Michael Dubitsky
- Listed as
- architect, authorized agent-others
- Firm
- Rapt Studio
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Oct 2026
67 permits since 2000 (architect on 66 permits, authorized agent-others on 1 permit): 43 completed, 13 in progress, 11 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 88 Spear St | Principal Builders Inc. | 9th floor: partial interior ti includes new partitions, doors, ceilings, finishes, and millwork. mep deferred.Details
9th floor: partial interior ti includes new partitions, doors, ceilings, finishes, and millwork. mep deferred. | $2,170,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 88 Spear St | 9th fl - interior soft demo of non-bearing partitions, millwork and finishesDetails
9th fl - interior soft demo of non-bearing partitions, millwork and finishes | $50,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 236 08th St | 1st flr. enlarge existing stair vesitibule and add new door into stair, relocate existing mailbox. all interior work.Details
1st flr. enlarge existing stair vesitibule and add new door into stair, relocate existing mailbox. all interior work. | $7,630 | |
| Sep 22, 2026 | In progress issued Oct 2026 | 1 Front St | Gci, Inc | 36th floor: t.i. demo existing partitions, ceilings, doors, and remove existing appliances at currant interior space. provide new non-bearing partitions, ceilings, lighting fixtures, millwork and finishes.Details
36th floor: t.i. demo existing partitions, ceilings, doors, and remove existing appliances at currant interior space. provide new non-bearing partitions, ceilings, lighting fixtures, millwork and finishes. | $1,280,000 |
| Jun 25, 2026 | In progress issued Aug 2026 | 667 Mission St | Novo Construction Inc | basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit.Details
basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit. | $1,504,200 |
| Jun 23, 2026 | In progress issued Sep 2026 | 667 Mission St | Novo Construction Inc | 4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.Details
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit. | $1,671,340 |
| Jun 23, 2026 | In progress issued Sep 2026 | 657 Mission St | Novo Construction Inc | 4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.Details
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit. | $1,671,340 |
| Jun 22, 2026 | In progress issued Jul 2026 | 657 Mission St | Novo Construction Inc | tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit.Details
tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit. | $2,929,920 |
| Jun 22, 2026 | In progress issued Jun 2026 | 657 Mission St | Novo Construction Inc | tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep.Details
tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep. | $2,139,556 |
| Jun 22, 2026 | In progress issued Aug 2026 | 667 Mission St | Novo Construction Inc | new interconnecting stair between level 4-6Details
new interconnecting stair between level 4-6 | $1,197,277 |
| Jun 16, 2026 | In progress issued Jun 2026 | 400 Montgomery St | Principal Builders Inc. | 2nd floor: ti includes light demo, new conference room, new storage alcore, relocation of mens room door, new breakroom for employee use. mep deferred.Details
2nd floor: ti includes light demo, new conference room, new storage alcore, relocation of mens room door, new breakroom for employee use. mep deferred. | $600,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 101 California St | Gci, Inc | 25th/f: partial t.i. of a single suite of an e) high riseDetails
25th/f: partial t.i. of a single suite of an e) high rise | $150,000 |
| May 1, 2025 | Completed final sign-off Oct 2025 | 730 Montgomery St | Novo Construction Inc | minor revision to pa#: 202502210771 to relocate proposed lift and adjust stair width at mezzanine.Details
minor revision to pa#: 202502210771 to relocate proposed lift and adjust stair width at mezzanine. | |
| Apr 8, 2025 | Completed final sign-off Sep 2025 | 730 Montgomery St | Novo Construction Inc | minor modification to existing historic facade. replace existing non-historic store front door. add new surface applied muntins to existing non historic glazing infill to match opposite side.Details
minor modification to existing historic facade. replace existing non-historic store front door. add new surface applied muntins to existing non historic glazing infill to match opposite side. | $60,000 |
| Apr 8, 2025 | Completed final sign-off Oct 2025 | 730 Montgomery St | Novo Construction Inc | minor revision to pa #202502210771 to remove deferred fire alarm and fire sprinklers systems from scope.Details
minor revision to pa #202502210771 to remove deferred fire alarm and fire sprinklers systems from scope. | |
| Mar 10, 2025 | Completed final sign-off Sep 2025 | 730 Montgomery St | installation of new non electric double-faced projecting sign.Details
installation of new non electric double-faced projecting sign. | $5,000 | |
| Feb 21, 2025 | Completed final sign-off Oct 2025 | 730 Montgomery St | Novo Construction Inc | on the first floor full tenant improvement on the second floor. new partial interior improvement mezzanine at the 2nd floor. new finishes, fixtuires, partitions, doors glazing, ceiling. mep deferred.Details
on the first floor full tenant improvement on the second floor. new partial interior improvement mezzanine at the 2nd floor. new finishes, fixtuires, partitions, doors glazing, ceiling. mep deferred. | $600,000 |
| Oct 11, 2024 | Completed final sign-off Mar 2025 | 101 California St | Source Planning And Construction Inc | 19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinkleredDetails
19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered | $1,675,000 |
| Sep 10, 2024 | In progress issued Sep 2024 | 101 California St | Source Planning And Construction Inc | demolition of interior walls, floor and wall finishes in a portion of floor 19, compliance with ab-017.Details
demolition of interior walls, floor and wall finishes in a portion of floor 19, compliance with ab-017. | $45,000 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 101 California St | Gci, Inc | 25th floor: t.i. new non-load bearing interior walls, lighting, finishes and mep.Details
25th floor: t.i. new non-load bearing interior walls, lighting, finishes and mep. | $1,500,000 |
| Feb 23, 2023 | Completed final sign-off Feb 2024 | 1355 Market St | Hathaway Dinwiddie Construct Co | revision to 201807275785. reclassify 7 conference rooms on floor 8 as rest areas to comply with complaint number 202299825Details
revision to 201807275785. reclassify 7 conference rooms on floor 8 as rest areas to comply with complaint number 202299825 | |
| Dec 22, 2022 | Never finaled issued Mar 2023, no final | 153 Kearny St | Principal Builders Inc. | t.i. on 2nd floor extg office space including limited new partitions, ceilings,lighting finishes, electrical and hvacDetails
t.i. on 2nd floor extg office space including limited new partitions, ceilings,lighting finishes, electrical and hvac | $195,000 |
| Dec 22, 2022 | Never finaled issued Mar 2023, no final | 153 Kearny St | Principal Builders Inc. | t.i. of mezzanine space including limited new partitions, lighting finishes, electrical and hvacDetails
t.i. of mezzanine space including limited new partitions, lighting finishes, electrical and hvac | $90,000 |
| Dec 22, 2022 | Never finaled issued Mar 2023, no final | 153 Kearny St | Principal Builders Inc. | t.i. of 3rd floor office space including limited new partitions,ceiling, lighting finishes, electrical and mechDetails
t.i. of 3rd floor office space including limited new partitions,ceiling, lighting finishes, electrical and mech | $205,000 |
| Dec 22, 2022 | Completed final sign-off Nov 2023 | 153 Kearny St | Principal Builders Inc. | t.i. of 6th floor space work including limited new partitions, ceilings,lighting finishes, electrical and hvacDetails
t.i. of 6th floor space work including limited new partitions, ceilings,lighting finishes, electrical and hvac | $195,000 |
| Nov 3, 2022 | Completed final sign-off Jan 2023 | 140 New Montgomery St | Truebeck Construction | 18th fl - revision to pa 2022-0218-8310 to install dw, refrigerator & hot water heaterDetails
18th fl - revision to pa 2022-0218-8310 to install dw, refrigerator & hot water heater | $4,000 |
| Sep 27, 2022 | Completed final sign-off Mar 2023 | 215 Fremont St | Novo Construction Inc | evacuation map signage for 2nd,3rd and 4th.Details
evacuation map signage for 2nd,3rd and 4th. | $3,000 |
| Sep 15, 2022 | Completed final sign-off May 2023 | 140 New Montgomery St | Principal Builders Inc. | 26/fl interior ti work includes new non-structural partitions, doors, ceilings, fixtures and finishes. mep deferred.Details
26/fl interior ti work includes new non-structural partitions, doors, ceilings, fixtures and finishes. mep deferred. | $934,000 |
| Aug 8, 2022 | Completed final sign-off Jan 2024 | 116 New Montgomery St | Swinerton Builders | construct new interior egress corridor and stair from 2/f to the g/f. stair connects 2 stories and is enclosed in 1-hr rated corridor per cbc 1023.2. no work at historic facade, stair, and balcony on this permit.Details
construct new interior egress corridor and stair from 2/f to the g/f. stair connects 2 stories and is enclosed in 1-hr rated corridor per cbc 1023.2. no work at historic facade, stair, and balcony on this permit. | $210,000 |
| Aug 8, 2022 | Completed final sign-off Jan 2024 | 116 New Montgomery St | Swinerton Builders | 2/f: interior t.i: consisting of open work space and meeting rooms. new non-structural partitions, doors, ceilings, finishes, and millworks. mep deferred.Details
2/f: interior t.i: consisting of open work space and meeting rooms. new non-structural partitions, doors, ceilings, finishes, and millworks. mep deferred. | $1,484,280 |
| Jul 27, 2022 | Completed final sign-off Jan 2023 | 140 New Montgomery St | Truebeck Construction | 18th fl: structural support/analysis for mep equipment in server room and anchorage details and analysis of loads on (e) structure.Details
18th fl: structural support/analysis for mep equipment in server room and anchorage details and analysis of loads on (e) structure. | |
| Jul 11, 2022 | Completed final sign-off May 2023 | 140 New Montgomery St | Principal Builders Inc. | partial interior demo on the 26th floor only. removal of parttions (non-structural), finishes and fixtures. to remain vacant per ab-017Details
partial interior demo on the 26th floor only. removal of parttions (non-structural), finishes and fixtures. to remain vacant per ab-017 | $45,000 |
| May 10, 2022 | Completed final sign-off Mar 2023 | 215 Fremont St | Novo Construction Inc | floores 2/3/4: interior t.i.: new partitions, glazing, doors, new mechanical and electrical to include new cooling vav low pressue ductwood. new lighting.Details
floores 2/3/4: interior t.i.: new partitions, glazing, doors, new mechanical and electrical to include new cooling vav low pressue ductwood. new lighting. | $945,000 |
| Apr 1, 2022 | Never finaled issued Apr 2022, no final | 1355 Market St | Hathaway Dinwiddie Construct Co | to comply with nov# 2106-0063. revision to egress pathway on 7/f & 8/f. new door release button on 7f & 8f. new exit sign on 8/f.Details
to comply with nov# 2106-0063. revision to egress pathway on 7/f & 8/f. new door release button on 7f & 8f. new exit sign on 8/f. | $1,000 |
| Apr 1, 2022 | Completed final sign-off Jun 2022 | 1355 Market St | Hathaway Dinwiddie Construct Co | to comply with nov# 2106-0063. revised evac maps to depict revised egress pathway on 8/f.Details
to comply with nov# 2106-0063. revised evac maps to depict revised egress pathway on 8/f. | |
| Jan 14, 2022 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | revision to pa# 202101273412. revised door operations, lighting layout, and lobby door. new partitions at platform.Details
revision to pa# 202101273412. revised door operations, lighting layout, and lobby door. new partitions at platform. | $2,000 |
| Dec 23, 2021 | Never finaled issued Oct 2022, no final | 116 New Montgomery St | Swinerton Builders | t.i.constisting of specific suite build-outs for future ground floor retail. new restrooms @ ground floor. mep & elevator deferred. no work at historical facade.Details
t.i.constisting of specific suite build-outs for future ground floor retail. new restrooms @ ground floor. mep & elevator deferred. no work at historical facade. | $837,000 |
| Dec 17, 2021 | Completed final sign-off Sep 2023 | 116 New Montgomery St | Swinerton Builders | g/f & 2/f: interior demo - remove non-bearing partitions, finishes and fixtures.Details
g/f & 2/f: interior demo - remove non-bearing partitions, finishes and fixtures. | $30,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | administative permit to correct language as follow: minor revision to 2021 0127 3412: to update (e) smoke control report to conform w/ t.i. work. no work on this permitDetails
administative permit to correct language as follow: minor revision to 2021 0127 3412: to update (e) smoke control report to conform w/ t.i. work. no work on this permit | |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | revision to 2021 0520 0701: technical infeasibility request @ accessible stall doors on fl 2, 3, & 4Details
revision to 2021 0520 0701: technical infeasibility request @ accessible stall doors on fl 2, 3, & 4 | |
| Nov 8, 2021 | Never finaled issued Oct 2022, no final | 116 New Montgomery St | Swinerton Builders | g/f: replacement of (e) non-original storefronts along mission str and the three northernmost storefronts along new montgomery st. no removal of original fabric modification of interior vestible. no mep work on this permit.Details
g/f: replacement of (e) non-original storefronts along mission str and the three northernmost storefronts along new montgomery st. no removal of original fabric modification of interior vestible. no mep work on this permit. | $300,000 |
| Nov 1, 2021 | Completed final sign-off Mar 2022 | 703 Market St | Skyline Construction | 9th floor: tennant security improvement. demo one office partitions, replace extg glass partitions with gyp. board partition. mep under seperate permit.Details
9th floor: tennant security improvement. demo one office partitions, replace extg glass partitions with gyp. board partition. mep under seperate permit. | $100,000 |
| Sep 16, 2021 | Completed final sign-off Jan 2022 | 30 03rd St | Skyline Construction | basement-2nd floors: non structural tenant improvement including partitions, lighting and added security door. deferred mep.Details
basement-2nd floors: non structural tenant improvement including partitions, lighting and added security door. deferred mep. | $100,000 |
| Sep 16, 2021 | Completed final sign-off Jan 2022 | 30 03rd St | Skyline Construction | 6th fl: non-structural t.i. consiting of partition alterations, lighting anfd security doors, deffered mepDetails
6th fl: non-structural t.i. consiting of partition alterations, lighting anfd security doors, deffered mep | $100,000 |
| Dec 13, 2019 | Completed final sign-off Oct 2021 | 1 Bush St | Clune Construction Company L P | 4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred.Details
4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred. | $1,200,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 16th fl ti mep for permit #201911026240 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
16th fl ti mep for permit #201911026240 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 1355 Market St | Hathaway Dinwiddie Co. | 8/f: occupancy correction at small training room 8303. egress clarification and (e) exit sign removal at airlock 8301. revision to 201807275785 maher not reqDetails
8/f: occupancy correction at small training room 8303. egress clarification and (e) exit sign removal at airlock 8301. revision to 201807275785 maher not req | $800 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1455 Market St | Principal Builders Inc. | 16th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 16th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher naDetails
16th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 16th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher na | $140,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1455 Market St | Principal Builders Inc. | 20th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 20th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher naDetails
20th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 20th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher na | $140,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1455 Market St | Principal Builders Inc. | 17th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 17th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher naDetails
17th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 17th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher na | $140,000 |
| Aug 27, 2019 | Completed final sign-off May 2020 | 1355 Market St | Truebeck Construction | revision t0 issue permit #201811135675. ti consist of new interior partitions, glazing, doors & millwork.Details
revision t0 issue permit #201811135675. ti consist of new interior partitions, glazing, doors & millwork. | $1,700,000 |
| Feb 21, 2019 | Never finaled issued Mar 2019, no final | 1355 Market St | Hathaway Dinwiddie Co. | install projector and paer hanging art displayDetails
install projector and paer hanging art display | $20,000 |
| Jan 24, 2019 | Completed final sign-off Apr 2019 | 1355 Market St | Hathaway Dinwiddie Co. | 8th floor: replace existing 90 min horizontal exit door with new 90 min rated door. like for like.Details
8th floor: replace existing 90 min horizontal exit door with new 90 min rated door. like for like. | $5,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 1355 Market St | Hathaway Dinwiddie Co. | 7th floor: replace existing 90 min horizontal exit door with new 90 min rated door. like for like.Details
7th floor: replace existing 90 min horizontal exit door with new 90 min rated door. like for like. | $5,000 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 153 Townsend St | Skyline Construction | revision to pa #201808167508 to add cage in idf room. 6th flDetails
revision to pa #201808167508 to add cage in idf room. 6th fl | $5,000 |
| Dec 13, 2018 | Completed final sign-off Jun 2022 | 55 02nd St | Principal Builders Inc. | 26th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permitDetails
26th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit | $899,000 |
| Dec 13, 2018 | Completed final sign-off Jun 2022 | 55 02nd St | Principal Builders Inc. | 25th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permitDetails
25th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit | $899,000 |
| Dec 6, 2018 | Completed final sign-off Feb 2019 | 55 02nd St | Principal Builders Inc. | 25/26f: demo of interior walls, doors, millwork, glazing and finishes. space to remain unoccupied under ab-017 ada to be provided w/ti work. maher n/a.Details
25/26f: demo of interior walls, doors, millwork, glazing and finishes. space to remain unoccupied under ab-017 ada to be provided w/ti work. maher n/a. | $113,875 |
| Nov 13, 2018 | Completed final sign-off Jun 2020 | 1355 Market St | Hathaway Dinwiddie Co., Truebeck Construction | 9th flr - ti - millwork, partitions. lighting, av, telecom, dishroom, & servery equipment. deferred mep, fire alarm & sprinkers.maher n/a.Details
9th flr - ti - millwork, partitions. lighting, av, telecom, dishroom, & servery equipment. deferred mep, fire alarm & sprinkers.maher n/a. | $1,082,977 |
| Sep 19, 2018 | Never finaled issued Oct 2018, no final | 153 Townsend St | Skyline Construction | rev to (e) communicating stair. demo (e) stairs between 9&8 flrs. create (n) openings from 8-6 flrs. construct (n) communicating stairs between 9 & 6th flrs with new finishes, hand rails & guard rails. maher n/a.Details
rev to (e) communicating stair. demo (e) stairs between 9&8 flrs. create (n) openings from 8-6 flrs. construct (n) communicating stairs between 9 & 6th flrs with new finishes, hand rails & guard rails. maher n/a. | $1,100,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 153 Townsend St | Skyline Construction | 6th fl: demo of nonload bearing partitions, associated power/telecom, outlets, millwork, ceiing tile, grid & lighting. sprinkler app: 2018-0808-6757Details
6th fl: demo of nonload bearing partitions, associated power/telecom, outlets, millwork, ceiing tile, grid & lighting. sprinkler app: 2018-0808-6757 | $10,000 |
| Nov 16, 2016 | Completed final sign-off Dec 2017 | 555 California St | Bcci Construction Company | 48th floor t.i. including new interior partitions, glazing, doors, millwork, lighting, electrical, plumbing & mechanical. fire alarm, sprinklers, under separate permit. n/a maher ordinanceDetails
48th floor t.i. including new interior partitions, glazing, doors, millwork, lighting, electrical, plumbing & mechanical. fire alarm, sprinklers, under separate permit. n/a maher ordinance | $1,950,000 |
| Nov 16, 2016 | Completed final sign-off Dec 2017 | 555 California St | Bcci Construction Company | 47th floor t.i. including new interior partitions, glazing, doors, millwork, lighting , electrical, plumbing & mechanical. fire alarm, sprinkler, fire under seperate permit demolition under pa# 201610271265.. n/a maher ordinanceDetails
47th floor t.i. including new interior partitions, glazing, doors, millwork, lighting , electrical, plumbing & mechanical. fire alarm, sprinkler, fire under seperate permit demolition under pa# 201610271265.. n/a maher ordinance | $1,950,000 |
| Aug 19, 2016 | Completed final sign-off Nov 2016 | 2 South Park | Principal Builders Inc. | interior demo of door, partitions & millwork, space to remain vacant under ab17 maher naDetails
interior demo of door, partitions & millwork, space to remain vacant under ab17 maher na | $16,000 |
| Jun 6, 2016 | Completed final sign-off May 2017 | 2 South Park | Principal Builders Inc. | 1st floor - change current use of tenant space from retail to office in mixed use bldg. change of use-only.Details
1st floor - change current use of tenant space from retail to office in mixed use bldg. change of use-only. |