Feb 2019 to Sep 2024

19 permits since 2000 (architect on 19 permits): 15 completed, 2 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Skyline Construction (10), Bcci Construction Company (3), Hp Build (3), Dpr Construction, Dpr Construction Inc, Hathaway Dinwiddie Co.
Engineers
Kevin T. O'keefe (2), Dennis Cheung, Jesus Cabellon Jr., Joseph Fay, Lars P. Mortensen, Lori Lee, Mark Koenigs, Meng Hsiu Chen
Authorized agents
Alex Morin

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 25, 2024Completed
final sign-off Jun 2025
100 Pine StHathaway Dinwiddie Co.30/f: interior tenant improvement.
Details
Permit
202409251615
Permit issued
Dec 10, 2024
Final sign-off
Jun 23, 2025

30/f: interior tenant improvement.

Open the permit page

$1,600,000
Feb 8, 2021Never finaled
issued Apr 2021, no final
360 03rd StBcci Construction Company5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a.
Details
Permit
202102084263
Permit issued
Apr 29, 2021

5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a.

Open the permit page

$50,000
Oct 22, 2020Completed
final sign-off Jan 2022
360 03rd StBcci Construction Company5/f: t.i. of tenant space (minus (2) equipment rooms). n/a.
Details
Permit
202010227136
Permit issued
Feb 3, 2021
Final sign-off
Jan 12, 2022

5/f: t.i. of tenant space (minus (2) equipment rooms). n/a.

Open the permit page

$500,000
Oct 20, 2020Never finaled
issued Dec 2020, no final
360 03rd StBcci Construction Company5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.
Details
Permit
202010206988
Permit issued
Dec 1, 2020

5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.

Open the permit page

$1,000,000
Sep 29, 2020Completed
final sign-off Apr 2022
405 Howard StSkyline Construction4/f,5/f,6/f: signs for emergency evacuation lan, directional sign, two-way communication system sign. ref pa201908209311, 201909252631 & 201910316117. maher n/a.
Details
Permit
202009295358
Permit issued
Oct 29, 2020
Final sign-off
Apr 12, 2022

4/f,5/f,6/f: signs for emergency evacuation lan, directional sign, two-way communication system sign. ref pa201908209311, 201909252631 & 201910316117. maher n/a.

Open the permit page

$3,000
Aug 11, 2020Completed
final sign-off May 2021
405 Howard StSkyline Construction1st fl - install new turnstiles elevator lobbies
Details
Permit
202008111504
Permit issued
Dec 10, 2020
Final sign-off
May 11, 2021

1st fl - install new turnstiles elevator lobbies

Open the permit page

$250,000
Mar 2, 2020Expired or cancelled
cancelled Jan 2026
405 Howard StSkyline Constructionexisting 6th fl terrance alterations. see pa #201908209311 for full ada compliance.
Details
Permit
202003025859

existing 6th fl terrance alterations. see pa #201908209311 for full ada compliance.

Open the permit page

$75,000
Feb 10, 2020Completed
final sign-off May 2021
405 Howard StSkyline Constructioninstall a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a **
Details
Permit
202002103966
Permit issued
Aug 7, 2020
Final sign-off
May 17, 2021

install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a **

Open the permit page

Dec 3, 2019Completed
final sign-off Jan 2020
143 02nd StHp Buildrevision to 201908290216 to correct reflected ceiling plan
Details
Permit
201912038505
Permit issued
Dec 6, 2019
Final sign-off
Jan 16, 2020

revision to 201908290216 to correct reflected ceiling plan

Open the permit page

Nov 21, 2019Completed
final sign-off Jan 2020
143 02nd StHp Build2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal list
Details
Permit
201911217831
Permit issued
Dec 6, 2019
Final sign-off
Jan 16, 2020

2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal list

Open the permit page

Nov 14, 2019Completed
final sign-off Jun 2020
345 California StDpr Construction15th and 20th floor: electrical av upgrades to 7 locations. paint and carpet upgrades in noted locations. restrooms to have ada partition upgrades. ada stall on 2oth floor. to recieve upgraded toilet.
Details
Permit
201911147259
Permit issued
Dec 18, 2019
Final sign-off
Jun 24, 2020

15th and 20th floor: electrical av upgrades to 7 locations. paint and carpet upgrades in noted locations. restrooms to have ada partition upgrades. ada stall on 2oth floor. to recieve upgraded toilet.

Open the permit page

$280,000
Oct 21, 2019Completed
final sign-off May 2021
405 Howard StSkyline Construction5/f: amend 201909252631; add ceiling demolition and sprinkler plan:201910215109. remain vacancy per ab-17. maher n/a.
Details
Permit
201910215070
Permit issued
Oct 22, 2019
Final sign-off
May 17, 2021

5/f: amend 201909252631; add ceiling demolition and sprinkler plan:201910215109. remain vacancy per ab-17. maher n/a.

Open the permit page

$50,000
Oct 21, 2019Completed
final sign-off May 2021
405 Howard StSkyline Construction4/f: amend permit 201910073751 to add ceiling demolition and sprinkler plan 201910215113. remaining vacany per ab-17. maher n/a.
Details
Permit
201910215069
Permit issued
Oct 22, 2019
Final sign-off
May 17, 2021

4/f: amend permit 201910073751 to add ceiling demolition and sprinkler plan 201910215113. remaining vacany per ab-17. maher n/a.

Open the permit page

$50,000
Oct 7, 2019Completed
final sign-off May 2021
405 Howard StSkyline Construction4th floor entire demo only
Details
Permit
201910073751
Permit issued
Oct 7, 2019
Final sign-off
May 17, 2021

4th floor entire demo only

Open the permit page

$40,000
Oct 2, 2019Completed
final sign-off May 2021
405 Howard StSkyline Constructionref pa# 2019-0925-2631. demo only for 5th floor.
Details
Permit
201910023281
Permit issued
Oct 2, 2019
Final sign-off
May 17, 2021

ref pa# 2019-0925-2631. demo only for 5th floor.

Open the permit page

Sep 25, 2019Completed
final sign-off Feb 2022
405 Howard StSkyline Construction5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a**
Details
Permit
201909252631
Permit issued
Jan 29, 2020
Final sign-off
Feb 3, 2022

5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a**

Open the permit page

$6,355,000
Aug 29, 2019Completed
final sign-off Jan 2020
143 02nd StHp Build2/f - interior alteration of tenant space. minor remodel of 2500 sf ofc the 3560 sf (mep/fire/life safety under sep permit if needed). operable partition under separate permit.
Details
Permit
201908290216
Permit issued
Sep 13, 2019
Final sign-off
Jan 16, 2020

2/f - interior alteration of tenant space. minor remodel of 2500 sf ofc the 3560 sf (mep/fire/life safety under sep permit if needed). operable partition under separate permit.

Open the permit page

$600,000
Aug 20, 2019Completed
final sign-off Feb 2022
405 Howard StSkyline Construction6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise evac plan for chg to a partial evac req on sep base bldg permit. maher n/a.
Details
Permit
201908209311
Permit issued
Jan 21, 2020
Final sign-off
Feb 3, 2022

6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise evac plan for chg to a partial evac req on sep base bldg permit. maher n/a.

Open the permit page

$6,355,000
Feb 22, 2019Expired or cancelled
cancelled Jan 2026
156 02nd StDpr Construction Inc1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgrade
Details
Permit
201902223626

1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgrade

Open the permit page

$1,437,541