 | Expired or cancelled | 370 03rd St | Southland Industries | install temporary ducting at 3rd floor shell space for comfort cooling at one day basketball media day. | $15,000 |