Tommy Kwan
- Listed as
- architect
- Firm
- Tommy Kwan Arch.
- Based in
- Millbrae
- On San Francisco permits
- Oct 2004 to Sep 2026
28 permits since 2000 (architect on 28 permits): 20 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Sep 2026 | 1515 37th Av | Jc Glazing | replace 6 windows in kind. otc due to window rating compliance.Details
replace 6 windows in kind. otc due to window rating compliance. | $20,000 |
| Jun 12, 2025 | In progress issued Jun 2026 | 745 Clayton St | Steven Liao Construction Company | work mainly on 2/f: kitchen and dining room remodel. bathroom remodel- addition of new powder room. closets. remove 1 window & relocate 1 window. work on 1/f: limited to related structural/dining remodel - 2 new pier footings and columns.Details
work mainly on 2/f: kitchen and dining room remodel. bathroom remodel- addition of new powder room. closets. remove 1 window & relocate 1 window. work on 1/f: limited to related structural/dining remodel - 2 new pier footings and columns. | $125,000 |
| Nov 26, 2024 | Completed final sign-off Jul 2026 | 425 Valley St | We Do Construction Inc. | stair reconfiguration, kitchen extension, open walls between dining/living, entry hallway. remodel master suite; new skylight, heat pump system, and tankless water heater. new beam in the lower floor (basement) for additional support. upgrade electrical panel from 100 to 150 ampDetails
stair reconfiguration, kitchen extension, open walls between dining/living, entry hallway. remodel master suite; new skylight, heat pump system, and tankless water heater. new beam in the lower floor (basement) for additional support. upgrade electrical panel from 100 to 150 amp | $175,000 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 329 Dellbrook Av | Good Neighbor Construction | master bedroom with bath. revision to pa#202010025707. reduce one bathroom.Details
master bedroom with bath. revision to pa#202010025707. reduce one bathroom. | |
| Jan 20, 2022 | Completed final sign-off Jan 2024 | 343 Walnut St | Wai On Liu | apt #4 & #6 (3rd & 4th fl): identical interior remodeling work. combine separate washroom & bathroom into 1 single bathroom in same location. combine kitchen & utility room into 1 large kitchen.Details
apt #4 & #6 (3rd & 4th fl): identical interior remodeling work. combine separate washroom & bathroom into 1 single bathroom in same location. combine kitchen & utility room into 1 large kitchen. | $50,000 |
| Nov 16, 2021 | Expired or cancelled cancelled Jan 2026 | 1860 Grant Av | identical work in both 3rd and 4th fl units: realign closets in bedroom and hall. kitchen, bath and powder room, convert closet to w/d, new wall mt tankless water heater at roof top penthouseDetails
identical work in both 3rd and 4th fl units: realign closets in bedroom and hall. kitchen, bath and powder room, convert closet to w/d, new wall mt tankless water heater at roof top penthouse | $80,000 | |
| Oct 2, 2020 | Completed final sign-off Aug 2023 | 329 Dellbrook Av | Good Neighbor Construction | remodel of 1/f to retain a single-car garage & reconfigure the remaining space to open office, family room, closets, bathroom & a master bedroom suite.Details
remodel of 1/f to retain a single-car garage & reconfigure the remaining space to open office, family room, closets, bathroom & a master bedroom suite. | $125,000 |
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2026 | 333 Dellbrook Av | Ideal Builders | remodel of ground fl to retain 1 car garage, master bedrm, office, laundry & closet; new deck w/spiral staircase on 1st fl; replace 1 window & 1 patio door at deck on 1st fl; convert 1 non-bearing full height wall to low wall at main floor. re-use (e) hot water heater & furnaceDetails
remodel of ground fl to retain 1 car garage, master bedrm, office, laundry & closet; new deck w/spiral staircase on 1st fl; replace 1 window & 1 patio door at deck on 1st fl; convert 1 non-bearing full height wall to low wall at main floor. re-use (e) hot water heater & furnace | $145,000 |
| Dec 23, 2019 | Completed final sign-off Mar 2020 | 1422 38th Av | K G Company | remodel (e) bathroom, enlarge closet in (e) bedroom, new metal ladder to roof (exterior)Details
remodel (e) bathroom, enlarge closet in (e) bedroom, new metal ladder to roof (exterior) | $17,000 |
| Jan 14, 2019 | Completed final sign-off Jul 2019 | 2410 Steiner St | Justin Farrelly Incorporated | limited int remodel w/no new area created. remodel of kitchen in (e) location. family rm in (e) location, add wet bar sink. remove (e) fireplace stack from 2nd to 3rd flr & roof. new cabinet at removed fireplace. re-partitioning in bedrm 2, 3 bath 3 on 3rd. new bathrmDetails
limited int remodel w/no new area created. remodel of kitchen in (e) location. family rm in (e) location, add wet bar sink. remove (e) fireplace stack from 2nd to 3rd flr & roof. new cabinet at removed fireplace. re-partitioning in bedrm 2, 3 bath 3 on 3rd. new bathrm | $95,000 |
| Dec 7, 2018 | Completed final sign-off Sep 2019 | 2006 18th Av | K G Company | new family room, bathroom & laundry room at ground level, enlarge exterior light well at ground level, rear yard decrease size of (e) deck at rear yardDetails
new family room, bathroom & laundry room at ground level, enlarge exterior light well at ground level, rear yard decrease size of (e) deck at rear yard | $150,000 |
| Jul 5, 2018 | Completed final sign-off Apr 2019 | 1680 Post St | J. Handa Construction | unit #c commercial interior ti hair salon of 467 sf. 2 washing stations, sink, washer/dryer & new hot water heater. change of use from medical use to retail sales and serviceDetails
unit #c commercial interior ti hair salon of 467 sf. 2 washing stations, sink, washer/dryer & new hot water heater. change of use from medical use to retail sales and service | $32,180 |
| Nov 13, 2017 | Completed final sign-off Mar 2019 | 317 Dellbrook Av | K G Company | new deck. remodel garage floor with new office, family room & bathroom.Details
new deck. remodel garage floor with new office, family room & bathroom. | $125,000 |
| Oct 11, 2017 | Expired or cancelled cancelled Jun 2022 | 58 Havelock St | one story family room addition & patio. interior upgrades to (e). 1 newbedroom, 1 new bathroom.Details
one story family room addition & patio. interior upgrades to (e). 1 newbedroom, 1 new bathroom. | $300,000 | |
| Nov 15, 2016 | Never finaled issued Mar 2017, no final | 862 Clay St | Huston General Contracting Inc. | commercial t.i. replace extg restroom with accessible one. block off extg loft space. upgrade to lighting system.Details
commercial t.i. replace extg restroom with accessible one. block off extg loft space. upgrade to lighting system. | $45,000 |
| Oct 31, 2016 | Completed final sign-off May 2017 | 2225 Pacific Av | Straightedge Construction | removal of wall in dining rm grnd flr. widening of wall openings in kitchen - grnd & middle flrs. remodel of 2 kitchens, 2 master bathrooms. relocate of hot water heaters (2) & 2 furnaces. overall paint and floor refinishDetails
removal of wall in dining rm grnd flr. widening of wall openings in kitchen - grnd & middle flrs. remodel of 2 kitchens, 2 master bathrooms. relocate of hot water heaters (2) & 2 furnaces. overall paint and floor refinish | $90,000 |
| Aug 15, 2016 | Completed final sign-off Sep 2016 | 337 Union St | L And P Construction | revision to pa #201510149612 - add 1 hour wall w/20 min door to form a media/tv room @ rear of garage, light, switches & electrical work.Details
revision to pa #201510149612 - add 1 hour wall w/20 min door to form a media/tv room @ rear of garage, light, switches & electrical work. | $6,000 |
| Oct 21, 2014 | Never finaled issued Aug 2016, no final | 2283 Shafter Av | erect 1-story, type 3, commercial kitchen food preparation building.Details
erect 1-story, type 3, commercial kitchen food preparation building. | $700,000 | |
| Apr 9, 2014 | Completed final sign-off Oct 2014 | 3233 Jackson St | L And P Construction | master bedroom/bathroom remodel, kitchen/family room remodel, remove skylight & replace with new roof. remove glass blocks & replace with windows in lightwell, not visable from street. n/a ordinance #155-13.Details
master bedroom/bathroom remodel, kitchen/family room remodel, remove skylight & replace with new roof. remove glass blocks & replace with windows in lightwell, not visable from street. n/a ordinance #155-13. | $110,000 |
| Feb 20, 2014 | Completed final sign-off Jun 2014 | 222 28th Av | L And P Construction | remodel master bathroom & bathroom 2 on 2/f, remove 1 window, replace 1 window & add 1 window of same size. add type x gyp bd. finish to portions of existing garage level wall & ceiling.Details
remodel master bathroom & bathroom 2 on 2/f, remove 1 window, replace 1 window & add 1 window of same size. add type x gyp bd. finish to portions of existing garage level wall & ceiling. | $28,000 |
| Dec 20, 2013 | Completed final sign-off Feb 2017 | 270 17th Av | David Jone, Kalix Inc Dbalara Construction | horizontal extension at gr floor behind garage below 2nd fl sunroom. stays within building envelope. new master bathroom, two bathrooms, new family room. renovate kitchens & secondary powder rm & two bathrooms. upgrade electrical panel.Details
horizontal extension at gr floor behind garage below 2nd fl sunroom. stays within building envelope. new master bathroom, two bathrooms, new family room. renovate kitchens & secondary powder rm & two bathrooms. upgrade electrical panel. | $198,000 |
| Dec 11, 2013 | Completed final sign-off Mar 2014 | 2000 Post St | Majestic Construction | g/f unit #103 -commercial interior t.i. for new nails/beauty shop, non-load bearing partitions, reception, treatment rooms, restroom ada compliance single user restroom, reuse-relcoate existing mech, lighting & sprinkler systems. no work to building exterior.Details
g/f unit #103 -commercial interior t.i. for new nails/beauty shop, non-load bearing partitions, reception, treatment rooms, restroom ada compliance single user restroom, reuse-relcoate existing mech, lighting & sprinkler systems. no work to building exterior. | $25,000 |
| Apr 1, 2011 | Completed final sign-off Sep 2011 | 215 Fremont St | All Best Buildrs.Inc./All Trusty Bldrs. | space 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking.Details
space 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking. | $5,000 |
| Dec 21, 2010 | Completed final sign-off Sep 2011 | 3281 Jackson St | Alpha Construction & Engineering Inc. | remodel kitchen, pantry, sitting room to new family rm & kitchen, remodel 1 bathrm & add 1 new full bathrm, remodel master bedrm/bathrm suite, add new central heating to 3rd fl in lieu of baseboard heaters.Details
remodel kitchen, pantry, sitting room to new family rm & kitchen, remodel 1 bathrm & add 1 new full bathrm, remodel master bedrm/bathrm suite, add new central heating to 3rd fl in lieu of baseboard heaters. | $148,000 |
| May 11, 2009 | Completed final sign-off Jun 2009 | 37 Presidio Av | repair of decking & railing of existing deck.Details
repair of decking & railing of existing deck. | $2,000 | |
| Jan 16, 2008 | Completed final sign-off May 2008 | 3730 Clay St | L And D Construction | remodel entire kitchen on 1st floor including 1. small modification to breakfast & dining room- relocate non-bearing wall. 2. replace/enlarge 2 windows & replace door w/new window.Details
remodel entire kitchen on 1st floor including 1. small modification to breakfast & dining room- relocate non-bearing wall. 2. replace/enlarge 2 windows & replace door w/new window. | $85,000 |
| May 10, 2005 | Completed final sign-off Oct 2007 | 2251 Green St | Metro Construction Inc. | horizontal addition of 2 floors to the rear of bldg. enlarge family room on ground floor, re-organize kitchen/bath. rework 1 bedroom & add a new 1. rework master bathroom.Details
horizontal addition of 2 floors to the rear of bldg. enlarge family room on ground floor, re-organize kitchen/bath. rework 1 bedroom & add a new 1. rework master bathroom. | $95,000 |
| Oct 21, 2004 | Never finaled issued Oct 2004, no final | 3227 Lawton St | Bestime Electric | work in street level only. convert (e) family room & storage room to : family room, 1 bed room,Details
work in street level only. convert (e) family room & storage room to : family room, 1 bed room, | $30,000 |