Permit GraphSan Francisco building permits since 2000

Block 3751, lot 157

360 03rd St

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 5, 2026Completed360 03rd StGci, Incste 400 - revision to pa 202511139521 to removed deferred submittals from street g0.0. no deferred submittals are required
Feb 4, 2026Completed360 03rd StGci, Incste 400 - revision pa 202511139521 to remove mep from deferred submittal on sheet g0.0
Nov 13, 2025Completed360 03rd StGci, Incste 400 - ti to include constrction of (n) non-structural partition, doors and sidelite, (n) flooring, touch-up paint, (n) millwork and minor ceiling work$420,000
Dec 11, 2024Completed360 03rd StSouthland Industrieschanging out 2 existing 15 ton computer room air handlers with 2 new liebert computer room handlers.$190,000
Feb 1, 2024In progress360 03rd StGolden Gate Fire Protection Incref to t.i. 202312212901: f/s relocate 2 pendents and delete 1 concealed pendent on 1/f$1,200
Jan 25, 2024Completed370 03rd StIntelligent Technologies & Services Inc1st fl: reconfigure the (e) clean agent system & controls along with clean agent nozzles and piping. this will eliminate 11 smokes and pull and abort station.$24,303
Jan 19, 2024Completed360 03rd StPyro-Comm Systems, Inc.1st fl: 2 ceiling strobes to be added to provode proper coverage. ref pa# 202312212901.$2,000
Jan 5, 2024Completed360 03rd StPeacock Constructionmechanical- relocate ceiling grilles, extending ductwork relocate 1 thermostat. new power and signal devices, title 24. ref pa#202312212901$180,000
Dec 21, 2023Completed360 03rd StPeacock Constructionscope of work: demo of existing production control room and adjacent audio room, including, associated non structural partitions, doors, ceilings, lighting, accessories and portion of (e) raised floor. new work include construction of audio and proudction control room with non structural partions$191,780
Nov 21, 2023In progress360 03rd StHp Build1st fl ste 101: demolition of existing millwork & finishes. new construction of non-structural demsing wall, lighting & finishes.$80,000
Oct 6, 2023Completed360 03rd StSouthland Industriesreplace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.$300,000
May 10, 2023Completed370 03rd StIntelligent Technologies & Services Incremove 2 heat detectors and add 1 smoke detectors to existing fire alarm system on 1st floor restroom.$10,375
Apr 17, 2023Completed360 03rd StGci, Inc1/f: mechanical & electrical work for t.i. to include demo of existing grille and installation of new grille w/ associated electrical wor, ref pa# 202212077790.$2,000
Dec 8, 2022Expired or cancelled360 03rd Stsuite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes.$900,000
Dec 7, 2022Completed360 03rd StGci, Inc1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms.$350,000
Jun 21, 2022Never finaled360 03rd StPyro-Comm Systems, Inc.1/f breakroom: this is a modification to an existing fire alarm system. 1 relay module will be added for card access interface and 1 ceiling strobe to be added to provide coverage. ref permit 202104068014.$1,000
Feb 2, 2022Completed360 03rd Stdemolition of extg doors, frames and hardware. infill extfg doors and install new doors, frames & hardware at extg wall.$68,000
Aug 17, 2021Completed360 03rd StPyro-Comm Systems, Inc.5/f: f/a as-builts to show correct number of call stations being added to the poject under scope of work under 202103237098.
Aug 16, 2021Completed360 03rd StAyoob & Peery Plumbing Co Incas built for pa# 2021-0415-8614, 5th fl. add (15) and relocate (2) sprinklers per t.i.
Aug 4, 2021Completed360 03rd StIntelligent Technologies & Services Incas-built plans remove reference to power shutdown. pa #202103317668 origianl approved permit.
Apr 15, 2021Completed360 03rd StAyoob & Peery Plumbing Co Inc5th floor: add (4) and relocate (2) sprinklers per t.i. ref #: 2020-1022-7136. job #: 21-606.$2,550
Apr 6, 2021Completed360 03rd StPyro-Comm Systems, Inc.this is a modification of an existing fire alarm system. 3 new monitor modules will be installed to supervise the existing pre-action panel. this is a revision to permit 2020-1210-0751
Mar 31, 2021Completed360 03rd StIntelligent Technologies & Services Incsupply & install a complete clean agent/pre-action detection & control system in 5th floor mdf room.$25,872
Mar 23, 2021Completed360 03rd StPyro-Comm Systems, Inc.add to existing fire alarm system: new notification appliance, two (new) twoway comm system call stations instaalled in the 5th floor elevator lobby and connected to master panel 1st floor$10,000
Feb 8, 2021Never finaled360 03rd StBcci Construction Company5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a.$50,000
Dec 10, 2020Never finaled360 03rd StPyro-Comm Systems, Inc.fire alarm. 6 relay modules will be added to mdf room to shutdown the computer room crac unit. all new devices will be added to existing facu.$2,000
Nov 24, 2020Completed360 03rd StAyoob & Peery Plumbing Co Incnew pre-action system for mdf room 5035. add 14 and remove 11 fire sprinklers per tenant improvements. reference 2020.1020.6988$7,350
Oct 22, 2020Completed360 03rd StBcci Construction Company5/f: t.i. of tenant space (minus (2) equipment rooms). n/a.$500,000
Oct 20, 2020Never finaled360 03rd StBcci Construction Company5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.$1,000,000
Nov 1, 2019Expired or cancelled360 03rd Stground floor: includes construction of non-structural partitions, light fixtures, glass side lights, doors, finishes. no change in area, occupancy or use. mep, fire alarm, sprinklers, t-24 calcs will be under seperate permit. n/a for maher$54,566
Jun 18, 2019Expired or cancelled360 03rd Stinstall (1) non-illuminated single-faced wall sign. "nektar"$13,600
Apr 29, 2019Completed360 03rd StXl Construction, Corporationrevision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req
Feb 21, 2019Completed360 03rd StPyro-Comm Systems, Inc.fire alarm ti - adding 82 speaker strobes, 18 strobes, 2 smk det, 4 return air smoke dets and 6 duct dets to be hooked up to (e) facu ref 201901281353$56,000
Feb 20, 2019Completed360 03rd StSabah International Incorporatedprovide & install a new engineered total flooding fk-5-1-12 clean agent fire enxtinguishing system. t.i. under #2019/0128/1353$111,821
Feb 12, 2019Never finaled360 03rd StEco Fire Sprinklers Incon 7th floor add (517) sprinklers in area of work for tenant improvement. also install single interlock pre-action system to cover idf room. permit ref #201901281353$285,000
Jan 28, 2019Completed360 03rd StXl Construction, Corporation7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work$7,273,098
Dec 6, 2018Completed360 03rd StXl Construction, Corporationinterior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit$100,000
Nov 6, 2018Completed360 03rd StXl Construction, Corporationdemo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be$5,000
Jun 22, 2018Expired or cancelled360 03rd Stinstallation of (2) stem lithium ion battery energy storage system (ess) will be used to offset peak demand charges by discharging directly into the facilities elec. distributtion system. the monitoring and control system detects both when to charge, and when to discharge. ** maher: n/a **$30,000
Feb 12, 2018Expired or cancelled360 03rd StPyro-Comm Systems, Inc.6th fl: pyro comm will provide (2) duct detectors & relays for hvac shutdown. maher na$1,500
Feb 1, 2018Completed360 03rd StM C S Construction Servicesground fl - building path of travel upgrades including relocation of restroom fixtures and upgrading accessories in the restrooms & shower room to be accesible$30,000
Jan 2, 2018Never finaled360 03rd StA M A Design Build Incorporated6th floor #615 - renovation of room #002 open office (one room only) for new broadcast equipment & freestanding furniture layout. n/a maher ordinance$340,000
Jun 6, 2017Never finaled360 03rd StR L H Fire Protection Inc3/f- fire sprinkler t.i., remove (4) pendents and replace drops with upright sprinklers where ceiling are removed. t.i. pa#201705267757. n/a ordinance #155-13$1,500
May 26, 2017Completed360 03rd StPrincipal Builders Inc.3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na$68,000
Apr 22, 2016Completed360 03rd StPyro-Comm Systems, Inc.6th fl: new fire alarm devices added to a ti improvement in an existing building to include 2 relay modules, 2 multi voltage relays, 3 duct detector, 2 smoke detectors 4 speaker/strobes ref 2016-0323-2802; maher n/a$5,500
Apr 14, 2016Completed360 03rd StSkyline Construction6th flr: mechanical work for ti 2016 0308 1412 - hvac for new rooms maher na$5,000
Apr 14, 2016Completed360 03rd StSkyline Construction6th flr: electrical work for ti 2016 0308 1412 maher na$10,000
Apr 13, 2016Completed370 03rd StGolden Gate Fire Protection Inc6th floor: fire sprinkler: relocate 7 pendent sprinklers . relocate 4 upright sprinklers. n/a for maher. t.i. #201603232802$5,775
Apr 11, 2016Completed360 03rd StSkyline Construction6th flr: mechanical work for tenant improvement, ref. 201603081412; maher n/a$3,000
Apr 1, 2016Never finaled360 03rd StTrue North Signs & Graphic Services6th floor - install (5) evacuation signs. n/a maher ordinance$1,750
Mar 23, 2016Never finaled360 03rd StSkyline Constructiontenant improvement - new partitions, doors, millwork. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13$255,000
Mar 15, 2016Completed360 03rd StSkyline Construction6th floor, tenant imrprovement new office, modification of non rated non structural partitions. mep & fire life safety under separate permit. maher na$10,000
Mar 15, 2016Completed360 03rd StSkyline Construction6th floor, electrical work for ti ref pa 2016-0308-1412. maher na$5,000
Mar 8, 2016Completed360 03rd StSkyline Construction6th floor: t.i. to include new non-load bearing partitions. mep under seperate permit. n/a for maher.$250,000
Feb 29, 2016Completed360 03rd StPioneer Fire Inc.4/f: relocate 3 pendents. relocate 1 uprright pendent; ref pa 2016 0105 6388; maher na$8,789
Feb 22, 2016Completed360 03rd StPyro-Comm Systems, Inc.4th floor: new fire alarm appliances added to t.i. in an extg bldg to include 4 speaker/strobes, 4 strobes. ref app#201601056388. n/a for maher$4,000
Feb 17, 2016Completed360 03rd StA M A Design Build Incorporatedoffice ti on 6th fl (suite 650): of existing high rise office b occupancy. 6th fl is a multi tennant floor. project consists of new interior partition$2,000
Feb 12, 2016Completed360 03rd StGci, Incref pa 2016-0105-6388, provided new lighting & branch circuiting to existing panel. maintened some existing power & signal outlets, provide new power branch circuiting raceway systems.$105,000
Feb 12, 2016Completed360 03rd StGci, Incref pa 2016-0105-6388, install 91) new water source heat pump for server room, duct distribution modifications for new layout rebalance zones, new plumbing$88,000
Jan 26, 2016Completed360 03rd StA M A Design Build Incorporatedsuite 650 - addition of supplemental ac unit for after hours use. minor rework of existing ductwork & vav boxes to accommodate new supplemental equipment. no architectural work, no electrical, no plumbing. n/a maher ordinance$100,000
Jan 21, 2016Expired or cancelled360 03rd StFerrari Colorapplying mesh sign on front window. temp 1/30-2/13. maher na$16,000
Jan 5, 2016Completed360 03rd StGci, Inctenant improvement, non structural alterations. walls, elec, lighting, hvac, mep deferred. n/a ordinance #155-13$400,000
Dec 21, 2015Completed360 03rd StPyro-Comm Systems, Inc.as built revisions to 201510079118
Dec 1, 2015Completed360 03rd StPyro-Comm Systems, Inc.1st floor: new fire alarm devices for new tenant generator added to existing building to include 3 monitor modules. maher not req. ref. pa#201502027215$1,500
Nov 12, 2015Never finaled360 03rd StAnderson, Rowe & Buckley, Inc.6th flr: existing fire sprinkler system apn 201510230651 t.i., 1 add sprk, 1 plugged outlet, 2 relocated spkrs; maher n/a$2,500
Oct 23, 2015Completed360 03rd StA M A Design Build Incorporatedrevision to app 2015-0814-4273 for t.i. on 6th floor for new parttions. minor mechanical and electrical work. there is no plbmg work associated scope. enlarge noc room. n/a for maher. life safety deferred.$25,000
Oct 20, 2015Completed360 03rd StAnderson, Rowe & Buckley, Inc.6th floor: fire sprinklers for ref pa 2015 0814 4273: relocate 16 heads, add 1 maher na$8,806
Oct 7, 2015Completed360 03rd StPyro-Comm Systems, Inc.new fire alarm devices for a ti in existing building to include 1 relay module, 1 smoke detector, 6 speaker/strobes, 1 strobe maher not req$4,300
Aug 28, 2015Completed360 03rd StPyro-Comm Systems, Inc.3rd floor:new fire alarm devices added to t.i. in an extg bldg to include: relay and 1 multi-voltage relay for av music shutdown. ref app#201507232320. n/a for maher$1,000
Aug 17, 2015Never finaled360 03rd StAllied Heating & Air Conditioning5th fl. install transfer fan replace wshp. maher na$15,541
Aug 14, 2015Completed360 03rd StA M A Design Build Incorporatedti on 6th floor of (e) office building. construction of new partitions and minor mechanical, elelctrical. fire sprinkler & fire alarm work under separate permit. there is no plumbing work associated with scope. n/a for maher.$500,000
Aug 4, 2015Never finaled360 03rd Ststreet space permit
Jul 23, 2015Completed360 03rd StPrincipal Builders Inc.3rd floor: upgrade to hvac and lighting to replace ducts and lighting fixtures. no new architectural work. extg tenant space. n/a for maher.$129,284
Jul 1, 2015Never finaled360 03rd Ststreet space
Jun 12, 2015Completed360 03rd StParamount Sign Contractorserect 2 projecting electric signs$45,000
Jun 3, 2015Completed360 03rd StPyro-Comm Systems, Inc.1st floor: new fire alarm devices added to t.i. include: 1 duct detector, 1 realy module, 1 voltage relay and 3 speaker/strobes. ref. t.i. appl. 2015.0326.1978. maher n/a.$4,300
Jun 2, 2015Completed360 03rd StAyoob & Peery Plumbing Co Inc4th flr: add 6 fire sprinkler per ti 2015 0429 4929 maher na$3,084
Jun 2, 2015Completed360 03rd StPyro-Comm Systems, Inc.4th flr: new fire alarm device added to ti in an (e) bld to include 1 speaker/strobe. maher na ref #2015.0429.4929$2,000
May 26, 2015Completed360 03rd StGci, Increvision to ref 201503261978: ada counter, move location, switchen panick door lock with standard lock and pulls. maher not req
May 13, 2015Completed360 03rd StGci, Incnew fcu and cu, new dx and condensate piping for new fcu ref 201503261979. n/a ordinance #155-13$42,000
May 11, 2015Never finaled360 03rd StPioneer Fire Inc.1st flr: relocate 1 sprinkler/ relocate (e) horizontal free standing fdc location, install new vertical, recessed fdc. ref pa 2015 0326 1978 maher na$4,800
May 1, 2015Completed360 03rd StPyro-Comm Systems, Inc.1st flr: new fire alarm system for ti: 1 speaker/strobe pa 2015 0429 4929 maher na$2,000
Apr 29, 2015Completed360 03rd StSc Builders, Inc4th flr -ti includes the demo of non structural partitions and building new non structural partitions. all new or revised hvac elec, plumbing, life safety under sep permit. maher not req$138,600
Apr 15, 2015Completed360 03rd StAnderson, Rowe & Buckley, Inc.ground flr: fire sprinkler - relocate 4 heads, add 2 heads, ref pa 2015 0326 1979 maher - not req'd$3,100
Apr 15, 2015Completed360 03rd StGci, Incref. to pa#201503261979, improvements to office space plan for floor lighting & power, connecting power to new lighting or relocate power outlets and tenant equipment. no changes made to existing base bldg electrical system. n/a ordinance #155-13$30,000
Mar 26, 2015Completed360 03rd StGci, Incwine bar/cafe new non stuctural partitions, hvac, electrical, plmg, millwork, ceilings electric stove. store front change. not visible from street (level below). n/a for the maher. ref app#201406118133$600,000
Mar 26, 2015Never finaled360 03rd StPrincipal Builders Inc.revision to app#201402249182 and to document assembly space on proposed plans for office t.i. on floors 3. no additional work. no change of use. n/a for the maher.$100
Mar 26, 2015Completed360 03rd StGci, Incnon structural partitons for new fitness studio. suspension training bar mounted to existing concrete slab. new built in closets. bottle filling station. ref 201406118133. n/a maher ordinance # 155-13$130,000
Mar 12, 2015Completed360 03rd StC B F Incremodel of exist. commercial office kitchen space:modifications to exist. partitions, plumbing&electrical;new cabinates. mep permited separatly.n/a maher$25,000
Feb 2, 2015Completed360 03rd StA M A Design Build Incorporatedste 615. installation of new optional emergency generator located on exterior of bldg at sw side at grade. work includes generator on new concrete pad with active diesel particulate filter. n/a for the maher$30,000
Feb 2, 2015Completed360 03rd StPyro-Comm Systems, Inc.2nd floor studio b: as-built fire alarm revision to pa #2014-1110-1156. n/a maher ordinance
Dec 3, 2014Completed360 03rd StAyoob & Peery Plumbing Co Inc4th floor - add and relocate fire sprinklers per t.i. 7 added, 10 relocated. ref. t.i. appl. 2014.1010.8622. maher n/a.$6,168
Dec 2, 2014Completed360 03rd StPyro-Comm Systems, Inc.new fire alarm devices added to tenant improvement to existing building to include power supply, 1 control module, 6 speaker/speaker/strobes$2,500
Nov 10, 2014Completed360 03rd StSc Builders, Inc4th flr: mechanical and electrical for pa #201410108622; maher n/a$30,000
Nov 10, 2014Completed360 03rd StPyro-Comm Systems, Inc.2nd floor studio b: new fire alarm to t.i. include 1 duct detector, 1 smoke detector, 4 relay modules and 4 voltage relays. ref. appl. 2014.1014.8742. maher n/a.$3,000
Oct 29, 2014Completed370 03rd StSkyline Constructionwindow washing equipment upgrades. compliance with maher ordinance no 155-13 not required.$250,000
Oct 15, 2014Completed360 03rd StSouthland Industries2nd flr: t.i. 201410148742 -for tv studio converting previously unoccupied studio space to useable space; mechanical/electrical only; maher n/a$32,000
Oct 14, 2014Completed360 03rd StSouthland Industriesconvert previously unoccupied space to useable space adding hvac and electrical. maher not required. t.i. for tv studio.$15,000
Oct 10, 2014Completed360 03rd StSc Builders, Inc4th flr, ste 400, t.i. includes the demo of non-structural partitions & building new non-structural paritions. all new or revised hvac, elec, plumbing & life safety, work will be design built & submitted separately, bldg is fully sprinklered; maher n/a$150,000
Sep 5, 2014Never finaled360 03rd StSouthland Industries2nd flr: install 2 vav boxes with hot water reheat/ducting (broadcasting) ;install 1-fan coil unit in rm 231 facility room; maher n/a$45,000
Jul 2, 2014Completed360 03rd StTrue North Signs & Graphic Servicesto reface extg 2 signs. n/a for the maher ordinance #155-13$200
Jul 2, 2014Completed360 03rd StTrue North Signs & Graphic Servicesto reface extg sign. n/a for the maher ordinance #155-13$4,400
Jul 1, 2014Completed360 03rd StPrincipal Builders Inc.3rd flr: revision to pa 201402128409 to show existing compliant restrooms on 3rd flr, current permit drawing do not show existing conditions. maher n/a
Jul 1, 2014Completed360 03rd StPyro-Comm Systems, Inc.4th floor - as builts for fire alarm, showing correct location of duct detector. related to pa #2014.0404.2503. n/a maher ordinance
Jun 25, 2014Completed360 03rd StGolden Gate Fire Protection Inc4th floor - add 9 upright sprinklers, wrap 1-1/4 pipe under 16 concrete beams. ref pa #2014.0407.2584. n/a maher ordinance$4,635
Jun 23, 2014Completed360 03rd StSkyline Construction4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required$5,000
Jun 20, 2014Completed360 03rd StTurner Construction Co5th floor - revision to pa #2013.12.13.4124 electrical only - expanding the area of work. n/a maher ordinance # 155.13
Jun 11, 2014Never finaled360 03rd Stchange of use. ground floor. existing office space of 2824 sq ft to change to retail space. tenants not selected yet. (n) retail will be 2787 sq ft. remain vancancy under ab-017. maher ord n/a.
Jun 4, 2014Completed370 03rd StSkyline Constructionnew guardrail at roof. n/a to ordinance #155-13$250,000
May 29, 2014Completed360 03rd StPyro-Comm Systems, Inc.phase 2- new fire alarm devices for tenant build out to include: 1 powder supply, 1 monitor module, 13 speaker/strobes and 1 strobe. ref appl # 201404072484. maher n/a.$5,000
May 28, 2014Completed360 03rd StPrincipal Builders Inc.structural work to reinforce floor with grinders and concrete overlay on 3rd floor t.i. ref app#201402249182 for t.i. work. n/a for the maher ordinance #155-13$35,000
Apr 23, 2014Completed360 03rd StR L H Fire Protection Inc4th floor fire sprinkler permit - relcoate 14 pendents, 14 uprights & add 18 pendent & 3 uprights. ref t.i. #2014.0407.2584. compliance with ordinance #155-13 not required$25,186
Apr 10, 2014Completed360 03rd StPyro-Comm Systems, Inc.new fire alarm devices for new tenant buildout to include 1 power supply 2 monitor module, 2 dual monitor modules, 6 relay modules, 5 voltage relays, 1 smoke detector, 15 speaker/strobes, 4 strobes. maher not required.$10,500
Apr 8, 2014Completed360 03rd StA M A Design Build Incorporatedthe scope of this submittal is limted to the deferred structural submittals of calculation for appl. 201312184460. n/a maher ordinance # 155-13
Apr 8, 2014Completed360 03rd StPyro-Comm Systems, Inc.6th floor (square trade) - new fire alarm devices for tenant build-out to include (1) duct dectector (2) fsp 851 smoke detectors (2) speaker / strobes. ref pa# 201403251618. compliance with ordinance #155-13 not required$4,000
Apr 7, 2014Completed360 03rd StPrincipal Builders Inc.t.i. on partial 4th floor tenant space to demo doors and parttions and construct new doors, non -structural partitions, millwork, finishes, mechanical and electrical. fire sprinklers and life safty on seperate permit. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13$200,000
Apr 7, 2014Never finaled360 03rd StR L H Fire Protection Incadd/relocate fire sprinklers for tenant improvement. add 105, relocate 32, total 137 heads. n/a ordinance #155-13.$70,000
Apr 4, 2014Completed360 03rd StPyro-Comm Systems, Inc.4th floor fire alarm t.i.: new fire alarm devices for new tenant build out to include 3 speaker/strobes, 1 strobe. ref arch app# 2014-0318-0997. compliance w/ordinance #155-13 not required$2,000
Apr 2, 2014Never finaled360 03rd Ststreet space and mta parking
Mar 31, 2014Completed360 03rd StGolden Gate Fire Protection Inc6th floor - relocate 5 upright sprinklers, add 1 upright. ref #201403251618. compliance w/ordinance #155-13 not required$2,575
Mar 25, 2014Completed360 03rd StSkyline Construction6th floor:renovation to 6th floor to create new separately demised tenant suite to include non-rated, non structural partitions and ceiling.mep under sep permit.n/a for the maher ordinance #155-13 and n/a for interim controls #428-13$192,000
Mar 25, 2014Expired or cancelled360 03rd StSkyline Construction6th floor: mechanical and electrical work for t.i. ref app#201403251618. n/a for the maher ordinance #155-13. and n/a for the interim #428-13$15,000
Mar 20, 2014Completed360 03rd StPyro-Comm Systems, Inc.3rd floor phase 2 - new fire alarm devices for new tenant build-out to include: (1) power supply, (1) control module, (4) duct detectors, (32) speaker/strobes, (4) strobes. ref #2014.0224.9182. compliance with ordinance #155-13 not required$13,000
Mar 20, 2014Completed360 03rd StIntelligent Technologies & Services Inc10 new smoke detectors & 1 bell. compliance with ordinance #155-13 not required. prer-action detection system. 201312184460 ti / 201403130649 pre-action sys$3,900
Mar 18, 2014Completed360 03rd StSkyline Constructioninterior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required$150,000
Mar 17, 2014Expired or cancelled370 03rd Stinstallation of new generator at the 1st floor. ** maher: compliance with ordinance no# 155-13 not required **$125,000
Mar 13, 2014Completed360 03rd StPrincipal Builders Inc.3rd floor mech title 24 to install new equipment on partial floor t.i. ref pa #2014.0224.9182. compliance with ordinance #155-13 not required$540,000
Mar 13, 2014Completed360 03rd StAnderson, Rowe & Buckley, Inc.existing fire sprinkler sytem tenant improvements, 89 sprinklers 1-2 " total pac 3 pre-act system (pa #201312184460) 6th floor. compliance with ordinance #155-13 not required$44,500
Mar 13, 2014Never finaled360 03rd StSouthland Industriesremove & replace (2) 50 ton air cooled chillers with (2) 80 ton air cooled chillers. provide new steel structure, provide roof screen. compliance with maher ordinance #155-13 not required, no disturbance of at least 50 cu yd of soil.$280,000
Mar 4, 2014Never finaled360 03rd StPrincipal Builders Inc.to add new lighting on partial 3/f t.i. ref. to pa#201402249182 for t.i. reference. na ordinance #155-13$600,000
Feb 25, 2014Completed360 03rd StR L H Fire Protection Increlocate fire sprinkler heads per tenant improvement pa# 2014-0212-8409 (5 relocate).$2,570
Feb 24, 2014Completed360 03rd StPrincipal Builders Inc.3rd floor t.i. to demo partitions, doors, & millwork & construct new partitoins, doors, finishes & millwork. mep, life safety & fire sprinklers on separate permit. compliance with ordinance #155-13 not required$1,560,000
Feb 19, 2014Completed360 03rd StGolden Gate Fire Protection Inc7th floor - relocate 81 pendent sprinklers , relocate 36 upright spirnklers. ref t.i. #2013.1212.4028. compliance with ordinance #155-13 not required.$64,395
Feb 12, 2014Completed360 03rd StPrincipal Builders Inc.3rd floor: t.i. for extg tenant space to demo and add new non-structural partitioning doors and finishes. mep, life safety, sprinklers on separate permits. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13.$60,000
Feb 6, 2014Never finaled360 03rd StSc Builders, Inc4/f- revision to pa#201303061642 adding electrical & lighting in scope.$5,000
Jan 27, 2014Completed360 03rd StPyro-Comm Systems, Inc.new fire alarm devices for a new tenant build-out. (1) remote power supply, (1) control module, (7) smoke/duct detectors, (28) speaker/strobes, (4) strobes, (2) door holders. t.i. pa#2013-1212-4028. compliance with ordinance no. 155-13 not required. excavation <50 cy. yd.$15,000
Dec 27, 2013Completed360 03rd StSkyline Constructionmechanical and electrical worl on the 7th fl to include new transfer fan, duct work relocation of thermostat and lighting to include new lighting, 2 new fsds.compliance with ord no 155-13 not required$200,000
Dec 18, 2013Completed360 03rd StA M A Design Build Incorporated6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required.$1,078,859
Dec 13, 2013Completed360 03rd StTurner Construction Co, Principal Builders Inc.5th floor:title 24 lighting at extg tenant suite to replace lighting fixtures in elevator lobby and reception area. no new arch work.$25,000
Dec 12, 2013Completed360 03rd StSkyline Constructionconstruction of non-structural partitions, doors, frames hardware, millwork, drywall and acoustical ceiling, grid/tile and finishes. mechanical, electrical, plumbing, fire sprinkler and life safety is a deferred submittal.$3,000,000
Nov 6, 2013Never finaled360 03rd StSc Builders, Inc4th floor-t.i includes removal & replacement of suite entry doors. all new or revised hvac, electrical, plumbing & life safety work will be submitted for permit separately. building if fully sprinklered$7,000
Oct 2, 2013Completed360 03rd StSouthland Industriestemporary cooling for one day media event on 3rd floor.$3,000
Sep 3, 2013Completed360 03rd StPyro-Comm Systems, Inc.as built revisions to 201306129301. fire alarm, 5/f
Sep 3, 2013Never finaled360 03rd StPyro-Comm Systems, Inc.revision to as built drawings 201302120060 fire alarm. add 1 sd, 2 ss, 1 cr. jjc
Aug 28, 2013Completed360 03rd StSkyline Construction6/f - mechanical & electrical for t.i.$3,000
Aug 22, 2013Expired or cancelled370 03rd Stadd new parapet ar roof, galvanized steel structure with ipe cladding$200,000
Aug 14, 2013Never finaled360 03rd StSkyline Constructionmechanical and electrical for tenant improvement on the 2nd floor. ref arch pa#201306250449$225,000
Aug 6, 2013Completed360 03rd StPyro-Comm Systems, Inc.add new fire alarm system to new tenant improvement. 2 duct smoke detectors 3 ceiling strobes, 26 ceiling speaker strobes$8,000
Aug 6, 2013Completed360 03rd StPyro-Comm Systems, Inc.add new fire alarm devices to new corridor and elevator lobby. 1 smoke detector, 4 speaker/strobes, 4 door hold opens$5,000
Jul 17, 2013Never finaled360 03rd StTrue North Signs & Graphic Services5 evacuation signs on 5th floor.$2,625
Jul 9, 2013Completed360 03rd StGolden Gate Fire Protection Inc7th floor - add 75 pendent sprinkler heads, add 35 upright sprinkler heads. t.i. #2013.06.20.0098$56,650
Jun 28, 2013Completed370 03rd Stinstallation of temporary sunshade at roof deck.structural approved under pa# 201305096580$25,000
Jun 26, 2013Completed360 03rd StPribuss Engineering Inc5th floor: fire sprinkler t.i add 262 fire sprinklers. relcate 29. ref pa# 201305025984.$176,515
Jun 20, 2013Completed360 03rd StSkyline Constructionselective (ti) demo of partitons, ceilings, and finishes. new partitions, restrooms' upgrades. mep and life safety under separate permit$25,000
Jun 20, 2013Never finaled360 03rd StSkyline Constructionpartial floor improvement to include selective demolition, new partitions, restrooms' upgrades. mep and life safety under separate permit$50,000
Jun 12, 2013Completed360 03rd StPyro-Comm Systems, Inc.install new fire alarm devices in new tenant build out on the 5th fl. 6 smoke detectors, 7 duct detectors, 15 strobes, 60 speaker/strobes. t.i ref pa# 201305025984$12,000
May 30, 2013Never finaled360 03rd StSkyline Construction7th floor:partial floor common space improvement on multi-tenant floor to include selective demolition and new partitions, doors and finishes. mep, life safty and fire sprinkler under seperate permit.$120,000
May 20, 2013Completed360 03rd StPribuss Engineering Incground floor fire sprinkler t.i. - relcoate 5 sprinkler heads, add 6 sprinkler heads, relocate & c.o. 2 sprinkelr heads total 13 heads. ref pa #2013.03.20.2628$6,690
May 9, 2013Completed370 03rd StTruebeck Constructionadd new temporary sun shade structure, 6 vertical poles with vertical fabric sun shades at existing roof deck. new support structural steel at 7th floor. fire alarm under sep. permit$35,000
May 9, 2013Completed360 03rd StPyro-Comm Systems, Inc.1st floor:add new fire alarm devices to 1st floor. tenant buildout kilroy management suite. 1 duct detector, 3 speaker/strobes, 1 strobe. t.i. app#201303202628$5,000
May 2, 2013Completed360 03rd StPrincipal Builders Inc.5th floor-full floor tenant improvement-selective demo, add new non load bearing partitions, doors & finishes with full m.e.p. life safety & sprinklers on seperate permit$3,928,689
Apr 23, 2013Completed360 03rd StPyro-Comm Systems, Inc.install new fire alarm device in elevator lobby and new corridor on the 4th fl. 2 speaker/strobe, 1 strobe, 3 smoke detectors. t.i pa# 201303051484$5,000
Mar 27, 2013Never finaled360 03rd StR L H Fire Protection Inc1st floor-fire sprinkler permit-relocate 1 pendent$2,000
Mar 25, 2013Never finaled360 03rd StAcco Engineered Systems Inc. Dba Acco En6th floor - revisoin to pa #2013.01.08.7454 - added non-infringement statement for life safety system.
Mar 21, 2013Completed360 03rd StAyoob & Peery Plumbing Co Inc4th floor add & relocate fire sprinkler heads per t.i-add 7 & relocate 11.$9,252
Mar 20, 2013Completed370 03rd StPribuss Engineering Incground fl. fire sprinkler ti . 14 sprinkler heads$7,205
Mar 20, 2013Completed360 03rd StTruebeck Construction1st floor management suite: t.i. for vacant office space on a portion of the ground floor. non rated, non structural walls, new finishes, new lighting. new mechanical and new ceiling.$95,000
Mar 19, 2013Completed370 03rd StPyro-Comm Systems, Inc.1st floor-add 2 weather rpoof speaker/strobes to new showers. ti pa# 2012-1024-2754$4,000
Mar 19, 2013Completed370 03rd StTruebeck Constructionpermit revision to app 2012.0719.5274: add sffd 95 question supplemental questionaire for design and installation of outdoor emergency diesel generator w/integral 800 gallon tank.
Mar 19, 2013Completed370 03rd StTruebeck Constructionrevision to pa# 2012-1024-2754-add smoke control non infringement statement & smoke control sequence of operations to plans
Mar 6, 2013Completed360 03rd St4th floor-partial floor common space improvement on multi-tenant floor including selective demolition, new partitions, doors, finishes. deferred submittals-m.e.p, fire sprinklers & life safety$50,000
Mar 5, 2013Completed360 03rd StSc Builders, Inc4th floor: electrical, revision to 201301309122.clarification of t.i. room outlets. room is not an ab-060 t.i. room. arch. drawings are 201301097554
Feb 28, 2013Completed370 03rd StPyro-Comm Systems, Inc.roof level-add 3 new weather proof speaker/strobes, 2 speaker strobe, 2 smoke detectors, 3 in duct smokes to roof top terrace. ti pa# 2012-0917-9869$6,000
Feb 26, 2013Never finaled360 03rd StPyro-Comm Systems, Inc.as built revisions to pa#2013-01-15-8048$600
Feb 26, 2013Completed370 03rd StPyro-Comm Systems, Inc.as built revisions to pa# 201301037124. added non infringement statement to drawings for the smoke control system.
Feb 21, 2013Completed360 03rd StAyoob & Peery Plumbing Co Inc4/f- add and relocate sprinkler heads per tenant improvements. 122 adds, 26 relocates. ref. pa #2013-0109-7554.$76,000
Feb 21, 2013Completed370 03rd StPyro-Comm Systems, Inc.install (n) smoke control panel & relay & monitor modules to provide manual control of the (e) fans & dampers including 2 (n) stairwell fans. the smoke control panel is addressed 360 3rd st. this is the correct address.$25,000
Feb 20, 2013Never finaled360 03rd StPyro-Comm Systems, Inc.4th fl: add new speaker/strobes throughout common open office area, conference room, break rooms. new smoke add to server room & relay to shut down fans. duct smoke/strobes added to new fsd, door hold opens added to reception door. 22 speaker/strobes, 11 strobes, 2 smokes, idd/ ref app 201301097554$10,000
Feb 13, 2013Expired or cancelled360 03rd StSkyline Construction3rd floor:revision to mep permit app#201301087454 sto install new vav box and fsd for elevator lobby and lighting. ref mep 20120108745 and arch 201212055512. smoke detector installation for fsd under separate fire alarm appl.
Feb 13, 2013Completed360 03rd StTrue North Signs & Graphic Servicesevacuation sign (plaques) on 1st,4th & 6th floors$7,500
Feb 12, 2013Completed360 03rd StPyro-Comm Systems, Inc./f lobby: add 3 new speaker/strobes to lobby and corridor area. new door hold opens and relay for control added to lobby doors. app#201212186415$5,000
Feb 12, 2013Completed360 03rd StGolden Gate Fire Protection Incfire sprinkler system upgrade; relocate 6 upright sprinklers on the 6th fl corridor & lobby. relocate 2 pendents. ti pa#2013-01-30-9088$4,120
Feb 4, 2013Completed370 03rd StTruebeck Constructionrefer to pa# 2012-0917-9869/r1-roof deck. m.e.p & landscape for new roof deck
Feb 1, 2013Completed370 03rd StRudolph Commercial Interiors Inc, Rciremove reception desk, install non bearing partition & door to create private office, add electrical outlet, path of travel permit #201208217912.$12,000
Feb 1, 2013Completed370 03rd StSuperior Automatic Sprinkler3rd - 7th floors install (n) branchline restraints (n) end of branchline restraints. also in pump room. bldg. permit # 201207195274$10,000
Jan 30, 2013Completed360 03rd StSc Builders, Inc4th floor:meps for arch. per app#201301097554$875,000
Jan 30, 2013Completed360 03rd StSkyline Constructionrevision to pa#2012-12-18-6415 to extend elevator lobby by reference to pa#2012-12-18-6415
Jan 25, 2013Completed360 03rd StGolden Gate Fire Protection Inc6th floor-fire sprinkler system upgrade, relocate 37 pendent sprinklers-relocate 18 upright heads & add 21 uprights. add 68 pendent sprinklers$74,160
Jan 17, 2013Completed360 03rd StAnderson, Rowe & Buckley, Inc.sprinkler & standpipe system. remove 3 sprinklers, add 4 sprinklers, relocate one roof hydrant.$2,000
Jan 15, 2013Completed360 03rd StPyro-Comm Systems, Inc.6th floor - install new speaker & strobe 35 in open office area, conference room & break room. (7 new strobe) (1 sd & power supply) t.i. pa #2012.12.05.5512.$7,000
Jan 9, 2013Completed360 03rd StSc Builders, Inc4th floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered$875,000
Jan 8, 2013Never finaled360 03rd StSkyline Construction6th floor-t.i-new medium pressure loop, installation of new low air distribution, 5 new fire/smoke dampers, new water source heat pumps, new hot water supply & condensor. ti pa# 2012-1205-5512$850,000
Jan 3, 2013Completed370 03rd StPyro-Comm Systems, Inc.add new speak/strobe to conference room, break room & open office areas. add new smoke & duct detectors to new fsd's. bldg pa# 201210242754$7,000
Dec 27, 2012Completed370 03rd StPribuss Engineering Incground floor:fire sprinkler t.i./add 62 heads.$31,900
Dec 18, 2012Completed360 03rd StSkyline Construction6th floor:partial floor common space improvement on multi tenant floor selective demo and new non lod bearing partitions.mep and life safety under seperate permit.$35,000
Dec 12, 2012Completed370 03rd StTruebeck Constructionadd new elevator "over-run" to (e) penthouse roof.$50,000
Dec 5, 2012Completed360 03rd StSkyline Constructiontenant improvement on the 6th floor to create open office, conference rooms and break area. mep, fire sprinkler, life safety under seperate permit.$2,200,000
Nov 29, 2012Completed370 03rd StTruebeck Constructionground floor, revision to pa#2012-0703-4041. construction of new wall floors & ceiling elements in two (2) new shower rooms on ground fl including new mech, elect, & plumb.$110,000
Oct 24, 2012Completed370 03rd StTruebeck Constructionrenovation of the ground floor; construction of non-structural partitions, ceiling, light fixtures, doors, side lights, plumbing. no change in occupancy or use. fire alarm & sprinkler under separate permit.$523,277
Oct 22, 2012Expired or cancelled370 03rd StSouthland Industriesinstall temporary ducting at 3rd floor shell space for comfort cooling at one day basketball media day.$15,000