Constructive Building Services Inc Dba C
- Based in
- Oakland
- On San Francisco permits
- Mar 2001 to Feb 2021
- Last 24 months
- 0 permits filed
18 permits since 2000: 14 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2021 | Completed final sign-off May 2021 | 2174 Union St | anchorage of fixed and/or mobile retail shelving units.Details
anchorage of fixed and/or mobile retail shelving units. | $7,500 |
| Feb 3, 2021 | Never finaled issued Apr 2021, no final | 1 Powell St | g/f retail: no modification to any (e) walls, doores, path of travel, exiseting or historay elements. temporary installation of pre-manufactoured furniture fixture. maher n/a.Details
g/f retail: no modification to any (e) walls, doores, path of travel, exiseting or historay elements. temporary installation of pre-manufactoured furniture fixture. maher n/a. | $3,000 |
| Nov 7, 2020 | Completed final sign-off Oct 2021 | 2675 Geary Bl | new non-bearing walls. updating (e) restroom to meet ada requirements. (n) ceiling and lighting, (n) power data and finishes, (n) electrical panel.Details
new non-bearing walls. updating (e) restroom to meet ada requirements. (n) ceiling and lighting, (n) power data and finishes, (n) electrical panel. | $80,000 |
| Oct 21, 2020 | Completed final sign-off Sep 2021 | 2174 Union St | interior t.i.: new non-load bearing partitions, hvac, electrical, plumbing, structural, lhghtin g& millwork. retail floor fixtures. fire life-safety deferreed.no change in zoning, use or occupancy.Details
interior t.i.: new non-load bearing partitions, hvac, electrical, plumbing, structural, lhghtin g& millwork. retail floor fixtures. fire life-safety deferreed.no change in zoning, use or occupancy. | $250,000 |
| Jul 27, 2020 | Expired or cancelled cancelled Jun 2021 | 1 Powell St | raise (e) light fixture. temporarily install framing and art installation. common areaDetails
raise (e) light fixture. temporarily install framing and art installation. common area | $3,000 |
| Jul 6, 2020 | Completed final sign-off May 2021 | 1010 03rd St | revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit.Details
revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit. | $10,000 |
| Oct 23, 2019 | Never finaled issued Nov 2019, no final | 1 Powell St | partial ti of an existing retail store. interior work only: pre-fabricated temporary set walls, structural truss, new floor finishes. new retail fixtures and displays intended for temporary "friends" - themed promotional installationDetails
partial ti of an existing retail store. interior work only: pre-fabricated temporary set walls, structural truss, new floor finishes. new retail fixtures and displays intended for temporary "friends" - themed promotional installation | $68,000 |
| Jun 12, 2019 | Completed final sign-off May 2021 | 1010 03rd St | first time ti retail. new non-bearing walls. new accessible restrooms. new ceiling & lighting. new power/data and finishes.Details
first time ti retail. new non-bearing walls. new accessible restrooms. new ceiling & lighting. new power/data and finishes. | $85,000 |
| Apr 10, 2019 | Completed final sign-off Oct 2019 | 255 California St | new non bearing walls (mino) and new finishes, new power/data finishes no maherDetails
new non bearing walls (mino) and new finishes, new power/data finishes no maher | $10,000 |
| Feb 6, 2019 | Completed final sign-off May 2019 | 827 Irving St | saw cut concrete. remove concrete and new 4" concrete slab at portiion of the retail space for new power floor boxes. demolition of int non structural partition walls. new non bearing walls and new finishes. new ceiling and lighting. new acessible ramp at boh. new power/data finishes. convert vacantDetails
saw cut concrete. remove concrete and new 4" concrete slab at portiion of the retail space for new power floor boxes. demolition of int non structural partition walls. new non bearing walls and new finishes. new ceiling and lighting. new acessible ramp at boh. new power/data finishes. convert vacant | $10,000 |
| Aug 23, 2016 | Completed final sign-off Dec 2016 | 2490 San Bruno Av | interior t.i. (cosmetic) finishes for new retail store. remove all radio shack finishes. n/a for maher.Details
interior t.i. (cosmetic) finishes for new retail store. remove all radio shack finishes. n/a for maher. | $75,000 |
| Aug 23, 2016 | Completed final sign-off Nov 2016 | 1567 Sloat Bl | interior t.i. (cosmetic) finishes for new retail store. remove all radio shack finishes. n/a for maher.Details
interior t.i. (cosmetic) finishes for new retail store. remove all radio shack finishes. n/a for maher. | $65,000 |
| May 28, 2015 | Completed final sign-off Dec 2016 | 5644 Geary Bl | interior tenant improvement - finishes (remove old radio shack finishes & install new at&t finishes); maher n/aDetails
interior tenant improvement - finishes (remove old radio shack finishes & install new at&t finishes); maher n/a | $120,000 |
| Mar 6, 2014 | Completed final sign-off Mar 2015 | 150 Post St | 4th floor suite #480- t.i. demo non structural partitions, construct new gyp. board partitions as indicated. relocate existing fluorescent light fixtures.Details
4th floor suite #480- t.i. demo non structural partitions, construct new gyp. board partitions as indicated. relocate existing fluorescent light fixtures. | $18,000 |
| Mar 4, 2014 | Completed final sign-off Mar 2015 | 150 Post St | #620- t.i., remove (e) gyp. board partition and replace with glazed partition, demo partitions as shown, build new +/- 69" high gyp.board partition.Details
#620- t.i., remove (e) gyp. board partition and replace with glazed partition, demo partitions as shown, build new +/- 69" high gyp.board partition. | $11,000 |
| Nov 12, 2013 | Completed final sign-off Nov 2013 | 150 Post St | to obtain final inspection for work approved under pa# 9821899. all work is completeDetails
to obtain final inspection for work approved under pa# 9821899. all work is complete | |
| Jul 3, 2002 | Never finaled issued Oct 2002, no final | 1303 Van Ness Av | correct notice ov violation #200225826 date 6/6/02 repla entry doors for disabled access close outDetails
correct notice ov violation #200225826 date 6/6/02 repla entry doors for disabled access close out | $8,000 |
| Mar 30, 2001 | Completed final sign-off Jun 2001 | 2401 Jackson St | repair (e) wood stairs/railings in rear lightwellDetails
repair (e) wood stairs/railings in rear lightwell | $10,000 |