Block 3738, lot 012
215 Fremont St
- City’s use
- Commercial Office
- Built
- 1928
- Stories
- 8
- Rooms
- 24 bathrooms
- Building
- 385,558 sq ft
- Lot
- 53,803 sq ft
- Zoning
- C3OSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 215 Fremont St | Gordon Prill Inc | arch, electrical, structural work in basement at (e) bike parking cage. relocate (e) fence & gate, new fence to match (e) including anchoring. install u shaped bike racks, new auto-operator at fence gate & modifications to lighting & power as required.Details
arch, electrical, structural work in basement at (e) bike parking cage. relocate (e) fence & gate, new fence to match (e) including anchoring. install u shaped bike racks, new auto-operator at fence gate & modifications to lighting & power as required. | $15,900 |
| Jan 6, 2026 | In progress issued Jan 2026 | 215 Fremont St | Pyro-Comm Systems, Inc. | floors: 2,3,4,6.7. fire alarm 2 power supply, 42 speaker strobes to be added for the new phone booths. pa#: 202512010652.Details
floors: 2,3,4,6.7. fire alarm 2 power supply, 42 speaker strobes to be added for the new phone booths. pa#: 202512010652. | $9,000 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 215 Fremont St | Gordon Prill Inc | 7th flr - mech scope incl install new water source heat pump (repl in-kind), new temp sensor reconnecting to existing utilities. 8th flr plumbing scope incl install of 3 new instahot and drain. structural scope includes anchoring of new heat pump. electrical scope includes disconnecting demolishedDetails
7th flr - mech scope incl install new water source heat pump (repl in-kind), new temp sensor reconnecting to existing utilities. 8th flr plumbing scope incl install of 3 new instahot and drain. structural scope includes anchoring of new heat pump. electrical scope includes disconnecting demolished | $98,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 215 Fremont St | Source Planning And Construction Inc | level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406Details
level 2,3,4,5,6 & 7: permitting of phone booths. ref pa # 202105200701 & 202101273406 | $640,000 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 215 Fremont St | Cobe Construction Inc | 2nd, 3rd and 4th fl. install new bevi water dispensers at (e) break rooms. scope of work includes minor plumbing and casework modifications.Details
2nd, 3rd and 4th fl. install new bevi water dispensers at (e) break rooms. scope of work includes minor plumbing and casework modifications. | $28,526 |
| Jan 6, 2025 | In progress issued Jan 2025 | 215 Fremont St | Pyro-Comm Systems, Inc. | 1/f: fire alarm - 1 relay module will be added for the turnstiles in the lobby.Details
1/f: fire alarm - 1 relay module will be added for the turnstiles in the lobby. | $1,000 |
| May 22, 2024 | In progress filed May 2024, not yet issued | 215 Fremont St | dish wireless: install (3)(n) antennas inside (3)(n) radomes, (1)(n) cabinet, (1)(n) electrical panel; no proposed batteriesDetails
dish wireless: install (3)(n) antennas inside (3)(n) radomes, (1)(n) cabinet, (1)(n) electrical panel; no proposed batteries | $140,000 | |
| Mar 25, 2024 | Completed final sign-off Jun 2024 | 215 Fremont St | Pyro-Comm Systems, Inc. | 2-4/f: 3 speaker strobes, 2 relay modules to be added to provide proper coverage. ref 2-3/f:pa #202312212970 & 4/ pa# 202402015035.Details
2-4/f: 3 speaker strobes, 2 relay modules to be added to provide proper coverage. ref 2-3/f:pa #202312212970 & 4/ pa# 202402015035. | $4,000 |
| Feb 6, 2024 | Completed final sign-off Feb 2024 | 215 Fremont St | Martin Sign Co Inc. | fabriction of (12) acrylic evacuation maps and installtion of the sameDetails
fabriction of (12) acrylic evacuation maps and installtion of the same | $500 |
| Feb 1, 2024 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | revision to 202310108255 on 4th floor to include (n) security vestibules. scope includes mep related trade workDetails
revision to 202310108255 on 4th floor to include (n) security vestibules. scope includes mep related trade work | $100,000 |
| Jan 11, 2024 | In progress issued Jan 2024 | 215 Fremont St | Pioneer Fire Inc. | 2/f vestibule: relocate 2 pendents, add 2 pendents; 3/f vestibule: relocate 3 pendents, 1 upright, add 1 pendent. ref pa# 202310108253.Details
2/f vestibule: relocate 2 pendents, add 2 pendents; 3/f vestibule: relocate 3 pendents, 1 upright, add 1 pendent. ref pa# 202310108253. | $1,350 |
| Jan 11, 2024 | Completed final sign-off Mar 2024 | 215 Fremont St | Pioneer Fire Inc. | 4/f vestibule: relocate 7 pendents, 2 uprights, ref pa# 202310108255.Details
4/f vestibule: relocate 7 pendents, 2 uprights, ref pa# 202310108255. | $1,350 |
| Jan 11, 2024 | Completed final sign-off Feb 2024 | 215 Fremont St | Pioneer Fire Inc. | 4/f: relocate 38 pendents, 2 uprights, add 5 pendents. ref pa# 202310108255.Details
4/f: relocate 38 pendents, 2 uprights, add 5 pendents. ref pa# 202310108255. | $6,450 |
| Jan 4, 2024 | Completed final sign-off Mar 2024 | 215 Fremont St | Pioneer Fire Inc. | 3rd floor: relocate 20 pendents, 1 upright. add 4 pendents. gc ti #202310108253Details
3rd floor: relocate 20 pendents, 1 upright. add 4 pendents. gc ti #202310108253 | $3,750 |
| Dec 21, 2023 | In progress issued Jan 2024 | 215 Fremont St | Novo Construction Inc | 4th floor: revision to pa#202310108253 and pa#202310108255. new mech louver on south facade on 4th floor.Details
4th floor: revision to pa#202310108253 and pa#202310108255. new mech louver on south facade on 4th floor. | $100,000 |
| Dec 21, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 2nd and 3rd floor new partitions and doors for new offices, mtg rooms and security vestibules. revision to pa #202310108253 and 202311080450Details
2nd and 3rd floor new partitions and doors for new offices, mtg rooms and security vestibules. revision to pa #202310108253 and 202311080450 | $300,000 |
| Dec 21, 2023 | Completed final sign-off Feb 2024 | 215 Fremont St | Pyro-Comm Systems, Inc. | fire alarm: 4 duct detectors, 4 relay modules, 6 speaker strobes to be added to provide proper coverage. ref to t.i. 202310108255Details
fire alarm: 4 duct detectors, 4 relay modules, 6 speaker strobes to be added to provide proper coverage. ref to t.i. 202310108255 | $5,000 |
| Dec 15, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demo and reinstall vav reheat and colling boxes as needed.Details
4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demo and reinstall vav reheat and colling boxes as needed. | |
| Nov 8, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 3/f: deferred mep for bpa#202310108253Details
3/f: deferred mep for bpa#202310108253 | $250,000 |
| Oct 10, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 3/f: ti (n) partition for offices, mtg rms, & proj work rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site.Details
3/f: ti (n) partition for offices, mtg rms, & proj work rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site. | $1,800,000 |
| Oct 10, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 4/f: ti (n) partition for proj work & utility rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site in limited qty.Details
4/f: ti (n) partition for proj work & utility rms. no change of use. all egress & life safety systems to remain in operation during & after construction. gc to provide temp exit signs/strobes as req by construction. no hazmat used/stored on site in limited qty. | $2,200,000 |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 215 Fremont St | Pioneer Fire Inc. | convert (9) pendents to upright on 3rd floor. remove (33) pendents. gfti# 202308255323Details
convert (9) pendents to upright on 3rd floor. remove (33) pendents. gfti# 202308255323 | $6,300 |
| Aug 25, 2023 | Completed final sign-off Mar 2024 | 215 Fremont St | Novo Construction Inc | interior non-structural demo 3rd fl approx 1931 sf and 4th ox 8504 sf inc removal of partitions, doors, finishes. no chang in use or occupant load. all egress and fire life safety (ie fire alarm, sprinklers, strobes system to be maintained during and after demo work. ab-017 applies & deferred to t.iDetails
interior non-structural demo 3rd fl approx 1931 sf and 4th ox 8504 sf inc removal of partitions, doors, finishes. no chang in use or occupant load. all egress and fire life safety (ie fire alarm, sprinklers, strobes system to be maintained during and after demo work. ab-017 applies & deferred to t.i | $94,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 215 Fremont St | Pioneer Fire Inc. | add (12) pendents in added clouds. gcti# 202205103865.Details
add (12) pendents in added clouds. gcti# 202205103865. | |
| Sep 27, 2022 | Completed final sign-off Mar 2023 | 215 Fremont St | Novo Construction Inc | evacuation map signage for 2nd,3rd and 4th.Details
evacuation map signage for 2nd,3rd and 4th. | $3,000 |
| Sep 20, 2022 | Completed final sign-off Oct 2022 | 215 Fremont St | Sabah International Incorporated | flrs 2,3,4: ti 202205103865 modify existing fire alarm system. add (3) led ceiling speaker/stobes.Details
flrs 2,3,4: ti 202205103865 modify existing fire alarm system. add (3) led ceiling speaker/stobes. | $30,910 |
| Jun 23, 2022 | Completed final sign-off Jun 2023 | 215 Fremont St | Sun Graphics | fabricate and install (8) emergency evacuation maps on floors 7 and 7a mezzanine, mounted to wall with vhb foam tape and silicone as needed.Details
fabricate and install (8) emergency evacuation maps on floors 7 and 7a mezzanine, mounted to wall with vhb foam tape and silicone as needed. | $3,800 |
| May 17, 2022 | Completed final sign-off Mar 2023 | 215 Fremont St | Pioneer Fire Inc. | floors 2, 3, 4: relocate (e) pendants & add new uprights to update coverage for new buildint. ref t.i. pa202205103865. maher n/a.Details
floors 2, 3, 4: relocate (e) pendants & add new uprights to update coverage for new buildint. ref t.i. pa202205103865. maher n/a. | $5,500 |
| May 10, 2022 | Completed final sign-off Mar 2023 | 215 Fremont St | Novo Construction Inc | floores 2/3/4: interior t.i.: new partitions, glazing, doors, new mechanical and electrical to include new cooling vav low pressue ductwood. new lighting.Details
floores 2/3/4: interior t.i.: new partitions, glazing, doors, new mechanical and electrical to include new cooling vav low pressue ductwood. new lighting. | $945,000 |
| Mar 25, 2022 | Completed final sign-off Apr 2022 | 215 Fremont St | Sabah International Incorporated | as-built submital to pa# 202108126293. as-built scope of work consist of updating the field addresses per sffd job card notes & the addition of 1 smoke detector in storage room # 835.Details
as-built submital to pa# 202108126293. as-built scope of work consist of updating the field addresses per sffd job card notes & the addition of 1 smoke detector in storage room # 835. | |
| Mar 21, 2022 | Completed final sign-off Apr 2022 | 215 Fremont St | Pioneer Fire Inc. | 8/f: fire as built to pa# 202108236890. added 5 additional sprinklers in soffit. gc ti pa# 202101273412.Details
8/f: fire as built to pa# 202108236890. added 5 additional sprinklers in soffit. gc ti pa# 202101273412. | |
| Feb 24, 2022 | Completed final sign-off Mar 2022 | 215 Fremont St | Novo Construction Inc | fire only evacuation maps 6th floor.Details
fire only evacuation maps 6th floor. | $1,000 |
| Jan 14, 2022 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | revision to pa# 202101273412. revised door operations, lighting layout, and lobby door. new partitions at platform.Details
revision to pa# 202101273412. revised door operations, lighting layout, and lobby door. new partitions at platform. | $2,000 |
| Dec 10, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | 6/f: rev to pa202101273406: updates including exiting plan, room names, rcp update, ceilinghts and conf room dimension changes.Details
6/f: rev to pa202101273406: updates including exiting plan, room names, rcp update, ceilinghts and conf room dimension changes. | $2,500 |
| Dec 9, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | 8th fl: deferred submittal to pa# 202101273412. specify installation of engineered steel reinforement seismic framing for terracotta partition. anchoring and custom fabricared chandlier element.Details
8th fl: deferred submittal to pa# 202101273412. specify installation of engineered steel reinforement seismic framing for terracotta partition. anchoring and custom fabricared chandlier element. | $7,000 |
| Dec 3, 2021 | Completed final sign-off Mar 2022 | 215 Fremont St | Novo Construction Inc | deferred submittal for 202101273412 evacuation map signages (4).Details
deferred submittal for 202101273412 evacuation map signages (4). | $400 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | revision to 2021 0520 0701: technical infeasibility request @ accessible stall doors on fl 2, 3, & 4Details
revision to 2021 0520 0701: technical infeasibility request @ accessible stall doors on fl 2, 3, & 4 | |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | administative permit to correct language as follow: minor revision to 2021 0127 3412: to update (e) smoke control report to conform w/ t.i. work. no work on this permitDetails
administative permit to correct language as follow: minor revision to 2021 0127 3412: to update (e) smoke control report to conform w/ t.i. work. no work on this permit | |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 215 Fremont St | Pioneer Fire Inc. | 6th fl - fire sprinklers relocaated existing fire sprinklers to accomodate new ti buildout. ref pa 2021-0127-3406Details
6th fl - fire sprinklers relocaated existing fire sprinklers to accomodate new ti buildout. ref pa 2021-0127-3406 | $7,500 |
| Oct 21, 2021 | Completed final sign-off Jul 2022 | 215 Fremont St | Sabah International Incorporated | revision to 202108216304: change 3 remote call stations instead of 4Details
revision to 202108216304: change 3 remote call stations instead of 4 | |
| Oct 21, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Sabah International Incorporated | floors 5/7/7a/8: install 9 new call stations instead of 12 listed under pa 202108126305.Details
floors 5/7/7a/8: install 9 new call stations instead of 12 listed under pa 202108126305. | |
| Aug 27, 2021 | Completed final sign-off Jan 2022 | 215 Fremont St | Sabah International Incorporated | 8/f: f/a interface with security control access system to unlo0ck doors on floor 7 & 7a upon fire alarm activation. interface will be provided on 8/f next to access control panel. add 4 relay module.Details
8/f: f/a interface with security control access system to unlo0ck doors on floor 7 & 7a upon fire alarm activation. interface will be provided on 8/f next to access control panel. add 4 relay module. | $18,972 |
| Aug 23, 2021 | Completed final sign-off Jun 2022 | 215 Fremont St | Pioneer Fire Inc. | 8/f: install new pendent sprinklers using (e) 1" outlet due to new wall & ceiling configuration, ref ti pa#202101273412Details
8/f: install new pendent sprinklers using (e) 1" outlet due to new wall & ceiling configuration, ref ti pa#202101273412 | $6,700 |
| Aug 19, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Sabah International Incorporated | floors 2,3,4,8: ti pa 202105200701. modify existing fire alarm system. add 4 remote power supplies, 30 led ceiling strobes, 8 led ceiling speaker/strobes, 4 dual modules, 4 control modules, 4 mini monitor modules.Details
floors 2,3,4,8: ti pa 202105200701. modify existing fire alarm system. add 4 remote power supplies, 30 led ceiling strobes, 8 led ceiling speaker/strobes, 4 dual modules, 4 control modules, 4 mini monitor modules. | $9,300 |
| Aug 12, 2021 | Completed final sign-off Mar 2022 | 215 Fremont St | Sabah International Incorporated | modify e fire alarm system. add 1 booster power supply, 2 dual sync modules, 7 smoke detectors, 4 duct detectors, 3 control relays, 23 strobes, 25 speaker strobesDetails
modify e fire alarm system. add 1 booster power supply, 2 dual sync modules, 7 smoke detectors, 4 duct detectors, 3 control relays, 23 strobes, 25 speaker strobes | $9,600 |
| Aug 12, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Sabah International Incorporated | provide a new 2-way emergency communication backbbone infrastructure system. install 1 main control unit. 2 master console phones. 1 telephone interface. 1 relay isolation module. 4 remote call station.Details
provide a new 2-way emergency communication backbbone infrastructure system. install 1 main control unit. 2 master console phones. 1 telephone interface. 1 relay isolation module. 4 remote call station. | $21,088 |
| Aug 12, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Sabah International Incorporated | install 12 new call stations. call stations will be installed on 6th fl inside stair #3 & elevator lobby, 7th fl inside stair #1,2,3 & elevator lobby, 7a mezzanine inside stair #1,2,3,& elevator lobby, 8th fl elevator lobby & inside stairwell #3.Details
install 12 new call stations. call stations will be installed on 6th fl inside stair #3 & elevator lobby, 7th fl inside stair #1,2,3 & elevator lobby, 7a mezzanine inside stair #1,2,3,& elevator lobby, 8th fl elevator lobby & inside stairwell #3. | $8,600 |
| Jul 1, 2021 | Completed final sign-off Aug 2021 | 215 Fremont St | Golden Gate Fire Protection Inc | 7/f: fire sprinklers, relocate (1) and add (1) pendant sprinkler, add (1) uprightDetails
7/f: fire sprinklers, relocate (1) and add (1) pendant sprinkler, add (1) upright | $1,575 |
| Jun 2, 2021 | Completed final sign-off Feb 2022 | 215 Fremont St | Pioneer Fire Inc. | add/relocate sprinkler heads to accomodate buildout on 2nd, 3rd, 4th & 8th floors gc ti # 2021-0520-0701Details
add/relocate sprinkler heads to accomodate buildout on 2nd, 3rd, 4th & 8th floors gc ti # 2021-0520-0701 | $8,700 |
| Jun 1, 2021 | Completed final sign-off Jul 2022 | 215 Fremont St | Novo Construction Inc | additional scope to approve permit 202101192900 to include demo and construction of temporary rated elevator lobby wall w/rated doors and vestibule, no electrical, no mech work.Details
additional scope to approve permit 202101192900 to include demo and construction of temporary rated elevator lobby wall w/rated doors and vestibule, no electrical, no mech work. | $5,000 |
| May 20, 2021 | Completed final sign-off Jun 2022 | 215 Fremont St | Novo Construction Inc | ti upgrade core/shell restrooms on levels 2,3,4 and 8. work includes demo, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittalDetails
ti upgrade core/shell restrooms on levels 2,3,4 and 8. work includes demo, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittal | $1,704,445 |
| Apr 8, 2021 | Never finaled issued May 2021, no final | 215 Fremont St | Skyline Construction | 7th fl/7th fl mezz minor interior demolition of non structural elements of interior partition, doors, finishes, ceiling, lighting and electrical. fire sprinkler and alarm under seperate permit.Details
7th fl/7th fl mezz minor interior demolition of non structural elements of interior partition, doors, finishes, ceiling, lighting and electrical. fire sprinkler and alarm under seperate permit. | |
| Apr 1, 2021 | Completed final sign-off Oct 2021 | 215 Fremont St | Pioneer Fire Inc. | demo of all existing pendents return to shell condition. gc ti#2021 0211 4501Details
demo of all existing pendents return to shell condition. gc ti#2021 0211 4501 | $5,500 |
| Mar 18, 2021 | Completed final sign-off Mar 2022 | 215 Fremont St | Sabah International Incorporated | ti# 2021-0127-3406 modify existing fire alarm system. add (49) ceiling strobe, (1) weatherproof ceiling strobe. (47) ceiling spekaer/strobes.Details
ti# 2021-0127-3406 modify existing fire alarm system. add (49) ceiling strobe, (1) weatherproof ceiling strobe. (47) ceiling spekaer/strobes. | $35,125 |
| Mar 17, 2021 | Completed final sign-off Apr 2021 | 215 Fremont St | Sabah International Incorporated | ti # 2020-1218-1371 modify existing fire alarm system add (3) control relays for heat pump control, (3) duct detectors at heat pumpDetails
ti # 2020-1218-1371 modify existing fire alarm system add (3) control relays for heat pump control, (3) duct detectors at heat pump | $8,700 |
| Feb 25, 2021 | Completed final sign-off Oct 2021 | 215 Fremont St | Pioneer Fire Inc. | fire sprinklers; remove existing pendent sprinklers to upright.Details
fire sprinklers; remove existing pendent sprinklers to upright. | $11,000 |
| Feb 11, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | interior t.i. to perform demolition for half of flr 8. includes safe off of mechanical, electrical, & plmg equipment. demolition of extg walls, extg millwork, extg ceiling grid & hardlid, & mep equipment. no work will be done to the exterior of the building. interior build out will be permittedDetails
interior t.i. to perform demolition for half of flr 8. includes safe off of mechanical, electrical, & plmg equipment. demolition of extg walls, extg millwork, extg ceiling grid & hardlid, & mep equipment. no work will be done to the exterior of the building. interior build out will be permitted | $100,000 |
| Jan 27, 2021 | Completed final sign-off Jul 2022 | 215 Fremont St | Novo Construction Inc | level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit.Details
level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit. | $10,000,000 |
| Jan 27, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor.Details
level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor. | $7,000,000 |
| Jan 19, 2021 | Completed final sign-off Jul 2022 | 215 Fremont St | Novo Construction Inc | 6/f: demo of (e) walls, safe-off of mep. removal of glass, millwork, celing grid and hard lid.Details
6/f: demo of (e) walls, safe-off of mep. removal of glass, millwork, celing grid and hard lid. | $300,000 |
| Jan 7, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Bcci Construction Company | 8th floor: administrative only permit to show assembly occupancy calculations to receive assembly stamps. ref: 2019-0722-6536, 2019-0417-8242.Details
8th floor: administrative only permit to show assembly occupancy calculations to receive assembly stamps. ref: 2019-0722-6536, 2019-0417-8242. | |
| Dec 18, 2020 | Completed final sign-off Apr 2021 | 215 Fremont St | Novo Construction Inc | 6/f: tenant improvement of (e) intermediate distribution frame (idf) & conversion of (e) storage room into transformer. install (2) transformers & (3) heat pumps to serve 2 (e) idf rooms.Details
6/f: tenant improvement of (e) intermediate distribution frame (idf) & conversion of (e) storage room into transformer. install (2) transformers & (3) heat pumps to serve 2 (e) idf rooms. | $540,000 |
| Dec 16, 2020 | Completed final sign-off Jan 2021 | 215 Fremont St | Tri-Signal Integration Inc. | 8th fl: fire alarm system (as-built to 2019-1122-7957): add (2) duct detectors with smoke detectors & relay modules, (7) speaker/strobes, (1) strobe to existing fire alarm system, and relocate (1) speaker/strobeDetails
8th fl: fire alarm system (as-built to 2019-1122-7957): add (2) duct detectors with smoke detectors & relay modules, (7) speaker/strobes, (1) strobe to existing fire alarm system, and relocate (1) speaker/strobe | |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | arch 2019-1031-6130. as built fire sprinkler plan. (2) relocates & (1) add. original fire sprinkler permit #2020-0107-1372.Details
arch 2019-1031-6130. as built fire sprinkler plan. (2) relocates & (1) add. original fire sprinkler permit #2020-0107-1372. | |
| Sep 28, 2020 | Completed final sign-off Dec 2020 | 215 Fremont St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install one pyro chemical fire system in the kitchen on the 8th floor. reference #201907226536Details
furnish and install one pyro chemical fire system in the kitchen on the 8th floor. reference #201907226536 | $9,500 |
| Jan 30, 2020 | Completed final sign-off May 2022 | 215 Fremont St | Bcci Construction Company | 2nd, 3rd, 4th fl - revision to occupancy plan for clarification in the food area/seating & alt workspace only. ref pa 2019-0619-3867.Details
2nd, 3rd, 4th fl - revision to occupancy plan for clarification in the food area/seating & alt workspace only. ref pa 2019-0619-3867. | |
| Jan 7, 2020 | Completed final sign-off Jan 2021 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 8th fl - existing fire sprinkler system ti 2 added & 30 relocated sprinklers. ref pa 2019-1031-6130Details
8th fl - existing fire sprinkler system ti 2 added & 30 relocated sprinklers. ref pa 2019-1031-6130 | $7,000 |
| Dec 30, 2019 | Completed final sign-off Dec 2020 | 215 Fremont St | Bcci Construction Company | roof- revision to previously approved permit. add roof screen for new mech equipment. ref pa #201907226536. structural drawings included.Details
roof- revision to previously approved permit. add roof screen for new mech equipment. ref pa #201907226536. structural drawings included. | |
| Dec 13, 2019 | Completed final sign-off Feb 2020 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | basement - added sprinkler within new walk-in cooler ref pa 2019-1031-6147Details
basement - added sprinkler within new walk-in cooler ref pa 2019-1031-6147 | $500 |
| Nov 22, 2019 | Completed final sign-off Jan 2021 | 215 Fremont St | Tri-Signal Integration Inc. | 8th fl. t.i. includes add (2) speakers/strobes, 1 strobe to (e) fa systems add 1 duet detector with relay, relocate 1 speaker/strobeDetails
8th fl. t.i. includes add (2) speakers/strobes, 1 strobe to (e) fa systems add 1 duet detector with relay, relocate 1 speaker/strobe | $3,500 |
| Oct 31, 2019 | Completed final sign-off Jan 2021 | 215 Fremont St | Bcci Construction Company | 8th floor: mep drawings to support approved arch. set for employee cafeteria. demo of ductwork and equipment. install new ductwork and equipment. ref app#201907226536Details
8th floor: mep drawings to support approved arch. set for employee cafeteria. demo of ductwork and equipment. install new ductwork and equipment. ref app#201907226536 | $1,500,000 |
| Oct 31, 2019 | Never finaled issued Nov 2019, no final | 215 Fremont St | Bcci Construction Company | basement - revision to previous permit to add scope to install a new prefabricated outdoor grade walk in cooler. mep deferred ref pa 2019-0510-0297Details
basement - revision to previous permit to add scope to install a new prefabricated outdoor grade walk in cooler. mep deferred ref pa 2019-0510-0297 | $30,000 |
| Oct 29, 2019 | Completed final sign-off Jan 2021 | 215 Fremont St | Bcci Construction Company | 8/f: administrative permit to revise verbage of the scope of work on preivoulsy approved permit. change "microkitchen" to "employee cafeteria.". ref pa201907226536. maher n/a.Details
8/f: administrative permit to revise verbage of the scope of work on preivoulsy approved permit. change "microkitchen" to "employee cafeteria.". ref pa201907226536. maher n/a. | |
| Oct 9, 2019 | Completed final sign-off Nov 2019 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 2,3,4/f: fire sprinklers, 15 relocated on 2nd & 3rd & 4th for total of 45 sprinklers. ref 201906193867Details
2,3,4/f: fire sprinklers, 15 relocated on 2nd & 3rd & 4th for total of 45 sprinklers. ref 201906193867 | $10,900 |
| Sep 12, 2019 | Completed final sign-off May 2022 | 215 Fremont St | Bcci Construction Company | floors 2/3/4: revision to clarify existing and new exist signs. no changes to the previously approved path of egress and exits. ref 2019-0510-0294, 2019-0510-0297 and 2019-0510-0300.Details
floors 2/3/4: revision to clarify existing and new exist signs. no changes to the previously approved path of egress and exits. ref 2019-0510-0294, 2019-0510-0297 and 2019-0510-0300. | |
| Aug 28, 2019 | Never finaled issued Sep 2019, no final | 215 Fremont St | Tri-Signal Integration Inc. | add to existing fa system: 2nd fl: 1 strobe,1 speaker/strobe. 3rd fl: strobe, 1 speaker/strobe. 4th fl: 1 strobe, 1 speaker/strobe.Details
add to existing fa system: 2nd fl: 1 strobe,1 speaker/strobe. 3rd fl: strobe, 1 speaker/strobe. 4th fl: 1 strobe, 1 speaker/strobe. | $4,000 |
| Aug 9, 2019 | Never finaled issued Aug 2019, no final | 215 Fremont St | Bcci Construction Company | 2,3,4 floors - mep deferred submittal for approved arch set. new mech equip, duct work and ele systems for mircokitchesn ref 201906193867Details
2,3,4 floors - mep deferred submittal for approved arch set. new mech equip, duct work and ele systems for mircokitchesn ref 201906193867 | $200,000 |
| Aug 6, 2019 | Completed final sign-off Feb 2020 | 215 Fremont St | Swinerton Builders | revision to pa 2019-0506-9884 to show furniture plan for the purpose of getting an "assembly permit" inspectionDetails
revision to pa 2019-0506-9884 to show furniture plan for the purpose of getting an "assembly permit" inspection | |
| Jul 31, 2019 | Completed final sign-off Oct 2019 | 215 Fremont St | Tri-Signal Integration Inc. | fa ti on 4th fl includes: add 2 power supplies, 1 control module, 57 speaker/strobes, 16 strobes, 1 speaker to existing fa system. ref pa #201905100300Details
fa ti on 4th fl includes: add 2 power supplies, 1 control module, 57 speaker/strobes, 16 strobes, 1 speaker to existing fa system. ref pa #201905100300 | $49,000 |
| Jul 31, 2019 | Completed final sign-off Oct 2019 | 215 Fremont St | Tri-Signal Integration Inc. | fa ti on 3rd fl includes: add 2 power supplies, 1 control module, 60 speaker/strobes, 17 strobes, 1 speaker to existing fa system. ref pa #201905100294Details
fa ti on 3rd fl includes: add 2 power supplies, 1 control module, 60 speaker/strobes, 17 strobes, 1 speaker to existing fa system. ref pa #201905100294 | $59,000 |
| Jul 31, 2019 | Completed final sign-off Oct 2019 | 215 Fremont St | Tri-Signal Integration Inc. | fa ti on 2nd fl includes: add 2 power supple, 1 control module, 1 relay module, 59 speaker/strobes; 12 strobes, 1 speaker to existing fa system. ref pa #201905100297Details
fa ti on 2nd fl includes: add 2 power supple, 1 control module, 1 relay module, 59 speaker/strobes; 12 strobes, 1 speaker to existing fa system. ref pa #201905100297 | $49,000 |
| Jul 25, 2019 | Completed final sign-off Dec 2020 | 215 Fremont St | Bcci Construction Company | 8th flr demo only permit to remove (e) partitions, finishes, ceilings and light fixtures; ref 201907236719; construction per pa 201907226536Details
8th flr demo only permit to remove (e) partitions, finishes, ceilings and light fixtures; ref 201907236719; construction per pa 201907226536 | $20,000 |
| Jul 23, 2019 | Completed final sign-off Feb 2020 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 8th flr. fire sprinklers demo 47 sprinklersDetails
8th flr. fire sprinklers demo 47 sprinklers | $23,500 |
| Jul 22, 2019 | Completed final sign-off Dec 2020 | 215 Fremont St | Bcci Construction Company | 8th flr - new partitions for microkitchens, new finishes, flooring and paint mep deferred ref 201904178242Details
8th flr - new partitions for microkitchens, new finishes, flooring and paint mep deferred ref 201904178242 | $1,100,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 2nd fl 201905100297 add 3 and relocate 22 spker, 3rd fl 201905100294, add 1 and relocate 4 spkrs, 4th fl 201905100300 add 2 , relocate 9 spkrs. existing fire sprinkler sytem ti.Details
2nd fl 201905100297 add 3 and relocate 22 spker, 3rd fl 201905100294, add 1 and relocate 4 spkrs, 4th fl 201905100300 add 2 , relocate 9 spkrs. existing fire sprinkler sytem ti. | $21,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | Bcci Construction Company | 2nd,3rd,4th floors: deferred arch. set for microkitchens. new partitions, finishes, flooring, paint, electrical and lightng. ref app#201905100297, 201905100294 and 201905100300. n/a for maherDetails
2nd,3rd,4th floors: deferred arch. set for microkitchens. new partitions, finishes, flooring, paint, electrical and lightng. ref app#201905100297, 201905100294 and 201905100300. n/a for maher | $450,000 |
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 215 Fremont St | Bcci Construction Company | 2,3,4th fl, electrical work to support approved architectural set. ref 201905100297, 201905100294, 201905100300Details
2,3,4th fl, electrical work to support approved architectural set. ref 201905100297, 201905100294, 201905100300 | $300,000 |
| Jun 11, 2019 | Completed final sign-off Sep 2019 | 215 Fremont St | Tri-Signal Integration Inc. | 1/f: fa ti includes: add 11 ceiling mount and 2 wall mount speaker/strobes, 4 relay modules, 6 smoke detectors, 2 ceiling mount strobes to (e) systemDetails
1/f: fa ti includes: add 11 ceiling mount and 2 wall mount speaker/strobes, 4 relay modules, 6 smoke detectors, 2 ceiling mount strobes to (e) system | $15,500 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 215 Fremont St | Bcci Construction Company | 3rd fl - mechanical only permit. demo ductwork, install new equipment, ductowrk & piping. ref pa 2019-0510-0294Details
3rd fl - mechanical only permit. demo ductwork, install new equipment, ductowrk & piping. ref pa 2019-0510-0294 | $130,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 215 Fremont St | Bcci Construction Company | 4th fl - mechanical only permit. demo ductwork, install new equipment, ductowrk & piping. ref pa 2019-0510-0300Details
4th fl - mechanical only permit. demo ductwork, install new equipment, ductowrk & piping. ref pa 2019-0510-0300 | $130,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 215 Fremont St | Bcci Construction Company | 2nd fl - mechanical only permit. demo ductwork, install new equipment, ductowrk & piping. ref pa 2019-0510-0297Details
2nd fl - mechanical only permit. demo ductwork, install new equipment, ductowrk & piping. ref pa 2019-0510-0297 | $130,000 |
| Jun 5, 2019 | Completed final sign-off Jul 2019 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 1st fl: existing fire sprinkler system - t.i. add 2 & relocate 18 sprinklers. arch #201905069884. maher naDetails
1st fl: existing fire sprinkler system - t.i. add 2 & relocate 18 sprinklers. arch #201905069884. maher na | $10,000 |
| May 10, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | Bcci Construction Company | 4th fl: limited demo of existing partitions, finishes, ceilings & light fixtures. micro kitchen under separate permit. n/a for maher.Details
4th fl: limited demo of existing partitions, finishes, ceilings & light fixtures. micro kitchen under separate permit. n/a for maher. | $900,000 |
| May 10, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | Bcci Construction Company | 3rd fl - demo & ti arch build out of office space. micro kitchen & mep deferred.Details
3rd fl - demo & ti arch build out of office space. micro kitchen & mep deferred. | $900,000 |
| May 10, 2019 | Completed final sign-off Oct 2020 | 215 Fremont St | Bcci Construction Company | 2nd fl: limited demo of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification.Details
2nd fl: limited demo of existing partitions, finishes, ceilings & light fixtures. new partitions, finishes, ceilings & light fixtures for offices, conference rooms, and partries. micro kitchen under separate permits. basement modification. | $900,000 |
| May 6, 2019 | Completed final sign-off Feb 2020 | 215 Fremont St | Swinerton Builders | scope include new doors, ceiling, light fixtures and finishes and construction o f new non-structural partitions, doors, ceilings, light fixtures and finishesDetails
scope include new doors, ceiling, light fixtures and finishes and construction o f new non-structural partitions, doors, ceilings, light fixtures and finishes | $750,000 |
| May 3, 2019 | Completed final sign-off Feb 2020 | 215 Fremont St | Swinerton Builders | 1st floor: demo of non structural partitions, doors, ceiling, light fixtures and finishes.Details
1st floor: demo of non structural partitions, doors, ceiling, light fixtures and finishes. | $20,000 |
| Apr 17, 2019 | Completed final sign-off Aug 2019 | 215 Fremont St | Field Construction Inc. | barrier removeal work on floor 1 and 8 restrooms. upgrade restrooms, showers, acessories to comply with cbc 2016 ada requirements. no mep scopeDetails
barrier removeal work on floor 1 and 8 restrooms. upgrade restrooms, showers, acessories to comply with cbc 2016 ada requirements. no mep scope | $56,700 |
| Feb 28, 2019 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | construction of non-structural partition, reuse of (e) door and patching, painting (e) finishesDetails
construction of non-structural partition, reuse of (e) door and patching, painting (e) finishes | $50,000 | |
| Feb 22, 2019 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | revision to 201810123022 modify e men and women ada restoom stall by relocating water closets, new grab bars, new toilet paper dispenser to meet codeDetails
revision to 201810123022 modify e men and women ada restoom stall by relocating water closets, new grab bars, new toilet paper dispenser to meet code | $1,500 | |
| Feb 22, 2019 | Never finaled issued Feb 2019, no final | 215 Fremont St | Swinerton Builders | revision to 201810123022. modify e men and women ada restroom stall by relocating water closets, install new grab bars, new toilet paper dispenser to meet code. 5th flDetails
revision to 201810123022. modify e men and women ada restroom stall by relocating water closets, install new grab bars, new toilet paper dispenser to meet code. 5th fl | $1,500 |
| Jan 23, 2019 | Completed final sign-off Mar 2019 | 215 Fremont St | Battalion One Fire Protection | convert existing dact to a new rf communicator, all existing alarm system components and sequences of operation shall remain unchanged.Details
convert existing dact to a new rf communicator, all existing alarm system components and sequences of operation shall remain unchanged. | |
| Jan 8, 2019 | Completed final sign-off Sep 2019 | 215 Fremont St | Olive Construction Corp | interior renovation - non structural demo & partition walls. int casework, int signage and graphics, vinyl installation of a self checkout turnstile and painting of interior surfaces, lighting office use lmtd to 1/3 or less accessory use (e) hvac system to remainDetails
interior renovation - non structural demo & partition walls. int casework, int signage and graphics, vinyl installation of a self checkout turnstile and painting of interior surfaces, lighting office use lmtd to 1/3 or less accessory use (e) hvac system to remain | $25,000 |
| Dec 26, 2018 | Expired or cancelled cancelled Aug 2023 | 215 Fremont St | determine occupant load for yoga studio a-3 occupancy. fire only permit.Details
determine occupant load for yoga studio a-3 occupancy. fire only permit. | ||
| Dec 3, 2018 | Never finaled issued Dec 2018, no final | 215 Fremont St | Swinerton Builders | 5th fl: revision to pa #201810123022. demo of new rooms, demo of new ceiling, new conf. rooms, new lights, add glass partition.Details
5th fl: revision to pa #201810123022. demo of new rooms, demo of new ceiling, new conf. rooms, new lights, add glass partition. | $10,000 |
| Nov 8, 2018 | Completed final sign-off Jan 2019 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 5/f: fire sprinkler ti, 14 relocated sprinklers, 2 added sprinkler relocate 14 and add 2.Details
5/f: fire sprinkler ti, 14 relocated sprinklers, 2 added sprinkler relocate 14 and add 2. | $8,000 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 215 Fremont St | Tri-Signal Integration Inc. | fire alarm ti - add 38 speaker strobes, 7 strobes, 4 sync modules. ref pa #201810123022.Details
fire alarm ti - add 38 speaker strobes, 7 strobes, 4 sync modules. ref pa #201810123022. | $30,000 |
| Oct 12, 2018 | Never finaled issued Nov 2018, no final | 215 Fremont St | Swinerton Builders | 5th floor: commercial t.i. to include new private offices and upgrade to extg offices, conference rooms, break area, and new led throughout. n/a for maherDetails
5th floor: commercial t.i. to include new private offices and upgrade to extg offices, conference rooms, break area, and new led throughout. n/a for maher | $2,500,000 |
| Mar 8, 2018 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | interior demo and buildout of 5th floor. mech, elec, plmg, life safety, fire alarm and sprinkler modification will be under seperate permit. n/a for maher !!!!!no ceiling demo peritted!!!!!!Details
interior demo and buildout of 5th floor. mech, elec, plmg, life safety, fire alarm and sprinkler modification will be under seperate permit. n/a for maher !!!!!no ceiling demo peritted!!!!!! | $3,000,000 | |
| Dec 6, 2017 | Completed final sign-off Mar 2018 | 215 Fremont St | 7th floor and 7a - evacuation plans total 8 n/a for maher.Details
7th floor and 7a - evacuation plans total 8 n/a for maher. | $4,000 | |
| Oct 16, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 7/f #7 & 7a- revision to arch. pa#201705247575 & 201708043960 to remove wall/door at office 7-409, add structural details for video wall. n/a ordinance #155-13Details
7/f #7 & 7a- revision to arch. pa#201705247575 & 201708043960 to remove wall/door at office 7-409, add structural details for video wall. n/a ordinance #155-13 | |
| Oct 6, 2017 | Completed final sign-off Jan 2018 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | f/s ti on 7th fl: relocate (106), add (57), total of (163) sprinkler heads. ref pa #2017-0524-7575. maher na. also, plugging 48 heads.Details
f/s ti on 7th fl: relocate (106), add (57), total of (163) sprinkler heads. ref pa #2017-0524-7575. maher na. also, plugging 48 heads. | $57,050 |
| Oct 4, 2017 | Completed final sign-off Dec 2017 | 215 Fremont St | Tri-Signal Integration Inc. | f/a ti on 7th & 7a fl: add (20) new strobes and (2) speaker strobes to existing fa system. relocate (40) speaker/strobes. ref pa #201705247575. maher naDetails
f/a ti on 7th & 7a fl: add (20) new strobes and (2) speaker strobes to existing fa system. relocate (40) speaker/strobes. ref pa #201705247575. maher na | $15,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 215 Fremont St | 6th floor: 215 fremont evac plan x 4Details
6th floor: 215 fremont evac plan x 4 | $1,800 | |
| Sep 8, 2017 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | #2a-remodel (e) g/f restaurant, new front entry power door operators, repair ada vertical lift, new interior finishes, lighting, furniture, replace kitchen equyipment, new low voltage. electrical, mechanical, plumbing, fire & life safety under seperate permit. no structural work/. n/a maherDetails
#2a-remodel (e) g/f restaurant, new front entry power door operators, repair ada vertical lift, new interior finishes, lighting, furniture, replace kitchen equyipment, new low voltage. electrical, mechanical, plumbing, fire & life safety under seperate permit. no structural work/. n/a maher | $85,000 | |
| Sep 6, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | revision to pa 2017-0602-8218 - added all hands space to open office. includes electrical title 24Details
revision to pa 2017-0602-8218 - added all hands space to open office. includes electrical title 24 | $15,000 |
| Aug 8, 2017 | Completed final sign-off Dec 2017 | 215 Fremont St | Tri-Signal Integration Inc. | on 6th floor - add 12 new strobes, 2 speaker strobes 3 sync modules while relocating 38 (e) speaker strobes fit bit suiteDetails
on 6th floor - add 12 new strobes, 2 speaker strobes 3 sync modules while relocating 38 (e) speaker strobes fit bit suite | $10,000 |
| Aug 4, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | floors 7 & 7a:rev to pa201705247575: adding assembly space into b occupancy. no change to (e) egress.Details
floors 7 & 7a:rev to pa201705247575: adding assembly space into b occupancy. no change to (e) egress. | |
| Jul 28, 2017 | Completed final sign-off Aug 2017 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 6th floor: extg fire sprinklker system t.i. 71 relocated sprinklers pendant,10 relocated uprights, 16 added pendant spkrs. 12 added uprights. ref app#201705035572. n/a for maherDetails
6th floor: extg fire sprinklker system t.i. 71 relocated sprinklers pendant,10 relocated uprights, 16 added pendant spkrs. 12 added uprights. ref app#201705035572. n/a for maher | $30,200 |
| Jun 7, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | revision to app#201705035572. scope includes interior layout and requirements and new finishes at r&d rooms 6-107 and 6-415 n/a for maherDetails
revision to app#201705035572. scope includes interior layout and requirements and new finishes at r&d rooms 6-107 and 6-415 n/a for maher | |
| Jun 2, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 7/f & 7m- replacement of selected lighting, power outlets and hvac, new plumbing connection to break room and restroom. ref. to t.i. pa#2017-0524-7575. n/a ordinance #155-13. fire alarm/sprinklers deferred.Details
7/f & 7m- replacement of selected lighting, power outlets and hvac, new plumbing connection to break room and restroom. ref. to t.i. pa#2017-0524-7575. n/a ordinance #155-13. fire alarm/sprinklers deferred. | |
| May 24, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | interior demolition of non structural element including but not limited to partiton, doors, lighting, ceiling. construction of new offices, conf room, break rms, finishes,mech, elec, plumbing, ls, fire alarm, sprnkler plans sep permitDetails
interior demolition of non structural element including but not limited to partiton, doors, lighting, ceiling. construction of new offices, conf room, break rms, finishes,mech, elec, plumbing, ls, fire alarm, sprnkler plans sep permit | $5,000,000 |
| May 3, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep.Details
6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep. | $3,000,000 |
| Jan 31, 2017 | Never finaled issued Feb 2017, no final | 215 Fremont St | Yes Construction | #2b -modify existing floor plan layout. relocate food service equipment. create new service counter at lower level space 2b; not more than 4 employees. n/a ordinance #155-13Details
#2b -modify existing floor plan layout. relocate food service equipment. create new service counter at lower level space 2b; not more than 4 employees. n/a ordinance #155-13 | $2,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2016 | 215 Fremont St | Tri-Signal Integration Inc. | basement fire alarm t.i. - add security gate release ref #201509096491. n/a maher ordinanceDetails
basement fire alarm t.i. - add security gate release ref #201509096491. n/a maher ordinance | $2,000 |
| Jan 7, 2016 | Completed final sign-off Feb 2016 | 215 Fremont St | Tri-Signal Integration Inc. | floors 1 - 7 fire alarm t.i. - add security release & elevator lobby door smoke detectors. ref #201510018546 & #201511102220.Details
floors 1 - 7 fire alarm t.i. - add security release & elevator lobby door smoke detectors. ref #201510018546 & #201511102220. | $10,000 |
| Jan 7, 2016 | Completed final sign-off Jan 2016 | 215 Fremont St | Pioneer Fire Inc. | add 5 sprinklers and relocate 6, ref ti 201511102220. compliance with maher ordinance no 155-13 not required.Details
add 5 sprinklers and relocate 6, ref ti 201511102220. compliance with maher ordinance no 155-13 not required. | $8,867 |
| Nov 23, 2015 | Completed final sign-off May 2016 | 215 Fremont St | Dome Construction Corp | ground floor lobby renovation limited to new finishes at the elevator wall elevation, new building directory signage and new carpet within the elevator cabs. n/a ordinance #155-13Details
ground floor lobby renovation limited to new finishes at the elevator wall elevation, new building directory signage and new carpet within the elevator cabs. n/a ordinance #155-13 | $55,000 |
| Nov 10, 2015 | Completed final sign-off Jul 2016 | 215 Fremont St | Dome Construction Corp | floors 3-7&7a: add new wall with door and card readers to secure each elevator lobby in order to subtenant the floors. add card reader to doors within elevator lobby as well as within the stairwell at each level. new finishes and lighting at elevator lobby. n/a ordinance #155-13Details
floors 3-7&7a: add new wall with door and card readers to secure each elevator lobby in order to subtenant the floors. add card reader to doors within elevator lobby as well as within the stairwell at each level. new finishes and lighting at elevator lobby. n/a ordinance #155-13 | $1,000,000 |
| Oct 30, 2015 | Completed final sign-off Nov 2015 | 215 Fremont St | P-T Group Inc | suite 2b - install & relocate 5 sprinkler heads per nfpa #13. t.i. #201508073731. n/a maher ordinanceDetails
suite 2b - install & relocate 5 sprinkler heads per nfpa #13. t.i. #201508073731. n/a maher ordinance | $1,750 |
| Oct 27, 2015 | Completed final sign-off Nov 2015 | 215 Fremont St | J & C Safety 1st Fire Protection Inc | 1st floor: ti - rework ul300 ansul system installationDetails
1st floor: ti - rework ul300 ansul system installation | $1,200 |
| Oct 1, 2015 | Completed final sign-off Jul 2016 | 215 Fremont St | Dome Construction Corp | 2nd flr: adding new wall with doors and card readers to secure the elevator lobby in order to sub tenant the floor. card readers to be added to doors within elevator lobby & within the stairwell at this level. elevator lobby is to receive new finishes and lighting. maher na. life safety deferred.Details
2nd flr: adding new wall with doors and card readers to secure the elevator lobby in order to sub tenant the floor. card readers to be added to doors within elevator lobby & within the stairwell at this level. elevator lobby is to receive new finishes and lighting. maher na. life safety deferred. | $20,000 |
| Sep 18, 2015 | Expired or cancelled cancelled Dec 2015 | 215 Fremont St | J & C Safety 1st Fire Protection Inc | 1st fl t.i. to install 6 automatic fire sprinklers. ref app#201508073731Details
1st fl t.i. to install 6 automatic fire sprinklers. ref app#201508073731 | $2,000 |
| Sep 9, 2015 | Completed final sign-off May 2016 | 215 Fremont St | Dome Construction Corp | add gates along beale st and fremont st at the driveway that runs from beale to fremont. also, add a prefab guard station to (e) curb. maher not reqDetails
add gates along beale st and fremont st at the driveway that runs from beale to fremont. also, add a prefab guard station to (e) curb. maher not req | $100,000 |
| Aug 7, 2015 | Completed final sign-off Nov 2015 | 215 Fremont St | 2b: modify (e) layout & equipment at (e) restaurant - interior only remodel existing unisex toilet, (e) type i hood & hvac, maher na. not more than 4 employees and no lighting changes.Details
2b: modify (e) layout & equipment at (e) restaurant - interior only remodel existing unisex toilet, (e) type i hood & hvac, maher na. not more than 4 employees and no lighting changes. | $10,000 | |
| Nov 4, 2014 | Completed final sign-off Nov 2014 | 215 Fremont St | Bilcor Inc | fire alarm ti- revision appl 2013.1014.8833. install 6 ceiling mount strobes and correction of project space is a yoga studio. ref. bldg. 2014.0311.0451. maher n/a.Details
fire alarm ti- revision appl 2013.1014.8833. install 6 ceiling mount strobes and correction of project space is a yoga studio. ref. bldg. 2014.0311.0451. maher n/a. | |
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 215 Fremont St | Bilcor Inc | fire alarm ti- first floor---install 10 wall mount speaker strobes and 2 ceiling mount speaker storbes. relocate 1 smoke detector, remove 4 smoke detectors and 1 pull stationDetails
fire alarm ti- first floor---install 10 wall mount speaker strobes and 2 ceiling mount speaker storbes. relocate 1 smoke detector, remove 4 smoke detectors and 1 pull station | $1,600 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 215 Fremont St | street space permitDetails
street space permit | ||
| Sep 22, 2014 | Completed final sign-off Jan 2015 | 215 Fremont St | Swinerton Builders | g/f -lobby area remodel to include minor demolition & new finishes. new partitions limited to wall furring at fornt wall panels.Details
g/f -lobby area remodel to include minor demolition & new finishes. new partitions limited to wall furring at fornt wall panels. | $299,181 |
| Sep 12, 2014 | Never finaled issued Sep 2014, no final | 215 Fremont St | Golden Gate Sign Company Inc. | replacement sign non electric. maher not requiredDetails
replacement sign non electric. maher not required | $1,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2014 | 215 Fremont St | Golden Gate Sign Company Inc. | new electric sign. maher not requiredDetails
new electric sign. maher not required | $5,000 |
| Sep 3, 2014 | Completed final sign-off Nov 2014 | 215 Fremont St | Golden Gate Fire Protection Inc | unit #6: relocate 44 pendant sprinkler heads on the 1st flr, relocate 10 upright sprinklers (t.i. #201403110451); maher n/aDetails
unit #6: relocate 44 pendant sprinkler heads on the 1st flr, relocate 10 upright sprinklers (t.i. #201403110451); maher n/a | $21,810 |
| Jul 21, 2014 | Completed final sign-off Sep 2014 | 215 Fremont St | Swinerton Builders | demolition of partition and finishes, construction of a new demising wall. exisitng duck work/lighting to remin. mep scope include new water/gas/electrical mters. space will remain vacant, a separte permit will be pulled for t.i. build out. ref pa 201403110451/r1; maher n/aDetails
demolition of partition and finishes, construction of a new demising wall. exisitng duck work/lighting to remin. mep scope include new water/gas/electrical mters. space will remain vacant, a separte permit will be pulled for t.i. build out. ref pa 201403110451/r1; maher n/a | $60,000 |
| Mar 11, 2014 | Completed final sign-off Nov 2014 | 215 Fremont St | Ellis Contracting Inc | work @ unit# 6 only. t.i for a 7,477 sqft yoga studio. work to include int.wall, ceilings, men's wonmen's locker rooms, spec mech systems, mech distubution, elec power devices & light fixtures associated interior finished & mill work. compliance with ordinance no. 155-13 not require.Details
work @ unit# 6 only. t.i for a 7,477 sqft yoga studio. work to include int.wall, ceilings, men's wonmen's locker rooms, spec mech systems, mech distubution, elec power devices & light fixtures associated interior finished & mill work. compliance with ordinance no. 155-13 not require. | $125,000 |
| Jul 16, 2013 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | demolition of (e) gym & locker rooms, construction of new non-load bearing partitions, interior doors/frames. demo (e) mechanical, electrical & plumbing. construction of (n) mechanical, elec. plumbing in equip. closet.Details
demolition of (e) gym & locker rooms, construction of new non-load bearing partitions, interior doors/frames. demo (e) mechanical, electrical & plumbing. construction of (n) mechanical, elec. plumbing in equip. closet. | $100,000 | |
| Jul 2, 2013 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | Swinerton Builders | rev. to existing pa#201210101758, new scope of work is non-structural demo of walk-in storage & construct 1 tenant use, single occupant restroom. remove from scope: gym & locker rooms, keep s.o. restroom in scope. no fsds in scope of work. jjcDetails
rev. to existing pa#201210101758, new scope of work is non-structural demo of walk-in storage & construct 1 tenant use, single occupant restroom. remove from scope: gym & locker rooms, keep s.o. restroom in scope. no fsds in scope of work. jjc | |
| Apr 5, 2013 | Completed final sign-off Oct 2013 | 215 Fremont St | interior remodel including paint & finishes @ (e) restaurant, new bar counter, new service counter @ center area. new kitchen equipment, new cased opening to vestibule @restroom. sprinkler & ls on separate permits. ul300 system to be recertified and tested.Details
interior remodel including paint & finishes @ (e) restaurant, new bar counter, new service counter @ center area. new kitchen equipment, new cased opening to vestibule @restroom. sprinkler & ls on separate permits. ul300 system to be recertified and tested. | $45,000 | |
| Oct 10, 2012 | Never finaled issued Nov 2012, no final | 215 Fremont St | Swinerton Builders | 1st floor - demolition of (e) locker rooms to upgrade/build out new locker rooms includes: ceiling, partitions, lighting, toilets, showers, lavs, non-structural demolition. non-structural demolition of tenant walk-in & storage. build out of tenant accessible single occup restroom for tenant use.Details
1st floor - demolition of (e) locker rooms to upgrade/build out new locker rooms includes: ceiling, partitions, lighting, toilets, showers, lavs, non-structural demolition. non-structural demolition of tenant walk-in & storage. build out of tenant accessible single occup restroom for tenant use. | $175,000 |
| Jul 30, 2012 | Completed final sign-off Aug 2012 | 215 Fremont St | Tri-Signal Integration Inc. | 8/f - add four door holders and four smoke detectors to existing fire alarm system.Details
8/f - add four door holders and four smoke detectors to existing fire alarm system. | $4,000 |
| Jan 9, 2012 | Completed final sign-off Feb 2012 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | extg fire sprinkler system. tenant improvements. remove 4 sprinklers, add 1 sprinklers at basement.Details
extg fire sprinkler system. tenant improvements. remove 4 sprinklers, add 1 sprinklers at basement. | $2,500 |
| Jan 5, 2012 | Completed final sign-off Feb 2012 | 215 Fremont St | Tri-Signal Integration Inc. | basement level-add 2 speaker/strobe & 4 weatherproof strobe to (e) fire alarm systemDetails
basement level-add 2 speaker/strobe & 4 weatherproof strobe to (e) fire alarm system | $2,200 |
| Dec 23, 2011 | Completed final sign-off Jan 2012 | 215 Fremont St | Pioneer Fire Inc. | 1st floor-(e) fire sprinkler system-tenant improvement-10 added sprinklers & 7 removed sprinklersDetails
1st floor-(e) fire sprinkler system-tenant improvement-10 added sprinklers & 7 removed sprinklers | $5,000 |
| Dec 21, 2011 | Completed final sign-off Feb 2012 | 215 Fremont St | Tri-Signal Integration Inc. | add 3 speaker/strobes and 2 strobes to existing fire alarm system. relocate 1 speaker/strobe and 1 strobeDetails
add 3 speaker/strobes and 2 strobes to existing fire alarm system. relocate 1 speaker/strobe and 1 strobe | $2,200 |
| Nov 23, 2011 | Completed final sign-off Feb 2012 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system: tenant improvements, 100-added sprinklers, 115-removed sprinklers @ 8th. flr.Details
existing fire sprinkler system: tenant improvements, 100-added sprinklers, 115-removed sprinklers @ 8th. flr. | $45,000 |
| Nov 18, 2011 | Completed final sign-off Dec 2011 | 215 Fremont St | Tri-Signal Integration Inc. | add 1 relay module and 2 speaker/strobes to existing fire alarm system. relocate 1 speaker strobeDetails
add 1 relay module and 2 speaker/strobes to existing fire alarm system. relocate 1 speaker strobe | $1,800 |
| Nov 18, 2011 | Completed final sign-off Dec 2011 | 215 Fremont St | Tri-Signal Integration Inc. | add 1 speaker strobe and 2 strobes to existing fire alarm system on 1st floor ibo model officeDetails
add 1 speaker strobe and 2 strobes to existing fire alarm system on 1st floor ibo model office | $1,500 |
| Nov 18, 2011 | Completed final sign-off Dec 2011 | 215 Fremont St | Tri-Signal Integration Inc. | relocate 1 manual pull station on the 1st floorDetails
relocate 1 manual pull station on the 1st floor | $1,200 |
| Nov 15, 2011 | Completed final sign-off Jan 2012 | 215 Fremont St | Pioneer Fire Inc. | 1st floor fire sprinkler system, underfloor protection, added 9 sprinklers.Details
1st floor fire sprinkler system, underfloor protection, added 9 sprinklers. | $4,000 |
| Nov 8, 2011 | Completed final sign-off Jun 2012 | 215 Fremont St | Swinerton Builders | garage level-installation of new bicycle racks & motorcycle parking. construct a new uni-sex shower rooms on a raise platform, relocate vestible lockers to new shower area. new paint & carpet in elevator vestible. new lighting as weel as upgrades to (e) lighting & fire sprinklersDetails
garage level-installation of new bicycle racks & motorcycle parking. construct a new uni-sex shower rooms on a raise platform, relocate vestible lockers to new shower area. new paint & carpet in elevator vestible. new lighting as weel as upgrades to (e) lighting & fire sprinklers | $250,000 |
| Nov 7, 2011 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | 8th floor-exterior storefront modifications, removal of an egress door & the installation of a set of double doors at the same elevationsDetails
8th floor-exterior storefront modifications, removal of an egress door & the installation of a set of double doors at the same elevations | $30,000 | |
| Nov 7, 2011 | Completed final sign-off Aug 2012 | 215 Fremont St | Swinerton Builders | 8th floor refresh, this permit pertains to all architectural trades. mep trades will be on a separate permit and gyp. metal studs, millwork, flooring, painting, window shades.Details
8th floor refresh, this permit pertains to all architectural trades. mep trades will be on a separate permit and gyp. metal studs, millwork, flooring, painting, window shades. | $800,000 |
| Oct 31, 2011 | Completed final sign-off Feb 2012 | 215 Fremont St | Swinerton Builders | permit to build mock up of a typical new branch with 2 offices, open floor plan, restroom & breakroom with raised floorDetails
permit to build mock up of a typical new branch with 2 offices, open floor plan, restroom & breakroom with raised floor | $129,000 |
| Oct 19, 2011 | Completed final sign-off Nov 2011 | 215 Fremont St | Westates Mechanical Corporation Inc | 1st floor:relocate 12 pendent sprinkler heads to new tenant improvement.Details
1st floor:relocate 12 pendent sprinkler heads to new tenant improvement. | $6,000 |
| Sep 28, 2011 | Never finaled issued Sep 2011, no final | 215 Fremont St | Swinerton Builders | interior non structural demo of partitions, finishes on the 8th floor ( partial). there is no exterior demo. ceilings and corridor walls and doors must remain.Details
interior non structural demo of partitions, finishes on the 8th floor ( partial). there is no exterior demo. ceilings and corridor walls and doors must remain. | $35,000 |
| Sep 22, 2011 | Never finaled issued Sep 2011, no final | 215 Fremont St | Real Signs And Lighting | ste #4: remove vinyl on face of existing sighn and apply new vinyl to read subwayDetails
ste #4: remove vinyl on face of existing sighn and apply new vinyl to read subway | $300 |
| Sep 22, 2011 | Never finaled issued Sep 2011, no final | 215 Fremont St | Real Signs And Lighting | remove vinyl on both sides of existing blade sign. apply new vinyl to read "subway"Details
remove vinyl on both sides of existing blade sign. apply new vinyl to read "subway" | $150 |
| Sep 20, 2011 | Completed final sign-off Sep 2011 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 1st floor:tenant improvements:extg fire sprinkler system. relocate 2 sprinklers.add 1 sprinklerDetails
1st floor:tenant improvements:extg fire sprinkler system. relocate 2 sprinklers.add 1 sprinkler | $1,500 |
| Sep 8, 2011 | Completed final sign-off Dec 2011 | 215 Fremont St | Swinerton Builders | new interior construction of non load bearing partitions and doors with associated mep and telecommunications. no plumbing to be performedDetails
new interior construction of non load bearing partitions and doors with associated mep and telecommunications. no plumbing to be performed | $245,514 |
| Aug 3, 2011 | Completed final sign-off Feb 2012 | 215 Fremont St | Matrix Hg Inc | remove 2 existing boilers for hvac system and replace with 2 new boilers for hvac system located in penthouseDetails
remove 2 existing boilers for hvac system and replace with 2 new boilers for hvac system located in penthouse | $135,000 |
| Jul 25, 2011 | Expired or cancelled expired Mar 2013 | 215 Fremont St | Jebian Construction Inc | remodel dinning room, add type ii hood. change from quisnos to subway.extg walls to remain, modify ceiling to new counter shapes.Details
remodel dinning room, add type ii hood. change from quisnos to subway.extg walls to remain, modify ceiling to new counter shapes. | $30,000 |
| May 5, 2011 | Completed final sign-off May 2011 | 215 Fremont St | Value Fire Protection Inc | ground floor-refer to t.i. pa# 2011-0401-3276-relocate 3 (e) heads and add 1 new for new ceiling layout.Details
ground floor-refer to t.i. pa# 2011-0401-3276-relocate 3 (e) heads and add 1 new for new ceiling layout. | $950 |
| Apr 1, 2011 | Completed final sign-off Sep 2011 | 215 Fremont St | All Best Buildrs.Inc./All Trusty Bldrs. | space 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking.Details
space 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking. | $5,000 |
| Feb 16, 2011 | Completed final sign-off Mar 2011 | 215 Fremont St | Pacific Auxiliary Fire Alarm | addition of (7) speaker/strobes, 5 strobes, 1 speaker, 18 smoke detectors, 3 duct detectors & 2 modules due to a tenant improvement of the the 8th floorDetails
addition of (7) speaker/strobes, 5 strobes, 1 speaker, 18 smoke detectors, 3 duct detectors & 2 modules due to a tenant improvement of the the 8th floor | $20,000 |
| Jan 20, 2011 | Completed final sign-off May 2011 | 215 Fremont St | Pioneer Fire Inc. | 8th floor:relocate 75 fire sprinklers. remove 11 fire sprinklers.add 5 sprinklersDetails
8th floor:relocate 75 fire sprinklers. remove 11 fire sprinklers.add 5 sprinklers | $10,000 |
| Dec 13, 2010 | Completed final sign-off Apr 2011 | 215 Fremont St | Swinerton Builders | new interior construction of non-load bearing partitions & doors with associated mep & telecom. fire/sprinklers/life safety under seperate permit. no structural.Details
new interior construction of non-load bearing partitions & doors with associated mep & telecom. fire/sprinklers/life safety under seperate permit. no structural. | $400,000 |
| Nov 5, 2010 | Completed final sign-off Jan 2011 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 4th floor - ti to existing fire sprinkler system, 4 added sprinklers, 4 relocated sprinklersDetails
4th floor - ti to existing fire sprinkler system, 4 added sprinklers, 4 relocated sprinklers | $1,600 |
| Oct 12, 2010 | Completed final sign-off Jan 2011 | 215 Fremont St | Bcci Construction Company | tenant improvement on the 4th floor including new partitions,doors and associated mechanical and electrical work. sprinkler and ls under separate permit.Details
tenant improvement on the 4th floor including new partitions,doors and associated mechanical and electrical work. sprinkler and ls under separate permit. | $100,000 |
| Aug 6, 2010 | Never finaled issued Aug 2010, no final | 215 Fremont St | street space permitDetails
street space permit | ||
| Jun 23, 2010 | Never finaled issued Jul 2010, no final | 215 Fremont St | Tri-Signal Integration Inc. | fire alarm control panel replacement. (voluntary) test 100% system functionality, up to 10% of existing services.Details
fire alarm control panel replacement. (voluntary) test 100% system functionality, up to 10% of existing services. | $18,000 |
| May 26, 2010 | Completed final sign-off Nov 2010 | 215 Fremont St | Bcci Construction Company | 3/fl - selective demolition of rooms, removal & relocation of lighting, power & signal & partitions. 9n) lighting with associated mechanical, electrical & title-24.Details
3/fl - selective demolition of rooms, removal & relocation of lighting, power & signal & partitions. 9n) lighting with associated mechanical, electrical & title-24. | $45,000 |
| May 7, 2010 | Completed final sign-off Nov 2010 | 215 Fremont St | Bcci Construction Company | office ti on the 2nd floor. selective demo of rooms, removal and relocation of lighting, power and signal and partitions. new lighting with associated mech, elec and title 24Details
office ti on the 2nd floor. selective demo of rooms, removal and relocation of lighting, power and signal and partitions. new lighting with associated mech, elec and title 24 | $45,000 |
| May 7, 2010 | Completed final sign-off Nov 2010 | 215 Fremont St | Bcci Construction Company | office ti on the 6th fl. selective demo. of rooms, removal and relocation of lighting, power and signal, and partitions. new lighting with associated mech, elec and title 24. no structural workDetails
office ti on the 6th fl. selective demo. of rooms, removal and relocation of lighting, power and signal, and partitions. new lighting with associated mech, elec and title 24. no structural work | $45,000 |
| Mar 19, 2010 | Completed final sign-off May 2010 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | revision to apn #2009.10.02.8178. added 45 relocated sprinklers - total 160 relocated. as-built drawing.Details
revision to apn #2009.10.02.8178. added 45 relocated sprinklers - total 160 relocated. as-built drawing. | $8,000 |
| Oct 21, 2009 | Completed final sign-off Dec 2009 | 215 Fremont St | Bcci Construction Company | 4th floor tenant improvement including construction of non-load bearing partitions & doors and associated mechanical and electrical. fire life safety under separate permit.Details
4th floor tenant improvement including construction of non-load bearing partitions & doors and associated mechanical and electrical. fire life safety under separate permit. | $100,000 |
| Oct 2, 2009 | Completed final sign-off May 2010 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | 4th. flr. tenant improvement to the (e) fire sprinkler system; 115-relocated (rotated) (change-out).Details
4th. flr. tenant improvement to the (e) fire sprinkler system; 115-relocated (rotated) (change-out). | $9,500 |
| Jun 30, 2009 | Expired or cancelled cancelled Jan 2026 | 215 Fremont St | interior construction of non load bearing partitions & doors. associated mechanical, electrical, sprinkler & life safety under seperate permitDetails
interior construction of non load bearing partitions & doors. associated mechanical, electrical, sprinkler & life safety under seperate permit | ||
| Jun 30, 2009 | Completed final sign-off Sep 2009 | 215 Fremont St | Bcci Construction Company | interior construction of non-load bearing partitions & doors. associated mechanical, electrical, sprinklers & life safety under separate permit.Details
interior construction of non-load bearing partitions & doors. associated mechanical, electrical, sprinklers & life safety under separate permit. | $100,000 |
| Apr 22, 2009 | Completed final sign-off May 2009 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | renew pa# 2007/04/10/8441 to obtain final inspection. all work has been completed.Details
renew pa# 2007/04/10/8441 to obtain final inspection. all work has been completed. | |
| Mar 5, 2009 | Never finaled issued Mar 2009, no final | 215 Fremont St | umbrella permit to comply with requirements with high-rise sprinkler ordinance # 377-93. no work all floors.Details
umbrella permit to comply with requirements with high-rise sprinkler ordinance # 377-93. no work all floors. | ||
| Sep 15, 2008 | Completed final sign-off Oct 2008 | 215 Fremont St | Pacific Auxiliary Fire Alarm | 1st floor-addition of 2 speaker/strobes, 1 duct detector and 1 manaul alarm due to tenant improvementDetails
1st floor-addition of 2 speaker/strobes, 1 duct detector and 1 manaul alarm due to tenant improvement | $3,400 |
| Sep 9, 2008 | Completed final sign-off Nov 2008 | 215 Fremont St | Ayoob & Peery Plumbing Co Inc | add fire sprinkler heads per retrofit work (23 total)/ground floor 2 head, 6 heads on 3rd floor, 7 heads on 4th floor, 7th floor 1 head,basement 6 heads, penthouse 1 headDetails
add fire sprinkler heads per retrofit work (23 total)/ground floor 2 head, 6 heads on 3rd floor, 7 heads on 4th floor, 7th floor 1 head,basement 6 heads, penthouse 1 head | $4,800 |
| Jul 24, 2008 | Never finaled issued Jul 2008, no final | 215 Fremont St | Sign & Sign Again | to erect non electric signDetails
to erect non electric sign | $1,200 |
| Jul 24, 2008 | Never finaled issued Jul 2008, no final | 215 Fremont St | Sign & Sign Again | to erect non electric wall signDetails
to erect non electric wall sign | $2,000 |
| Jul 16, 2008 | Completed final sign-off Oct 2008 | 215 Fremont St | Anderson, Rowe & Buckley, Inc. | at 1st floor. tenant improvements to the existing fire sprinkler system, 9 new heads.Details
at 1st floor. tenant improvements to the existing fire sprinkler system, 9 new heads. | $1,800 |
| May 30, 2008 | Completed final sign-off Oct 2008 | 215 Fremont St | 1st floor - tenant improvement restaurant consisting of new interior partitions, electrical, plumbing, sprinkler relocation. swing bathroom doors opposite direction into mult-accommodation handicapped accessible stall.Details
1st floor - tenant improvement restaurant consisting of new interior partitions, electrical, plumbing, sprinkler relocation. swing bathroom doors opposite direction into mult-accommodation handicapped accessible stall. | $115,000 | |
| Mar 13, 2008 | Never finaled issued Mar 2008, no final | 215 Fremont St | Sign & Sign Again | to erect non electric signDetails
to erect non electric sign | |
| Feb 6, 2008 | Never finaled issued Feb 2008, no final | 215 Fremont St | add one wall and one door to existing basement to create new tool room. women and mens stall door change direction of door swing.Details
add one wall and one door to existing basement to create new tool room. women and mens stall door change direction of door swing. | $5,000 | |
| Feb 6, 2008 | Never finaled issued Feb 2008, no final | 215 Fremont St | Richlen Construction | revision to appl #200802013798: add new demising partition, add new 1:50 slope at suite entrance, lock-off existing door.Details
revision to appl #200802013798: add new demising partition, add new 1:50 slope at suite entrance, lock-off existing door. | |
| Feb 1, 2008 | Completed final sign-off May 2008 | 215 Fremont St | Richlen Construction | 1st floor: revision to appl #200711097805 to include construction of additional front corridor, rate partition and new door. no hvac required, lighting to be relocated from building stock.Details
1st floor: revision to appl #200711097805 to include construction of additional front corridor, rate partition and new door. no hvac required, lighting to be relocated from building stock. | $20,000 |
| Feb 1, 2008 | Completed final sign-off May 2008 | 215 Fremont St | Richlen Construction | 1st flr: me & el design build for aim fitness sp, mech work: add (1) new heat pump incl ductwork & controls, add (1) new vav box incl ductwork & controls, relocate supply & return air grills incl req'd new ductwork. elec work: relocate lights fr (e) space & bldg stock.f.s.& l.s.under separate permitDetails
1st flr: me & el design build for aim fitness sp, mech work: add (1) new heat pump incl ductwork & controls, add (1) new vav box incl ductwork & controls, relocate supply & return air grills incl req'd new ductwork. elec work: relocate lights fr (e) space & bldg stock.f.s.& l.s.under separate permit | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (24), Novo Construction Inc (24), Tri-Signal Integration Inc. (19), Anderson, Rowe & Buckley, Inc. (18), Pioneer Fire Inc. (17), Swinerton Builders (16), Sabah International Incorporated (11), Skyline Construction (8), Dome Construction Corp (4), Pyro-Comm Systems, Inc. (4), Richlen Construction (3), Sign & Sign Again (3), Bilcor Inc (2), Golden Gate Fire Protection Inc (2), Golden Gate Sign Company Inc. (2), Gordon Prill Inc (2), J & C Safety 1st Fire Protection Inc (2), Pacific Auxiliary Fire Alarm (2), Real Signs And Lighting (2), Aaa Restaurant Fire Control/Dba Aaa Fire, All Best Buildrs.Inc./All Trusty Bldrs., Ayoob & Peery Plumbing Co Inc, Battalion One Fire Protection, Cobe Construction Inc, Ellis Contracting Inc, Field Construction Inc., Jebian Construction Inc, Martin Sign Co Inc., Matrix Hg Inc, Olive Construction Corp, P-T Group Inc, Source Planning And Construction Inc, Sun Graphics, Value Fire Protection Inc, Westates Mechanical Corporation Inc, Yes Construction
- Architects
- J. Bradford Gambrell (9), Michael Dubitsky (5), Teresa Emery (5), Eric Ibsen (4), Wendy Woo (4), Tracy A Wong (3), Charles Blank (2), Daniel Epperson (2), Andrew Levine, Jack Munson, Julia Seen, Martha Breed, Michael Steiner, Michael Thomas Fries, Pollack, Scott Clement, Stanley H Lew, Steve Lawler, Suheil Shatara, Tommy Kwan
- Engineers
- Rudolfo P Bustos Iii (8), Joshua Mcmahan (3), Juan F. Orosco (3), Cheryl Nuttall (2), Donald Dammen (2), Eugene Tuan (2), Lars Mortensen (2), Laurie K. Johnston (2), Anderson & Rowe & Buckey, Christopher Wener, Craig Allen Laws, Derek Stefureac, Donald D. Dammen, Ehab H Omar, Ramson E Paulus, Ronson Provido, Selinda Avenenti Martinez, Stephen Shafter, Suheil Shatara, Teresa K Emery, Thomas Parrish, Tracy A Wong, Wendy Woo
- Authorized agent-otherss
- Jacob Christie (5), Fred Maguire (2)
- Designers
- Michael Joseph Donahue (2), Andrew Erickson, C. Sabah, S David Hansen, Sun Graphics
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.