Peter A Leptuch
- Listed as
- engineer
- On San Francisco permits
- Jul 2017 to May 2024
12 permits since 2000 (engineer on 12 permits): 8 completed, 1 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2024 | In progress filed May 2024, not yet issued | 200 Post St | ground floor: interior renovation of existing demiseo retail space.Details
ground floor: interior renovation of existing demiseo retail space. | $100,000 | |
| Feb 28, 2022 | Expired or cancelled cancelled Jan 2026 | 925 Cole St | minor t.i.: (n) sales fixtures, millwork & finishes. (n) existing ceiling. (n) existing light fixtures & elec outlets. (n) non-load bearing partitions, plumbing, hvac & ductwork. (n) woodframe storefront infill w/ 1" thick iron, clear insulated tempered & temper resistant glass.Details
minor t.i.: (n) sales fixtures, millwork & finishes. (n) existing ceiling. (n) existing light fixtures & elec outlets. (n) non-load bearing partitions, plumbing, hvac & ductwork. (n) woodframe storefront infill w/ 1" thick iron, clear insulated tempered & temper resistant glass. | $250,000 | |
| Dec 30, 2021 | Expired or cancelled withdrawn May 2022 | 405 Howard St | g/f: demolition of existing wall partitions, furniture, lighting and fixtures. new partition walls, ceilings, furniture, fixtures, finishes and mep system.Details
g/f: demolition of existing wall partitions, furniture, lighting and fixtures. new partition walls, ceilings, furniture, fixtures, finishes and mep system. | $600,000 | |
| Nov 16, 2021 | Completed final sign-off Jun 2022 | 2000 Chestnut St | installation of new finshes and fixtures throughout. installation of new lighting and electrical outlets throughout.Details
installation of new finshes and fixtures throughout. installation of new lighting and electrical outlets throughout. | $300,000 | |
| Nov 1, 2021 | Completed final sign-off Apr 2022 | 701 Market St | 1st fl - t-mobile interior ti include (n) non-structural partitions/doors, sales area fixtures. back of house furniture, ceiling, lighting.Details
1st fl - t-mobile interior ti include (n) non-structural partitions/doors, sales area fixtures. back of house furniture, ceiling, lighting. | $91,394 | |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 191 Warriors Wy | suite 100: revision to pa 202012040249, change in the layout of the service area.Details
suite 100: revision to pa 202012040249, change in the layout of the service area. | ||
| Dec 4, 2020 | Completed final sign-off Jan 2022 | 191 Warriors Wy | Gray West Construction Inc, Swinerton Builders | (ste #100): 2,510 sqft t.i. for philz coffee. interior only. remodeling, new partition walls, ceilings, m.e.p. & food prep equipment. 1st time tenant.Details
(ste #100): 2,510 sqft t.i. for philz coffee. interior only. remodeling, new partition walls, ceilings, m.e.p. & food prep equipment. 1st time tenant. | $290,000 |
| Nov 30, 2020 | Expired or cancelled cancelled Jan 2026 | 422 Folsom St | Flynn Construction Of California Inc | revision to ti scope pa# 201908017598, 201911086797. revised stairs to switchbak layout & revised railing at stair and floor opening. revision to ti scope pa# 201907256932 including add sanctuary room at b1, relocate w/h closet to l1. revise mech, plumb, elec. to reflect as-built conditions.Details
revision to ti scope pa# 201908017598, 201911086797. revised stairs to switchbak layout & revised railing at stair and floor opening. revision to ti scope pa# 201907256932 including add sanctuary room at b1, relocate w/h closet to l1. revise mech, plumb, elec. to reflect as-built conditions. | $10,000 |
| Nov 7, 2020 | Completed final sign-off Oct 2021 | 2675 Geary Bl | Constructive Building Services Inc Dba C | new non-bearing walls. updating (e) restroom to meet ada requirements. (n) ceiling and lighting, (n) power data and finishes, (n) electrical panel.Details
new non-bearing walls. updating (e) restroom to meet ada requirements. (n) ceiling and lighting, (n) power data and finishes, (n) electrical panel. | $80,000 |
| Jul 6, 2020 | Completed final sign-off May 2021 | 1010 03rd St | Constructive Building Services Inc Dba C | revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit.Details
revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit. | $10,000 |
| May 31, 2019 | Completed final sign-off Jan 2020 | 845 Market St | Rylko Builders Inc. | space 129. ti of interior retail store. work includes new partitions, finishes, furnishing & lighting. signage under separate permitDetails
space 129. ti of interior retail store. work includes new partitions, finishes, furnishing & lighting. signage under separate permit | $180,000 |
| Jul 19, 2017 | Completed final sign-off Nov 2017 | 1698 Bryant St | Horizon Retail Construction Inc | tenant improvement - remodel of (e) metro pcs - cashwrap, flooring, fixtures, bathroom, plumbing & conduit work. all other to remain.Details
tenant improvement - remodel of (e) metro pcs - cashwrap, flooring, fixtures, bathroom, plumbing & conduit work. all other to remain. | $93,945 |