Block 3737, lot 030
405 Howard St
- City’s use
- Commercial Office
- Built
- 2003
- Stories
- 10
- Building
- 614,740 sq ft
- Lot
- 75,659 sq ft
- Zoning
- C3OSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 405 Howard St | Vencon Construction | revision to permit # 202606233763 to correct address suite number. the suite number was shown incorrectly as 104. the correct address is 405 howard st. suite 140. the tenant and permit application is q specialty coffee.Details
revision to permit # 202606233763 to correct address suite number. the suite number was shown incorrectly as 104. the correct address is 405 howard st. suite 140. the tenant and permit application is q specialty coffee. | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 405 Howard St | demo only permit of interior space on the 7th floorDetails
demo only permit of interior space on the 7th floor | $60,000 | |
| Aug 26, 2026 | In progress issued Oct 2026 | 405 Howard St | Bear Flag Ironworks Llc | installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access.Details
installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access. | $375,000 |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 405 Howard St | ste 130: interior ti, convert an existing restaurant space into a goop kitchen concept.Details
ste 130: interior ti, convert an existing restaurant space into a goop kitchen concept. | $1,300,000 | |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - mech work ti ref pa 202607064544Details
3rd fl - mech work ti ref pa 202607064544 | $56,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - electrical work ti ref pa 202607064544Details
3rd fl - electrical work ti ref pa 202607064544 | $199,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 405 Howard St | Novo Construction Inc | 3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred.Details
3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred. | $1,714,000 |
| Jun 23, 2026 | In progress issued Sep 2026 | 405 Howard St | Vencon Construction | ste 104 - ti for coffee shop (limited restaurant) new counter service and new kitchen equipment.Details
ste 104 - ti for coffee shop (limited restaurant) new counter service and new kitchen equipment. | $30,000 |
| Mar 23, 2026 | In progress issued Apr 2026 | 405 Howard St | Skyline Construction | rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246)Details
rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246) | |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 405 Howard St | Ayoob & Peery Plumbing Co Inc | 3rd floor: relocate 2 fire sprinkler per ti job #25-689. ref #202509256075Details
3rd floor: relocate 2 fire sprinkler per ti job #25-689. ref #202509256075 | $1,242 |
| Oct 21, 2025 | In progress issued Oct 2025 | 405 Howard St | Everon Llc | 3rd floor. 3rd demo- remove 3 wall mount speaker and 1 duct detector for heat pump 3-1 that is being decommisioned. ref#: 202509256075.Details
3rd floor. 3rd demo- remove 3 wall mount speaker and 1 duct detector for heat pump 3-1 that is being decommisioned. ref#: 202509256075. | $3,000 |
| Sep 25, 2025 | Completed final sign-off Nov 2025 | 405 Howard St | Bcci Construction Company | 3rd flr. demolition of 7 doors and 3 non structural demising walls at the 3rd floor. no ceiling demolition. floor is currently unoccupied. no change to mep or sprinklers and no fire, life and safety.Details
3rd flr. demolition of 7 doors and 3 non structural demising walls at the 3rd floor. no ceiling demolition. floor is currently unoccupied. no change to mep or sprinklers and no fire, life and safety. | $75,000 |
| Aug 1, 2025 | Completed final sign-off Aug 2025 | 405 Howard St | Everon Llc | fire alarm as built drawing for pa#: 202505227129. identify duct dectator location on plans for fsd per sffd inspector.Details
fire alarm as built drawing for pa#: 202505227129. identify duct dectator location on plans for fsd per sffd inspector. | |
| Jun 25, 2025 | In progress issued Jun 2025 | 405 Howard St | Skyline Construction | fire only permit evacuation sign for previously approved application for 8,9, and 10th floor. t.i. work pa# 2024-1212-6728, 2024-1212-6726,and 2025-0103-7683Details
fire only permit evacuation sign for previously approved application for 8,9, and 10th floor. t.i. work pa# 2024-1212-6728, 2024-1212-6726,and 2025-0103-7683 | $2,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 1st fl ref pa #2025-0507-5995 (e) fire sprinkler system - tenant improvements relocate 18 and add 1 fire spinklerDetails
1st fl ref pa #2025-0507-5995 (e) fire sprinkler system - tenant improvements relocate 18 and add 1 fire spinkler | $5,100 |
| Jun 2, 2025 | Completed final sign-off Jun 2025 | 405 Howard St | Everon Llc | fire alarm ti on parking level 1 - break room. replace (e) speaker strobe with new. add (1) smoke detector, (1) control relay for fsd, and (2) control relays for fan shutdown. ref pa# 202412187041Details
fire alarm ti on parking level 1 - break room. replace (e) speaker strobe with new. add (1) smoke detector, (1) control relay for fsd, and (2) control relays for fan shutdown. ref pa# 202412187041 | $3,500 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 405 Howard St | Everon Llc | repplace 2 speaker strobes with new and add 1 new spaeker only ref pa# 2025-0507-5995Details
repplace 2 speaker strobes with new and add 1 new spaeker only ref pa# 2025-0507-5995 | $3,200 |
| May 16, 2025 | Completed final sign-off Jun 2025 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | demo plan turn 11 sprinklers uprightDetails
demo plan turn 11 sprinklers upright | $2,500 |
| May 14, 2025 | In progress issued May 2025 | 405 Howard St | Skyline Construction | 8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction onlyDetails
8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction only | |
| May 7, 2025 | In progress issued May 2025 | 405 Howard St | Skyline Construction | 1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting & controlsDetails
1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting & controls | $251,766 |
| Apr 24, 2025 | In progress issued May 2025 | 405 Howard St | Skyline Construction | 7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.Details
7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring. | $172,000 |
| Apr 10, 2025 | Completed final sign-off Aug 2025 | 405 Howard St | Everon Llc | fire alarm t.i. on 8th floor: replace 26 speaker strobes, add 18 spk. strobe, 80 spk. & replace 4 at 2 control relay for fan shutdown, 2 control relay for card access, 1 control relay for music shutdown, 2 duct det. with relays, & six 2 way call stations. ref pa#202412126728.Details
fire alarm t.i. on 8th floor: replace 26 speaker strobes, add 18 spk. strobe, 80 spk. & replace 4 at 2 control relay for fan shutdown, 2 control relay for card access, 1 control relay for music shutdown, 2 duct det. with relays, & six 2 way call stations. ref pa#202412126728. | $70,000 |
| Mar 26, 2025 | Completed final sign-off Sep 2025 | 405 Howard St | Everon Llc | 9th fl - fire alarm ti on replace 26 speaker strobes; add 19 speaker, 93 speaker; replace 7 speaker; 2 control replays for uft shutdown; 1 control relay for card access; 1 power supply w/2 50 watts amp & (3) 2-way call stations. ref pa 202412126726Details
9th fl - fire alarm ti on replace 26 speaker strobes; add 19 speaker, 93 speaker; replace 7 speaker; 2 control replays for uft shutdown; 1 control relay for card access; 1 power supply w/2 50 watts amp & (3) 2-way call stations. ref pa 202412126726 | $60,000 |
| Mar 26, 2025 | In progress issued Mar 2025 | 405 Howard St | Everon Llc | 10th fl - fire alarm ti replace 24 speaker strobe w/new; add 18 speaker strobes, 1 speaker, 6 strobes, 1 control relay for uft shutdown; 1 for card access; 1 power supply w/2 50 watts amp & (4) 2-way call stations. ref pa 202501037683Details
10th fl - fire alarm ti replace 24 speaker strobe w/new; add 18 speaker strobes, 1 speaker, 6 strobes, 1 control relay for uft shutdown; 1 for card access; 1 power supply w/2 50 watts amp & (4) 2-way call stations. ref pa 202501037683 | $30,000 |
| Mar 24, 2025 | Completed final sign-off Jul 2025 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 8th fl - existing fire sprinkler system ti ref pa 202412126728Details
8th fl - existing fire sprinkler system ti ref pa 202412126728 | $32,900 |
| Feb 21, 2025 | Completed final sign-off May 2025 | 405 Howard St | Bcci Construction Company | 1st/f mail rm- convert portion of e) empty office space into cold shell for new mail rm, included demo of walls, doors, flooring, systems, & associated electrical systems. const to include capping of e) hvacm new full height partitions, & n) interior clerestory windows, interior build out of mail rmDetails
1st/f mail rm- convert portion of e) empty office space into cold shell for new mail rm, included demo of walls, doors, flooring, systems, & associated electrical systems. const to include capping of e) hvacm new full height partitions, & n) interior clerestory windows, interior build out of mail rm | $355,000 |
| Feb 19, 2025 | In progress issued Apr 2025 | 405 Howard St | Skyline Construction | 8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal.Details
8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal. | $200,000 |
| Feb 14, 2025 | Completed final sign-off Aug 2025 | 405 Howard St | Skyline Construction | 10/fl-ref 202501037683- mep for office ti to include ductwork , lighting, power and signalDetails
10/fl-ref 202501037683- mep for office ti to include ductwork , lighting, power and signal | $200,000 |
| Feb 11, 2025 | In progress issued Feb 2025 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | ti existing fire sprinkler system add 1 & relocate 123 sprinklers. ref pa 202501037683Details
ti existing fire sprinkler system add 1 & relocate 123 sprinklers. ref pa 202501037683 | $31,000 |
| Feb 11, 2025 | Completed final sign-off Jul 2025 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 9th fl - ti existing fire sprinkler system add 5 & relocate 118 sprinklers. ref pa 202412126726Details
9th fl - ti existing fire sprinkler system add 5 & relocate 118 sprinklers. ref pa 202412126726 | $31,000 |
| Jan 17, 2025 | In progress issued Mar 2025 | 405 Howard St | Skyline Construction | mep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controlsDetails
mep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controls | $200,000 |
| Jan 3, 2025 | Completed final sign-off Aug 2025 | 405 Howard St | Skyline Construction | 10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permitDetails
10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permit | $852,000 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 405 Howard St | Bcci Construction Company | basement level 1: convert (e) storage room to (n) break room including relocating (e) lighting & furniture and provide new light fixtures and power receptacles. no plumbing fixturesDetails
basement level 1: convert (e) storage room to (n) break room including relocating (e) lighting & furniture and provide new light fixtures and power receptacles. no plumbing fixtures | $25,458 |
| Dec 12, 2024 | In progress issued Jan 2025 | 405 Howard St | Skyline Construction | 8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit.Details
8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit. | $1,704,000 |
| Dec 12, 2024 | In progress issued Jan 2025 | 405 Howard St | Skyline Construction | partial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferredDetails
partial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferred | $1,212,800 |
| Nov 20, 2024 | Completed final sign-off Jun 2025 | 405 Howard St | Bcci Construction Company | document building ground floor entrances, elevators, and parking path of travel to full compliance. includes (n) parking striping, ev charging stalls and exit signageDetails
document building ground floor entrances, elevators, and parking path of travel to full compliance. includes (n) parking striping, ev charging stalls and exit signage | $8,000 |
| Oct 22, 2024 | In progress issued Dec 2024 | 405 Howard St | Skyline Construction | 8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection contractor.Details
8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection contractor. | $170,000 |
| Sep 13, 2024 | In progress issued Sep 2024 | 405 Howard St | Everon Llc | 3/f: fire alarm ti- relocate 1 control relay to interfere w/ access control at new location.Details
3/f: fire alarm ti- relocate 1 control relay to interfere w/ access control at new location. | $800 |
| Oct 11, 2023 | Completed final sign-off Jan 2025 | 405 Howard St | Everon Llc | 3rd/f: fire alarm t.i. add 4 speaker strobes & relocate 2. ref to 202308234998Details
3rd/f: fire alarm t.i. add 4 speaker strobes & relocate 2. ref to 202308234998 | $2,500 |
| Oct 3, 2023 | Never finaled issued Oct 2023, no final | 405 Howard St | Golden Gate Fire Protection Inc | fire sprinkler t.i. relocate 3 pendents and 7 uprights on the 3rd fl. ref pa# 2023-0823-4998Details
fire sprinkler t.i. relocate 3 pendents and 7 uprights on the 3rd fl. ref pa# 2023-0823-4998 | $6,200 |
| Aug 23, 2023 | Completed final sign-off Feb 2025 | 405 Howard St | Sc Builders, Inc | 3/f: demising of existing tenant space, new partitions, doors, lighting and finishes, no change in occupancy, use or area. interior work onlyDetails
3/f: demising of existing tenant space, new partitions, doors, lighting and finishes, no change in occupancy, use or area. interior work only | $169,099 |
| Oct 19, 2022 | Completed final sign-off Oct 2022 | 405 Howard St | Golden Gate Fire Protection Inc | 2/f: as built, add (1) upright to soutsdie in storage (400), ref bpa#202204293272Details
2/f: as built, add (1) upright to soutsdie in storage (400), ref bpa#202204293272 | $1,000 |
| Sep 28, 2022 | Never finaled issued Sep 2022, no final | 405 Howard St | Everon Llc | rev to pa# 2022-0803-9845: update mode/make of notification appliances, update candela settling add 2 power supplies and updateDetails
rev to pa# 2022-0803-9845: update mode/make of notification appliances, update candela settling add 2 power supplies and update | $3,000 |
| Sep 22, 2022 | Completed final sign-off Oct 2022 | 405 Howard St | Maguire Inc Dba Lahue And Associates | 2/f: evacuation signs (7)Details
2/f: evacuation signs (7) | $2,957 |
| Aug 3, 2022 | Never finaled issued Sep 2022, no final | 405 Howard St | Everon Llc | 2/f: f/a t.i., add (76) spker/strobes, (60) speakers, (22) strobes, (2) power supplies, (2) smoke detectors, (5) duct detectors w/relays for tsd, (2) duct detectors for ahu w/relays, (1) duct detector for supply fan, (2) relays fro card reader interface, (2) relays for heat pump, (2) relays forDetails
2/f: f/a t.i., add (76) spker/strobes, (60) speakers, (22) strobes, (2) power supplies, (2) smoke detectors, (5) duct detectors w/relays for tsd, (2) duct detectors for ahu w/relays, (1) duct detector for supply fan, (2) relays fro card reader interface, (2) relays for heat pump, (2) relays for | $40,000 |
| Apr 29, 2022 | Completed final sign-off Oct 2022 | 405 Howard St | Golden Gate Fire Protection Inc | 2nd fl: fire sprinklers - relocate 284 pendent sprinklers & relocate 232 uprights. ref pa# 202201186188Details
2nd fl: fire sprinklers - relocate 284 pendent sprinklers & relocate 232 uprights. ref pa# 202201186188 | $99,250 |
| Apr 28, 2022 | Completed final sign-off Mar 2023 | 405 Howard St | Skyline Construction | 2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188.Details
2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188. | |
| Feb 3, 2022 | Completed final sign-off Jun 2022 | 405 Howard St | Sc Builders, Inc | 3/f: reference pa 202109138246: interior tenant improvement including ancourage of new non structural, pavilion elements to existing pt concrete slab.Details
3/f: reference pa 202109138246: interior tenant improvement including ancourage of new non structural, pavilion elements to existing pt concrete slab. | $10,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2022 | 405 Howard St | Skyline Construction | to obtain final inspection for work approved under pa 202003036071 (4th fl), 202002204964 (5 & 2020012929922. all work is completeDetails
to obtain final inspection for work approved under pa 202003036071 (4th fl), 202002204964 (5 & 2020012929922. all work is complete | |
| Jan 21, 2022 | Completed final sign-off Apr 2022 | 405 Howard St | Skyline Construction | to obtain final inspection for work approved under pa 202009295358. renew wxpired sign permit for 4th, 5th, 6th floor.Details
to obtain final inspection for work approved under pa 202009295358. renew wxpired sign permit for 4th, 5th, 6th floor. | |
| Jan 18, 2022 | Completed final sign-off Mar 2023 | 405 Howard St | Skyline Construction | tenant improvement of extg 2nd floor. all work is interior, no exterior or common areas. seperate permit for fire life safety and mep work.Details
tenant improvement of extg 2nd floor. all work is interior, no exterior or common areas. seperate permit for fire life safety and mep work. | $4,879,800 |
| Dec 30, 2021 | Expired or cancelled withdrawn May 2022 | 405 Howard St | g/f: demolition of existing wall partitions, furniture, lighting and fixtures. new partition walls, ceilings, furniture, fixtures, finishes and mep system.Details
g/f: demolition of existing wall partitions, furniture, lighting and fixtures. new partition walls, ceilings, furniture, fixtures, finishes and mep system. | $600,000 | |
| Dec 22, 2021 | Completed final sign-off Oct 2022 | 405 Howard St | Golden Gate Fire Protection Inc | fire sprinkler heads upright for demo pa# 202112214824.Details
fire sprinkler heads upright for demo pa# 202112214824. | $5,000 |
| Dec 21, 2021 | Never finaled issued Jan 2022, no final | 405 Howard St | Skyline Construction | demo of interior partitions and ceilings. ab-017 applies. no exterior work. sprinkler upright permit #202112224914.Details
demo of interior partitions and ceilings. ab-017 applies. no exterior work. sprinkler upright permit #202112224914. | $20,000 |
| Dec 8, 2021 | Completed final sign-off Jan 2022 | 405 Howard St | Everon Llc | fire alarm ti - add 21 speaker only on 4th fl; 24 speaker only on 5th fl & 20 speaker only on the 6th fl; ref pa 2019-1031-6117, 2019-0925-2631-2019-0820-9311Details
fire alarm ti - add 21 speaker only on 4th fl; 24 speaker only on 5th fl & 20 speaker only on the 6th fl; ref pa 2019-1031-6117, 2019-0925-2631-2019-0820-9311 | $32,500 |
| Dec 1, 2021 | Completed final sign-off Apr 2022 | 405 Howard St | Everon Llc | fire alarm t.i. on 3rd floor: add 2 speaker strobes,7 speakers, & relocate 2 speaker strobers. ref #202109138246Details
fire alarm t.i. on 3rd floor: add 2 speaker strobes,7 speakers, & relocate 2 speaker strobers. ref #202109138246 | $4,000 |
| Sep 13, 2021 | Completed final sign-off Jun 2022 | 405 Howard St | Sc Builders, Inc | 3rd fl: construction of (1) conference room. installation of furniture partitions, lighting, power and finishes. no change in occupancy or use.Details
3rd fl: construction of (1) conference room. installation of furniture partitions, lighting, power and finishes. no change in occupancy or use. | $959,900 |
| Jul 22, 2021 | Completed final sign-off Feb 2022 | 405 Howard St | Skyline Construction | structural detail revision to previously approved permit #202105251005 phone booth by eliminating detail #4 of frainery anchorage to raf.Details
structural detail revision to previously approved permit #202105251005 phone booth by eliminating detail #4 of frainery anchorage to raf. | |
| Jul 12, 2021 | Expired or cancelled cancelled Dec 2021 | 405 Howard St | Everon Llc | f/a t.i.: add wireless chime system-add (3) new facu for wireless system,12 repeaters,1 gateweay,21 chimes on 4/f;14 repeaters,1 gateway,24 chimes on 5/f;6 repeaters,1gateway,20 chimes on 6/f;3 est modules to monitor wireless sys & 3 relays from wireless sysem to est.Details
f/a t.i.: add wireless chime system-add (3) new facu for wireless system,12 repeaters,1 gateweay,21 chimes on 4/f;14 repeaters,1 gateway,24 chimes on 5/f;6 repeaters,1gateway,20 chimes on 6/f;3 est modules to monitor wireless sys & 3 relays from wireless sysem to est. | $40,000 |
| Jun 29, 2021 | Never finaled issued Jul 2021, no final | 405 Howard St | Skyline Construction | as-built plans for fire/smoke dampers location with matrix requested by sffd.revision to 4/5/6 floors under pa 202001292992, 202002204904, 202003036071. maher n/a.Details
as-built plans for fire/smoke dampers location with matrix requested by sffd.revision to 4/5/6 floors under pa 202001292992, 202002204904, 202003036071. maher n/a. | |
| Jun 14, 2021 | Completed final sign-off Feb 2022 | 405 Howard St | Skyline Construction | revision to pa# 201910316117; 201909252631;201908209311. location of magnetic lock hardware info. and access control doors.Details
revision to pa# 201910316117; 201909252631;201908209311. location of magnetic lock hardware info. and access control doors. | |
| Jun 8, 2021 | Completed final sign-off Mar 2022 | 405 Howard St | Skyline Construction | revision to previously approved permit #2020-0211-4190 occupant load from 131 to 97Details
revision to previously approved permit #2020-0211-4190 occupant load from 131 to 97 | |
| May 25, 2021 | Completed final sign-off Jan 2022 | 405 Howard St | Skyline Construction | rev to pa 201910316117 by adding two ballasy plates (1"x30" each) to each brooth to resist overturning.Details
rev to pa 201910316117 by adding two ballasy plates (1"x30" each) to each brooth to resist overturning. | $5,000 |
| May 19, 2021 | Completed final sign-off Feb 2022 | 405 Howard St | Gci, Inc | voluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane wall anchors.Details
voluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane wall anchors. | $94,000 |
| Apr 20, 2021 | Completed final sign-off Jul 2021 | 405 Howard St | Golden Gate Fire Protection Inc | fire sprinklers. relocate 3 pendent sprinklers and 2 uprights on the 1st floor. t.i. ref # 2019-1230-0993Details
fire sprinklers. relocate 3 pendent sprinklers and 2 uprights on the 1st floor. t.i. ref # 2019-1230-0993 | $2,500 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 405 Howard St | Sc Builders, Inc | 3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets.Details
3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets. | |
| Apr 15, 2021 | Completed final sign-off Jul 2021 | 405 Howard St | Everon Llc | fire alarm t.i. - 1st flr. add (5) speaker strobes, (5) duct detectors w/relays for fsd, & (1) duct detector for fcu w/relay. ref# 2019-1230-0993Details
fire alarm t.i. - 1st flr. add (5) speaker strobes, (5) duct detectors w/relays for fsd, & (1) duct detector for fcu w/relay. ref# 2019-1230-0993 | $7,000 |
| Mar 8, 2021 | Completed final sign-off Oct 2021 | 405 Howard St | Peacock Construction | install 1 new condensing unit. install 1 new fan coil unit. install low pressure duct. install 5 fire/smoke dampers. electrical- power, lighting & signal. ref pa# 201912300993.Details
install 1 new condensing unit. install 1 new fan coil unit. install low pressure duct. install 5 fire/smoke dampers. electrical- power, lighting & signal. ref pa# 201912300993. | |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 405 Howard St | Everon Llc | fire alarm t.i. - 3rd floor. add (4) speaker/strobes, (1) control relay for door release & (1) control relay for fans. add (3) 2-way call stations at elevator lobbies. ti ref # 2021-0415-867; 2-way comm backbone ref # 2020-0827-2814Details
fire alarm t.i. - 3rd floor. add (4) speaker/strobes, (1) control relay for door release & (1) control relay for fans. add (3) 2-way call stations at elevator lobbies. ti ref # 2021-0415-867; 2-way comm backbone ref # 2020-0827-2814 | $7,500 |
| Feb 18, 2021 | Completed final sign-off Mar 2021 | 405 Howard St | R L H Fire Protection Inc | fire sprinkler permit relocate 6 and add 4 sprinklers on the 3rd floor. ti # 2020-0926-5173Details
fire sprinkler permit relocate 6 and add 4 sprinklers on the 3rd floor. ti # 2020-0926-5173 | $4,000 |
| Jan 29, 2021 | Completed final sign-off Oct 2021 | 405 Howard St | Peacock Construction | suite 101-rev to pa201912300993 to replace the pot with newly approved pot under 202008111504, cvoersheet & da checklist. maher n/a.Details
suite 101-rev to pa201912300993 to replace the pot with newly approved pot under 202008111504, cvoersheet & da checklist. maher n/a. | |
| Jan 28, 2021 | Completed final sign-off Jan 2022 | 405 Howard St | Everon Llc | modify existing firefighter's fan control graphic to accomodate tenant improvement changes on floor 4, 5, & 6. reference smoke control report on sheet fa-44.Details
modify existing firefighter's fan control graphic to accomodate tenant improvement changes on floor 4, 5, & 6. reference smoke control report on sheet fa-44. | $5,000 |
| Sep 29, 2020 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | revision for dph review only in reference to approved bldg permit 201910316117, 201909252631 & 201908209311.Details
revision for dph review only in reference to approved bldg permit 201910316117, 201909252631 & 201908209311. | |
| Sep 29, 2020 | Completed final sign-off Apr 2022 | 405 Howard St | Skyline Construction | 4/f,5/f,6/f: signs for emergency evacuation lan, directional sign, two-way communication system sign. ref pa201908209311, 201909252631 & 201910316117. maher n/a.Details
4/f,5/f,6/f: signs for emergency evacuation lan, directional sign, two-way communication system sign. ref pa201908209311, 201909252631 & 201910316117. maher n/a. | $3,000 |
| Sep 28, 2020 | Never finaled issued Nov 2020, no final | 405 Howard St | Red Hawk Fire & Security Ca Llc | replace existing network cable for fire alarm system at basement level to meet 2 hr survivability. reference sheet fa-1b approved meeting minutesDetails
replace existing network cable for fire alarm system at basement level to meet 2 hr survivability. reference sheet fa-1b approved meeting minutes | $1,000 |
| Sep 26, 2020 | Completed final sign-off Jun 2021 | 405 Howard St | Sc Builders, Inc | 3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit.Details
3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit. | $383,125 |
| Sep 25, 2020 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | revision to service hub layout near exit stairs #1 & #3 on 4th, 5th, 6th floors previously approved under pa #2019-0820-9311, 2019-0925-2631, & 2019-1031-6117 requested by fire dept. reverify occupnat loadfor all assembly rooms on all 3 floors.Details
revision to service hub layout near exit stairs #1 & #3 on 4th, 5th, 6th floors previously approved under pa #2019-0820-9311, 2019-0925-2631, & 2019-1031-6117 requested by fire dept. reverify occupnat loadfor all assembly rooms on all 3 floors. | $80,000 |
| Sep 8, 2020 | Completed final sign-off Nov 2020 | 405 Howard St | Red Hawk Fire & Security Ca Llc | ref pa# 201908209311; 6th fl. fire alarm t.i. add 1 weather proof speaker strobeDetails
ref pa# 201908209311; 6th fl. fire alarm t.i. add 1 weather proof speaker strobe | $1,200 |
| Aug 28, 2020 | Completed final sign-off Nov 2021 | 405 Howard St | Red Hawk Fire & Security Ca Llc | modify existing fire alarm system evacuation matrix to partial evacuation. no reference drawing.Details
modify existing fire alarm system evacuation matrix to partial evacuation. no reference drawing. | $2,000 |
| Aug 27, 2020 | Completed final sign-off Sep 2021 | 405 Howard St | Red Hawk Fire & Security Ca Llc | provide building 2-way communication system head end equipment & riser backbone. scope include 1 command center, 1 sub master station, 2 push button door unlock stations w/ relay, 2 monitoring module for 2-way comm equiptment, 1 control relay.Details
provide building 2-way communication system head end equipment & riser backbone. scope include 1 command center, 1 sub master station, 2 push button door unlock stations w/ relay, 2 monitoring module for 2-way comm equiptment, 1 control relay. | $10,000 |
| Aug 11, 2020 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | 1st fl - install new turnstiles elevator lobbiesDetails
1st fl - install new turnstiles elevator lobbies | $250,000 |
| Jun 12, 2020 | Completed final sign-off Mar 2021 | 405 Howard St | Red Hawk Fire & Security Ca Llc | t.i. on 1st floor - add (6) control relay to interface with lobby turnstileDetails
t.i. on 1st floor - add (6) control relay to interface with lobby turnstile | $3,600 |
| May 11, 2020 | Completed final sign-off Feb 2022 | 405 Howard St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 5th floor - relocate e appliances as shown on plan. add (1) control relay for crac unit, (96) smoke detectors, (9) duct detectors, (22) monitoring modules for fsd status, (20) control relays for fsds, (3) control relay for uft, (64) ceiling speaker strobes. ref# 2019-0925-2631Details
fire alarm t.i. on 5th floor - relocate e appliances as shown on plan. add (1) control relay for crac unit, (96) smoke detectors, (9) duct detectors, (22) monitoring modules for fsd status, (20) control relays for fsds, (3) control relay for uft, (64) ceiling speaker strobes. ref# 2019-0925-2631 | $115,000 |
| May 11, 2020 | Completed final sign-off Feb 2022 | 405 Howard St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 4th floor - add (1) node to facu includes amps on 4th flr. add (1) power w/sync module, (35) ceiling speakers, (41) strobes, (21) wall speaker strobes, (51) ceiling speaker strobes, (1) weatherproof speaker strobes, (4) weatherproof ceiling speakers, ref# 2019-1031-6117Details
fire alarm t.i. on 4th floor - add (1) node to facu includes amps on 4th flr. add (1) power w/sync module, (35) ceiling speakers, (41) strobes, (21) wall speaker strobes, (51) ceiling speaker strobes, (1) weatherproof speaker strobes, (4) weatherproof ceiling speakers, ref# 2019-1031-6117 | $140,000 |
| May 8, 2020 | Completed final sign-off Feb 2022 | 405 Howard St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 6th floor - relocate e appliances as shown on plan. replace (1) existing power supply and add (1) new. add (2) ceiling speakers, (1) weatherproof speaker strobes, (24) ceiling strobes, (43) ceiling speaker strobes, (15) wall mount speaker strobes. ref# 2019-0820-9311Details
fire alarm t.i. on 6th floor - relocate e appliances as shown on plan. replace (1) existing power supply and add (1) new. add (2) ceiling speakers, (1) weatherproof speaker strobes, (24) ceiling strobes, (43) ceiling speaker strobes, (15) wall mount speaker strobes. ref# 2019-0820-9311 | $130,000 |
| Mar 3, 2020 | Expired or cancelled expired Feb 2022 | 405 Howard St | Skyline Construction | 4th fl - mechanical & electrical system for 4th fl office ti. fire alarm, fire sprinkler, fire life safety system under separate permit. ref pa #201910316117.Details
4th fl - mechanical & electrical system for 4th fl office ti. fire alarm, fire sprinkler, fire life safety system under separate permit. ref pa #201910316117. | |
| Mar 2, 2020 | Expired or cancelled cancelled Jan 2026 | 405 Howard St | Skyline Construction | existing 6th fl terrance alterations. see pa #201908209311 for full ada compliance.Details
existing 6th fl terrance alterations. see pa #201908209311 for full ada compliance. | $75,000 |
| Feb 20, 2020 | Expired or cancelled expired Feb 2022 | 405 Howard St | Skyline Construction | mechanical & electrical system for 5th fl office tenant improvement. fire alarm, fire sprinklers, & fire life safety system under separate permits. arch ti permit approved under #201909252631.Details
mechanical & electrical system for 5th fl office tenant improvement. fire alarm, fire sprinklers, & fire life safety system under separate permits. arch ti permit approved under #201909252631. | |
| Feb 11, 2020 | Completed final sign-off Mar 2022 | 405 Howard St | Skyline Construction | revision to 201908209311: renovation to e 6th fl roof terrace. maher not reqDetails
revision to 201908209311: renovation to e 6th fl roof terrace. maher not req | |
| Feb 10, 2020 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a **Details
install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a ** | |
| Feb 10, 2020 | Completed final sign-off Mar 2021 | 405 Howard St | R L H Fire Protection Inc | 4th fl - fire sprinkler permit. install 326 pendents, 189 uprights on 5 new hose valves. ref pa 2019-1010-4129Details
4th fl - fire sprinkler permit. install 326 pendents, 189 uprights on 5 new hose valves. ref pa 2019-1010-4129 | $300,000 |
| Feb 7, 2020 | Expired or cancelled cancelled Dec 2022 | 405 Howard St | Novo Construction Inc | addition of 13 room phone booths of (e) open office space. addition of (n) sprinklers and fire strobes tied to (e) systems. no mep work. **maher n/a**Details
addition of 13 room phone booths of (e) open office space. addition of (n) sprinklers and fire strobes tied to (e) systems. no mep work. **maher n/a** | $23,675 |
| Feb 6, 2020 | Expired or cancelled cancelled Jan 2026 | 405 Howard St | convert existing mdf/idf room 234 and crac room 233 to storage room 234 and storage rm 233 ordinary hazard. no mech, elec, plumbing, fireDetails
convert existing mdf/idf room 234 and crac room 233 to storage room 234 and storage rm 233 ordinary hazard. no mech, elec, plumbing, fire | $34,275 | |
| Feb 6, 2020 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | revision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft enclosure.Details
revision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft enclosure. | $100,000 |
| Jan 31, 2020 | Completed final sign-off Apr 2020 | 405 Howard St | R L H Fire Protection Inc | fire sprinkler permit. remove all existing pendent sprinklers and arm-over piping and replace with 294 upright sprinklers. ti pa #2019-0820-9311Details
fire sprinkler permit. remove all existing pendent sprinklers and arm-over piping and replace with 294 upright sprinklers. ti pa #2019-0820-9311 | $60,000 |
| Jan 29, 2020 | Expired or cancelled expired Feb 2022 | 405 Howard St | Skyline Construction | 6/f: mechanical & electrical system for 6th fl office ti. fire alarm, fire sprinkler & life safety under separate permit. ref pa 2019-0820-9311Details
6/f: mechanical & electrical system for 6th fl office ti. fire alarm, fire sprinkler & life safety under separate permit. ref pa 2019-0820-9311 | |
| Jan 29, 2020 | Completed final sign-off Mar 2021 | 405 Howard St | R L H Fire Protection Inc | 6/f: f/s only - install 284 pendents, 256 uprights and 5 new fire hose valves on the 6/f. ref t.i. pa#201908209311. maher n/a.Details
6/f: f/s only - install 284 pendents, 256 uprights and 5 new fire hose valves on the 6/f. ref t.i. pa#201908209311. maher n/a. | $95,000 |
| Jan 29, 2020 | Never finaled issued Feb 2020, no final | 405 Howard St | R L H Fire Protection Inc | 5/f: f/s only - install 326 pendents, 315uprights and 6 new fire hose valves on the 5/f. ref t.i. pa#201909252631. maher n/a.Details
5/f: f/s only - install 326 pendents, 315uprights and 6 new fire hose valves on the 5/f. ref t.i. pa#201909252631. maher n/a. | $99,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2021 | 405 Howard St | Peacock Construction | build out of office space with new stairs and lift. 2 offices structural work included. life safety, mech, plmg, & sprinkler system modifications under seperate permits.Details
build out of office space with new stairs and lift. 2 offices structural work included. life safety, mech, plmg, & sprinkler system modifications under seperate permits. | $315,000 |
| Oct 31, 2019 | Completed final sign-off Feb 2022 | 405 Howard St | Skyline Construction | 4th floor: interior improvement/alterations. mep, fire alarm, life safty, and fire sprinker system under seperate permit. modify existing tenant egress plan temporary during demo/const n/a for maherDetails
4th floor: interior improvement/alterations. mep, fire alarm, life safty, and fire sprinker system under seperate permit. modify existing tenant egress plan temporary during demo/const n/a for maher | $6,100,000 |
| Oct 21, 2019 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | 4/f: amend permit 201910073751 to add ceiling demolition and sprinkler plan 201910215113. remaining vacany per ab-17. maher n/a.Details
4/f: amend permit 201910073751 to add ceiling demolition and sprinkler plan 201910215113. remaining vacany per ab-17. maher n/a. | $50,000 |
| Oct 21, 2019 | Completed final sign-off May 2021 | 405 Howard St | R L H Fire Protection Inc | 4th floor: 313 upright sprinklers. ref app#201910073751Details
4th floor: 313 upright sprinklers. ref app#201910073751 | $66,043 |
| Oct 21, 2019 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | 5/f: amend 201909252631; add ceiling demolition and sprinkler plan:201910215109. remain vacancy per ab-17. maher n/a.Details
5/f: amend 201909252631; add ceiling demolition and sprinkler plan:201910215109. remain vacancy per ab-17. maher n/a. | $50,000 |
| Oct 21, 2019 | Completed final sign-off May 2021 | 405 Howard St | R L H Fire Protection Inc | 5th floor: 313 upright sprinklers. ref app#201909252631Details
5th floor: 313 upright sprinklers. ref app#201909252631 | $66,040 |
| Oct 17, 2019 | Completed final sign-off Feb 2020 | 405 Howard St | Novo Construction Inc | to establish a3 occupancy in e office space. reallocate existing square footage to accomodate a larger employee lounge ref 201507141406Details
to establish a3 occupancy in e office space. reallocate existing square footage to accomodate a larger employee lounge ref 201507141406 | |
| Oct 10, 2019 | Expired or cancelled withdrawn Feb 2020 | 405 Howard St | Skyline Construction | 4th floor: full gut & build out including boardrooms, breakrooms, idf, showers. ** maher: n/a **Details
4th floor: full gut & build out including boardrooms, breakrooms, idf, showers. ** maher: n/a ** | $6,355,000 |
| Oct 7, 2019 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | 4th floor entire demo onlyDetails
4th floor entire demo only | $40,000 |
| Oct 2, 2019 | Completed final sign-off May 2021 | 405 Howard St | Skyline Construction | ref pa# 2019-0925-2631. demo only for 5th floor.Details
ref pa# 2019-0925-2631. demo only for 5th floor. | |
| Sep 30, 2019 | Completed final sign-off Apr 2021 | 405 Howard St | Skyline Construction | interior demo on the 6th floor of 52,456 sf demo to include non load bearing walls furniture and finishes, ref 201908209311Details
interior demo on the 6th floor of 52,456 sf demo to include non load bearing walls furniture and finishes, ref 201908209311 | $40,000 |
| Sep 25, 2019 | Completed final sign-off Feb 2022 | 405 Howard St | Skyline Construction | 5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a**Details
5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a** | $6,355,000 |
| Aug 20, 2019 | Completed final sign-off Feb 2022 | 405 Howard St | Skyline Construction | 6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise evac plan for chg to a partial evac req on sep base bldg permit. maher n/a.Details
6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise evac plan for chg to a partial evac req on sep base bldg permit. maher n/a. | $6,355,000 |
| May 14, 2019 | Completed final sign-off Oct 2020 | 405 Howard St | Golden Gate Sign Company Inc. | install one illuminated single-faced wall sign "orrick/pwc" sign 5.Details
install one illuminated single-faced wall sign "orrick/pwc" sign 5. | $10,000 |
| May 14, 2019 | Completed final sign-off Sep 2020 | 405 Howard St | Golden Gate Sign Company Inc. | install one illuminated single-faced wall sign "pwc" sign 4a.Details
install one illuminated single-faced wall sign "pwc" sign 4a. | $10,000 |
| May 14, 2019 | Never finaled issued Jun 2019, no final | 405 Howard St | Golden Gate Sign Company Inc. | install one illuminated single-faced wall sign "orrick" sign 4b.Details
install one illuminated single-faced wall sign "orrick" sign 4b. | $10,000 |
| May 14, 2019 | Completed final sign-off Sep 2020 | 405 Howard St | Golden Gate Sign Company Inc. | install one non-illuminated single-faced wall sign "orrick/pwc" sign 3.Details
install one non-illuminated single-faced wall sign "orrick/pwc" sign 3. | $3,000 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 405 Howard St | Blackline Construction | #550:installing a wood facade of the front and side of a house onto the walls of the lobby of an office and installing turf carpet panels on the floor to create a theatrical set piece(temporary) for the complany.(open door) backyard furniture will also be present. interior decoration only.Details
#550:installing a wood facade of the front and side of a house onto the walls of the lobby of an office and installing turf carpet panels on the floor to create a theatrical set piece(temporary) for the complany.(open door) backyard furniture will also be present. interior decoration only. | $40,000 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 405 Howard St | street spaceDetails
street space | ||
| May 30, 2018 | Never finaled issued May 2018, no final | 405 Howard St | Ayoob & Peery Plumbing Co Inc | relocate and add fire sprinkler per ti 201801239286. 2 add on 4th flr, 1 relocate 4th flrDetails
relocate and add fire sprinkler per ti 201801239286. 2 add on 4th flr, 1 relocate 4th flr | $1,275 |
| May 21, 2018 | Completed final sign-off May 2018 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 1st floor: extg fire sprinkler system as build relocated 6 sprinklers. ref# 201803163877 and arch app#201712156655. n/a for maherDetails
1st floor: extg fire sprinkler system as build relocated 6 sprinklers. ref# 201803163877 and arch app#201712156655. n/a for maher | $3,000 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 405 Howard St | Red Hawk Fire & Security Ca Llc | parking level & 1st fl. fire alarm ti add 14 wall mount speaker strobes, 11 celiing speakers, 2 duct detectors for fan with 2 control relays for shutdown. ref pa 2017-1215-6655 and mech. 2018/01/31/0053. n/a for maher.Details
parking level & 1st fl. fire alarm ti add 14 wall mount speaker strobes, 11 celiing speakers, 2 duct detectors for fan with 2 control relays for shutdown. ref pa 2017-1215-6655 and mech. 2018/01/31/0053. n/a for maher. | $14,000 |
| Mar 20, 2018 | Completed final sign-off Apr 2018 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 2 new speaker/strobes. ref app#201712126222. n/a for maherDetails
2 new speaker/strobes. ref app#201712126222. n/a for maher | $5,000 |
| Mar 16, 2018 | Completed final sign-off Jun 2018 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti 26 relocated sprinklers, 15 added sprinklers. ref pa 2017-1215-6655Details
existing fire sprinkler system ti 26 relocated sprinklers, 15 added sprinklers. ref pa 2017-1215-6655 | $20,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 405 Howard St | Bcci Construction Company | 2nd flr - provide exit signage, panic hardware & assembly permit to clear fire violation notice maher naDetails
2nd flr - provide exit signage, panic hardware & assembly permit to clear fire violation notice maher na | $10,000 |
| Jan 31, 2018 | Never finaled issued Jan 2018, no final | 405 Howard St | Novo Construction Inc | revision to app#201712156655 to change the scope of work to mechanical air distibution only. n/a for maherDetails
revision to app#201712156655 to change the scope of work to mechanical air distibution only. n/a for maher | |
| Jan 23, 2018 | Completed final sign-off Nov 2018 | 405 Howard St | Bcci Construction Company | 4th flr #400 - mechanical & electrical work to support approved arch ti ref 201712126222 maher naDetails
4th flr #400 - mechanical & electrical work to support approved arch ti ref 201712126222 maher na | $78,000 |
| Dec 15, 2017 | Never finaled issued Jan 2018, no final | 405 Howard St | Novo Construction Inc | ti of (e) showroom space by converting (e) vacant showrm to new model unit gallery for the transbay block & residential development. new lobby/recept desk, bld & site model rooms. material library and model res living /kit/mast bath. remodel (e) bathrm w/2 new ofc/mtg and kitchenette at base lvl.Details
ti of (e) showroom space by converting (e) vacant showrm to new model unit gallery for the transbay block & residential development. new lobby/recept desk, bld & site model rooms. material library and model res living /kit/mast bath. remodel (e) bathrm w/2 new ofc/mtg and kitchenette at base lvl. | $235,000 |
| Dec 12, 2017 | Completed final sign-off Nov 2018 | 405 Howard St | Bcci Construction Company | 4th fl - minor interior ti -add 1 new office, drywall, doors, finishes. no mech or elec; n/a maherDetails
4th fl - minor interior ti -add 1 new office, drywall, doors, finishes. no mech or elec; n/a maher | $13,068 |
| Oct 11, 2017 | Completed final sign-off Feb 2018 | 405 Howard St | Peacock Construction | t.i. interior only for extg coffee shop. installation of new partitions, finishes, fixtures, furnitures, casework, millwork and equipments. n/a for maher.Details
t.i. interior only for extg coffee shop. installation of new partitions, finishes, fixtures, furnitures, casework, millwork and equipments. n/a for maher. | $140,000 |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 405 Howard St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 6th floor - add 2 control relay for ti equipment interface. ref pa 2016-0301-0885. maher naDetails
fire alarm ti on the 6th floor - add 2 control relay for ti equipment interface. ref pa 2016-0301-0885. maher na | $1,200 |
| Jun 28, 2017 | Completed final sign-off Feb 2018 | 405 Howard St | Gci, Inc | add ls device and signage ref 201511243507Details
add ls device and signage ref 201511243507 | |
| Mar 31, 2017 | Never finaled issued Mar 2017, no final | 235 01st St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Mar 14, 2017 | Completed final sign-off Mar 2017 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 3/f- fire alarm as built drawing for pa#201612215641. remove fsd's and associated control relays no longer required due to changes of floor smoke zone n/a ordinance #155-13Details
3/f- fire alarm as built drawing for pa#201612215641. remove fsd's and associated control relays no longer required due to changes of floor smoke zone n/a ordinance #155-13 | |
| Jan 17, 2017 | Completed final sign-off Aug 2017 | 405 Howard St | Maguire Inc Dba Lahue And Associates | 3rd floor - 10 evacuation signs.Details
3rd floor - 10 evacuation signs. | $4,060 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 405 Howard St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 3rd fl. add 8 speaker strobes, 1 ceiling strobe. ref 2016-0610-9611. maher ord 155-13 naDetails
fire alarm ti on 3rd fl. add 8 speaker strobes, 1 ceiling strobe. ref 2016-0610-9611. maher ord 155-13 na | $5,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 405 Howard St | Skyline Construction | ref permit # 201507141406, need to change occupancy of lounge from b to a3 on sheet a04cDetails
ref permit # 201507141406, need to change occupancy of lounge from b to a3 on sheet a04c | |
| Oct 3, 2016 | Completed final sign-off Oct 2016 | 405 Howard St | Ad Art Inc. | revision to permit 201512175329: one sign only and not 2 signs per building inspection comments; maher n/a (signs c&d)Details
revision to permit 201512175329: one sign only and not 2 signs per building inspection comments; maher n/a (signs c&d) | $5,000 |
| Sep 27, 2016 | Completed final sign-off Nov 2016 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 3rd floor fire sprinkler system tenant improvements - relocate 21 sprinklers, add 13 sprinklers. ref #2016-0610-9611 n/a maher ordinanceDetails
3rd floor fire sprinkler system tenant improvements - relocate 21 sprinklers, add 13 sprinklers. ref #2016-0610-9611 n/a maher ordinance | $11,000 |
| Sep 20, 2016 | Never finaled issued Sep 2016, no final | 405 Howard St | Red Hawk Fire & Security Ca Llc | 6th flr: fire alarm t.i., add one speaker strobe, ref. 201603010885; maher n/aDetails
6th flr: fire alarm t.i., add one speaker strobe, ref. 201603010885; maher n/a | $1,000 |
| Sep 20, 2016 | Completed final sign-off Oct 2016 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 1st flr, fire alarm t.i. add 3 speakers and one speaker strobe; ref. # 2016-0509-6904. n/a maher ord. 155-13Details
1st flr, fire alarm t.i. add 3 speakers and one speaker strobe; ref. # 2016-0509-6904. n/a maher ord. 155-13 | $2,000 |
| Aug 5, 2016 | Completed final sign-off Apr 2017 | 405 Howard St | Sc Builders, Inc | 3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previous multi zone occupancy. n/a ordinance #155-13Details
3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previous multi zone occupancy. n/a ordinance #155-13 | $90,000 |
| Jun 10, 2016 | Completed final sign-off Apr 2017 | 405 Howard St | Sc Builders, Inc | selective demolition & construction of non structural partitions, millwork, finishes, ceiling lighting, additional restrooms, mep. included in the submittal. fire sprinkler & life safety under separate permit. n/a ordinance #155-13Details
selective demolition & construction of non structural partitions, millwork, finishes, ceiling lighting, additional restrooms, mep. included in the submittal. fire sprinkler & life safety under separate permit. n/a ordinance #155-13 | $1,429,450 |
| May 9, 2016 | Never finaled issued Jul 2016, no final | 405 Howard St | Swinerton Builders | demo millwork and low walls-construction, new partitions, millwork doors frames ceilings, & finishes. install new mechanical electrical lights to accomodate new layout. n/a for maher.Details
demo millwork and low walls-construction, new partitions, millwork doors frames ceilings, & finishes. install new mechanical electrical lights to accomodate new layout. n/a for maher. | $250,000 |
| Mar 10, 2016 | Completed final sign-off Feb 2018 | 405 Howard St | Gci, Inc | electrical - powerd for 2 small server racks. permit is for idf room only. referenced ti 2015.1124.3507 maher naDetails
electrical - powerd for 2 small server racks. permit is for idf room only. referenced ti 2015.1124.3507 maher na | $10,000 |
| Mar 10, 2016 | Completed final sign-off Mar 2016 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 1 control module for fan shutdown. t.i. pa#201511243507. n/a ordinance #155-13Details
1 control module for fan shutdown. t.i. pa#201511243507. n/a ordinance #155-13 | $2,500 |
| Mar 9, 2016 | Completed final sign-off Feb 2018 | 405 Howard St | Gci, Inc | 6th floor: install new exhaust fan. install new transfer airboot. ref. app#201511243507. n/a for maher.Details
6th floor: install new exhaust fan. install new transfer airboot. ref. app#201511243507. n/a for maher. | $5,000 |
| Mar 1, 2016 | Completed final sign-off Feb 2018 | 405 Howard St | Gci, Inc | 6th floor: tenant improvements to convert extg offices into meeting rooms. new carpet and paint. mechanical plan submitted under separate permit.Details
6th floor: tenant improvements to convert extg offices into meeting rooms. new carpet and paint. mechanical plan submitted under separate permit. | $67,000 |
| Feb 26, 2016 | Completed final sign-off Oct 2017 | 405 Howard St | Gci, Inc | electrical - new electrical ref pa 2015-1124-3507. maher naDetails
electrical - new electrical ref pa 2015-1124-3507. maher na | |
| Feb 11, 2016 | Completed final sign-off Mar 2016 | 405 Howard St | Red Hawk Fire & Security Ca Llc | add 5 new control relay, 2 new duct sd, 4 new interposing relays,4 new wall mounts, 7 new mount/strobes (1)new ceiling mount speaker,t.i. 201511102314; maher n/aDetails
add 5 new control relay, 2 new duct sd, 4 new interposing relays,4 new wall mounts, 7 new mount/strobes (1)new ceiling mount speaker,t.i. 201511102314; maher n/a | $1,870 |
| Feb 1, 2016 | Completed final sign-off Mar 2016 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 6th flr: existing fire sprinkler system tenant improvements, 8 sprinklers (4 new and 4 relo) ref ti 2015-1124-3507; maher n/aDetails
6th flr: existing fire sprinkler system tenant improvements, 8 sprinklers (4 new and 4 relo) ref ti 2015-1124-3507; maher n/a | $6,500 |
| Jan 21, 2016 | Completed final sign-off Feb 2016 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system t.i., 43 sprinklers on g/f. pa#201511102314. n/a ordinance #155-13Details
fire sprinkler system t.i., 43 sprinklers on g/f. pa#201511102314. n/a ordinance #155-13 | $22,000 |
| Dec 17, 2015 | Completed final sign-off Oct 2016 | 405 Howard St | Ad Art Inc. | electric wall signDetails
electric wall sign | $15,000 |
| Dec 17, 2015 | Completed final sign-off Oct 2016 | 405 Howard St | Ad Art Inc. | electric wall signDetails
electric wall sign | $10,000 |
| Nov 24, 2015 | Completed final sign-off Oct 2017 | 405 Howard St | Gci, Inc | 6th floor tenant improvements. modification to parts of the existing space, reception area, open offices, and support facilities. m.e.p. to be on separate permits.Details
6th floor tenant improvements. modification to parts of the existing space, reception area, open offices, and support facilities. m.e.p. to be on separate permits. | $105,000 |
| Nov 10, 2015 | Completed final sign-off Oct 2016 | 405 Howard St | Swinerton Builders | demo (e) partitions, flooring, finishes. construct new non structural partitions. install (n) doors, frames, finishes, lights and mech to accomodate new layout add 2 ada bathrooms. maher naDetails
demo (e) partitions, flooring, finishes. construct new non structural partitions. install (n) doors, frames, finishes, lights and mech to accomodate new layout add 2 ada bathrooms. maher na | $745,000 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 405 Howard St | Red Hawk Fire & Security Ca Llc | add 1 speaker/strobe, 17 speakers maher na ref pa 7th floor 2015-0728-2642, 8th floor, 2015-0728-2649; 9th floor, 2015-0728-2650Details
add 1 speaker/strobe, 17 speakers maher na ref pa 7th floor 2015-0728-2642, 8th floor, 2015-0728-2649; 9th floor, 2015-0728-2650 | $12,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 405 Howard St | Pribuss Engineering Inc | floors 7, 8, 9: fire sprinkler ti under general contractor ref pa 2015-0728-2642, 2015-0728-2649, 2015-0728-2650. relocate 63, add 8, plug 6.Details
floors 7, 8, 9: fire sprinkler ti under general contractor ref pa 2015-0728-2642, 2015-0728-2649, 2015-0728-2650. relocate 63, add 8, plug 6. | $14,200 |
| Sep 30, 2015 | Completed final sign-off Jan 2016 | 405 Howard St | Red Hawk Fire & Security Ca Llc | add 26 speaker/strobe, 1 power supplyDetails
add 26 speaker/strobe, 1 power supply | $12,000 |
| Aug 11, 2015 | Completed final sign-off Dec 2015 | 405 Howard St | Skyline Construction | mechanical and electrical work to tenant improvement on the 2nd fl ref 201507141406 maher not reqDetails
mechanical and electrical work to tenant improvement on the 2nd fl ref 201507141406 maher not req | $200,000 |
| Jul 28, 2015 | Completed final sign-off Mar 2016 | 405 Howard St | Richlen Construction | partial remodel of 8/f, interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal hvac required. n/a ordinance #155-13. life safety deferred.Details
partial remodel of 8/f, interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal hvac required. n/a ordinance #155-13. life safety deferred. | $300,000 |
| Jul 28, 2015 | Completed final sign-off Mar 2016 | 405 Howard St | Richlen Construction | partial remodel of 9/f, interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal hvac required. n/a ordinance #155-13. life safety deferred.Details
partial remodel of 9/f, interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal hvac required. n/a ordinance #155-13. life safety deferred. | $300,000 |
| Jul 28, 2015 | Completed final sign-off Mar 2016 | 405 Howard St | Richlen Construction | partial remodel of 7/f, a total of 4,649 sq.ft. of interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal hvac required. n/a ordinance #155-13. life safety deferred.Details
partial remodel of 7/f, a total of 4,649 sq.ft. of interior t.i. includes addition of new interior offices, new furniture, interior finish upgrades and minor upgrades to existing restrooms to comply with current code, minimal hvac required. n/a ordinance #155-13. life safety deferred. | $300,000 |
| Jul 14, 2015 | Completed final sign-off Apr 2017 | 405 Howard St | Skyline Construction | t.i. on 2/f to include modification of existing tenant space selective demolition and new non-load bearing partitions and new finishes. n/a ordinance #155-13Details
t.i. on 2/f to include modification of existing tenant space selective demolition and new non-load bearing partitions and new finishes. n/a ordinance #155-13 | $1,000,000 |
| Jun 19, 2015 | Completed final sign-off Aug 2015 | 405 Howard St | Transceive Communications Inc. | tenants moving out. tennants wanted indoor ceiling antennas to be removed off ceiling tiles. cables are left next tennats. (18) total.Details
tenants moving out. tennants wanted indoor ceiling antennas to be removed off ceiling tiles. cables are left next tennats. (18) total. | $1,200 |
| Jan 14, 2015 | Expired or cancelled cancelled Jan 2020 | 405 Howard St | Novo Construction Inc | 4th and 5th floor: as built submitted for mechanical and smoke control work. ref app #Details
4th and 5th floor: as built submitted for mechanical and smoke control work. ref app # | |
| Nov 3, 2014 | Completed final sign-off Nov 2014 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | revision to appl 2014.0325.1567 as built to fire sprinkler permit. add (1) head. (original arch apn # 201401156307) maher n/a.Details
revision to appl 2014.0325.1567 as built to fire sprinkler permit. add (1) head. (original arch apn # 201401156307) maher n/a. | $515 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 405 Howard St | Red Hawk Fire & Security Ca Llc | provide (2) control relays for two vfd's, provide (2) monitor modules to monitor vfd run. t.i. pa#201406178572. n/a ordinance #155-13Details
provide (2) control relays for two vfd's, provide (2) monitor modules to monitor vfd run. t.i. pa#201406178572. n/a ordinance #155-13 | $11,000 |
| Aug 19, 2014 | Completed final sign-off Jul 2015 | 405 Howard St | Gci, Inc | 1st, 2nd & 3rd floors: voluntary structural upgrade. n/a ordinance #155-13Details
1st, 2nd & 3rd floors: voluntary structural upgrade. n/a ordinance #155-13 | $75,000 |
| Jul 17, 2014 | Expired or cancelled cancelled Sep 2023 | 405 Howard St | Skyline Construction | as built submittal for revised smoke control report for 405 howard st 4th & 5th floor.Details
as built submittal for revised smoke control report for 405 howard st 4th & 5th floor. | |
| Jun 17, 2014 | Never finaled issued Oct 2014, no final | 405 Howard St | Skyline Construction | floors: 4,5,10 & 11: provide new motor & vfd for existing smoke exhaust fans on 10 & ll, necessitated by opening stairway between floors 4 & 5. n/a for maher ordinance.Details
floors: 4,5,10 & 11: provide new motor & vfd for existing smoke exhaust fans on 10 & ll, necessitated by opening stairway between floors 4 & 5. n/a for maher ordinance. | $10,000 |
| Jun 10, 2014 | Completed final sign-off Feb 2015 | 405 Howard St | Skyline Construction | 4th floor:mechanical and electrical work for t.i. on the 4th floor. ref arch #201402259300. sprinkler & alarm to be under separate permit.Details
4th floor:mechanical and electrical work for t.i. on the 4th floor. ref arch #201402259300. sprinkler & alarm to be under separate permit. | $99,000 |
| Apr 2, 2014 | Completed final sign-off Apr 2014 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 4th and 5th floor: add 44 new speaker/strobes. relocate 5 extg speaker/strobes. add one new audio amplifier to extg facp. ref app#201401156307 for 4th floor and 201401226781.n/a for the maher ordinance #155-13Details
4th and 5th floor: add 44 new speaker/strobes. relocate 5 extg speaker/strobes. add one new audio amplifier to extg facp. ref app#201401156307 for 4th floor and 201401226781.n/a for the maher ordinance #155-13 | $14,000 |
| Mar 25, 2014 | Completed final sign-off Nov 2014 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system tenant improvements 17 new sprinklersDetails
fire sprinkler system tenant improvements 17 new sprinklers | $8,500 |
| Mar 13, 2014 | Completed final sign-off Mar 2014 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvements 4th flr 16 sprinklers 5th floor 57 sprinklers, apn (4flr) 201401156307, apn (5th) 201401226781. maher not required.Details
existing fire sprinkler system tenant improvements 4th flr 16 sprinklers 5th floor 57 sprinklers, apn (4flr) 201401156307, apn (5th) 201401226781. maher not required. | $37,500 |
| Feb 25, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | Skyline Construction | new communicating stairs between 4th and 5th floors. new openings in structural post tension concrete slab. no mechanical work under this permit. new smoke control report. ** maher: compliance with ordinance no# 155-13 not required **Details
new communicating stairs between 4th and 5th floors. new openings in structural post tension concrete slab. no mechanical work under this permit. new smoke control report. ** maher: compliance with ordinance no# 155-13 not required ** | $300,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | Skyline Construction | tenant improvement existing space includes minor demolition. construction of new partitions and finishes. convience stairs to 5th floor, mechanical, electrical, fire alarm, fire sprinklers, smoke control and plumbing work under separate permit. making assembly space with occpuant load 322.Details
tenant improvement existing space includes minor demolition. construction of new partitions and finishes. convience stairs to 5th floor, mechanical, electrical, fire alarm, fire sprinklers, smoke control and plumbing work under separate permit. making assembly space with occpuant load 322. | $300,000 |
| Jan 28, 2014 | Completed final sign-off Feb 2014 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 5th floor fire sprinkler system t.i. - corridors, 2 removed sprinklers, 5 added sprinklers, 8 relocated sprinklers, ref pa #2013.1230.5252, compliance with ordinance #155-13 not requiredDetails
5th floor fire sprinkler system t.i. - corridors, 2 removed sprinklers, 5 added sprinklers, 8 relocated sprinklers, ref pa #2013.1230.5252, compliance with ordinance #155-13 not required | $7,500 |
| Jan 22, 2014 | Completed final sign-off Feb 2015 | 405 Howard St | Skyline Construction | 5th floor mechanical & electrical work for tenant improvement. ref pa #2014.0122.6781. compliance with ordinance #155-13 not required.Details
5th floor mechanical & electrical work for tenant improvement. ref pa #2014.0122.6781. compliance with ordinance #155-13 not required. | $25,000 |
| Jan 22, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | Skyline Construction | 5th floor tenant improvement of existing space including minordemolition, construction of new walls & finishes. mep under separate permit.Details
5th floor tenant improvement of existing space including minordemolition, construction of new walls & finishes. mep under separate permit. | $900,000 |
| Jan 22, 2014 | Completed final sign-off Feb 2015 | 405 Howard St | Skyline Construction | 4th floor mechanical & electrical work for tenant improvement. ref pa #2014.0115.6307; compliance with ord no 155-13 not requiredDetails
4th floor mechanical & electrical work for tenant improvement. ref pa #2014.0115.6307; compliance with ord no 155-13 not required | $85,000 |
| Jan 15, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | Skyline Construction | tenant improvement of existing space including minor demolition, construction of new walls and finishes. mep. under seperate permit. compliance with ordinance #155-13, not required.Details
tenant improvement of existing space including minor demolition, construction of new walls and finishes. mep. under seperate permit. compliance with ordinance #155-13, not required. | $200,000 |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 405 Howard St | Skyline Construction | 5th fl. south lobby and corridor off the elevator lobby will be renovated, 2 new tenant entries. north corridor modified so that the door into the tenant entry will be closer o the stairwell; compliance with ord 15-133 not required,Details
5th fl. south lobby and corridor off the elevator lobby will be renovated, 2 new tenant entries. north corridor modified so that the door into the tenant entry will be closer o the stairwell; compliance with ord 15-133 not required, | $125,000 |
| Dec 30, 2013 | Completed final sign-off Mar 2014 | 405 Howard St | Novo Construction Inc | revision to 201309066111. change from metal stud gypsum board wall to exposed wood stud (fire treated and plywood wall)Details
revision to 201309066111. change from metal stud gypsum board wall to exposed wood stud (fire treated and plywood wall) | |
| Dec 13, 2013 | Completed final sign-off Mar 2014 | 405 Howard St | Peacock Construction Inc | demo only of selected items per lease termination agreement, selected doors, and non-structural walls and reception desk (per ab-017). space will remain vacant.Details
demo only of selected items per lease termination agreement, selected doors, and non-structural walls and reception desk (per ab-017). space will remain vacant. | $6,400 |
| Dec 11, 2013 | Completed final sign-off Jan 2014 | 405 Howard St | Red Hawk Fire & Security Ca Llc | 4th floor - addition of (12) new speaker/strobes & (1) new control relay to existing fire alarm system. relocation of (4) existing speaker strobes & (1) speaker. ref t.i. #2013.09.06.6111Details
4th floor - addition of (12) new speaker/strobes & (1) new control relay to existing fire alarm system. relocation of (4) existing speaker strobes & (1) speaker. ref t.i. #2013.09.06.6111 | $6,500 |
| Nov 8, 2013 | Completed final sign-off Dec 2013 | 405 Howard St | Red Hawk Fire & Security Ca Llc | addition of nine speakers and nine speaker strobes to existing fire alarm circuits. all work to be completed on 6th floor only- construction plan is 201301107689-Details
addition of nine speakers and nine speaker strobes to existing fire alarm circuits. all work to be completed on 6th floor only- construction plan is 201301107689- | $9,000 |
| Nov 7, 2013 | Never finaled issued Feb 2014, no final | 405 Howard St | Gci, Inc | new deck on the extg 6/f roof; less than 50 occupants; replace extg cast paver with new tiles, planter boxes and seats. verify exiting and panic hardware; accessory use to office; fire alarm separate permit.Details
new deck on the extg 6/f roof; less than 50 occupants; replace extg cast paver with new tiles, planter boxes and seats. verify exiting and panic hardware; accessory use to office; fire alarm separate permit. | $8,500 |
| Nov 4, 2013 | Completed final sign-off Dec 2013 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 4th floor fire sprinkler systems existing t/i 22 added sprinklers, three relocatedDetails
4th floor fire sprinkler systems existing t/i 22 added sprinklers, three relocated | $12,500 |
| Sep 20, 2013 | Completed final sign-off Dec 2013 | 405 Howard St | 4th floor-demolish an (e) wall & build new tenant demising wallDetails
4th floor-demolish an (e) wall & build new tenant demising wall | $15,000 | |
| Sep 6, 2013 | Completed final sign-off Mar 2014 | 405 Howard St | 4th floor-t.i will to renovate & demise an (e) tenant space. 1 conference room will be added to the space as well as other accessory spaces. common area work will include the removal of a storage room to become a waiting area, adjacent tenant space to north will be part of another project scopeDetails
4th floor-t.i will to renovate & demise an (e) tenant space. 1 conference room will be added to the space as well as other accessory spaces. common area work will include the removal of a storage room to become a waiting area, adjacent tenant space to north will be part of another project scope | $450,000 | |
| Feb 6, 2013 | Completed final sign-off Dec 2013 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 6th floor tenant improvement existing fire sprinkler system - 49 relocated sprinklers. ref pa #2011.03.09.1699.Details
6th floor tenant improvement existing fire sprinkler system - 49 relocated sprinklers. ref pa #2011.03.09.1699. | $24,500 |
| Jan 10, 2013 | Never finaled issued Oct 2013, no final | 405 Howard St | Gci, Inc | ti on 6th floor to expand (e) office space & mep system. construct (n) partitions, doors, millwork & finishing.Details
ti on 6th floor to expand (e) office space & mep system. construct (n) partitions, doors, millwork & finishing. | $700,000 |
| Jun 8, 2012 | Completed final sign-off Jul 2012 | 405 Howard St | Allied Fire Protection | add 2 upright sprinkler at 8th floor storage shed.Details
add 2 upright sprinkler at 8th floor storage shed. | $500 |
| Oct 25, 2011 | Completed final sign-off Nov 2011 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 3rd floor-t.i. (e) fire sprinkler system-5 added sprinklers, 12 relocated & 1 removed sprinklersDetails
3rd floor-t.i. (e) fire sprinkler system-5 added sprinklers, 12 relocated & 1 removed sprinklers | $4,000 |
| Sep 13, 2011 | Completed final sign-off Dec 2011 | 405 Howard St | Bcci Construction Company | 3rd floor-tenant improvement in suite #320-3 new offices & conference room. re-use light fixturesDetails
3rd floor-tenant improvement in suite #320-3 new offices & conference room. re-use light fixtures | $239,250 |
| May 10, 2011 | Completed final sign-off Aug 2011 | 405 Howard St | Pribuss Engineering Inc | 6th floor:fire sprinkler t.i./31 relocated heads/18 added headsDetails
6th floor:fire sprinkler t.i./31 relocated heads/18 added heads | $26,216 |
| Mar 9, 2011 | Completed final sign-off Nov 2011 | 405 Howard St | Gci, Inc | 6th floor tenant improvement for new office including new non-load bearing partitions & doors, frames, millwork, ceiling, finishes, & m.e.p.Details
6th floor tenant improvement for new office including new non-load bearing partitions & doors, frames, millwork, ceiling, finishes, & m.e.p. | $250,000 |
| Dec 7, 2010 | Never finaled issued Dec 2010, no final | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 6th fl: new preaction system. 138 heads removed, 181 heads addedDetails
6th fl: new preaction system. 138 heads removed, 181 heads added | $85,000 |
| Aug 13, 2010 | Completed final sign-off Aug 2010 | 405 Howard St | Paradigm General Contractors | revision to pa# 2010.05.04.1678. relocate 1 existing strobe for new office layout.Details
revision to pa# 2010.05.04.1678. relocate 1 existing strobe for new office layout. | |
| May 4, 2010 | Completed final sign-off Aug 2010 | 405 Howard St | Capitol Electric Const | 5th floor ste# 555 - demo (e) audible/visual speaker /strobe. install new audible/visual speaker/strobes. demo 2 existing, install 2 audible visual spker strobe. relocate 1 spkr strobe, install 1 strobe. no other work this permit. ref #201004261069.Details
5th floor ste# 555 - demo (e) audible/visual speaker /strobe. install new audible/visual speaker/strobes. demo 2 existing, install 2 audible visual spker strobe. relocate 1 spkr strobe, install 1 strobe. no other work this permit. ref #201004261069. | $2,800 |
| Apr 26, 2010 | Completed final sign-off Aug 2010 | 405 Howard St | Anderson, Rowe & Buckley, Inc. | 5th. flr.: tenant improvements to the (e) fire sprinkler system. 2-added sprinklers, 1-relocated sprinkler.Details
5th. flr.: tenant improvements to the (e) fire sprinkler system. 2-added sprinklers, 1-relocated sprinkler. | $600 |