Permit GraphShortlistSan Francisco building permits since 2000

Block 3751, lot 157

360 03rd St

City’s use
Commercial Office
Built
1976
Stories
7
Building
428,194 sq ft
Lot
72,012 sq ft
Zoning
M1
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 5, 2026Completed
final sign-off Sep 2026
360 03rd StGci, Incste 400 - revision to pa 202511139521 to removed deferred submittals from street g0.0. no deferred submittals are required
Details
Permit
202608056086
Permit issued
Aug 12, 2026
Final sign-off
Sep 14, 2026

ste 400 - revision to pa 202511139521 to removed deferred submittals from street g0.0. no deferred submittals are required

Open the permit page

Feb 4, 2026Completed
final sign-off Sep 2026
360 03rd StGci, Incste 400 - revision pa 202511139521 to remove mep from deferred submittal on sheet g0.0
Details
Permit
202602045200
Permit issued
Feb 10, 2026
Final sign-off
Sep 14, 2026

ste 400 - revision pa 202511139521 to remove mep from deferred submittal on sheet g0.0

Open the permit page

Nov 13, 2025Completed
final sign-off Sep 2026
360 03rd StGci, Incste 400 - ti to include constrction of (n) non-structural partition, doors and sidelite, (n) flooring, touch-up paint, (n) millwork and minor ceiling work
Details
Permit
202511139521
Permit issued
Dec 11, 2025
Final sign-off
Sep 14, 2026

ste 400 - ti to include constrction of (n) non-structural partition, doors and sidelite, (n) flooring, touch-up paint, (n) millwork and minor ceiling work

Open the permit page

$420,000
Dec 11, 2024Completed
final sign-off Feb 2025
360 03rd StSouthland Industrieschanging out 2 existing 15 ton computer room air handlers with 2 new liebert computer room handlers.
Details
Permit
202412116600
Permit issued
Dec 11, 2024
Final sign-off
Feb 4, 2025

changing out 2 existing 15 ton computer room air handlers with 2 new liebert computer room handlers.

Open the permit page

$190,000
Feb 1, 2024In progress
issued Feb 2024
360 03rd StGolden Gate Fire Protection Incref to t.i. 202312212901: f/s relocate 2 pendents and delete 1 concealed pendent on 1/f
Details
Permit
202402015069
Permit issued
Feb 1, 2024

ref to t.i. 202312212901: f/s relocate 2 pendents and delete 1 concealed pendent on 1/f

Open the permit page

$1,200
Jan 25, 2024Completed
final sign-off Mar 2024
370 03rd StIntelligent Technologies & Services Inc1st fl: reconfigure the (e) clean agent system & controls along with clean agent nozzles and piping. this will eliminate 11 smokes and pull and abort station.
Details
Permit
202401254665
Permit issued
Feb 8, 2024
Final sign-off
Mar 5, 2024

1st fl: reconfigure the (e) clean agent system & controls along with clean agent nozzles and piping. this will eliminate 11 smokes and pull and abort station.

Open the permit page

$24,303
Jan 19, 2024Completed
final sign-off Feb 2024
360 03rd StPyro-Comm Systems, Inc.1st fl: 2 ceiling strobes to be added to provode proper coverage. ref pa# 202312212901.
Details
Permit
202401194301
Permit issued
Jan 19, 2024
Final sign-off
Feb 22, 2024

1st fl: 2 ceiling strobes to be added to provode proper coverage. ref pa# 202312212901.

Open the permit page

$2,000
Jan 5, 2024Completed
final sign-off Sep 2024
360 03rd StPeacock Constructionmechanical- relocate ceiling grilles, extending ductwork relocate 1 thermostat. new power and signal devices, title 24. ref pa#202312212901
Details
Permit
202401053520
Permit issued
Jan 10, 2024
Final sign-off
Sep 18, 2024

mechanical- relocate ceiling grilles, extending ductwork relocate 1 thermostat. new power and signal devices, title 24. ref pa#202312212901

Open the permit page

$180,000
Dec 21, 2023Completed
final sign-off Mar 2024
360 03rd StPeacock Constructionscope of work: demo of existing production control room and adjacent audio room, including, associated non structural partitions, doors, ceilings, lighting, accessories and portion of (e) raised floor. new work include construction of audio and proudction control room with non structural partions
Details
Permit
202312212901
Permit issued
Dec 27, 2023
Final sign-off
Mar 13, 2024

scope of work: demo of existing production control room and adjacent audio room, including, associated non structural partitions, doors, ceilings, lighting, accessories and portion of (e) raised floor. new work include construction of audio and proudction control room with non structural partions

Open the permit page

$191,780
Nov 21, 2023In progress
issued Dec 2023
360 03rd StHp Build1st fl ste 101: demolition of existing millwork & finishes. new construction of non-structural demsing wall, lighting & finishes.
Details
Permit
202311211235
Permit issued
Dec 11, 2023

1st fl ste 101: demolition of existing millwork & finishes. new construction of non-structural demsing wall, lighting & finishes.

Open the permit page

$80,000
Oct 6, 2023Completed
final sign-off Oct 2024
360 03rd StSouthland Industriesreplace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.
Details
Permit
202310068165
Permit issued
Oct 20, 2023
Final sign-off
Oct 8, 2024

replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.

Open the permit page

$300,000
May 10, 2023Completed
final sign-off Jun 2023
370 03rd StIntelligent Technologies & Services Incremove 2 heat detectors and add 1 smoke detectors to existing fire alarm system on 1st floor restroom.
Details
Permit
202305107488
Permit issued
May 10, 2023
Final sign-off
Jun 30, 2023

remove 2 heat detectors and add 1 smoke detectors to existing fire alarm system on 1st floor restroom.

Open the permit page

$10,375
Apr 17, 2023Completed
final sign-off Jul 2023
360 03rd StGci, Inc1/f: mechanical & electrical work for t.i. to include demo of existing grille and installation of new grille w/ associated electrical wor, ref pa# 202212077790.
Details
Permit
202304175809
Permit issued
Apr 25, 2023
Final sign-off
Jul 13, 2023

1/f: mechanical & electrical work for t.i. to include demo of existing grille and installation of new grille w/ associated electrical wor, ref pa# 202212077790.

Open the permit page

$2,000
Dec 8, 2022Expired or cancelled
withdrawn Oct 2023
360 03rd Stsuite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes.
Details
Permit
202212087865

suite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes.

Open the permit page

$900,000
Dec 7, 2022Completed
final sign-off Jul 2023
360 03rd StGci, Inc1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms.
Details
Permit
202212077790
Permit issued
Mar 29, 2023
Final sign-off
Jul 17, 2023

1st/flr: demolition of existing shower, toilet, non-structural partition wall, ceiling, lighting and finishes. upgrading existing restroom and shower into all gender accessible restrooms.

Open the permit page

$350,000
Jun 21, 2022Never finaled
issued Jun 2022, no final
360 03rd StPyro-Comm Systems, Inc.1/f breakroom: this is a modification to an existing fire alarm system. 1 relay module will be added for card access interface and 1 ceiling strobe to be added to provide coverage. ref permit 202104068014.
Details
Permit
202206216696
Permit issued
Jun 21, 2022

1/f breakroom: this is a modification to an existing fire alarm system. 1 relay module will be added for card access interface and 1 ceiling strobe to be added to provide coverage. ref permit 202104068014.

Open the permit page

$1,000
Feb 2, 2022Completed
final sign-off Jul 2022
360 03rd Stdemolition of extg doors, frames and hardware. infill extfg doors and install new doors, frames & hardware at extg wall.
Details
Permit
202202027184
Permit issued
Apr 22, 2022
Final sign-off
Jul 5, 2022

demolition of extg doors, frames and hardware. infill extfg doors and install new doors, frames & hardware at extg wall.

Open the permit page

$68,000
Aug 17, 2021Completed
final sign-off Sep 2021
360 03rd StPyro-Comm Systems, Inc.5/f: f/a as-builts to show correct number of call stations being added to the poject under scope of work under 202103237098.
Details
Permit
202108176569
Permit issued
Aug 17, 2021
Final sign-off
Sep 10, 2021

5/f: f/a as-builts to show correct number of call stations being added to the poject under scope of work under 202103237098.

Open the permit page

Aug 16, 2021Completed
final sign-off Aug 2021
360 03rd StAyoob & Peery Plumbing Co Incas built for pa# 2021-0415-8614, 5th fl. add (15) and relocate (2) sprinklers per t.i.
Details
Permit
202108166506
Permit issued
Aug 17, 2021
Final sign-off
Aug 23, 2021

as built for pa# 2021-0415-8614, 5th fl. add (15) and relocate (2) sprinklers per t.i.

Open the permit page

Aug 4, 2021Completed
final sign-off Aug 2021
360 03rd StIntelligent Technologies & Services Incas-built plans remove reference to power shutdown. pa #202103317668 origianl approved permit.
Details
Permit
202108045722
Permit issued
Aug 4, 2021
Final sign-off
Aug 17, 2021

as-built plans remove reference to power shutdown. pa #202103317668 origianl approved permit.

Open the permit page

Apr 15, 2021Completed
final sign-off Aug 2021
360 03rd StAyoob & Peery Plumbing Co Inc5th floor: add (4) and relocate (2) sprinklers per t.i. ref #: 2020-1022-7136. job #: 21-606.
Details
Permit
202104158614
Permit issued
May 13, 2021
Final sign-off
Aug 23, 2021

5th floor: add (4) and relocate (2) sprinklers per t.i. ref #: 2020-1022-7136. job #: 21-606.

Open the permit page

$2,550
Apr 6, 2021Completed
final sign-off Oct 2021
360 03rd StPyro-Comm Systems, Inc.this is a modification of an existing fire alarm system. 3 new monitor modules will be installed to supervise the existing pre-action panel. this is a revision to permit 2020-1210-0751
Details
Permit
202104068014
Permit issued
May 5, 2021
Final sign-off
Oct 1, 2021

this is a modification of an existing fire alarm system. 3 new monitor modules will be installed to supervise the existing pre-action panel. this is a revision to permit 2020-1210-0751

Open the permit page

Mar 31, 2021Completed
final sign-off Aug 2021
360 03rd StIntelligent Technologies & Services Incsupply & install a complete clean agent/pre-action detection & control system in 5th floor mdf room.
Details
Permit
202103317668
Permit issued
Apr 20, 2021
Final sign-off
Aug 16, 2021

supply & install a complete clean agent/pre-action detection & control system in 5th floor mdf room.

Open the permit page

$25,872
Mar 23, 2021Completed
final sign-off Sep 2021
360 03rd StPyro-Comm Systems, Inc.add to existing fire alarm system: new notification appliance, two (new) twoway comm system call stations instaalled in the 5th floor elevator lobby and connected to master panel 1st floor
Details
Permit
202103237098
Permit issued
Jul 8, 2021
Final sign-off
Sep 13, 2021

add to existing fire alarm system: new notification appliance, two (new) twoway comm system call stations instaalled in the 5th floor elevator lobby and connected to master panel 1st floor

Open the permit page

$10,000
Feb 8, 2021Never finaled
issued Apr 2021, no final
360 03rd StBcci Construction Company5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a.
Details
Permit
202102084263
Permit issued
Apr 29, 2021

5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a.

Open the permit page

$50,000
Dec 10, 2020Never finaled
issued Jan 2021, no final
360 03rd StPyro-Comm Systems, Inc.fire alarm. 6 relay modules will be added to mdf room to shutdown the computer room crac unit. all new devices will be added to existing facu.
Details
Permit
202012100751
Permit issued
Jan 14, 2021

fire alarm. 6 relay modules will be added to mdf room to shutdown the computer room crac unit. all new devices will be added to existing facu.

Open the permit page

$2,000
Nov 24, 2020Completed
final sign-off Aug 2021
360 03rd StAyoob & Peery Plumbing Co Incnew pre-action system for mdf room 5035. add 14 and remove 11 fire sprinklers per tenant improvements. reference 2020.1020.6988
Details
Permit
202011249650
Permit issued
Jan 21, 2021
Final sign-off
Aug 23, 2021

new pre-action system for mdf room 5035. add 14 and remove 11 fire sprinklers per tenant improvements. reference 2020.1020.6988

Open the permit page

$7,350
Oct 22, 2020Completed
final sign-off Jan 2022
360 03rd StBcci Construction Company5/f: t.i. of tenant space (minus (2) equipment rooms). n/a.
Details
Permit
202010227136
Permit issued
Feb 3, 2021
Final sign-off
Jan 12, 2022

5/f: t.i. of tenant space (minus (2) equipment rooms). n/a.

Open the permit page

$500,000
Oct 20, 2020Never finaled
issued Dec 2020, no final
360 03rd StBcci Construction Company5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.
Details
Permit
202010206988
Permit issued
Dec 1, 2020

5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.

Open the permit page

$1,000,000
Nov 1, 2019Expired or cancelled
cancelled Jan 2026
360 03rd Stground floor: includes construction of non-structural partitions, light fixtures, glass side lights, doors, finishes. no change in area, occupancy or use. mep, fire alarm, sprinklers, t-24 calcs will be under seperate permit. n/a for maher
Details
Permit
201911016191

ground floor: includes construction of non-structural partitions, light fixtures, glass side lights, doors, finishes. no change in area, occupancy or use. mep, fire alarm, sprinklers, t-24 calcs will be under seperate permit. n/a for maher

Open the permit page

$54,566
Jun 18, 2019Expired or cancelled
cancelled Jan 2026
360 03rd Stinstall (1) non-illuminated single-faced wall sign. "nektar"
Details
Permit
201906183666

install (1) non-illuminated single-faced wall sign. "nektar"

Open the permit page

$13,600
Apr 29, 2019Completed
final sign-off Aug 2019
360 03rd StXl Construction, Corporationrevision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req
Details
Permit
201904299173
Permit issued
May 6, 2019
Final sign-off
Aug 2, 2019

revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req

Open the permit page

Feb 21, 2019Completed
final sign-off May 2019
360 03rd StPyro-Comm Systems, Inc.fire alarm ti - adding 82 speaker strobes, 18 strobes, 2 smk det, 4 return air smoke dets and 6 duct dets to be hooked up to (e) facu ref 201901281353
Details
Permit
201902213429
Permit issued
Feb 21, 2019
Final sign-off
May 10, 2019

fire alarm ti - adding 82 speaker strobes, 18 strobes, 2 smk det, 4 return air smoke dets and 6 duct dets to be hooked up to (e) facu ref 201901281353

Open the permit page

$56,000
Feb 20, 2019Completed
final sign-off Jun 2019
360 03rd StSabah International Incorporatedprovide & install a new engineered total flooding fk-5-1-12 clean agent fire enxtinguishing system. t.i. under #2019/0128/1353
Details
Permit
201902203334
Permit issued
May 23, 2019
Final sign-off
Jun 7, 2019

provide & install a new engineered total flooding fk-5-1-12 clean agent fire enxtinguishing system. t.i. under #2019/0128/1353

Open the permit page

$111,821
Feb 12, 2019Never finaled
issued Mar 2019, no final
360 03rd StEco Fire Sprinklers Incon 7th floor add (517) sprinklers in area of work for tenant improvement. also install single interlock pre-action system to cover idf room. permit ref #201901281353
Details
Permit
201902122709
Permit issued
Mar 19, 2019

on 7th floor add (517) sprinklers in area of work for tenant improvement. also install single interlock pre-action system to cover idf room. permit ref #201901281353

Open the permit page

$285,000
Jan 28, 2019Completed
final sign-off Aug 2019
360 03rd StXl Construction, Corporation7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work
Details
Permit
201901281353
Permit issued
Jan 29, 2019
Final sign-off
Aug 2, 2019

7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work

Open the permit page

$7,273,098
Dec 6, 2018Completed
final sign-off Jun 2019
360 03rd StXl Construction, Corporationinterior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit
Details
Permit
201812067656
Permit issued
Dec 7, 2018
Final sign-off
Jun 4, 2019

interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit

Open the permit page

$100,000
Nov 6, 2018Completed
final sign-off May 2019
360 03rd StXl Construction, Corporationdemo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be
Details
Permit
201811065181
Permit issued
Nov 8, 2018
Final sign-off
May 8, 2019

demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be

Open the permit page

$5,000
Jun 22, 2018Expired or cancelled
cancelled Feb 2024
360 03rd Stinstallation of (2) stem lithium ion battery energy storage system (ess) will be used to offset peak demand charges by discharging directly into the facilities elec. distributtion system. the monitoring and control system detects both when to charge, and when to discharge. ** maher: n/a **
Details
Permit
201806222742

installation of (2) stem lithium ion battery energy storage system (ess) will be used to offset peak demand charges by discharging directly into the facilities elec. distributtion system. the monitoring and control system detects both when to charge, and when to discharge. ** maher: n/a **

Open the permit page

$30,000
Feb 12, 2018Expired or cancelled
cancelled Jun 2019
360 03rd StPyro-Comm Systems, Inc.6th fl: pyro comm will provide (2) duct detectors & relays for hvac shutdown. maher na
Details
Permit
201802121027
Permit issued
Feb 12, 2018

6th fl: pyro comm will provide (2) duct detectors & relays for hvac shutdown. maher na

Open the permit page

$1,500
Feb 1, 2018Completed
final sign-off Jun 2019
360 03rd StM C S Construction Servicesground fl - building path of travel upgrades including relocation of restroom fixtures and upgrading accessories in the restrooms & shower room to be accesible
Details
Permit
201802010117
Permit issued
Feb 6, 2018
Final sign-off
Jun 4, 2019

ground fl - building path of travel upgrades including relocation of restroom fixtures and upgrading accessories in the restrooms & shower room to be accesible

Open the permit page

$30,000
Jan 2, 2018Never finaled
issued Feb 2018, no final
360 03rd StA M A Design Build Incorporated6th floor #615 - renovation of room #002 open office (one room only) for new broadcast equipment & freestanding furniture layout. n/a maher ordinance
Details
Permit
201801027675
Permit issued
Feb 13, 2018

6th floor #615 - renovation of room #002 open office (one room only) for new broadcast equipment & freestanding furniture layout. n/a maher ordinance

Open the permit page

$340,000
Jun 6, 2017Never finaled
issued Jun 2017, no final
360 03rd St3/f- fire sprinkler t.i., remove (4) pendents and replace drops with upright sprinklers where ceiling are removed. t.i. pa#201705267757. n/a ordinance #155-13
Details
Permit
201706068540
Permit issued
Jun 6, 2017

3/f- fire sprinkler t.i., remove (4) pendents and replace drops with upright sprinklers where ceiling are removed. t.i. pa#201705267757. n/a ordinance #155-13

Open the permit page

$1,500
May 26, 2017Completed
final sign-off Oct 2017
360 03rd StPrincipal Builders Inc.3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na
Details
Permit
201705267757
Permit issued
May 30, 2017
Final sign-off
Oct 24, 2017

3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na

Open the permit page

$68,000
Apr 22, 2016Completed
final sign-off May 2016
360 03rd StPyro-Comm Systems, Inc.6th fl: new fire alarm devices added to a ti improvement in an existing building to include 2 relay modules, 2 multi voltage relays, 3 duct detector, 2 smoke detectors 4 speaker/strobes ref 2016-0323-2802; maher n/a
Details
Permit
201604225493
Permit issued
Apr 22, 2016
Final sign-off
May 25, 2016

6th fl: new fire alarm devices added to a ti improvement in an existing building to include 2 relay modules, 2 multi voltage relays, 3 duct detector, 2 smoke detectors 4 speaker/strobes ref 2016-0323-2802; maher n/a

Open the permit page

$5,500
Apr 14, 2016Completed
final sign-off Oct 2016
360 03rd StSkyline Construction6th flr: mechanical work for ti 2016 0308 1412 - hvac for new rooms maher na
Details
Permit
201604144751
Permit issued
Apr 25, 2016
Final sign-off
Oct 31, 2016

6th flr: mechanical work for ti 2016 0308 1412 - hvac for new rooms maher na

Open the permit page

$5,000
Apr 14, 2016Completed
final sign-off Oct 2016
360 03rd StSkyline Construction6th flr: electrical work for ti 2016 0308 1412 maher na
Details
Permit
201604144753
Permit issued
May 3, 2016
Final sign-off
Oct 31, 2016

6th flr: electrical work for ti 2016 0308 1412 maher na

Open the permit page

$10,000
Apr 13, 2016Completed
final sign-off Apr 2016
370 03rd StGolden Gate Fire Protection Inc6th floor: fire sprinkler: relocate 7 pendent sprinklers . relocate 4 upright sprinklers. n/a for maher. t.i. #201603232802
Details
Permit
201604134630
Permit issued
Apr 13, 2016
Final sign-off
Apr 29, 2016

6th floor: fire sprinkler: relocate 7 pendent sprinklers . relocate 4 upright sprinklers. n/a for maher. t.i. #201603232802

Open the permit page

$5,775
Apr 11, 2016Completed
final sign-off Oct 2016
360 03rd StSkyline Construction6th flr: mechanical work for tenant improvement, ref. 201603081412; maher n/a
Details
Permit
201604114432
Permit issued
May 12, 2016
Final sign-off
Oct 31, 2016

6th flr: mechanical work for tenant improvement, ref. 201603081412; maher n/a

Open the permit page

$3,000
Apr 1, 2016Never finaled
issued Apr 2016, no final
360 03rd StTrue North Signs & Graphic Services6th floor - install (5) evacuation signs. n/a maher ordinance
Details
Permit
201604013714
Permit issued
Apr 1, 2016

6th floor - install (5) evacuation signs. n/a maher ordinance

Open the permit page

$1,750
Mar 23, 2016Never finaled
issued Mar 2016, no final
360 03rd StSkyline Constructiontenant improvement - new partitions, doors, millwork. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13
Details
Permit
201603232802
Permit issued
Mar 23, 2016

tenant improvement - new partitions, doors, millwork. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13

Open the permit page

$255,000
Mar 15, 2016Completed
final sign-off Oct 2016
360 03rd StSkyline Construction6th floor, tenant imrprovement new office, modification of non rated non structural partitions. mep & fire life safety under separate permit. maher na
Details
Permit
201603152016
Permit issued
Mar 15, 2016
Final sign-off
Oct 31, 2016

6th floor, tenant imrprovement new office, modification of non rated non structural partitions. mep & fire life safety under separate permit. maher na

Open the permit page

$10,000
Mar 15, 2016Completed
final sign-off Oct 2016
360 03rd StSkyline Construction6th floor, electrical work for ti ref pa 2016-0308-1412. maher na
Details
Permit
201603152015
Permit issued
Mar 15, 2016
Final sign-off
Oct 31, 2016

6th floor, electrical work for ti ref pa 2016-0308-1412. maher na

Open the permit page

$5,000
Mar 8, 2016Completed
final sign-off Oct 2016
360 03rd StSkyline Construction6th floor: t.i. to include new non-load bearing partitions. mep under seperate permit. n/a for maher.
Details
Permit
201603081412
Permit issued
Mar 8, 2016
Final sign-off
Oct 31, 2016

6th floor: t.i. to include new non-load bearing partitions. mep under seperate permit. n/a for maher.

Open the permit page

$250,000
Feb 29, 2016Completed
final sign-off Mar 2016
360 03rd StPioneer Fire Inc.4/f: relocate 3 pendents. relocate 1 uprright pendent; ref pa 2016 0105 6388; maher na
Details
Permit
201602290781
Permit issued
Feb 29, 2016
Final sign-off
Mar 15, 2016

4/f: relocate 3 pendents. relocate 1 uprright pendent; ref pa 2016 0105 6388; maher na

Open the permit page

$8,789
Feb 22, 2016Completed
final sign-off Mar 2016
360 03rd StPyro-Comm Systems, Inc.4th floor: new fire alarm appliances added to t.i. in an extg bldg to include 4 speaker/strobes, 4 strobes. ref app#201601056388. n/a for maher
Details
Permit
201602220203
Permit issued
Feb 22, 2016
Final sign-off
Mar 22, 2016

4th floor: new fire alarm appliances added to t.i. in an extg bldg to include 4 speaker/strobes, 4 strobes. ref app#201601056388. n/a for maher

Open the permit page

$4,000
Feb 17, 2016Completed
final sign-off Mar 2016
360 03rd StA M A Design Build Incorporatedoffice ti on 6th fl (suite 650): of existing high rise office b occupancy. 6th fl is a multi tennant floor. project consists of new interior partition
Details
Permit
201602179744
Permit issued
Feb 18, 2016
Final sign-off
Mar 9, 2016

office ti on 6th fl (suite 650): of existing high rise office b occupancy. 6th fl is a multi tennant floor. project consists of new interior partition

Open the permit page

$2,000
Feb 12, 2016Completed
final sign-off Jul 2016
360 03rd StGci, Incref pa 2016-0105-6388, provided new lighting & branch circuiting to existing panel. maintened some existing power & signal outlets, provide new power branch circuiting raceway systems.
Details
Permit
201602129475
Permit issued
Feb 23, 2016
Final sign-off
Jul 29, 2016

ref pa 2016-0105-6388, provided new lighting & branch circuiting to existing panel. maintened some existing power & signal outlets, provide new power branch circuiting raceway systems.

Open the permit page

$105,000
Feb 12, 2016Completed
final sign-off Jul 2016
360 03rd StGci, Incref pa 2016-0105-6388, install 91) new water source heat pump for server room, duct distribution modifications for new layout rebalance zones, new plumbing
Details
Permit
201602129474
Permit issued
Feb 12, 2016
Final sign-off
Jul 5, 2016

ref pa 2016-0105-6388, install 91) new water source heat pump for server room, duct distribution modifications for new layout rebalance zones, new plumbing

Open the permit page

$88,000
Jan 26, 2016Completed
final sign-off Mar 2016
360 03rd StA M A Design Build Incorporatedsuite 650 - addition of supplemental ac unit for after hours use. minor rework of existing ductwork & vav boxes to accommodate new supplemental equipment. no architectural work, no electrical, no plumbing. n/a maher ordinance
Details
Permit
201601268043
Permit issued
Feb 4, 2016
Final sign-off
Mar 9, 2016

suite 650 - addition of supplemental ac unit for after hours use. minor rework of existing ductwork & vav boxes to accommodate new supplemental equipment. no architectural work, no electrical, no plumbing. n/a maher ordinance

Open the permit page

$100,000
Jan 21, 2016Expired or cancelled
cancelled Jan 2026
360 03rd StFerrari Colorapplying mesh sign on front window. temp 1/30-2/13. maher na
Details
Permit
201601217588

applying mesh sign on front window. temp 1/30-2/13. maher na

Open the permit page

$16,000
Jan 5, 2016Completed
final sign-off Jul 2016
360 03rd StGci, Inctenant improvement, non structural alterations. walls, elec, lighting, hvac, mep deferred. n/a ordinance #155-13
Details
Permit
201601056388
Permit issued
Jan 5, 2016
Final sign-off
Jul 5, 2016

tenant improvement, non structural alterations. walls, elec, lighting, hvac, mep deferred. n/a ordinance #155-13

Open the permit page

$400,000
Dec 21, 2015Completed
final sign-off Jan 2016
360 03rd StPyro-Comm Systems, Inc.as built revisions to 201510079118
Details
Permit
201512215625
Permit issued
Dec 21, 2015
Final sign-off
Jan 27, 2016

as built revisions to 201510079118

Open the permit page

Dec 1, 2015Completed
final sign-off Dec 2015
360 03rd StPyro-Comm Systems, Inc.1st floor: new fire alarm devices for new tenant generator added to existing building to include 3 monitor modules. maher not req. ref. pa#201502027215
Details
Permit
201512013883
Permit issued
Dec 1, 2015
Final sign-off
Dec 8, 2015

1st floor: new fire alarm devices for new tenant generator added to existing building to include 3 monitor modules. maher not req. ref. pa#201502027215

Open the permit page

$1,500
Nov 12, 2015Never finaled
issued Nov 2015, no final
360 03rd StAnderson, Rowe & Buckley, Inc.6th flr: existing fire sprinkler system apn 201510230651 t.i., 1 add sprk, 1 plugged outlet, 2 relocated spkrs; maher n/a
Details
Permit
201511122360
Permit issued
Nov 12, 2015

6th flr: existing fire sprinkler system apn 201510230651 t.i., 1 add sprk, 1 plugged outlet, 2 relocated spkrs; maher n/a

Open the permit page

$2,500
Oct 23, 2015Completed
final sign-off Jan 2016
360 03rd StA M A Design Build Incorporatedrevision to app 2015-0814-4273 for t.i. on 6th floor for new parttions. minor mechanical and electrical work. there is no plbmg work associated scope. enlarge noc room. n/a for maher. life safety deferred.
Details
Permit
201510230651
Permit issued
Oct 30, 2015
Final sign-off
Jan 12, 2016

revision to app 2015-0814-4273 for t.i. on 6th floor for new parttions. minor mechanical and electrical work. there is no plbmg work associated scope. enlarge noc room. n/a for maher. life safety deferred.

Open the permit page

$25,000
Oct 20, 2015Completed
final sign-off Nov 2015
360 03rd StAnderson, Rowe & Buckley, Inc.6th floor: fire sprinklers for ref pa 2015 0814 4273: relocate 16 heads, add 1 maher na
Details
Permit
201510200150
Permit issued
Oct 20, 2015
Final sign-off
Nov 13, 2015

6th floor: fire sprinklers for ref pa 2015 0814 4273: relocate 16 heads, add 1 maher na

Open the permit page

$8,806
Oct 7, 2015Completed
final sign-off Jan 2016
360 03rd StPyro-Comm Systems, Inc.new fire alarm devices for a ti in existing building to include 1 relay module, 1 smoke detector, 6 speaker/strobes, 1 strobe maher not req
Details
Permit
201510079118
Permit issued
Oct 9, 2015
Final sign-off
Jan 26, 2016

new fire alarm devices for a ti in existing building to include 1 relay module, 1 smoke detector, 6 speaker/strobes, 1 strobe maher not req

Open the permit page

$4,300
Aug 28, 2015Completed
final sign-off Sep 2015
360 03rd StPyro-Comm Systems, Inc.3rd floor:new fire alarm devices added to t.i. in an extg bldg to include: relay and 1 multi-voltage relay for av music shutdown. ref app#201507232320. n/a for maher
Details
Permit
201508285564
Permit issued
Aug 28, 2015
Final sign-off
Sep 11, 2015

3rd floor:new fire alarm devices added to t.i. in an extg bldg to include: relay and 1 multi-voltage relay for av music shutdown. ref app#201507232320. n/a for maher

Open the permit page

$1,000
Aug 17, 2015Never finaled
issued Aug 2015, no final
360 03rd StAllied Heating & Air Conditioning5th fl. install transfer fan replace wshp. maher na
Details
Permit
201508174473
Permit issued
Aug 17, 2015

5th fl. install transfer fan replace wshp. maher na

Open the permit page

$15,541
Aug 14, 2015Completed
final sign-off Jan 2016
360 03rd StA M A Design Build Incorporatedti on 6th floor of (e) office building. construction of new partitions and minor mechanical, elelctrical. fire sprinkler & fire alarm work under separate permit. there is no plumbing work associated with scope. n/a for maher.
Details
Permit
201508144273
Permit issued
Sep 3, 2015
Final sign-off
Jan 12, 2016

ti on 6th floor of (e) office building. construction of new partitions and minor mechanical, elelctrical. fire sprinkler & fire alarm work under separate permit. there is no plumbing work associated with scope. n/a for maher.

Open the permit page

$500,000
Aug 4, 2015Never finaled
issued Aug 2015, no final
360 03rd Ststreet space permit
Details
Permit
M610867
Permit issued
Aug 4, 2015

street space permit

Open the permit page

Jul 23, 2015Completed
final sign-off Oct 2015
360 03rd StPrincipal Builders Inc.3rd floor: upgrade to hvac and lighting to replace ducts and lighting fixtures. no new architectural work. extg tenant space. n/a for maher.
Details
Permit
201507232320
Permit issued
Jul 23, 2015
Final sign-off
Oct 19, 2015

3rd floor: upgrade to hvac and lighting to replace ducts and lighting fixtures. no new architectural work. extg tenant space. n/a for maher.

Open the permit page

$129,284
Jul 1, 2015Never finaled
issued Jul 2015, no final
360 03rd Ststreet space
Details
Permit
M599347
Permit issued
Jul 1, 2015

street space

Open the permit page

Jun 12, 2015Completed
final sign-off Nov 2015
360 03rd StParamount Sign Contractorserect 2 projecting electric signs
Details
Permit
201506128809
Permit issued
Jun 12, 2015
Final sign-off
Nov 19, 2015

erect 2 projecting electric signs

Open the permit page

$45,000
Jun 3, 2015Completed
final sign-off Jul 2015
360 03rd StPyro-Comm Systems, Inc.1st floor: new fire alarm devices added to t.i. include: 1 duct detector, 1 realy module, 1 voltage relay and 3 speaker/strobes. ref. t.i. appl. 2015.0326.1978. maher n/a.
Details
Permit
201506037996
Permit issued
Jun 3, 2015
Final sign-off
Jul 9, 2015

1st floor: new fire alarm devices added to t.i. include: 1 duct detector, 1 realy module, 1 voltage relay and 3 speaker/strobes. ref. t.i. appl. 2015.0326.1978. maher n/a.

Open the permit page

$4,300
Jun 2, 2015Completed
final sign-off Jun 2015
360 03rd StAyoob & Peery Plumbing Co Inc4th flr: add 6 fire sprinkler per ti 2015 0429 4929 maher na
Details
Permit
201506027871
Permit issued
Jun 3, 2015
Final sign-off
Jun 24, 2015

4th flr: add 6 fire sprinkler per ti 2015 0429 4929 maher na

Open the permit page

$3,084
Jun 2, 2015Completed
final sign-off Jun 2015
360 03rd StPyro-Comm Systems, Inc.4th flr: new fire alarm device added to ti in an (e) bld to include 1 speaker/strobe. maher na ref #2015.0429.4929
Details
Permit
201506027841
Permit issued
Jun 2, 2015
Final sign-off
Jun 17, 2015

4th flr: new fire alarm device added to ti in an (e) bld to include 1 speaker/strobe. maher na ref #2015.0429.4929

Open the permit page

$2,000
May 26, 2015Completed
final sign-off Jun 2015
360 03rd StGci, Increvision to ref 201503261978: ada counter, move location, switchen panick door lock with standard lock and pulls. maher not req
Details
Permit
201505267135
Permit issued
May 28, 2015
Final sign-off
Jun 29, 2015

revision to ref 201503261978: ada counter, move location, switchen panick door lock with standard lock and pulls. maher not req

Open the permit page

May 13, 2015Completed
final sign-off Jul 2015
360 03rd StGci, Incnew fcu and cu, new dx and condensate piping for new fcu ref 201503261979. n/a ordinance #155-13
Details
Permit
201505136183
Permit issued
May 14, 2015
Final sign-off
Jul 16, 2015

new fcu and cu, new dx and condensate piping for new fcu ref 201503261979. n/a ordinance #155-13

Open the permit page

$42,000
May 11, 2015Never finaled
issued May 2015, no final
360 03rd StPioneer Fire Inc.1st flr: relocate 1 sprinkler/ relocate (e) horizontal free standing fdc location, install new vertical, recessed fdc. ref pa 2015 0326 1978 maher na
Details
Permit
201505115939
Permit issued
May 11, 2015

1st flr: relocate 1 sprinkler/ relocate (e) horizontal free standing fdc location, install new vertical, recessed fdc. ref pa 2015 0326 1978 maher na

Open the permit page

$4,800
May 1, 2015Completed
final sign-off Jun 2015
360 03rd StPyro-Comm Systems, Inc.1st flr: new fire alarm system for ti: 1 speaker/strobe pa 2015 0429 4929 maher na
Details
Permit
201505015155
Permit issued
May 1, 2015
Final sign-off
Jun 4, 2015

1st flr: new fire alarm system for ti: 1 speaker/strobe pa 2015 0429 4929 maher na

Open the permit page

$2,000
Apr 29, 2015Completed
final sign-off Jun 2015
360 03rd StSc Builders, Inc4th flr -ti includes the demo of non structural partitions and building new non structural partitions. all new or revised hvac elec, plumbing, life safety under sep permit. maher not req
Details
Permit
201504294929
Permit issued
May 7, 2015
Final sign-off
Jun 30, 2015

4th flr -ti includes the demo of non structural partitions and building new non structural partitions. all new or revised hvac elec, plumbing, life safety under sep permit. maher not req

Open the permit page

$138,600
Apr 15, 2015Completed
final sign-off May 2015
360 03rd StAnderson, Rowe & Buckley, Inc.ground flr: fire sprinkler - relocate 4 heads, add 2 heads, ref pa 2015 0326 1979 maher - not req'd
Details
Permit
201504153695
Permit issued
Apr 15, 2015
Final sign-off
May 1, 2015

ground flr: fire sprinkler - relocate 4 heads, add 2 heads, ref pa 2015 0326 1979 maher - not req'd

Open the permit page

$3,100
Apr 15, 2015Completed
final sign-off Jul 2015
360 03rd StGci, Incref. to pa#201503261979, improvements to office space plan for floor lighting & power, connecting power to new lighting or relocate power outlets and tenant equipment. no changes made to existing base bldg electrical system. n/a ordinance #155-13
Details
Permit
201504153651
Permit issued
Apr 16, 2015
Final sign-off
Jul 16, 2015

ref. to pa#201503261979, improvements to office space plan for floor lighting & power, connecting power to new lighting or relocate power outlets and tenant equipment. no changes made to existing base bldg electrical system. n/a ordinance #155-13

Open the permit page

$30,000
Mar 26, 2015Completed
final sign-off Jul 2015
360 03rd StGci, Incnon structural partitons for new fitness studio. suspension training bar mounted to existing concrete slab. new built in closets. bottle filling station. ref 201406118133. n/a maher ordinance # 155-13
Details
Permit
201503261979
Permit issued
Apr 6, 2015
Final sign-off
Jul 16, 2015

non structural partitons for new fitness studio. suspension training bar mounted to existing concrete slab. new built in closets. bottle filling station. ref 201406118133. n/a maher ordinance # 155-13

Open the permit page

$130,000
Mar 26, 2015Never finaled
issued Apr 2015, no final
360 03rd StPrincipal Builders Inc.revision to app#201402249182 and to document assembly space on proposed plans for office t.i. on floors 3. no additional work. no change of use. n/a for the maher.
Details
Permit
201503261996
Permit issued
Apr 24, 2015

revision to app#201402249182 and to document assembly space on proposed plans for office t.i. on floors 3. no additional work. no change of use. n/a for the maher.

Open the permit page

$100
Mar 26, 2015Completed
final sign-off Jun 2015
360 03rd StGci, Incwine bar/cafe new non stuctural partitions, hvac, electrical, plmg, millwork, ceilings electric stove. store front change. not visible from street (level below). n/a for the maher. ref app#201406118133
Details
Permit
201503261978
Permit issued
May 15, 2015
Final sign-off
Jun 29, 2015

wine bar/cafe new non stuctural partitions, hvac, electrical, plmg, millwork, ceilings electric stove. store front change. not visible from street (level below). n/a for the maher. ref app#201406118133

Open the permit page

$600,000
Mar 12, 2015Completed
final sign-off Oct 2015
360 03rd StC B F Incremodel of exist. commercial office kitchen space:modifications to exist. partitions, plumbing&electrical;new cabinates. mep permited separatly.n/a maher
Details
Permit
201503120636
Permit issued
Mar 17, 2015
Final sign-off
Oct 21, 2015

remodel of exist. commercial office kitchen space:modifications to exist. partitions, plumbing&electrical;new cabinates. mep permited separatly.n/a maher

Open the permit page

$25,000
Feb 2, 2015Completed
final sign-off Mar 2015
360 03rd StPyro-Comm Systems, Inc.2nd floor studio b: as-built fire alarm revision to pa #2014-1110-1156. n/a maher ordinance
Details
Permit
201502027233
Permit issued
Feb 2, 2015
Final sign-off
Mar 6, 2015

2nd floor studio b: as-built fire alarm revision to pa #2014-1110-1156. n/a maher ordinance

Open the permit page

Feb 2, 2015Completed
final sign-off May 2016
360 03rd StA M A Design Build Incorporatedste 615. installation of new optional emergency generator located on exterior of bldg at sw side at grade. work includes generator on new concrete pad with active diesel particulate filter. n/a for the maher
Details
Permit
201502027215
Permit issued
Apr 27, 2015
Final sign-off
May 2, 2016

ste 615. installation of new optional emergency generator located on exterior of bldg at sw side at grade. work includes generator on new concrete pad with active diesel particulate filter. n/a for the maher

Open the permit page

$30,000
Dec 3, 2014Completed
final sign-off Dec 2014
360 03rd StAyoob & Peery Plumbing Co Inc4th floor - add and relocate fire sprinklers per t.i. 7 added, 10 relocated. ref. t.i. appl. 2014.1010.8622. maher n/a.
Details
Permit
201412032965
Permit issued
Dec 3, 2014
Final sign-off
Dec 17, 2014

4th floor - add and relocate fire sprinklers per t.i. 7 added, 10 relocated. ref. t.i. appl. 2014.1010.8622. maher n/a.

Open the permit page

$6,168
Dec 2, 2014Completed
final sign-off Dec 2014
360 03rd StPyro-Comm Systems, Inc.new fire alarm devices added to tenant improvement to existing building to include power supply, 1 control module, 6 speaker/speaker/strobes
Details
Permit
201412022825
Permit issued
Dec 2, 2014
Final sign-off
Dec 22, 2014

new fire alarm devices added to tenant improvement to existing building to include power supply, 1 control module, 6 speaker/speaker/strobes

Open the permit page

$2,500
Nov 10, 2014Completed
final sign-off Mar 2015
360 03rd StPyro-Comm Systems, Inc.2nd floor studio b: new fire alarm to t.i. include 1 duct detector, 1 smoke detector, 4 relay modules and 4 voltage relays. ref. appl. 2014.1014.8742. maher n/a.
Details
Permit
201411101156
Permit issued
Nov 10, 2014
Final sign-off
Mar 6, 2015

2nd floor studio b: new fire alarm to t.i. include 1 duct detector, 1 smoke detector, 4 relay modules and 4 voltage relays. ref. appl. 2014.1014.8742. maher n/a.

Open the permit page

$3,000
Nov 10, 2014Completed
final sign-off Feb 2015
360 03rd StSc Builders, Inc4th flr: mechanical and electrical for pa #201410108622; maher n/a
Details
Permit
201411101111
Permit issued
Nov 12, 2014
Final sign-off
Feb 24, 2015

4th flr: mechanical and electrical for pa #201410108622; maher n/a

Open the permit page

$30,000
Oct 29, 2014Completed
final sign-off Jul 2015
370 03rd StSkyline Constructionwindow washing equipment upgrades. compliance with maher ordinance no 155-13 not required.
Details
Permit
201410290192
Permit issued
Nov 18, 2014
Final sign-off
Jul 31, 2015

window washing equipment upgrades. compliance with maher ordinance no 155-13 not required.

Open the permit page

$250,000
Oct 15, 2014Completed
final sign-off Jun 2015
360 03rd StSouthland Industries2nd flr: t.i. 201410148742 -for tv studio converting previously unoccupied studio space to useable space; mechanical/electrical only; maher n/a
Details
Permit
201410158989
Permit issued
Nov 3, 2014
Final sign-off
Jun 24, 2015

2nd flr: t.i. 201410148742 -for tv studio converting previously unoccupied studio space to useable space; mechanical/electrical only; maher n/a

Open the permit page

$32,000
Oct 14, 2014Completed
final sign-off Jun 2015
360 03rd StSouthland Industriesconvert previously unoccupied space to useable space adding hvac and electrical. maher not required. t.i. for tv studio.
Details
Permit
201410148742
Permit issued
Oct 14, 2014
Final sign-off
Jun 24, 2015

convert previously unoccupied space to useable space adding hvac and electrical. maher not required. t.i. for tv studio.

Open the permit page

$15,000
Oct 10, 2014Completed
final sign-off Feb 2015
360 03rd StSc Builders, Inc4th flr, ste 400, t.i. includes the demo of non-structural partitions & building new non-structural paritions. all new or revised hvac, elec, plumbing & life safety, work will be design built & submitted separately, bldg is fully sprinklered; maher n/a
Details
Permit
201410108622
Permit issued
Oct 29, 2014
Final sign-off
Feb 13, 2015

4th flr, ste 400, t.i. includes the demo of non-structural partitions & building new non-structural paritions. all new or revised hvac, elec, plumbing & life safety, work will be design built & submitted separately, bldg is fully sprinklered; maher n/a

Open the permit page

$150,000
Sep 5, 2014Never finaled
issued Sep 2014, no final
360 03rd StSouthland Industries2nd flr: install 2 vav boxes with hot water reheat/ducting (broadcasting) ;install 1-fan coil unit in rm 231 facility room; maher n/a
Details
Permit
201409055486
Permit issued
Sep 5, 2014

2nd flr: install 2 vav boxes with hot water reheat/ducting (broadcasting) ;install 1-fan coil unit in rm 231 facility room; maher n/a

Open the permit page

$45,000
Jul 2, 2014Completed
final sign-off Apr 2015
360 03rd StTrue North Signs & Graphic Servicesto reface extg sign. n/a for the maher ordinance #155-13
Details
Permit
201407020292
Permit issued
Jul 2, 2014
Final sign-off
Apr 23, 2015

to reface extg sign. n/a for the maher ordinance #155-13

Open the permit page

$4,400
Jul 2, 2014Completed
final sign-off Apr 2015
360 03rd StTrue North Signs & Graphic Servicesto reface extg 2 signs. n/a for the maher ordinance #155-13
Details
Permit
201407020293
Permit issued
Jul 2, 2014
Final sign-off
Apr 23, 2015

to reface extg 2 signs. n/a for the maher ordinance #155-13

Open the permit page

$200
Jul 1, 2014Completed
final sign-off Jul 2014
360 03rd StPyro-Comm Systems, Inc.4th floor - as builts for fire alarm, showing correct location of duct detector. related to pa #2014.0404.2503. n/a maher ordinance
Details
Permit
201407010240
Permit issued
Jul 1, 2014
Final sign-off
Jul 14, 2014

4th floor - as builts for fire alarm, showing correct location of duct detector. related to pa #2014.0404.2503. n/a maher ordinance

Open the permit page

Jul 1, 2014Completed
final sign-off Aug 2014
360 03rd StPrincipal Builders Inc.3rd flr: revision to pa 201402128409 to show existing compliant restrooms on 3rd flr, current permit drawing do not show existing conditions. maher n/a
Details
Permit
201407010218
Permit issued
Jul 7, 2014
Final sign-off
Aug 19, 2014

3rd flr: revision to pa 201402128409 to show existing compliant restrooms on 3rd flr, current permit drawing do not show existing conditions. maher n/a

Open the permit page

Jun 25, 2014Completed
final sign-off Jul 2014
360 03rd StGolden Gate Fire Protection Inc4th floor - add 9 upright sprinklers, wrap 1-1/4 pipe under 16 concrete beams. ref pa #2014.0407.2584. n/a maher ordinance
Details
Permit
201406259404
Permit issued
Jun 25, 2014
Final sign-off
Jul 7, 2014

4th floor - add 9 upright sprinklers, wrap 1-1/4 pipe under 16 concrete beams. ref pa #2014.0407.2584. n/a maher ordinance

Open the permit page

$4,635
Jun 23, 2014Completed
final sign-off Oct 2014
360 03rd StSkyline Construction4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required
Details
Permit
201406239056
Permit issued
Jul 9, 2014
Final sign-off
Oct 21, 2014

4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required

Open the permit page

$5,000
Jun 20, 2014Completed
final sign-off Jun 2015
360 03rd StTurner Construction Co5th floor - revision to pa #2013.12.13.4124 electrical only - expanding the area of work. n/a maher ordinance # 155.13
Details
Permit
201406208955
Permit issued
Jun 30, 2014
Final sign-off
Jun 5, 2015

5th floor - revision to pa #2013.12.13.4124 electrical only - expanding the area of work. n/a maher ordinance # 155.13

Open the permit page

Jun 11, 2014Never finaled
issued Feb 2015, no final
360 03rd Stchange of use. ground floor. existing office space of 2824 sq ft to change to retail space. tenants not selected yet. (n) retail will be 2787 sq ft. remain vancancy under ab-017. maher ord n/a.
Details
Permit
201406118133
Permit issued
Feb 19, 2015

change of use. ground floor. existing office space of 2824 sq ft to change to retail space. tenants not selected yet. (n) retail will be 2787 sq ft. remain vancancy under ab-017. maher ord n/a.

Open the permit page

Jun 4, 2014Completed
final sign-off Jul 2015
370 03rd StSkyline Constructionnew guardrail at roof. n/a to ordinance #155-13
Details
Permit
201406047445
Permit issued
Jul 30, 2014
Final sign-off
Jul 31, 2015

new guardrail at roof. n/a to ordinance #155-13

Open the permit page

$250,000
May 29, 2014Completed
final sign-off Jun 2014
360 03rd StPyro-Comm Systems, Inc.phase 2- new fire alarm devices for tenant build out to include: 1 powder supply, 1 monitor module, 13 speaker/strobes and 1 strobe. ref appl # 201404072484. maher n/a.
Details
Permit
201405297016
Permit issued
May 30, 2014
Final sign-off
Jun 30, 2014

phase 2- new fire alarm devices for tenant build out to include: 1 powder supply, 1 monitor module, 13 speaker/strobes and 1 strobe. ref appl # 201404072484. maher n/a.

Open the permit page

$5,000
May 28, 2014Completed
final sign-off Aug 2014
360 03rd StPrincipal Builders Inc.structural work to reinforce floor with grinders and concrete overlay on 3rd floor t.i. ref app#201402249182 for t.i. work. n/a for the maher ordinance #155-13
Details
Permit
201405286887
Permit issued
May 30, 2014
Final sign-off
Aug 19, 2014

structural work to reinforce floor with grinders and concrete overlay on 3rd floor t.i. ref app#201402249182 for t.i. work. n/a for the maher ordinance #155-13

Open the permit page

$35,000
Apr 23, 2014Completed
final sign-off Jun 2014
360 03rd St4th floor fire sprinkler permit - relcoate 14 pendents, 14 uprights & add 18 pendent & 3 uprights. ref t.i. #2014.0407.2584. compliance with ordinance #155-13 not required
Details
Permit
201404233955
Permit issued
Apr 23, 2014
Final sign-off
Jun 18, 2014

4th floor fire sprinkler permit - relcoate 14 pendents, 14 uprights & add 18 pendent & 3 uprights. ref t.i. #2014.0407.2584. compliance with ordinance #155-13 not required

Open the permit page

$25,186
Apr 10, 2014Completed
final sign-off Apr 2014
360 03rd StPyro-Comm Systems, Inc.new fire alarm devices for new tenant buildout to include 1 power supply 2 monitor module, 2 dual monitor modules, 6 relay modules, 5 voltage relays, 1 smoke detector, 15 speaker/strobes, 4 strobes. maher not required.
Details
Permit
201404102936
Permit issued
Apr 14, 2014
Final sign-off
Apr 28, 2014

new fire alarm devices for new tenant buildout to include 1 power supply 2 monitor module, 2 dual monitor modules, 6 relay modules, 5 voltage relays, 1 smoke detector, 15 speaker/strobes, 4 strobes. maher not required.

Open the permit page

$10,500
Apr 8, 2014Completed
final sign-off May 2014
360 03rd StPyro-Comm Systems, Inc.6th floor (square trade) - new fire alarm devices for tenant build-out to include (1) duct dectector (2) fsp 851 smoke detectors (2) speaker / strobes. ref pa# 201403251618. compliance with ordinance #155-13 not required
Details
Permit
201404082697
Permit issued
Apr 8, 2014
Final sign-off
May 12, 2014

6th floor (square trade) - new fire alarm devices for tenant build-out to include (1) duct dectector (2) fsp 851 smoke detectors (2) speaker / strobes. ref pa# 201403251618. compliance with ordinance #155-13 not required

Open the permit page

$4,000
Apr 8, 2014Completed
final sign-off Jul 2014
360 03rd StA M A Design Build Incorporatedthe scope of this submittal is limted to the deferred structural submittals of calculation for appl. 201312184460. n/a maher ordinance # 155-13
Details
Permit
201404082763
Permit issued
Apr 18, 2014
Final sign-off
Jul 22, 2014

the scope of this submittal is limted to the deferred structural submittals of calculation for appl. 201312184460. n/a maher ordinance # 155-13

Open the permit page

Apr 7, 2014Never finaled
issued Apr 2014, no final
360 03rd Stadd/relocate fire sprinklers for tenant improvement. add 105, relocate 32, total 137 heads. n/a ordinance #155-13.
Details
Permit
201404072609
Permit issued
Apr 7, 2014

add/relocate fire sprinklers for tenant improvement. add 105, relocate 32, total 137 heads. n/a ordinance #155-13.

Open the permit page

$70,000
Apr 7, 2014Completed
final sign-off Aug 2014
360 03rd StPrincipal Builders Inc.t.i. on partial 4th floor tenant space to demo doors and parttions and construct new doors, non -structural partitions, millwork, finishes, mechanical and electrical. fire sprinklers and life safty on seperate permit. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13
Details
Permit
201404072584
Permit issued
May 12, 2014
Final sign-off
Aug 19, 2014

t.i. on partial 4th floor tenant space to demo doors and parttions and construct new doors, non -structural partitions, millwork, finishes, mechanical and electrical. fire sprinklers and life safty on seperate permit. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13

Open the permit page

$200,000
Apr 4, 2014Completed
final sign-off Jul 2014
360 03rd StPyro-Comm Systems, Inc.4th floor fire alarm t.i.: new fire alarm devices for new tenant build out to include 3 speaker/strobes, 1 strobe. ref arch app# 2014-0318-0997. compliance w/ordinance #155-13 not required
Details
Permit
201404042503
Permit issued
Apr 4, 2014
Final sign-off
Jul 14, 2014

4th floor fire alarm t.i.: new fire alarm devices for new tenant build out to include 3 speaker/strobes, 1 strobe. ref arch app# 2014-0318-0997. compliance w/ordinance #155-13 not required

Open the permit page

$2,000
Apr 2, 2014Never finaled
issued Apr 2014, no final
360 03rd Ststreet space and mta parking
Details
Permit
M476387
Permit issued
Apr 2, 2014

street space and mta parking

Open the permit page

Mar 31, 2014Completed
final sign-off Apr 2014
360 03rd StGolden Gate Fire Protection Inc6th floor - relocate 5 upright sprinklers, add 1 upright. ref #201403251618. compliance w/ordinance #155-13 not required
Details
Permit
201403312067
Permit issued
Apr 1, 2014
Final sign-off
Apr 25, 2014

6th floor - relocate 5 upright sprinklers, add 1 upright. ref #201403251618. compliance w/ordinance #155-13 not required

Open the permit page

$2,575
Mar 25, 2014Completed
final sign-off May 2014
360 03rd StSkyline Construction6th floor:renovation to 6th floor to create new separately demised tenant suite to include non-rated, non structural partitions and ceiling.mep under sep permit.n/a for the maher ordinance #155-13 and n/a for interim controls #428-13
Details
Permit
201403251618
Permit issued
Apr 7, 2014
Final sign-off
May 13, 2014

6th floor:renovation to 6th floor to create new separately demised tenant suite to include non-rated, non structural partitions and ceiling.mep under sep permit.n/a for the maher ordinance #155-13 and n/a for interim controls #428-13

Open the permit page

$192,000
Mar 25, 2014Expired or cancelled
cancelled Jan 2026
360 03rd StSkyline Construction6th floor: mechanical and electrical work for t.i. ref app#201403251618. n/a for the maher ordinance #155-13. and n/a for the interim #428-13
Details
Permit
201403251622

6th floor: mechanical and electrical work for t.i. ref app#201403251618. n/a for the maher ordinance #155-13. and n/a for the interim #428-13

Open the permit page

$15,000
Mar 20, 2014Completed
final sign-off Apr 2014
360 03rd StIntelligent Technologies & Services Inc10 new smoke detectors & 1 bell. compliance with ordinance #155-13 not required. prer-action detection system. 201312184460 ti / 201403130649 pre-action sys
Details
Permit
201403201203
Permit issued
Mar 20, 2014
Final sign-off
Apr 28, 2014

10 new smoke detectors & 1 bell. compliance with ordinance #155-13 not required. prer-action detection system. 201312184460 ti / 201403130649 pre-action sys

Open the permit page

$3,900
Mar 20, 2014Completed
final sign-off Jun 2014
360 03rd StPyro-Comm Systems, Inc.3rd floor phase 2 - new fire alarm devices for new tenant build-out to include: (1) power supply, (1) control module, (4) duct detectors, (32) speaker/strobes, (4) strobes. ref #2014.0224.9182. compliance with ordinance #155-13 not required
Details
Permit
201403201249
Permit issued
Mar 20, 2014
Final sign-off
Jun 30, 2014

3rd floor phase 2 - new fire alarm devices for new tenant build-out to include: (1) power supply, (1) control module, (4) duct detectors, (32) speaker/strobes, (4) strobes. ref #2014.0224.9182. compliance with ordinance #155-13 not required

Open the permit page

$13,000
Mar 18, 2014Completed
final sign-off Oct 2014
360 03rd StSkyline Constructioninterior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required
Details
Permit
201403180997
Permit issued
Mar 19, 2014
Final sign-off
Oct 21, 2014

interior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required

Open the permit page

$150,000
Mar 17, 2014Expired or cancelled
cancelled Jun 2016
370 03rd Stinstallation of new generator at the 1st floor. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201403170897

installation of new generator at the 1st floor. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$125,000
Mar 13, 2014Completed
final sign-off Apr 2014
360 03rd StAnderson, Rowe & Buckley, Inc.existing fire sprinkler sytem tenant improvements, 89 sprinklers 1-2 " total pac 3 pre-act system (pa #201312184460) 6th floor. compliance with ordinance #155-13 not required
Details
Permit
201403130649
Permit issued
Mar 13, 2014
Final sign-off
Apr 16, 2014

existing fire sprinkler sytem tenant improvements, 89 sprinklers 1-2 " total pac 3 pre-act system (pa #201312184460) 6th floor. compliance with ordinance #155-13 not required

Open the permit page

$44,500
Mar 13, 2014Completed
final sign-off Aug 2014
360 03rd StPrincipal Builders Inc.3rd floor mech title 24 to install new equipment on partial floor t.i. ref pa #2014.0224.9182. compliance with ordinance #155-13 not required
Details
Permit
201403130687
Permit issued
Mar 24, 2014
Final sign-off
Aug 19, 2014

3rd floor mech title 24 to install new equipment on partial floor t.i. ref pa #2014.0224.9182. compliance with ordinance #155-13 not required

Open the permit page

$540,000
Mar 13, 2014Never finaled
issued Mar 2014, no final
360 03rd StSouthland Industriesremove & replace (2) 50 ton air cooled chillers with (2) 80 ton air cooled chillers. provide new steel structure, provide roof screen. compliance with maher ordinance #155-13 not required, no disturbance of at least 50 cu yd of soil.
Details
Permit
201403130643
Permit issued
Mar 31, 2014

remove & replace (2) 50 ton air cooled chillers with (2) 80 ton air cooled chillers. provide new steel structure, provide roof screen. compliance with maher ordinance #155-13 not required, no disturbance of at least 50 cu yd of soil.

Open the permit page

$280,000
Mar 4, 2014Never finaled
issued Mar 2014, no final
360 03rd StPrincipal Builders Inc.to add new lighting on partial 3/f t.i. ref. to pa#201402249182 for t.i. reference. na ordinance #155-13
Details
Permit
201403049839
Permit issued
Mar 4, 2014

to add new lighting on partial 3/f t.i. ref. to pa#201402249182 for t.i. reference. na ordinance #155-13

Open the permit page

$600,000
Feb 25, 2014Completed
final sign-off Mar 2014
360 03rd Strelocate fire sprinkler heads per tenant improvement pa# 2014-0212-8409 (5 relocate).
Details
Permit
201402259288
Permit issued
Feb 25, 2014
Final sign-off
Mar 12, 2014

relocate fire sprinkler heads per tenant improvement pa# 2014-0212-8409 (5 relocate).

Open the permit page

$2,570
Feb 24, 2014Completed
final sign-off Aug 2014
360 03rd StPrincipal Builders Inc.3rd floor t.i. to demo partitions, doors, & millwork & construct new partitoins, doors, finishes & millwork. mep, life safety & fire sprinklers on separate permit. compliance with ordinance #155-13 not required
Details
Permit
201402249182
Permit issued
Mar 3, 2014
Final sign-off
Aug 19, 2014

3rd floor t.i. to demo partitions, doors, & millwork & construct new partitoins, doors, finishes & millwork. mep, life safety & fire sprinklers on separate permit. compliance with ordinance #155-13 not required

Open the permit page

$1,560,000
Feb 19, 2014Completed
final sign-off Feb 2014
360 03rd StGolden Gate Fire Protection Inc7th floor - relocate 81 pendent sprinklers , relocate 36 upright spirnklers. ref t.i. #2013.1212.4028. compliance with ordinance #155-13 not required.
Details
Permit
201402198792
Permit issued
Feb 19, 2014
Final sign-off
Feb 26, 2014

7th floor - relocate 81 pendent sprinklers , relocate 36 upright spirnklers. ref t.i. #2013.1212.4028. compliance with ordinance #155-13 not required.

Open the permit page

$64,395
Feb 12, 2014Completed
final sign-off Aug 2014
360 03rd StPrincipal Builders Inc.3rd floor: t.i. for extg tenant space to demo and add new non-structural partitioning doors and finishes. mep, life safety, sprinklers on separate permits. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13.
Details
Permit
201402128409
Permit issued
Feb 12, 2014
Final sign-off
Aug 19, 2014

3rd floor: t.i. for extg tenant space to demo and add new non-structural partitioning doors and finishes. mep, life safety, sprinklers on separate permits. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13.

Open the permit page

$60,000
Feb 6, 2014Never finaled
issued Feb 2014, no final
360 03rd StSc Builders, Inc4/f- revision to pa#201303061642 adding electrical & lighting in scope.
Details
Permit
201402067922
Permit issued
Feb 7, 2014

4/f- revision to pa#201303061642 adding electrical & lighting in scope.

Open the permit page

$5,000
Jan 27, 2014Completed
final sign-off Oct 2014
360 03rd StPyro-Comm Systems, Inc.new fire alarm devices for a new tenant build-out. (1) remote power supply, (1) control module, (7) smoke/duct detectors, (28) speaker/strobes, (4) strobes, (2) door holders. t.i. pa#2013-1212-4028. compliance with ordinance no. 155-13 not required. excavation <50 cy. yd.
Details
Permit
201401277134
Permit issued
Jan 27, 2014
Final sign-off
Oct 14, 2014

new fire alarm devices for a new tenant build-out. (1) remote power supply, (1) control module, (7) smoke/duct detectors, (28) speaker/strobes, (4) strobes, (2) door holders. t.i. pa#2013-1212-4028. compliance with ordinance no. 155-13 not required. excavation <50 cy. yd.

Open the permit page

$15,000
Dec 27, 2013Completed
final sign-off Oct 2014
360 03rd StSkyline Constructionmechanical and electrical worl on the 7th fl to include new transfer fan, duct work relocation of thermostat and lighting to include new lighting, 2 new fsds.compliance with ord no 155-13 not required
Details
Permit
201312275124
Permit issued
Jan 22, 2014
Final sign-off
Oct 17, 2014

mechanical and electrical worl on the 7th fl to include new transfer fan, duct work relocation of thermostat and lighting to include new lighting, 2 new fsds.compliance with ord no 155-13 not required

Open the permit page

$200,000
Dec 18, 2013Completed
final sign-off Jul 2014
360 03rd StA M A Design Build Incorporated6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required.
Details
Permit
201312184460
Permit issued
Feb 14, 2014
Final sign-off
Jul 22, 2014

6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required.

Open the permit page

$1,078,859
Dec 13, 2013Completed
final sign-off Jun 2015
360 03rd StTurner Construction Co, Principal Builders Inc.5th floor:title 24 lighting at extg tenant suite to replace lighting fixtures in elevator lobby and reception area. no new arch work.
Details
Permit
201312134124
Permit issued
Dec 13, 2013
Final sign-off
Jun 5, 2015

5th floor:title 24 lighting at extg tenant suite to replace lighting fixtures in elevator lobby and reception area. no new arch work.

Open the permit page

$25,000
Dec 12, 2013Completed
final sign-off Oct 2014
360 03rd StSkyline Constructionconstruction of non-structural partitions, doors, frames hardware, millwork, drywall and acoustical ceiling, grid/tile and finishes. mechanical, electrical, plumbing, fire sprinkler and life safety is a deferred submittal.
Details
Permit
201312124028
Permit issued
Dec 27, 2013
Final sign-off
Oct 17, 2014

construction of non-structural partitions, doors, frames hardware, millwork, drywall and acoustical ceiling, grid/tile and finishes. mechanical, electrical, plumbing, fire sprinkler and life safety is a deferred submittal.

Open the permit page

$3,000,000
Nov 6, 2013Never finaled
issued Dec 2013, no final
360 03rd StSc Builders, Inc4th floor-t.i includes removal & replacement of suite entry doors. all new or revised hvac, electrical, plumbing & life safety work will be submitted for permit separately. building if fully sprinklered
Details
Permit
201311061227
Permit issued
Dec 2, 2013

4th floor-t.i includes removal & replacement of suite entry doors. all new or revised hvac, electrical, plumbing & life safety work will be submitted for permit separately. building if fully sprinklered

Open the permit page

$7,000
Oct 2, 2013Completed
final sign-off Oct 2013
360 03rd StSouthland Industriestemporary cooling for one day media event on 3rd floor.
Details
Permit
201310028234
Permit issued
Oct 4, 2013
Final sign-off
Oct 15, 2013

temporary cooling for one day media event on 3rd floor.

Open the permit page

$3,000
Sep 3, 2013Completed
final sign-off Oct 2013
360 03rd StPyro-Comm Systems, Inc.as built revisions to 201306129301. fire alarm, 5/f
Details
Permit
201309035814
Permit issued
Sep 3, 2013
Final sign-off
Oct 9, 2013

as built revisions to 201306129301. fire alarm, 5/f

Open the permit page

Sep 3, 2013Never finaled
issued Sep 2013, no final
360 03rd StPyro-Comm Systems, Inc.revision to as built drawings 201302120060 fire alarm. add 1 sd, 2 ss, 1 cr. jjc
Details
Permit
201309035816
Permit issued
Sep 3, 2013

revision to as built drawings 201302120060 fire alarm. add 1 sd, 2 ss, 1 cr. jjc

Open the permit page

Aug 28, 2013Completed
final sign-off Oct 2014
360 03rd StSkyline Construction6/f - mechanical & electrical for t.i.
Details
Permit
201308285461
Permit issued
Aug 29, 2013
Final sign-off
Oct 17, 2014

6/f - mechanical & electrical for t.i.

Open the permit page

$3,000
Aug 22, 2013Expired or cancelled
cancelled Jan 2026
370 03rd Stadd new parapet ar roof, galvanized steel structure with ipe cladding
Details
Permit
201308224979

add new parapet ar roof, galvanized steel structure with ipe cladding

Open the permit page

$200,000
Aug 14, 2013Never finaled
issued Sep 2013, no final
360 03rd StSkyline Constructionmechanical and electrical for tenant improvement on the 2nd floor. ref arch pa#201306250449
Details
Permit
201308144278
Permit issued
Sep 24, 2013

mechanical and electrical for tenant improvement on the 2nd floor. ref arch pa#201306250449

Open the permit page

$225,000
Aug 6, 2013Completed
final sign-off Oct 2013
360 03rd StPyro-Comm Systems, Inc.add new fire alarm system to new tenant improvement. 2 duct smoke detectors 3 ceiling strobes, 26 ceiling speaker strobes
Details
Permit
201308063618
Permit issued
Aug 6, 2013
Final sign-off
Oct 7, 2013

add new fire alarm system to new tenant improvement. 2 duct smoke detectors 3 ceiling strobes, 26 ceiling speaker strobes

Open the permit page

$8,000
Aug 6, 2013Completed
final sign-off Oct 2013
360 03rd StPyro-Comm Systems, Inc.add new fire alarm devices to new corridor and elevator lobby. 1 smoke detector, 4 speaker/strobes, 4 door hold opens
Details
Permit
201308063617
Permit issued
Aug 6, 2013
Final sign-off
Oct 15, 2013

add new fire alarm devices to new corridor and elevator lobby. 1 smoke detector, 4 speaker/strobes, 4 door hold opens

Open the permit page

$5,000
Jul 17, 2013Never finaled
issued Jul 2013, no final
360 03rd StTrue North Signs & Graphic Services5 evacuation signs on 5th floor.
Details
Permit
201307172042
Permit issued
Jul 17, 2013

5 evacuation signs on 5th floor.

Open the permit page

$2,625
Jul 9, 2013Completed
final sign-off Mar 2014
360 03rd StGolden Gate Fire Protection Inc7th floor - add 75 pendent sprinkler heads, add 35 upright sprinkler heads. t.i. #2013.06.20.0098
Details
Permit
201307091392
Permit issued
Jul 9, 2013
Final sign-off
Mar 27, 2014

7th floor - add 75 pendent sprinkler heads, add 35 upright sprinkler heads. t.i. #2013.06.20.0098

Open the permit page

$56,650
Jun 28, 2013Completed
final sign-off Oct 2013
370 03rd Stinstallation of temporary sunshade at roof deck.structural approved under pa# 201305096580
Details
Permit
201306280733
Permit issued
Jul 12, 2013
Final sign-off
Oct 4, 2013

installation of temporary sunshade at roof deck.structural approved under pa# 201305096580

Open the permit page

$25,000
Jun 26, 2013Completed
final sign-off Jul 2013
360 03rd StPribuss Engineering Inc5th floor: fire sprinkler t.i add 262 fire sprinklers. relcate 29. ref pa# 201305025984.
Details
Permit
201306260506
Permit issued
Jun 26, 2013
Final sign-off
Jul 22, 2013

5th floor: fire sprinkler t.i add 262 fire sprinklers. relcate 29. ref pa# 201305025984.

Open the permit page

$176,515
Jun 20, 2013Completed
final sign-off Oct 2013
360 03rd StSkyline Constructionselective (ti) demo of partitons, ceilings, and finishes. new partitions, restrooms' upgrades. mep and life safety under separate permit
Details
Permit
201306200096
Permit issued
Jun 21, 2013
Final sign-off
Oct 2, 2013

selective (ti) demo of partitons, ceilings, and finishes. new partitions, restrooms' upgrades. mep and life safety under separate permit

Open the permit page

$25,000
Jun 20, 2013Never finaled
issued Jun 2013, no final
360 03rd StSkyline Constructionpartial floor improvement to include selective demolition, new partitions, restrooms' upgrades. mep and life safety under separate permit
Details
Permit
201306200098
Permit issued
Jun 21, 2013

partial floor improvement to include selective demolition, new partitions, restrooms' upgrades. mep and life safety under separate permit

Open the permit page

$50,000
Jun 12, 2013Completed
final sign-off Oct 2013
360 03rd StPyro-Comm Systems, Inc.install new fire alarm devices in new tenant build out on the 5th fl. 6 smoke detectors, 7 duct detectors, 15 strobes, 60 speaker/strobes. t.i ref pa# 201305025984
Details
Permit
201306129301
Permit issued
Jun 25, 2013
Final sign-off
Oct 7, 2013

install new fire alarm devices in new tenant build out on the 5th fl. 6 smoke detectors, 7 duct detectors, 15 strobes, 60 speaker/strobes. t.i ref pa# 201305025984

Open the permit page

$12,000
May 30, 2013Never finaled
issued Jun 2013, no final
360 03rd StSkyline Construction7th floor:partial floor common space improvement on multi-tenant floor to include selective demolition and new partitions, doors and finishes. mep, life safty and fire sprinkler under seperate permit.
Details
Permit
201305308163
Permit issued
Jun 20, 2013

7th floor:partial floor common space improvement on multi-tenant floor to include selective demolition and new partitions, doors and finishes. mep, life safty and fire sprinkler under seperate permit.

Open the permit page

$120,000
May 20, 2013Completed
final sign-off Jun 2013
360 03rd StPribuss Engineering Incground floor fire sprinkler t.i. - relcoate 5 sprinkler heads, add 6 sprinkler heads, relocate & c.o. 2 sprinkelr heads total 13 heads. ref pa #2013.03.20.2628
Details
Permit
201305207323
Permit issued
May 20, 2013
Final sign-off
Jun 26, 2013

ground floor fire sprinkler t.i. - relcoate 5 sprinkler heads, add 6 sprinkler heads, relocate & c.o. 2 sprinkelr heads total 13 heads. ref pa #2013.03.20.2628

Open the permit page

$6,690
May 9, 2013Completed
final sign-off Aug 2013
360 03rd StPyro-Comm Systems, Inc.1st floor:add new fire alarm devices to 1st floor. tenant buildout kilroy management suite. 1 duct detector, 3 speaker/strobes, 1 strobe. t.i. app#201303202628
Details
Permit
201305096533
Permit issued
May 9, 2013
Final sign-off
Aug 12, 2013

1st floor:add new fire alarm devices to 1st floor. tenant buildout kilroy management suite. 1 duct detector, 3 speaker/strobes, 1 strobe. t.i. app#201303202628

Open the permit page

$5,000
May 9, 2013Completed
final sign-off Oct 2013
370 03rd StTruebeck Constructionadd new temporary sun shade structure, 6 vertical poles with vertical fabric sun shades at existing roof deck. new support structural steel at 7th floor. fire alarm under sep. permit
Details
Permit
201305096580
Permit issued
May 22, 2013
Final sign-off
Oct 4, 2013

add new temporary sun shade structure, 6 vertical poles with vertical fabric sun shades at existing roof deck. new support structural steel at 7th floor. fire alarm under sep. permit

Open the permit page

$35,000
May 2, 2013Completed
final sign-off Sep 2013
360 03rd StPrincipal Builders Inc.5th floor-full floor tenant improvement-selective demo, add new non load bearing partitions, doors & finishes with full m.e.p. life safety & sprinklers on seperate permit
Details
Permit
201305025984
Permit issued
Jun 19, 2013
Final sign-off
Sep 27, 2013

5th floor-full floor tenant improvement-selective demo, add new non load bearing partitions, doors & finishes with full m.e.p. life safety & sprinklers on seperate permit

Open the permit page

$3,928,689
Apr 23, 2013Completed
final sign-off Jan 2014
360 03rd StPyro-Comm Systems, Inc.install new fire alarm device in elevator lobby and new corridor on the 4th fl. 2 speaker/strobe, 1 strobe, 3 smoke detectors. t.i pa# 201303051484
Details
Permit
201304235262
Permit issued
Apr 24, 2013
Final sign-off
Jan 2, 2014

install new fire alarm device in elevator lobby and new corridor on the 4th fl. 2 speaker/strobe, 1 strobe, 3 smoke detectors. t.i pa# 201303051484

Open the permit page

$5,000
Mar 27, 2013Never finaled
issued Mar 2013, no final
360 03rd St1st floor-fire sprinkler permit-relocate 1 pendent
Details
Permit
201303273173
Permit issued
Mar 27, 2013

1st floor-fire sprinkler permit-relocate 1 pendent

Open the permit page

$2,000
Mar 25, 2013Never finaled
issued Mar 2013, no final
360 03rd StAcco Engineered Systems Inc. Dba Acco En6th floor - revisoin to pa #2013.01.08.7454 - added non-infringement statement for life safety system.
Details
Permit
201303252944
Permit issued
Mar 25, 2013

6th floor - revisoin to pa #2013.01.08.7454 - added non-infringement statement for life safety system.

Open the permit page

Mar 21, 2013Completed
final sign-off Apr 2013
360 03rd StAyoob & Peery Plumbing Co Inc4th floor add & relocate fire sprinkler heads per t.i-add 7 & relocate 11.
Details
Permit
201303212691
Permit issued
Mar 21, 2013
Final sign-off
Apr 15, 2013

4th floor add & relocate fire sprinkler heads per t.i-add 7 & relocate 11.

Open the permit page

$9,252
Mar 20, 2013Completed
final sign-off Jan 2014
360 03rd StTruebeck Construction1st floor management suite: t.i. for vacant office space on a portion of the ground floor. non rated, non structural walls, new finishes, new lighting. new mechanical and new ceiling.
Details
Permit
201303202628
Permit issued
May 15, 2013
Final sign-off
Jan 9, 2014

1st floor management suite: t.i. for vacant office space on a portion of the ground floor. non rated, non structural walls, new finishes, new lighting. new mechanical and new ceiling.

Open the permit page

$95,000
Mar 20, 2013Completed
final sign-off Mar 2013
370 03rd StPribuss Engineering Incground fl. fire sprinkler ti . 14 sprinkler heads
Details
Permit
201303202589
Permit issued
Mar 20, 2013
Final sign-off
Mar 29, 2013

ground fl. fire sprinkler ti . 14 sprinkler heads

Open the permit page

$7,205
Mar 19, 2013Completed
final sign-off Jul 2013
370 03rd StTruebeck Constructionpermit revision to app 2012.0719.5274: add sffd 95 question supplemental questionaire for design and installation of outdoor emergency diesel generator w/integral 800 gallon tank.
Details
Permit
201303192536
Permit issued
Mar 20, 2013
Final sign-off
Jul 22, 2013

permit revision to app 2012.0719.5274: add sffd 95 question supplemental questionaire for design and installation of outdoor emergency diesel generator w/integral 800 gallon tank.

Open the permit page

Mar 19, 2013Completed
final sign-off May 2013
370 03rd StPyro-Comm Systems, Inc.1st floor-add 2 weather rpoof speaker/strobes to new showers. ti pa# 2012-1024-2754
Details
Permit
201303192485
Permit issued
Mar 19, 2013
Final sign-off
May 30, 2013

1st floor-add 2 weather rpoof speaker/strobes to new showers. ti pa# 2012-1024-2754

Open the permit page

$4,000
Mar 19, 2013Completed
final sign-off Apr 2013
370 03rd StTruebeck Constructionrevision to pa# 2012-1024-2754-add smoke control non infringement statement & smoke control sequence of operations to plans
Details
Permit
201303192472
Permit issued
Mar 27, 2013
Final sign-off
Apr 23, 2013

revision to pa# 2012-1024-2754-add smoke control non infringement statement & smoke control sequence of operations to plans

Open the permit page

Mar 6, 2013Completed
final sign-off Mar 2014
360 03rd St4th floor-partial floor common space improvement on multi-tenant floor including selective demolition, new partitions, doors, finishes. deferred submittals-m.e.p, fire sprinklers & life safety
Details
Permit
201303061642
Permit issued
Mar 22, 2013
Final sign-off
Mar 10, 2014

4th floor-partial floor common space improvement on multi-tenant floor including selective demolition, new partitions, doors, finishes. deferred submittals-m.e.p, fire sprinklers & life safety

Open the permit page

$50,000
Mar 5, 2013Completed
final sign-off Jun 2013
360 03rd StSc Builders, Inc4th floor: electrical, revision to 201301309122.clarification of t.i. room outlets. room is not an ab-060 t.i. room. arch. drawings are 201301097554
Details
Permit
201303051484
Permit issued
Mar 22, 2013
Final sign-off
Jun 18, 2013

4th floor: electrical, revision to 201301309122.clarification of t.i. room outlets. room is not an ab-060 t.i. room. arch. drawings are 201301097554

Open the permit page

Feb 28, 2013Completed
final sign-off Jul 2013
370 03rd StPyro-Comm Systems, Inc.roof level-add 3 new weather proof speaker/strobes, 2 speaker strobe, 2 smoke detectors, 3 in duct smokes to roof top terrace. ti pa# 2012-0917-9869
Details
Permit
201302281165
Permit issued
Feb 28, 2013
Final sign-off
Jul 22, 2013

roof level-add 3 new weather proof speaker/strobes, 2 speaker strobe, 2 smoke detectors, 3 in duct smokes to roof top terrace. ti pa# 2012-0917-9869

Open the permit page

$6,000
Feb 26, 2013Completed
final sign-off Apr 2013
370 03rd StPyro-Comm Systems, Inc.as built revisions to pa# 201301037124. added non infringement statement to drawings for the smoke control system.
Details
Permit
201302260910
Permit issued
Apr 2, 2013
Final sign-off
Apr 15, 2013

as built revisions to pa# 201301037124. added non infringement statement to drawings for the smoke control system.

Open the permit page

Feb 26, 2013Never finaled
issued Apr 2013, no final
360 03rd StPyro-Comm Systems, Inc.as built revisions to pa#2013-01-15-8048
Details
Permit
201302260912
Permit issued
Apr 12, 2013

as built revisions to pa#2013-01-15-8048

Open the permit page

$600
Feb 21, 2013Completed
final sign-off Apr 2013
360 03rd StAyoob & Peery Plumbing Co Inc4/f- add and relocate sprinkler heads per tenant improvements. 122 adds, 26 relocates. ref. pa #2013-0109-7554.
Details
Permit
201302210679
Permit issued
Feb 22, 2013
Final sign-off
Apr 15, 2013

4/f- add and relocate sprinkler heads per tenant improvements. 122 adds, 26 relocates. ref. pa #2013-0109-7554.

Open the permit page

$76,000
Feb 21, 2013Completed
final sign-off Aug 2014
370 03rd StPyro-Comm Systems, Inc.install (n) smoke control panel & relay & monitor modules to provide manual control of the (e) fans & dampers including 2 (n) stairwell fans. the smoke control panel is addressed 360 3rd st. this is the correct address.
Details
Permit
201302210661
Permit issued
Apr 19, 2013
Final sign-off
Aug 22, 2014

install (n) smoke control panel & relay & monitor modules to provide manual control of the (e) fans & dampers including 2 (n) stairwell fans. the smoke control panel is addressed 360 3rd st. this is the correct address.

Open the permit page

$25,000
Feb 20, 2013Never finaled
issued Feb 2013, no final
360 03rd StPyro-Comm Systems, Inc.4th fl: add new speaker/strobes throughout common open office area, conference room, break rooms. new smoke add to server room & relay to shut down fans. duct smoke/strobes added to new fsd, door hold opens added to reception door. 22 speaker/strobes, 11 strobes, 2 smokes, idd/ ref app 201301097554
Details
Permit
201302200554
Permit issued
Feb 21, 2013

4th fl: add new speaker/strobes throughout common open office area, conference room, break rooms. new smoke add to server room & relay to shut down fans. duct smoke/strobes added to new fsd, door hold opens added to reception door. 22 speaker/strobes, 11 strobes, 2 smokes, idd/ ref app 201301097554

Open the permit page

$10,000
Feb 13, 2013Expired or cancelled
cancelled Jan 2026
360 03rd StSkyline Construction3rd floor:revision to mep permit app#201301087454 sto install new vav box and fsd for elevator lobby and lighting. ref mep 20120108745 and arch 201212055512. smoke detector installation for fsd under separate fire alarm appl.
Details
Permit
201302130138

3rd floor:revision to mep permit app#201301087454 sto install new vav box and fsd for elevator lobby and lighting. ref mep 20120108745 and arch 201212055512. smoke detector installation for fsd under separate fire alarm appl.

Open the permit page

Feb 13, 2013Completed
final sign-off Sep 2015
360 03rd StTrue North Signs & Graphic Servicesevacuation sign (plaques) on 1st,4th & 6th floors
Details
Permit
201302130174
Permit issued
Feb 13, 2013
Final sign-off
Sep 10, 2015

evacuation sign (plaques) on 1st,4th & 6th floors

Open the permit page

$7,500
Feb 12, 2013Completed
final sign-off Oct 2013
360 03rd StPyro-Comm Systems, Inc./f lobby: add 3 new speaker/strobes to lobby and corridor area. new door hold opens and relay for control added to lobby doors. app#201212186415
Details
Permit
201302120060
Permit issued
Feb 12, 2013
Final sign-off
Oct 18, 2013

/f lobby: add 3 new speaker/strobes to lobby and corridor area. new door hold opens and relay for control added to lobby doors. app#201212186415

Open the permit page

$5,000
Feb 12, 2013Completed
final sign-off Mar 2013
360 03rd StGolden Gate Fire Protection Incfire sprinkler system upgrade; relocate 6 upright sprinklers on the 6th fl corridor & lobby. relocate 2 pendents. ti pa#2013-01-30-9088
Details
Permit
201302120045
Permit issued
Feb 12, 2013
Final sign-off
Mar 27, 2013

fire sprinkler system upgrade; relocate 6 upright sprinklers on the 6th fl corridor & lobby. relocate 2 pendents. ti pa#2013-01-30-9088

Open the permit page

$4,120
Feb 4, 2013Completed
final sign-off Aug 2014
370 03rd StTruebeck Constructionrefer to pa# 2012-0917-9869/r1-roof deck. m.e.p & landscape for new roof deck
Details
Permit
201302049441
Permit issued
Feb 8, 2013
Final sign-off
Aug 22, 2014

refer to pa# 2012-0917-9869/r1-roof deck. m.e.p & landscape for new roof deck

Open the permit page

Feb 1, 2013Completed
final sign-off Apr 2013
370 03rd StRudolph Commercial Interiors Inc, Rciremove reception desk, install non bearing partition & door to create private office, add electrical outlet, path of travel permit #201208217912.
Details
Permit
201302019284
Permit issued
Feb 13, 2013
Final sign-off
Apr 19, 2013

remove reception desk, install non bearing partition & door to create private office, add electrical outlet, path of travel permit #201208217912.

Open the permit page

$12,000
Feb 1, 2013Completed
final sign-off Mar 2013
370 03rd StSuperior Automatic Sprinkler3rd - 7th floors install (n) branchline restraints (n) end of branchline restraints. also in pump room. bldg. permit # 201207195274
Details
Permit
201302019279
Permit issued
Feb 1, 2013
Final sign-off
Mar 26, 2013

3rd - 7th floors install (n) branchline restraints (n) end of branchline restraints. also in pump room. bldg. permit # 201207195274

Open the permit page

$10,000
Jan 30, 2013Completed
final sign-off Aug 2013
360 03rd StSc Builders, Inc4th floor:meps for arch. per app#201301097554
Details
Permit
201301309122
Permit issued
Feb 8, 2013
Final sign-off
Aug 5, 2013

4th floor:meps for arch. per app#201301097554

Open the permit page

$875,000
Jan 30, 2013Completed
final sign-off Oct 2014
360 03rd StSkyline Constructionrevision to pa#2012-12-18-6415 to extend elevator lobby by reference to pa#2012-12-18-6415
Details
Permit
201301309088
Permit issued
Feb 5, 2013
Final sign-off
Oct 17, 2014

revision to pa#2012-12-18-6415 to extend elevator lobby by reference to pa#2012-12-18-6415

Open the permit page

Jan 25, 2013Completed
final sign-off Feb 2013
360 03rd StGolden Gate Fire Protection Inc6th floor-fire sprinkler system upgrade, relocate 37 pendent sprinklers-relocate 18 upright heads & add 21 uprights. add 68 pendent sprinklers
Details
Permit
201301258788
Permit issued
Jan 25, 2013
Final sign-off
Feb 14, 2013

6th floor-fire sprinkler system upgrade, relocate 37 pendent sprinklers-relocate 18 upright heads & add 21 uprights. add 68 pendent sprinklers

Open the permit page

$74,160
Jan 17, 2013Completed
final sign-off Apr 2013
360 03rd StAnderson, Rowe & Buckley, Inc.sprinkler & standpipe system. remove 3 sprinklers, add 4 sprinklers, relocate one roof hydrant.
Details
Permit
201301178216
Permit issued
Jan 18, 2013
Final sign-off
Apr 24, 2013

sprinkler & standpipe system. remove 3 sprinklers, add 4 sprinklers, relocate one roof hydrant.

Open the permit page

$2,000
Jan 15, 2013Completed
final sign-off Apr 2013
360 03rd StPyro-Comm Systems, Inc.6th floor - install new speaker & strobe 35 in open office area, conference room & break room. (7 new strobe) (1 sd & power supply) t.i. pa #2012.12.05.5512.
Details
Permit
201301158048
Permit issued
Jan 17, 2013
Final sign-off
Apr 26, 2013

6th floor - install new speaker & strobe 35 in open office area, conference room & break room. (7 new strobe) (1 sd & power supply) t.i. pa #2012.12.05.5512.

Open the permit page

$7,000
Jan 9, 2013Completed
final sign-off Jun 2013
360 03rd StSc Builders, Inc4th floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered
Details
Permit
201301097554
Permit issued
Jan 18, 2013
Final sign-off
Jun 18, 2013

4th floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered

Open the permit page

$875,000
Jan 8, 2013Never finaled
issued Feb 2013, no final
360 03rd StSkyline Construction6th floor-t.i-new medium pressure loop, installation of new low air distribution, 5 new fire/smoke dampers, new water source heat pumps, new hot water supply & condensor. ti pa# 2012-1205-5512
Details
Permit
201301087454
Permit issued
Feb 14, 2013

6th floor-t.i-new medium pressure loop, installation of new low air distribution, 5 new fire/smoke dampers, new water source heat pumps, new hot water supply & condensor. ti pa# 2012-1205-5512

Open the permit page

$850,000
Jan 3, 2013Completed
final sign-off Apr 2013
370 03rd StPyro-Comm Systems, Inc.add new speak/strobe to conference room, break room & open office areas. add new smoke & duct detectors to new fsd's. bldg pa# 201210242754
Details
Permit
201301037124
Permit issued
Jan 3, 2013
Final sign-off
Apr 23, 2013

add new speak/strobe to conference room, break room & open office areas. add new smoke & duct detectors to new fsd's. bldg pa# 201210242754

Open the permit page

$7,000
Dec 27, 2012Completed
final sign-off Jan 2013
370 03rd StPribuss Engineering Incground floor:fire sprinkler t.i./add 62 heads.
Details
Permit
201212276887
Permit issued
Dec 27, 2012
Final sign-off
Jan 15, 2013

ground floor:fire sprinkler t.i./add 62 heads.

Open the permit page

$31,900
Dec 18, 2012Completed
final sign-off Oct 2014
360 03rd StSkyline Construction6th floor:partial floor common space improvement on multi tenant floor selective demo and new non lod bearing partitions.mep and life safety under seperate permit.
Details
Permit
201212186415
Permit issued
Dec 26, 2012
Final sign-off
Oct 17, 2014

6th floor:partial floor common space improvement on multi tenant floor selective demo and new non lod bearing partitions.mep and life safety under seperate permit.

Open the permit page

$35,000
Dec 12, 2012Completed
final sign-off Oct 2013
370 03rd StTruebeck Constructionadd new elevator "over-run" to (e) penthouse roof.
Details
Permit
201212126075
Permit issued
Apr 2, 2013
Final sign-off
Oct 24, 2013

add new elevator "over-run" to (e) penthouse roof.

Open the permit page

$50,000
Dec 5, 2012Completed
final sign-off Oct 2013
360 03rd StSkyline Constructiontenant improvement on the 6th floor to create open office, conference rooms and break area. mep, fire sprinkler, life safety under seperate permit.
Details
Permit
201212055512
Permit issued
Dec 17, 2012
Final sign-off
Oct 2, 2013

tenant improvement on the 6th floor to create open office, conference rooms and break area. mep, fire sprinkler, life safety under seperate permit.

Open the permit page

$2,200,000
Nov 29, 2012Completed
final sign-off Jun 2013
370 03rd StTruebeck Constructionground floor, revision to pa#2012-0703-4041. construction of new wall floors & ceiling elements in two (2) new shower rooms on ground fl including new mech, elect, & plumb.
Details
Permit
201211295132
Permit issued
Jan 10, 2013
Final sign-off
Jun 5, 2013

ground floor, revision to pa#2012-0703-4041. construction of new wall floors & ceiling elements in two (2) new shower rooms on ground fl including new mech, elect, & plumb.

Open the permit page

$110,000
Oct 24, 2012Completed
final sign-off Apr 2013
370 03rd StTruebeck Constructionrenovation of the ground floor; construction of non-structural partitions, ceiling, light fixtures, doors, side lights, plumbing. no change in occupancy or use. fire alarm & sprinkler under separate permit.
Details
Permit
201210242754
Permit issued
Nov 6, 2012
Final sign-off
Apr 23, 2013

renovation of the ground floor; construction of non-structural partitions, ceiling, light fixtures, doors, side lights, plumbing. no change in occupancy or use. fire alarm & sprinkler under separate permit.

Open the permit page

$523,277
Oct 22, 2012Expired or cancelled
expired Aug 2014
370 03rd StSouthland Industriesinstall temporary ducting at 3rd floor shell space for comfort cooling at one day basketball media day.
Details
Permit
201210222582
Permit issued
Oct 22, 2012

install temporary ducting at 3rd floor shell space for comfort cooling at one day basketball media day.

Open the permit page

$15,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Pyro-Comm Systems, Inc. (43), Skyline Construction (25), Gci, Inc (13), Principal Builders Inc. (12), A M A Design Build Incorporated (8), Golden Gate Fire Protection Inc (8), Sc Builders, Inc (8), Southland Industries (8), Truebeck Construction (8), Ayoob & Peery Plumbing Co Inc (7), Anderson, Rowe & Buckley, Inc. (5), Intelligent Technologies & Services Inc (5), True North Signs & Graphic Services (5), Pribuss Engineering Inc (4), Xl Construction, Corporation (4), Bcci Construction Company (3), Peacock Construction (2), Pioneer Fire Inc. (2), Turner Construction Co (2), Acco Engineered Systems Inc. Dba Acco En, Allied Heating & Air Conditioning, C B F Inc, Eco Fire Sprinklers Inc, Ferrari Color, Hp Build, M C S Construction Services, Paramount Sign Contractors, Rudolph Commercial Interiors Inc, Rci, Sabah International Incorporated, Superior Automatic Sprinkler
Architects
John Mickow (4), Douglass Zucker (3), Eric Ibsen (3), John C. Workley (3), Joseph A. Remling (3), Teresa K Emery (3), Alan Johansen, Andrew Rob Levine, Clement Soga, Daniel Huntsman, David Louis Swartz, John Thiele, Melissa Pesci, Peter Noone, Rene Calara, Seth Hanley, Stephen R. Gustafson, Tyson Goderey
Engineers
Alexander Joseph Pacheco (3), Elisabeth M Allen (3), Erin Alex (3), Joseph Fay (3), Justin Schultz (3), Arthur Metzler (2), Craig Ristow (2), Jesus B Cabellon Jr (2), Kevin T. O'keefe (2), Alexander F. Graebe, Anthony Bruno, Carl Milsum, David Louis Swartz, Henry Holbrook Hyde Iii, Kevin Carter, Lori Lee, Mehdi Shahmirza, Pablo Orozco, Rudizon Alegre, Timothy Mcpartland, Tony H Shakouri, Wayne Wong
Authorized agents
Alex Morin
Designers
Pyro-Comm Systems, Inc.
Pmt consultant/expediters
Prasad More

Find contractors for work like this