Mark Koenigs

License
S6051
Look the license up with the state
Listed as
architect, engineer
Firm
Thornton Tomasetti
Based in
San Francisco
On San Francisco permits
Feb 2020 to Oct 2026

30 permits since 2000 (engineer on 29 permits, architect on 1 permit): 14 completed, 9 in progress, 3 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 2, 2026In progress
filed Oct 2026, not yet issued
1089 03rd Stproj-26-0643: mou port - deferred submittal for atrium audio-visual diplay piers (reference pa# 202511079166 & b-2025-025
Details
Permit
202609218439
Status
filed
Filed
Oct 2, 2026
Address
1089 03rd St

proj-26-0643: mou port - deferred submittal for atrium audio-visual diplay piers (reference pa# 202511079166 & b-2025-025

Open the permit page

Dec 16, 2025In progress
filed Dec 2025, not yet issued
1089 03rd Stproj-25-625; mou port. ti on 5th, 6th, 7th & 8th floor in (e) 8 story office building. imporvements to include arch, mep, structural, full prep kitchen & satellite food service stations work to accomodate new tenant build out. includes change of occupancy from b to a-2 on lvl 5 & b to a-3 on lvl.7
Details
Permit
202511079166
Status
approved
Filed
Dec 16, 2025
Declared cost
$32,500,000
Address
1089 03rd St

proj-25-625; mou port. ti on 5th, 6th, 7th & 8th floor in (e) 8 story office building. imporvements to include arch, mep, structural, full prep kitchen & satellite food service stations work to accomodate new tenant build out. includes change of occupancy from b to a-2 on lvl 5 & b to a-3 on lvl.7

Open the permit page

$32,500,000
Oct 10, 2025In progress
filed Oct 2025, not yet issued
1089 03rd Stproj#25-0621-mou port: alteration to existing floor plates on level 6,7,& 8.demo existing slab & create floor openings as shown, for future tenant improvements.provide temporary code compliance with smoke control report.
Details
Permit
202509266165
Status
approved
Filed
Oct 10, 2025
Declared cost
$1,750,000
Address
1089 03rd St

proj#25-0621-mou port: alteration to existing floor plates on level 6,7,& 8.demo existing slab & create floor openings as shown, for future tenant improvements.provide temporary code compliance with smoke control report.

Open the permit page

$1,750,000
Sep 16, 2025Expired or cancelled
cancelled May 2026
650 07th StPrincipal Builders Inc.interior ti of ground fl existing office space. mechanical deferred.
Details
Permit
202509165427
Status
cancelled
Filed
Sep 16, 2025
Permit issued
Oct 9, 2025
Declared cost
$250,000
Address
650 07th St

interior ti of ground fl existing office space. mechanical deferred.

Open the permit page

$250,000
Jul 18, 2025Expired or cancelled
cancelled May 2026
650 07th StPrincipal Builders Inc.2nd & 3rd floor - partial demo of existing non structural partitions for pass through; brick wall to receive partial demo and new concrete portal reinforcement assembly for new openings
Details
Permit
202507181111
Status
cancelled
Filed
Jul 18, 2025
Permit issued
Aug 4, 2025
Declared cost
$75,000
Address
650 07th St

2nd & 3rd floor - partial demo of existing non structural partitions for pass through; brick wall to receive partial demo and new concrete portal reinforcement assembly for new openings

Open the permit page

$75,000
Jun 20, 2025In progress
filed Jun 2025, not yet issued
1090 Dr Maya Angelou Lnproj-25-0613 - mou-port: revision to gsw tenant improvement fro base building bathrooms. reference pa # 202412247382 proj-24-0610 & port permit #b-2024-0274.
Details
Permit
202506209141
Status
approved
Filed
Jun 20, 2025
Address
1090 Dr Maya Angelou Ln

proj-25-0613 - mou-port: revision to gsw tenant improvement fro base building bathrooms. reference pa # 202412247382 proj-24-0610 & port permit #b-2024-0274.

Open the permit page

Apr 24, 2025In progress
issued May 2025
405 Howard StSkyline Construction7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.
Details
Permit
202504245172
Status
issued
Filed
Apr 24, 2025
Permit issued
May 15, 2025
Declared cost
$172,000
Address
405 Howard St

7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.

Open the permit page

$172,000
Jan 23, 2025In progress
filed Jan 2025, not yet issued
1090 Dr Maya Angelou Lnproj-24-0610; mou-port: office tenant improvement of non-structural partitions, ceilings, doors,lighting, electrical, mechanical, plumbing, av & it on levels 3 and 4. new stepped aisle and stepped seating in slab opening. ref: permit application number #2024-1025-3714 for slab opening.
Details
Permit
202412247382
Status
approved
Filed
Jan 23, 2025
Declared cost
$6,583,515
Address
1090 Dr Maya Angelou Ln

proj-24-0610; mou-port: office tenant improvement of non-structural partitions, ceilings, doors,lighting, electrical, mechanical, plumbing, av & it on levels 3 and 4. new stepped aisle and stepped seating in slab opening. ref: permit application number #2024-1025-3714 for slab opening.

Open the permit page

$6,583,515
Jan 23, 2025Completed
final sign-off Feb 2026
1455 03rd StPrincipal Builders Inc.4th & 5th fl - install phone structural & electrical
Details
Permit
202501238910
Status
complete
Filed
Jan 23, 2025
Permit issued
Mar 10, 2025
Final sign-off
Feb 12, 2026
Declared cost
$30,000
Address
1455 03rd St

4th & 5th fl - install phone structural & electrical

Open the permit page

$30,000
Jan 23, 2025Completed
final sign-off Feb 2026
1455 03rd StPrincipal Builders Inc.10th & 11th fl - install phone structural & electrical
Details
Permit
202501238907
Status
complete
Filed
Jan 23, 2025
Permit issued
Mar 11, 2025
Final sign-off
Feb 12, 2026
Declared cost
$30,000
Address
1455 03rd St

10th & 11th fl - install phone structural & electrical

Open the permit page

$30,000
Jan 23, 2025Completed
final sign-off Feb 2026
1455 03rd StPrincipal Builders Inc.6th & 7th fl - install phone structural & electrical
Details
Permit
202501238911
Status
complete
Filed
Jan 23, 2025
Permit issued
Mar 11, 2025
Final sign-off
Feb 12, 2026
Declared cost
$30,000
Address
1455 03rd St

6th & 7th fl - install phone structural & electrical

Open the permit page

$30,000
Jan 23, 2025Completed
final sign-off Feb 2026
1455 03rd StPrincipal Builders Inc.8th & 9th fl - install phone structural & electrical
Details
Permit
202501238912
Status
complete
Filed
Jan 23, 2025
Permit issued
Mar 11, 2025
Final sign-off
Feb 12, 2026
Declared cost
$30,000
Address
1455 03rd St

8th & 9th fl - install phone structural & electrical

Open the permit page

$30,000
Jan 23, 2025Completed
final sign-off Feb 2026
1455 03rd StPrincipal Builders Inc.2nd & 3rd fl - install phone structural & electrical
Details
Permit
202501238909
Status
complete
Filed
Jan 23, 2025
Permit issued
Mar 10, 2025
Final sign-off
Feb 12, 2026
Declared cost
$30,000
Address
1455 03rd St

2nd & 3rd fl - install phone structural & electrical

Open the permit page

$30,000
Dec 12, 2024In progress
issued Jan 2025
405 Howard StSkyline Construction8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit.
Details
Permit
202412126728
Status
issued
Filed
Dec 12, 2024
Permit issued
Jan 30, 2025
Declared cost
$1,704,000
Address
405 Howard St

8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit.

Open the permit page

$1,704,000
Nov 20, 2024In progress
filed Nov 2024, not yet issued
1090 Dr Maya Angelou Lnproj-24-0607;mou-port: alt permit for demo of a portion of the (e) 4th flr slab, for a future stair connection between lvl 3 and lvl 4 to be submitted under a separate t.i. permit. work includes the construction of a 2 hr. rated smoke barrier to allow for smoke control around the (n) floor opening.
Details
Permit
202410253714
Status
approved
Filed
Nov 20, 2024
Declared cost
$221,000
Address
1090 Dr Maya Angelou Ln

proj-24-0607;mou-port: alt permit for demo of a portion of the (e) 4th flr slab, for a future stair connection between lvl 3 and lvl 4 to be submitted under a separate t.i. permit. work includes the construction of a 2 hr. rated smoke barrier to allow for smoke control around the (n) floor opening.

Open the permit page

$221,000
Aug 30, 2024In progress
issued Oct 2024
1515 03rd StPrincipal Builders Inc.level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376
Details
Permit
202408309841
Status
issued
Filed
Aug 30, 2024
Permit issued
Oct 4, 2024
Declared cost
$3,999,516
Address
1515 03rd St

level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376

Open the permit page

$3,999,516
May 30, 2024Completed
final sign-off Jan 2025
1450 Owens StTruebeck Constructiondeferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.
Details
Permit
202405303298
Status
complete
Filed
May 30, 2024
Permit issued
Aug 6, 2024
Final sign-off
Jan 10, 2025
Declared cost
$10,000
Address
1450 Owens St

deferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.

Open the permit page

$10,000
Dec 5, 2022Never finaled
filed Dec 2022, never issued
425 Mission Stproj-22-0516:tjpa ti mou - tenate build out of 9e) park level restaurant space #p-01. vertical addition of enclosed roofpark mezzanine (dbi pre-application meeting 4/30/22). roof top mechanical equipment.
Details
Permit
202212057693
Status
filed
Filed
Dec 5, 2022
Declared cost
$5,200,000
Address
425 Mission St

proj-22-0516:tjpa ti mou - tenate build out of 9e) park level restaurant space #p-01. vertical addition of enclosed roofpark mezzanine (dbi pre-application meeting 4/30/22). roof top mechanical equipment.

Open the permit page

$5,200,000
Oct 27, 2022Never finaled
filed Oct 2022, never issued
300 Toni Stone Cgproj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries,
Details
Permit
202210275305
Status
approved
Filed
Oct 27, 2022
Declared cost
$22,000,000
Address
300 Toni Stone Cg

proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries,

Open the permit page

$22,000,000
Oct 7, 2022Expired or cancelled
cancelled Jan 2026
400 Paul Avrevision to pa#202009033417, 201603293329 to reovide fundation water proofing system in basement.
Details
Permit
202210074013
Status
cancelled
Filed
Oct 7, 2022
Declared cost
$20,000
Address
400 Paul Av

revision to pa#202009033417, 201603293329 to reovide fundation water proofing system in basement.

Open the permit page

$20,000
Jun 8, 2022Completed
final sign-off May 2023
400 Paul AvWalsh Construction Company Ii Llcrevision to generator and fuel oil addendum revised generator pad design. ref to 2014 1117 1675 s8 & 202010277447.
Details
Permit
202206085904
Status
complete
Filed
Jun 8, 2022
Permit issued
Jun 9, 2022
Final sign-off
May 24, 2023
Address
400 Paul Av

revision to generator and fuel oil addendum revised generator pad design. ref to 2014 1117 1675 s8 & 202010277447.

Open the permit page

Jun 2, 2022Completed
final sign-off Feb 2024
50 California StRichlen Constructiondemo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads.
Details
Permit
202206025434
Status
complete
Filed
Jun 2, 2022
Permit issued
Jun 6, 2022
Final sign-off
Feb 8, 2024
Declared cost
$160,000
Address
50 California St

demo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads.

Open the permit page

$160,000
Aug 19, 2021Expired or cancelled
withdrawn Nov 2021
400 Paul Avbldg a & b - partial ti on level 1 to provide reception & office space. mep to serve limited area of this improvement. structural for (n) building canopy, stair opening, stair and roof equipment. exterior work includes replacements fo windows & new canopy over front door
Details
Permit
202108196750
Status
withdrawn
Filed
Aug 19, 2021
Declared cost
$858,000
Address
400 Paul Av

bldg a & b - partial ti on level 1 to provide reception & office space. mep to serve limited area of this improvement. structural for (n) building canopy, stair opening, stair and roof equipment. exterior work includes replacements fo windows & new canopy over front door

Open the permit page

$858,000
Jul 22, 2021Completed
final sign-off Feb 2022
405 Howard StSkyline Constructionstructural detail revision to previously approved permit #202105251005 phone booth by eliminating detail #4 of frainery anchorage to raf.
Details
Permit
202107224888
Status
complete
Filed
Jul 22, 2021
Permit issued
Jul 22, 2021
Final sign-off
Feb 3, 2022
Address
405 Howard St

structural detail revision to previously approved permit #202105251005 phone booth by eliminating detail #4 of frainery anchorage to raf.

Open the permit page

May 25, 2021Completed
final sign-off Jan 2022
405 Howard StSkyline Constructionrev to pa 201910316117 by adding two ballasy plates (1"x30" each) to each brooth to resist overturning.
Details
Permit
202105251005
Status
complete
Filed
May 25, 2021
Permit issued
May 25, 2021
Final sign-off
Jan 24, 2022
Declared cost
$5,000
Address
405 Howard St

rev to pa 201910316117 by adding two ballasy plates (1"x30" each) to each brooth to resist overturning.

Open the permit page

$5,000
Dec 28, 2020Completed
final sign-off May 2025
1450 Owens StTruebeck Constructionconstruction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709
Details
Permit
202012281760
Status
complete
Filed
Dec 28, 2020
Permit issued
Aug 31, 2021
Final sign-off
May 19, 2025
Declared cost
$68,000,000
Address
1450 Owens St

construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709

Open the permit page

$68,000,000
Sep 3, 2020Never finaled
issued Aug 2021, no final
400 Paul AvWalsh Construction Company Ii Llcrevision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments)
Details
Permit
202009033417
Status
issued
Filed
Sep 3, 2020
Permit issued
Aug 11, 2021
Address
400 Paul Av

revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments)

Open the permit page

Jul 6, 2020Completed
final sign-off May 2021
1010 03rd StConstructive Building Services Inc Dba Crevision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit.
Details
Permit
202007069648
Status
complete
Filed
Jul 6, 2020
Permit issued
Aug 14, 2020
Final sign-off
May 5, 2021
Declared cost
$10,000
Address
1010 03rd St

revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit.

Open the permit page

$10,000
Feb 10, 2020Completed
final sign-off May 2021
405 Howard StSkyline Constructioninstall a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a **
Details
Permit
202002103966
Status
complete
Filed
Feb 10, 2020
Permit issued
Aug 7, 2020
Final sign-off
May 17, 2021
Address
405 Howard St

install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a **

Open the permit page

Feb 6, 2020Completed
final sign-off May 2021
405 Howard StSkyline Constructionrevision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft enclosure.
Details
Permit
202002063750
Status
complete
Filed
Feb 6, 2020
Permit issued
Feb 14, 2020
Final sign-off
May 17, 2021
Declared cost
$100,000
Address
405 Howard St

revision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft enclosure.

Open the permit page

$100,000