Block 3706, lot 001
703 Market St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 21
- Rooms
- 21 bathrooms
- Building
- 115,260 sq ft
- Lot
- 5,248 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
161 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 703 Market St | t-mobile: install new wireless facility. install 4 new frp screen, 8 new antennas, 16 new rrus, 4 new cabinets, cables, new batteries, new 200amp panel.Details
t-mobile: install new wireless facility. install 4 new frp screen, 8 new antennas, 16 new rrus, 4 new cabinets, cables, new batteries, new 200amp panel. | $185,000 | |
| Oct 30, 2025 | Completed final sign-off Dec 2025 | 703 Market St | Build Group Inc. | 11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered.Details
11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered. | $25,000 |
| Jan 27, 2025 | In progress issued Jan 2025 | 703 Market St | W M Wireless Inc | temporary project: additional wireless equipment for cny + pride equipment to be removed july 2025. temp addition of 1 microwave 2', 4 antennas, 16 radios, & 2 cabinets, use (e) panel for power supply located in (e) rack, route hybrid cables to antennas, no batteries.Details
temporary project: additional wireless equipment for cny + pride equipment to be removed july 2025. temp addition of 1 microwave 2', 4 antennas, 16 radios, & 2 cabinets, use (e) panel for power supply located in (e) rack, route hybrid cables to antennas, no batteries. | $10,000 |
| Feb 5, 2024 | Completed final sign-off Aug 2024 | 703 Market St | W M Wireless Inc | temporary addition of tmobile equipment on roof top for chinese new year and pride parade. addition of 2 antennas, 1 cabinet, 1 2' microwave dish, 9 radio units and 3 hybrid cables. all equipment on non penatrated roofs. no batteries used. 1 temporary electrical to existing 30a 2ph twistlock.Details
temporary addition of tmobile equipment on roof top for chinese new year and pride parade. addition of 2 antennas, 1 cabinet, 1 2' microwave dish, 9 radio units and 3 hybrid cables. all equipment on non penatrated roofs. no batteries used. 1 temporary electrical to existing 30a 2ph twistlock. | $7,000 |
| Jan 6, 2023 | Completed final sign-off Sep 2023 | 703 Market St | W M Wireless Inc | t-mobile: addition of temp. wireless equip. for chinese new year special event. install 1 antennas, 1 cabinet, 1 microwave dish, 12 radio units, 2 hybrid cables.Details
t-mobile: addition of temp. wireless equip. for chinese new year special event. install 1 antennas, 1 cabinet, 1 microwave dish, 12 radio units, 2 hybrid cables. | $6,500 |
| Mar 4, 2022 | Completed final sign-off Jun 2022 | 701 Market St | Pribuss Engineering Inc | g/f: add and modify fire sprinkler head locations to accomodate new ceiling and partition for sales floor on g/f. total 14 fire sprinkler heads. ref t.i. pa 202111011582.maher n/a.Details
g/f: add and modify fire sprinkler head locations to accomodate new ceiling and partition for sales floor on g/f. total 14 fire sprinkler heads. ref t.i. pa 202111011582.maher n/a. | $8,120 |
| Dec 1, 2021 | Completed final sign-off Mar 2022 | 703 Market St | Skyline Construction | 9th floor: new power and data workstations and offices, new lighting and controls for previously approved architctural plans pa# 2021-1101-1555.Details
9th floor: new power and data workstations and offices, new lighting and controls for previously approved architctural plans pa# 2021-1101-1555. | |
| Nov 1, 2021 | Completed final sign-off Apr 2022 | 701 Market St | 1st fl - t-mobile interior ti include (n) non-structural partitions/doors, sales area fixtures. back of house furniture, ceiling, lighting.Details
1st fl - t-mobile interior ti include (n) non-structural partitions/doors, sales area fixtures. back of house furniture, ceiling, lighting. | $91,394 | |
| Nov 1, 2021 | Completed final sign-off Mar 2022 | 703 Market St | Skyline Construction | 9th floor: tennant security improvement. demo one office partitions, replace extg glass partitions with gyp. board partition. mep under seperate permit.Details
9th floor: tennant security improvement. demo one office partitions, replace extg glass partitions with gyp. board partition. mep under seperate permit. | $100,000 |
| Dec 10, 2020 | Never finaled issued Jan 2021, no final | 703 Market St | Convergint Technologies Llc | fire alarm ti: elevator upgrade (8) new smoke detectors in elevator machine room for recall functions and emr notification.Details
fire alarm ti: elevator upgrade (8) new smoke detectors in elevator machine room for recall functions and emr notification. | $24,000 |
| Oct 19, 2020 | Never finaled issued Feb 2021, no final | 701 Market St | Coast Sign Incorporated | 2 signs "t-moble". electric, wall, single-faced, 19.2 sq ftDetails
2 signs "t-moble". electric, wall, single-faced, 19.2 sq ft | $8,000 |
| Sep 23, 2019 | Completed final sign-off Dec 2019 | 705 Market St | Signtech Electrical Advertising Inc. | install 1 non-illuminated double faced projecting sign for blue bottleDetails
install 1 non-illuminated double faced projecting sign for blue bottle | $3,000 |
| Aug 29, 2019 | Completed final sign-off Jun 2021 | 703 Market St | Convergint Technologies Llc | 1st floor: ref pa# 201908219395; ceiling mount devices related to walls total 4 devicesDetails
1st floor: ref pa# 201908219395; ceiling mount devices related to walls total 4 devices | |
| Aug 21, 2019 | Completed final sign-off Aug 2019 | 703 Market St | Convergint Technologies Llc | 1st fl - fire alarm ti 5 new speaker strobes. ref pa 2019-0124-1121Details
1st fl - fire alarm ti 5 new speaker strobes. ref pa 2019-0124-1121 | $7,000 |
| Aug 20, 2019 | Expired or cancelled cancelled Jan 2026 | 705 Market St | Westates Mechanical Corporation Inc | admin permit to correct address from 201905301984Details
admin permit to correct address from 201905301984 | |
| Jul 15, 2019 | Completed final sign-off Aug 2020 | 705 Market St | Peacock Construction | rev to pa 201903155299; add site plan to cover sheet, structural drawing for mech openingDetails
rev to pa 201903155299; add site plan to cover sheet, structural drawing for mech opening | $1,000 |
| Jul 11, 2019 | Completed final sign-off Sep 2019 | 703 Market St | Eric F Anderson Incorporated | revision to pa 201901241121. revised panel schedule and power plan. updated title 24 w/ 1 (n) fixtureDetails
revision to pa 201901241121. revised panel schedule and power plan. updated title 24 w/ 1 (n) fixture | |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 705 Market St | Bay City Mechanical Inc | g/f: install new water source heat pump and inline supply fan for future tenant developement. ref app#201903155299Details
g/f: install new water source heat pump and inline supply fan for future tenant developement. ref app#201903155299 | $83,400 |
| Jun 11, 2019 | Expired or cancelled withdrawn Jul 2019 | 705 Market St | Peacock Construction | rev to pa# 201903155299; to allow for a duct penetration throug a non-structural brick wallDetails
rev to pa# 201903155299; to allow for a duct penetration throug a non-structural brick wall | |
| May 30, 2019 | Completed final sign-off Feb 2021 | 703 Market St | Westates Mechanical Corporation Inc | sprinkler modification at ground flr in area of work. relocate 14 pendent heads, main piping will remain as (e) outside area of workDetails
sprinkler modification at ground flr in area of work. relocate 14 pendent heads, main piping will remain as (e) outside area of work | $5,910 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 703 Market St | street space onlyDetails
street space only | ||
| Mar 15, 2019 | Completed final sign-off Aug 2020 | 705 Market St | Peacock Construction | non-struct demo, (n) partition, entry door auto door operators, toilet room remodel. no change in occupancy, use or area. mep, srpinklers, life safety under separate permitDetails
non-struct demo, (n) partition, entry door auto door operators, toilet room remodel. no change in occupancy, use or area. mep, srpinklers, life safety under separate permit | $60,000 |
| Jan 24, 2019 | Completed final sign-off Sep 2019 | 705 Market St | Eric F Anderson Incorporated | ground floor: coffee bar millwork partitions, ceilings, finishes, mech, elec, plumbing. no exterior or structutal.Details
ground floor: coffee bar millwork partitions, ceilings, finishes, mech, elec, plumbing. no exterior or structutal. | $171,180 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 703 Market St | street spaceDetails
street space | ||
| Nov 7, 2018 | Completed final sign-off Nov 2018 | 703 Market St | Convergint Technologies Llc | ref pa# 201807245455; 1st fl. fire alarm t.i. 1st fl. sprint store, 2 control relays for fan control, 5 new sprinkler strobes, 2 new strobes and 4 duct detectors for new ac unitsDetails
ref pa# 201807245455; 1st fl. fire alarm t.i. 1st fl. sprint store, 2 control relays for fan control, 5 new sprinkler strobes, 2 new strobes and 4 duct detectors for new ac units | $5,000 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 703 Market St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 18 pendents, add 1 uprights & relocate 1 upright for sprint. ref pa #201807245455.Details
fire sprinkler only - relocate 18 pendents, add 1 uprights & relocate 1 upright for sprint. ref pa #201807245455. | $10,000 |
| Oct 23, 2018 | Never finaled issued Nov 2018, no final | 701 Market St | Integrated Sign Installations Inc | install 2 illuminated "sprint" wall signsDetails
install 2 illuminated "sprint" wall signs | $6,000 |
| Oct 11, 2018 | Never finaled issued Oct 2018, no final | 703 Market St | street spaceDetails
street space | ||
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 703 Market St | street spaceDetails
street space | ||
| Jul 24, 2018 | Completed final sign-off Apr 2019 | 703 Market St | Source Planning And Construction Inc | 1st flr. tenant improvement. new sales floor at rear, new display fixtures, ceiling, plumbing fixtures, mechanical ductwork to diffusers, interior partitions, floor finishes, outlets, relocate electrical panels.Details
1st flr. tenant improvement. new sales floor at rear, new display fixtures, ceiling, plumbing fixtures, mechanical ductwork to diffusers, interior partitions, floor finishes, outlets, relocate electrical panels. | $150,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 703 Market St | street spaceDetails
street space | ||
| Jul 10, 2018 | Never finaled issued Aug 2018, no final | 703 Market St | Sky Rider Equip Co Inc | provide and install tie-back anchors for use of an hll system for unscheduled maintenance as well as a new non penatrating hatch guardrail with self closing gateDetails
provide and install tie-back anchors for use of an hll system for unscheduled maintenance as well as a new non penatrating hatch guardrail with self closing gate | |
| Apr 30, 2018 | Never finaled filed Apr 2018, never issued | 703 Market St | non structural exterior alterations to the corner retail entry at third and market streets. (e) glazing is to be demo'd and replaced with fixed glazing at third st and swinging doors with sidelights at market st.Details
non structural exterior alterations to the corner retail entry at third and market streets. (e) glazing is to be demo'd and replaced with fixed glazing at third st and swinging doors with sidelights at market st. | $69,500 | |
| Jan 8, 2018 | Completed final sign-off Feb 2019 | 703 Market St | Dome Construction Corp | title 24 under pa 201708154840, 201612134779, 201511233384Details
title 24 under pa 201708154840, 201612134779, 201511233384 | $38,465 |
| Dec 29, 2017 | Completed final sign-off Jan 2018 | 703 Market St | Convergint Technologies Llc | basement/1st flr: fire alarm ti. new sprinkler water flow (one) and new sprinkler temper supervisory switch (three). ref 201605258238Details
basement/1st flr: fire alarm ti. new sprinkler water flow (one) and new sprinkler temper supervisory switch (three). ref 201605258238 | $3,000 |
| Dec 21, 2017 | Expired or cancelled cancelled Mar 2019 | 701 Market St | Dome Construction Corp | landlord upgrade of mechanical units for future build out. demo of existing ductworkDetails
landlord upgrade of mechanical units for future build out. demo of existing ductwork | $82,000 |
| Dec 15, 2017 | Never finaled issued Dec 2017, no final | 703 Market St | Dome Construction Corp | title 24 permit, ref 201707273040Details
title 24 permit, ref 201707273040 | $900,000 |
| Dec 15, 2017 | Completed final sign-off Jan 2018 | 703 Market St | Convergint Technologies Llc | 20th flr: fire alarm 1 pull station, 5 duct detectors, 5 control relays, 2 smoke det, 4 strobes, 10 speaker/strobesDetails
20th flr: fire alarm 1 pull station, 5 duct detectors, 5 control relays, 2 smoke det, 4 strobes, 10 speaker/strobes | $15,000 |
| Aug 15, 2017 | Completed final sign-off Feb 2019 | 703 Market St | Dome Construction Corp | ground floor: modification of work permitted under application #201511233384. the project consists of modifications to the interior elevator wall finishes at the ground floor lobby. glass block will remain exposed and new ceramic tile panel pilasters constructed elev. doors.Details
ground floor: modification of work permitted under application #201511233384. the project consists of modifications to the interior elevator wall finishes at the ground floor lobby. glass block will remain exposed and new ceramic tile panel pilasters constructed elev. doors. | $38,000 |
| Jul 31, 2017 | Never finaled issued Jul 2017, no final | 703 Market St | street spaceDetails
street space | ||
| Jul 27, 2017 | Never finaled issued Oct 2017, no final | 703 Market St | Dome Construction Corp | 20thfl: project consist of new t.i. including walls, glazing door,s and finishes, and new accessibile restrooms. no structural work. is involced. seperate demo permit #201707141866. mep/fire life saftey deferred.Details
20thfl: project consist of new t.i. including walls, glazing door,s and finishes, and new accessibile restrooms. no structural work. is involced. seperate demo permit #201707141866. mep/fire life saftey deferred. | $255,000 |
| Jul 26, 2017 | Completed final sign-off Sep 2017 | 703 Market St | Martin Sign Co Inc. | fabrication and installation of 6 evac maps for 2nd,3rd,4th fl.Details
fabrication and installation of 6 evac maps for 2nd,3rd,4th fl. | $600 |
| Jul 14, 2017 | Completed final sign-off Mar 2018 | 703 Market St | Dome Construction Corp | 20th fl: project consist of demolition of non-structural and non-load bearing interior partitions and ceilings, glazing, doors and finishes. no structural demo involvedDetails
20th fl: project consist of demolition of non-structural and non-load bearing interior partitions and ceilings, glazing, doors and finishes. no structural demo involved | $17,750 |
| Jun 14, 2017 | Never finaled issued Jun 2017, no final | 703 Market St | street space permitDetails
street space permit | ||
| May 30, 2017 | Completed final sign-off Jun 2017 | 703 Market St | Skyline Construction | 16th floor - t1 consists of removing wall between two existing confrerence rooms to make one larger conference roomDetails
16th floor - t1 consists of removing wall between two existing confrerence rooms to make one larger conference room | $15,000 |
| Apr 26, 2017 | Completed final sign-off Nov 2017 | 703 Market St | Ayoob & Peery Plumbing Co Inc | basement- per t.i., install new fire service. ref. t.i. pa#201511233384Details
basement- per t.i., install new fire service. ref. t.i. pa#201511233384 | $2,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 703 Market St | Convergint Technologies Llc | 2nd-4th flr: as builts for 201703141368 - modify sequence of events for won doorDetails
2nd-4th flr: as builts for 201703141368 - modify sequence of events for won door | |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 703 Market St | Convergint Technologies Llc | 2,3,4,5,6,14,15,16,19 flr: as builts for 201611162838- modify sequence of events for won doorDetails
2,3,4,5,6,14,15,16,19 flr: as builts for 201611162838- modify sequence of events for won door | |
| Mar 14, 2017 | Completed final sign-off Apr 2017 | 703 Market St | Convergint Technologies Llc | fire alarm ti on floor 2,3,4 including: 3 control relays, 19 speakrs, 2 speaker/strobes, 21 duct detectors ref#201612144891, 201606149882, 201607212956Details
fire alarm ti on floor 2,3,4 including: 3 control relays, 19 speakrs, 2 speaker/strobes, 21 duct detectors ref#201612144891, 201606149882, 201607212956 | $20,000 |
| Mar 14, 2017 | Completed final sign-off Oct 2017 | 703 Market St | Ayoob & Peery Plumbing Co Inc | 1st floor - per tenant improvement - t.i. improvement: install 53 sprinklers & line piping to provide shell protection. ref pa#201511233384.Details
1st floor - per tenant improvement - t.i. improvement: install 53 sprinklers & line piping to provide shell protection. ref pa#201511233384. | $27,855 |
| Mar 6, 2017 | Completed final sign-off May 2017 | 703 Market St | Dome Construction Corp | install future heating and cooling vrv system. no architectural associated with this permit. mechanical shell work only. hvac for distribution under separate t.i. permit.Details
install future heating and cooling vrv system. no architectural associated with this permit. mechanical shell work only. hvac for distribution under separate t.i. permit. | $160,000 |
| Mar 3, 2017 | Completed final sign-off Mar 2017 | 703 Market St | Ayoob & Peery Plumbing Co Inc | floors 2,3,4 per tenant improvement: install (1) sprinkler head at communicating door. ref #201606149882 & #201607212956.Details
floors 2,3,4 per tenant improvement: install (1) sprinkler head at communicating door. ref #201606149882 & #201607212956. | $1,576 |
| Feb 7, 2017 | Never finaled issued Feb 2017, no final | 703 Market St | street spaceDetails
street space | ||
| Feb 7, 2017 | Never finaled issued Feb 2017, no final | 703 Market St | street spaceDetails
street space | ||
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | mechanical, electrical, plumbing for ti on the 3rd fl. ref bpa#201612144886.Details
mechanical, electrical, plumbing for ti on the 3rd fl. ref bpa#201612144886. | $75,000 |
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | mechanical, electrical, plumbing for ti on the 2nd fl. ref bpa#201612144891Details
mechanical, electrical, plumbing for ti on the 2nd fl. ref bpa#201612144891 | $75,000 |
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | mechanical, electrical, plumbing for ti on the 4th flDetails
mechanical, electrical, plumbing for ti on the 4th fl | $75,000 |
| Jan 17, 2017 | Completed final sign-off Aug 2017 | 703 Market St | Convergint Technologies Llc | all floors: two-way communication system in stairwell, including 1) control panel, 4 call stations, 1 monitor module, 1 power supplyDetails
all floors: two-way communication system in stairwell, including 1) control panel, 4 call stations, 1 monitor module, 1 power supply | $10,000 |
| Jan 10, 2017 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | title-24 floors 2,3,4 - ref floor 2 pa#201612144891, floor 3 pa#201612144886, floor 4 pa #201612144890.Details
title-24 floors 2,3,4 - ref floor 2 pa#201612144891, floor 3 pa#201612144886, floor 4 pa #201612144890. | |
| Jan 10, 2017 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | title 24 for floor 5 and 6. reference mep 2016.1014.0276. ti reference 2016.07.28.3548Details
title 24 for floor 5 and 6. reference mep 2016.1014.0276. ti reference 2016.07.28.3548 | |
| Jan 10, 2017 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | title 24 for floor 16 and 19 - ref #201608245829 (mep)Details
title 24 for floor 16 and 19 - ref #201608245829 (mep) | |
| Jan 10, 2017 | Completed final sign-off May 2017 | 703 Market St | Dome Construction Corp | title 24 for floor 14 reference #201608175202.Details
title 24 for floor 14 reference #201608175202. | |
| Jan 10, 2017 | Completed final sign-off May 2017 | 703 Market St | Dome Construction Corp | title 24 for floor 15, reference 201608245825.Details
title 24 for floor 15, reference 201608245825. | |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | 4/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit.Details
4/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit. | $250,000 |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | 3/f: t.i. (n) partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit.Details
3/f: t.i. (n) partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit. | $250,000 |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | 2/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit.Details
2/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit. | $250,000 |
| Dec 13, 2016 | Completed final sign-off Feb 2019 | 703 Market St | Dome Construction Corp | modification of 201511233384. add new exit door into lobby to act as 2nd exit for retail spaceDetails
modification of 201511233384. add new exit door into lobby to act as 2nd exit for retail space | $2,000 |
| Nov 16, 2016 | Never finaled issued Dec 2016, no final | 703 Market St | Convergint Technologies Llc | fire alarm ti for floors 2-6, 14-16, 19. ref appln #201607283548, 201608245825, 201608175202, 201605258238, 201610140275. including (6) pull stations, (39) smoke detectors, (36) duct detectors, (9) booster panels, (21) relays, (117) speaker/strobes, strobesDetails
fire alarm ti for floors 2-6, 14-16, 19. ref appln #201607283548, 201608245825, 201608175202, 201605258238, 201610140275. including (6) pull stations, (39) smoke detectors, (36) duct detectors, (9) booster panels, (21) relays, (117) speaker/strobes, strobes | $75,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 15/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing; ref pa201608245829Details
15/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing; ref pa201608245829 | $62,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 5&6/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa#201608245829Details
5&6/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa#201608245829 | $124,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 14/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing ref 201608245829Details
14/f: furnish and install five 5 new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing ref 201608245829 | $62,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Bay City Mechanical Inc | 16&19/f: furnish and install (5) new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa201608245829Details
16&19/f: furnish and install (5) new hot water fancoils per floor. furnish and install new supply, return, and exhaust ductwork. insulation as req by title 24. independent air and water balancing. ref pa201608245829 | $124,000 |
| Aug 24, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 15th floor - project consists of ti for market ready including walls, glass, doors and finishes. new accessible restroom are included - no structural work. demo is completed under #2016-0503-6433. mep & fls under separate permit.Details
15th floor - project consists of ti for market ready including walls, glass, doors and finishes. new accessible restroom are included - no structural work. demo is completed under #2016-0503-6433. mep & fls under separate permit. | $254,400 |
| Aug 24, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 16 & 19 floor - ti for market ready including new restrooms, walls, glazing, doors. no structural work is uncluded. demo has been previously permitted. demo permit for 16th fl: #2016-0503-6434. demo permit for 19th fl: #2016-0823-5721.Details
16 & 19 floor - ti for market ready including new restrooms, walls, glazing, doors. no structural work is uncluded. demo has been previously permitted. demo permit for 16th fl: #2016-0503-6434. demo permit for 19th fl: #2016-0823-5721. | $508,000 |
| Aug 23, 2016 | Completed final sign-off Mar 2017 | 703 Market St | Dome Construction Corp | 19th floor: project consists of demo to (e) office space.Details
19th floor: project consists of demo to (e) office space. | $20,000 |
| Aug 17, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 14th flr: ti including walls, glazing, doors & finishes as wekk as new accessible restrooms. no structural work in involved, demo complete under permit 201601136961Details
14th flr: ti including walls, glazing, doors & finishes as wekk as new accessible restrooms. no structural work in involved, demo complete under permit 201601136961 | $254,400 |
| Jul 28, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 5th & 6th floor: new tenant improvements including, wall, glazing, doors and finishes for the entire space as well as new accessible restrooms. no structural and demo has been previously permitted and is complete; separate mep, life safety permit.Details
5th & 6th floor: new tenant improvements including, wall, glazing, doors and finishes for the entire space as well as new accessible restrooms. no structural and demo has been previously permitted and is complete; separate mep, life safety permit. | $508,000 |
| Jul 21, 2016 | Never finaled issued Nov 2016, no final | 703 Market St | Dome Construction Corp | 2nd, 3rd, 4th floors: drywall @ communicating opening. service (e) doors revision to pa 201605258238Details
2nd, 3rd, 4th floors: drywall @ communicating opening. service (e) doors revision to pa 201605258238 | $5,555 |
| May 25, 2016 | Never finaled issued Jul 2016, no final | 703 Market St | Dome Construction Corp | floors 2,3,4, interior base building upgrades in building new accessible restrooms and enclosure of elevator lobbies. does not anticipate authorization or approval of any future use or occupancy without permits and modification. sprinklers under separate permit.Details
floors 2,3,4, interior base building upgrades in building new accessible restrooms and enclosure of elevator lobbies. does not anticipate authorization or approval of any future use or occupancy without permits and modification. sprinklers under separate permit. | $160,500 |
| May 3, 2016 | Completed final sign-off Mar 2017 | 703 Market St | C C I Commercial Construction & Improv | 16th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
16th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| May 3, 2016 | Completed final sign-off Mar 2017 | 703 Market St | C C I Commercial Construction & Improv | 15th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
15th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| May 3, 2016 | Completed final sign-off Mar 2017 | 703 Market St | C C I Commercial Construction & Improv | 3rd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
3rd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| May 3, 2016 | Completed final sign-off Jun 2016 | 703 Market St | Convergint Technologies Llc | fire alarm ti on floors 8,9,10, 11 including 4 pull stations, 4 sync modules, 8 relays, 16 smoke det, 20 duct det, 4 power supplies, 42 speaker strobes, 16 strobes ref 201509015742, 201509247912Details
fire alarm ti on floors 8,9,10, 11 including 4 pull stations, 4 sync modules, 8 relays, 16 smoke det, 20 duct det, 4 power supplies, 42 speaker strobes, 16 strobes ref 201509015742, 201509247912 | $20,000 |
| May 3, 2016 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | 2nd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
2nd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| Apr 20, 2016 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install five new hot water fancoils. furnish and install new supply, return and exhaust ductwork. insulation as required by title 24. independent air and water balancing. referenced ti 201509015742Details
furnish and install five new hot water fancoils. furnish and install new supply, return and exhaust ductwork. insulation as required by title 24. independent air and water balancing. referenced ti 201509015742 | $10,000 |
| Apr 20, 2016 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install five new hot water fancoils. furnish and install new supply, return and exhaust ductwork. insulation as required by title 24. independent air and water balancing.Details
furnish and install five new hot water fancoils. furnish and install new supply, return and exhaust ductwork. insulation as required by title 24. independent air and water balancing. | $10,000 |
| Apr 20, 2016 | Completed final sign-off Sep 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install five new hot water fancoils. furnish and install new supply, return and exhaust ductwork. insulation as required by title 24. independent air and water balancing. reference ti 201510220452Details
furnish and install five new hot water fancoils. furnish and install new supply, return and exhaust ductwork. insulation as required by title 24. independent air and water balancing. reference ti 201510220452 | $10,000 |
| Mar 31, 2016 | Completed final sign-off Sep 2016 | 703 Market St | C C I Commercial Construction & Improv | 8th floor: title 24 only.referenced mep 2016.04.20.5280Details
8th floor: title 24 only.referenced mep 2016.04.20.5280 | $200 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 21st floor: title 24 only. referenced mep 2015.0804.3263Details
21st floor: title 24 only. referenced mep 2015.0804.3263 | $200 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 12th floor: title 24 onlyDetails
12th floor: title 24 only | $200 |
| Mar 31, 2016 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | 11th floor: title 24 only. referenced mep 2016.0420.5283Details
11th floor: title 24 only. referenced mep 2016.0420.5283 | $200 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 7th floor: title 24 only. reference 2015.0727.2540Details
7th floor: title 24 only. reference 2015.0727.2540 | $200 |
| Mar 31, 2016 | Completed final sign-off Sep 2016 | 703 Market St | C C I Commercial Construction & Improv | 9th floor: title 24 only. referenced ti 2016.0420.5280Details
9th floor: title 24 only. referenced ti 2016.0420.5280 | $200 |
| Mar 31, 2016 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | 10th floor: title 24 only. reference 2016.04.20.5282 mep.Details
10th floor: title 24 only. reference 2016.04.20.5282 mep. | $200 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 17th floor: title 24 only. mep_______Details
17th floor: title 24 only. mep_______ | $200 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 13th floor: title 24 only. referenced ti 2015.09.25.8134Details
13th floor: title 24 only. referenced ti 2015.09.25.8134 | $200 |
| Mar 22, 2016 | Never finaled issued Mar 2016, no final | 703 Market St | street space permitDetails
street space permit | ||
| Feb 8, 2016 | Never finaled issued Feb 2016, no final | 703 Market St | street space permitDetails
street space permit | ||
| Jan 13, 2016 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | 14th and 4th floors: demolition of non-structural and non load bearing interior partitions and ceiling: including walls, glazing, doors and finishes. soft demolition only. no structural demolition involved. t.i. under seperate permit. per ab-017Details
14th and 4th floors: demolition of non-structural and non load bearing interior partitions and ceiling: including walls, glazing, doors and finishes. soft demolition only. no structural demolition involved. t.i. under seperate permit. per ab-017 | $20,000 |
| Jan 13, 2016 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | 5th and 6th floors: demolition of non-structural and non load bearing interior partitions and ceiling: including walls, glazing, doors and finishes. soft demolition only. no structural demolition involved. t.i. under seperate permit.Details
5th and 6th floors: demolition of non-structural and non load bearing interior partitions and ceiling: including walls, glazing, doors and finishes. soft demolition only. no structural demolition involved. t.i. under seperate permit. | $20,000 |
| Nov 23, 2015 | Completed final sign-off Feb 2019 | 703 Market St | Dome Construction Corp, C C I Commercial Construction & Improv | project consists of the removal of non-structural decorative exteior stone surround, existing glazing & doors & the install off (n) stone surround, glazing & doors. the interior lobby is to be refinished including a new guard desk.Details
project consists of the removal of non-structural decorative exteior stone surround, existing glazing & doors & the install off (n) stone surround, glazing & doors. the interior lobby is to be refinished including a new guard desk. | $500,000 |
| Nov 13, 2015 | Completed final sign-off May 2017 | 703 Market St | Convergint Technologies Llc | fire alarm t.i. on floors: 7,12,13, and 17. ref app#201507131254, 201507272540, including 4 pull stations, 1 isolator module, 4 powersupplies, 201508063522 and 201508113875. 4 sync modules, 16 smoke det, 42 speaker/strobes, 12 control relays, 24 duct det 16 strobes.Details
fire alarm t.i. on floors: 7,12,13, and 17. ref app#201507131254, 201507272540, including 4 pull stations, 1 isolator module, 4 powersupplies, 201508063522 and 201508113875. 4 sync modules, 16 smoke det, 42 speaker/strobes, 12 control relays, 24 duct det 16 strobes. | $30,000 |
| Nov 12, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | revision to pa 2015-0806-3522. metal stud framing splicing due to field conditionDetails
revision to pa 2015-0806-3522. metal stud framing splicing due to field condition | |
| Oct 30, 2015 | Completed final sign-off Nov 2015 | 703 Market St | Convergint Technologies Llc | fire alarm ti on 21st fl including: 1 pull station, isolation module, power supply, 1 sync module, 4 smoke det, 10 speaker/strobes, 3 control relays, duct detectors, 1 strobeDetails
fire alarm ti on 21st fl including: 1 pull station, isolation module, power supply, 1 sync module, 4 smoke det, 10 speaker/strobes, 3 control relays, duct detectors, 1 strobe | $10,000 |
| Oct 22, 2015 | Completed final sign-off Sep 2016 | 703 Market St | C C I Commercial Construction & Improv | 8th & 9th floors: new ti- new walls, int glazing, door & finishes. new restroom will be provided. demo work under 201506239676 & 201507030619Details
8th & 9th floors: new ti- new walls, int glazing, door & finishes. new restroom will be provided. demo work under 201506239676 & 201507030619 | $508,000 |
| Oct 16, 2015 | Completed final sign-off May 2017 | 703 Market St | C C I Commercial Construction & Improv | furnish and install 5 new hot water fancoils. furnish and install new supply. returne and exhaust duct workDetails
furnish and install 5 new hot water fancoils. furnish and install new supply. returne and exhaust duct work | $5,000 |
| Oct 16, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install 5 new hot water fan coils. furnish and install new supply, returne and exhaust duct workDetails
furnish and install 5 new hot water fan coils. furnish and install new supply, returne and exhaust duct work | $5,000 |
| Sep 29, 2015 | Completed final sign-off Jun 2016 | 703 Market St | Convergint Technologies Llc | replacement of fire alarm system.Details
replacement of fire alarm system. | $80,000 |
| Sep 25, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 17th floor: furnish and install 5 new hot water fancoils. furnish and install new supply. return and exhaust ductwork.Details
17th floor: furnish and install 5 new hot water fancoils. furnish and install new supply. return and exhaust ductwork. | $5,000 |
| Sep 25, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 13th floor: furnish and install 5 new hot water fancoils. furnish and install new suuply. return and exhaust ductwork.Details
13th floor: furnish and install 5 new hot water fancoils. furnish and install new suuply. return and exhaust ductwork. | $5,000 |
| Sep 24, 2015 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | 10th fl tenant improvement including walls, glazing, doors, finishes for the 10th fl. new accessible restrooms. no structural work. demo under 201506239680Details
10th fl tenant improvement including walls, glazing, doors, finishes for the 10th fl. new accessible restrooms. no structural work. demo under 201506239680 | $254,000 |
| Sep 17, 2015 | Completed final sign-off Aug 2016 | 703 Market St | Eco Fire Sprinklers Inc | 21st flr: no work- calculation & plan to prove (e) fire pump and ug for (e) fire escape sprinklers at 21st flr, building permit 201507010454Details
21st flr: no work- calculation & plan to prove (e) fire pump and ug for (e) fire escape sprinklers at 21st flr, building permit 201507010454 | $1,200 |
| Sep 1, 2015 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | ti including walls, glazing, doors and finishes for the entire 11th floor, as well as new accesible restrooms. no structural work and demo has been already permitted and performedDetails
ti including walls, glazing, doors and finishes for the entire 11th floor, as well as new accesible restrooms. no structural work and demo has been already permitted and performed | $254,000 |
| Aug 11, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | new tenant improvements including walls, doors, int glazing and finishes as well new accessible restrooms on the 13th fl. no structural. demo work previously permitted and completed. mep & fire life safety under separate permit.Details
new tenant improvements including walls, doors, int glazing and finishes as well new accessible restrooms on the 13th fl. no structural. demo work previously permitted and completed. mep & fire life safety under separate permit. | $254,400 |
| Aug 11, 2015 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | basement - (n) ada accessible ramp & stairs to replace (e) non accessible ramp & stairs; (n) rated walls, doors & smoke detector at (e) passenger elevator lobbyDetails
basement - (n) ada accessible ramp & stairs to replace (e) non accessible ramp & stairs; (n) rated walls, doors & smoke detector at (e) passenger elevator lobby | $16,850 |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | tenant improvement including walls, interir glazing, doors and finishes for 17th fl including new accessible restrooms, no structural work. under separate permit demo pa#201504305050.Details
tenant improvement including walls, interir glazing, doors and finishes for 17th fl including new accessible restrooms, no structural work. under separate permit demo pa#201504305050. | $254,400 |
| Aug 4, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 21st floor: furnish and install 5 new hot water fancoils. furnish and install new supply return and exhaust ductwork. insulation as required by t-24. independant air and water balancing ref app#2015-0701-0454Details
21st floor: furnish and install 5 new hot water fancoils. furnish and install new supply return and exhaust ductwork. insulation as required by t-24. independant air and water balancing ref app#2015-0701-0454 | $100,000 |
| Aug 4, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install one new steam to hot water heat exchanger. furnish and install new 2 new hot water circulating pumps. furnish and install new heating hot water risers from the basement to the 21st floor with/stub outs on all floors. ref app#201507010454Details
furnish and install one new steam to hot water heat exchanger. furnish and install new 2 new hot water circulating pumps. furnish and install new heating hot water risers from the basement to the 21st floor with/stub outs on all floors. ref app#201507010454 | $200,000 |
| Jul 27, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | new t.i. including, walls, glazing, doors, and finishes for the 7th floor as well as new accessible restrooms. demo work is complete and no structural work.Details
new t.i. including, walls, glazing, doors, and finishes for the 7th floor as well as new accessible restrooms. demo work is complete and no structural work. | $254,400 |
| Jul 13, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 12th floor: new t.i. including walls, glazing, doors and finishes for the entire tenant space, as well as new accessible restrooms. no structural work.Details
12th floor: new t.i. including walls, glazing, doors and finishes for the entire tenant space, as well as new accessible restrooms. no structural work. | $250,000 |
| Jul 9, 2015 | Expired or cancelled cancelled Oct 2016 | 703 Market St | C C I Commercial Construction & Improv | to accomodate future new water, tel/data and fire lift safety risers being installed up through the bldg, project consists on 2nd floor only of the construction of new closets to house risers and the relocation of an extg tenant corridor wall to allow proper corridor width.Details
to accomodate future new water, tel/data and fire lift safety risers being installed up through the bldg, project consists on 2nd floor only of the construction of new closets to house risers and the relocation of an extg tenant corridor wall to allow proper corridor width. | $2,625 |
| Jul 3, 2015 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | soft demo ab-017 on 8th floor.Details
soft demo ab-017 on 8th floor. | $10,000 |
| Jul 1, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | project consists of new t.i. to the 21/f including walls, glazing, doors and finishes for entire space. no structural work.Details
project consists of new t.i. to the 21/f including walls, glazing, doors and finishes for entire space. no structural work. | $242,000 |
| Jun 23, 2015 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | demolition of non structural and non load bearing interior partitions and ceilings. include walls, glazing, doors and finishes. soft demo only. no structural demoliton involved. all work to be done on 9th floor. per ab-017Details
demolition of non structural and non load bearing interior partitions and ceilings. include walls, glazing, doors and finishes. soft demo only. no structural demoliton involved. all work to be done on 9th floor. per ab-017 | $5,000 |
| Jun 23, 2015 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | demolition of non structural and non load bearing interior partitions and ceilings. include walls, glazing, doors and finishes. soft demo only. no structural demoliton involved. all work to be done on 11th floor. per ab-017Details
demolition of non structural and non load bearing interior partitions and ceilings. include walls, glazing, doors and finishes. soft demo only. no structural demoliton involved. all work to be done on 11th floor. per ab-017 | $5,000 |
| Jun 23, 2015 | Completed final sign-off Jul 2016 | 703 Market St | C C I Commercial Construction & Improv | demolition of non structural and non load bearing interior partitions and ceilings. include walls, glazing, doors and finishes. soft demo only. no structural demoliton involved. all work to be done on 10th floor. per ab-017Details
demolition of non structural and non load bearing interior partitions and ceilings. include walls, glazing, doors and finishes. soft demo only. no structural demoliton involved. all work to be done on 10th floor. per ab-017 | $5,000 |
| May 7, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 7th floor: non structural soft demo ab-017Details
7th floor: non structural soft demo ab-017 | $5,000 |
| Apr 30, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | non structural demo per ab017Details
non structural demo per ab017 | $10,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | 12th flr: ab-017 non structural soft demoDetails
12th flr: ab-017 non structural soft demo | $10,000 |
| Mar 27, 2015 | Expired or cancelled withdrawn May 2017 | 703 Market St | C C I Commercial Construction & Improv | 13th flr: project consists of new ti including walls, glazing, doors and finishes for the space. new restrooms are to be included, no structural work involved.Details
13th flr: project consists of new ti including walls, glazing, doors and finishes for the space. new restrooms are to be included, no structural work involved. | $243,000 |
| Dec 4, 2014 | Expired or cancelled cancelled Jul 2015 | 703 Market St | C C I Commercial Construction & Improv | new t.i. to the entire 21st floor including partitions, glazing, doors, finishes and accessible restrooms.Details
new t.i. to the entire 21st floor including partitions, glazing, doors, finishes and accessible restrooms. | $282,326 |
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 703 Market St | Skyline Construction | 13th floor: demolition of non-structural and non-load bearing interior walls or partitions and ceilings including walls, glazing, doors and finishes. for ab-017. t.i. permit under separate. maher n/a.Details
13th floor: demolition of non-structural and non-load bearing interior walls or partitions and ceilings including walls, glazing, doors and finishes. for ab-017. t.i. permit under separate. maher n/a. | $16,000 |
| Aug 28, 2014 | Never finaled issued Aug 2014, no final | 703 Market St | Skyline Construction | ab-017 demolition of interior partitions ceiling, glazing, doors and finishes. n/a interimDetails
ab-017 demolition of interior partitions ceiling, glazing, doors and finishes. n/a interim | $8,000 |
| Jun 23, 2014 | Completed final sign-off Aug 2016 | 703 Market St | Skyline Construction, C C I Commercial Construction & Improv | enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs.Details
enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs. | $41,490 |
| Jun 17, 2014 | Completed final sign-off Sep 2014 | 703 Market St | Skyline Construction | minor alteration to an extg tenant space on a multi-tenant floor. new work is patching and replacement of extg suspended ceiling and lighting. new portion of rated corridor with tenant entry door and new accessible sink.Details
minor alteration to an extg tenant space on a multi-tenant floor. new work is patching and replacement of extg suspended ceiling and lighting. new portion of rated corridor with tenant entry door and new accessible sink. | $11,210 |
| May 12, 2011 | Completed final sign-off Aug 2011 | 701 Market St | Sabah International Incorporated | provide new fire alarm notification for the at & t flagship store. addition of 1 power booster supply, 3 wall strobes & 6 ceiling speakers strobes.Details
provide new fire alarm notification for the at & t flagship store. addition of 1 power booster supply, 3 wall strobes & 6 ceiling speakers strobes. | $10,458 |
| Apr 28, 2011 | Completed final sign-off Dec 2011 | 701 Market St | Cb Bovenkamp Inc. | m e p associated with issued bldg permit app#201102180522Details
m e p associated with issued bldg permit app#201102180522 | $21,000 |
| Apr 28, 2011 | Never finaled issued Apr 2011, no final | 701 Market St | West Coast Sign | to erect electrical sign. reface s1,install vinyl on s2(doors),reface s3Details
to erect electrical sign. reface s1,install vinyl on s2(doors),reface s3 | $2,400 |
| Feb 18, 2011 | Completed final sign-off Aug 2011 | 701 Market St | Cb Bovenkamp Inc. | 1st floor interior tenant improvement ot include demo of (e) interior walls, reconstruction of new interior partiiton walls, 2 ada compliant restrooms & associated plumbing, electrical & signage. mech, life safety, sprinkler, alarm under separate permit.Details
1st floor interior tenant improvement ot include demo of (e) interior walls, reconstruction of new interior partiiton walls, 2 ada compliant restrooms & associated plumbing, electrical & signage. mech, life safety, sprinkler, alarm under separate permit. | $200,000 |
| Sep 29, 2010 | Never finaled issued Sep 2010, no final | 703 Market St | street space for scaffoldDetails
street space for scaffold | ||
| Aug 31, 2010 | Never finaled issued Aug 2010, no final | 703 Market St | street spaceDetails
street space | ||
| Jul 21, 2010 | Completed final sign-off Dec 2010 | 703 Market St | Rainbow Waterproofing & Restor | to provide restorative and repair work to exterior, mortar and brick to original condition at the 13 th floorDetails
to provide restorative and repair work to exterior, mortar and brick to original condition at the 13 th floor | $10,000 |
| Jul 14, 2010 | Completed final sign-off Dec 2010 | 703 Market St | Rainbow Waterproofing & Restor | to comply with nov#201055889. for exploratory work and to asses (e) stone mortar condition attached to brick backing on the 13th. flr. area of work approx. 15'x5'. no exterior change.Details
to comply with nov#201055889. for exploratory work and to asses (e) stone mortar condition attached to brick backing on the 13th. flr. area of work approx. 15'x5'. no exterior change. | $10,000 |
| Jun 22, 2010 | Never finaled issued Jun 2010, no final | 703 Market St | street space permitDetails
street space permit | ||
| Mar 10, 2009 | Never finaled issued Mar 2009, no final | 703 Market St | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| Sep 12, 2008 | Never finaled issued Sep 2008, no final | 701 Market St | provide a new notification fire alarm system for the a t and t flagship stores. 1 power booster supply, 2 ceiling strobes, 3 speaker strobesDetails
provide a new notification fire alarm system for the a t and t flagship stores. 1 power booster supply, 2 ceiling strobes, 3 speaker strobes | $14,841 | |
| Jul 31, 2008 | Never finaled issued Jul 2008, no final | 701 Market St | revision to appl #200806235068 - rearrange fixtures & wall unit.Details
revision to appl #200806235068 - rearrange fixtures & wall unit. | $5,000 | |
| Jun 23, 2008 | Never finaled issued Jun 2008, no final | 701 Market St | 1st floor: refinished existing at at & t store interior wall & finishing, repalce existing sale furniture, add light tracks and demo.Details
1st floor: refinished existing at at & t store interior wall & finishing, repalce existing sale furniture, add light tracks and demo. | $5,000 | |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 703 Market St | Rudolph Caler/Lumen Electric | oti-2 18th floor elDetails
oti-2 18th floor el | $27,000 |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 703 Market St | Red Hawk Fire & Security Ca Llc | 18th floor, ti fire alarm engineering/installationDetails
18th floor, ti fire alarm engineering/installation | $9,500 |
| Mar 13, 2007 | Completed final sign-off Apr 2008 | 703 Market St | remove (e) terrazo floor finish & replace with stone tiles. remove (e) wood wall finish & replace with new stone slabs & structural support system. install (n) guard station & suspended ceiling. minor electrical work to be performed, reinstall (e) light fixtures.Details
remove (e) terrazo floor finish & replace with stone tiles. remove (e) wood wall finish & replace with new stone slabs & structural support system. install (n) guard station & suspended ceiling. minor electrical work to be performed, reinstall (e) light fixtures. | $85,000 | |
| Dec 5, 2006 | Completed final sign-off Jul 2007 | 703 Market St | wrap manager: oti-1 18th floor, el, ls.Details
wrap manager: oti-1 18th floor, el, ls. | $100,000 | |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 703 Market St | interior non structural demolition of 18th floor. disabled access at vacant spaces per ab 017, sfbc 2001Details
interior non structural demolition of 18th floor. disabled access at vacant spaces per ab 017, sfbc 2001 | $21,000 | |
| Jan 3, 2005 | Completed final sign-off Feb 2005 | 701 Market St | Johnston Sign Company | erect paintedDetails
erect painted | |
| Dec 18, 2003 | Completed final sign-off Jan 2004 | 703 Market St | Pacific Auxiliary Fire Alarm | revision to pa 200307280533 for additn 4 smoke detectors, 1 wallmount horn, 1 ceiling mount strobe &Details
revision to pa 200307280533 for additn 4 smoke detectors, 1 wallmount horn, 1 ceiling mount strobe & | $2,600 |
| Dec 2, 2003 | Completed final sign-off Feb 2004 | 703 Market St | Ward Alan Emery Construction Inc. | convert existing restroom for hc barrier removal.Details
convert existing restroom for hc barrier removal. | $25,000 |
| Jul 28, 2003 | Completed final sign-off Jan 2004 | 703 Market St | Pacific Auxiliary Fire Alarm | adding new devices to the fire alarm system due to remodel of the 21st floorDetails
adding new devices to the fire alarm system due to remodel of the 21st floor | $30,000 |
| Jul 1, 2003 | Completed final sign-off Jan 2004 | 703 Market St | Collier Ostrom Enterpises | install (n) interior non bearing walls. on 21st flrDetails
install (n) interior non bearing walls. on 21st flr | $175,000 |
| May 15, 2003 | Completed final sign-off Sep 2003 | 703 Market St | Collier Ostrom Enterpises | soft demolition of interiorwalls and finisher,on 21st floorDetails
soft demolition of interiorwalls and finisher,on 21st floor | $8,000 |
| Dec 14, 2001 | Expired or cancelled expired Mar 2004 | 701 Market St | A S F Electric Inc | adding four fire alarm devices first floorDetails
adding four fire alarm devices first floor | $2,500 |
| May 7, 2001 | Expired or cancelled expired May 2002 | 701 Market St | t/i to (e) retail store add attitional handicap toilet per plansDetails
t/i to (e) retail store add attitional handicap toilet per plans | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C C I Commercial Construction & Improv (46), Dome Construction Corp (21), Convergint Technologies Llc (15), Skyline Construction (13), Bay City Mechanical Inc (5), Ayoob & Peery Plumbing Co Inc (3), Peacock Construction (3), W M Wireless Inc (3), Anderson Eric F Inc (2), Cb Bovenkamp Inc. (2), Collier Ostrom Enterpises (2), Pacific Auxiliary Fire Alarm (2), Rainbow Waterproofing & Restor (2), Westates Mechanical Corporation Inc (2), A S F Electric Inc, Build Group Inc., Coast Sign Incorporated, Eco Fire Sprinklers Inc, Golden Gate Fire Protection Inc, Integrated Sign Installations Inc, Johnston Sign Company, Martin Sign Co Inc., Pribuss Engineering Inc, Red Hawk Fire & Security Ca Llc, Rudolph Caler/Lumen Electric, Sabah International Incorporated, Signtech Electrical Advertising Inc., Sky Rider Equip Co Inc, Source Planning And Construction Inc, Ward Alan Emery Construction Inc., West Coast Sign
- Architects
- John L Thiele (25), Gene P. Pena (2), George S Soskin (2), Leif Glomset (2), Ariane Lebrilla, Doug Tom, Gerald D. Wilhelm, Gregory Mattola, John Kamus, Lewis James Burrows, Michael Dubitsky, Robert J Sargenti
- Engineers
- David Johnson (5), Theodore Garcia (5), Anton O C Jakosalem (2), James R. Spore (2), Alan C. Burr, Cbf Electric Data, David Johnson, Don Penn, Joel Martman, Matthew Chase, Meng Hsiu Chen, Paul Breen, Peter A Leptuch, Rodrigo Santos
- Attorneys
- Theodore Garcia
- Authorized agent-otherss
- Edgar Arambulo, Travuth Mock
- Designers
- John L Thiele, John Pribus Bayardo Chamorro, Theodore G. Garcia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.