L And D Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jun 2011
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2011 | Completed final sign-off Mar 2012 | 4146 18th St | converting the back of a vacant commercial into a men's room & a storage room, accessible from back patio area. install an ada-complying restroom for the vacant space. fire alarm separate permitDetails
converting the back of a vacant commercial into a men's room & a storage room, accessible from back patio area. install an ada-complying restroom for the vacant space. fire alarm separate permit | $25,500 |
| Sep 17, 2010 | Completed final sign-off Dec 2010 | 2850 Steiner St | remodel bathroom, replacing flooring, sink, toilet and tub.Details
remodel bathroom, replacing flooring, sink, toilet and tub. | $10,000 |
| Sep 16, 2010 | Completed final sign-off Dec 2010 | 2337 Vallejo St | remodel & expand master bedroom (by taking over (e) closet), remove fireplace in master bedroomDetails
remodel & expand master bedroom (by taking over (e) closet), remove fireplace in master bedroom | $10,000 |
| Nov 12, 2009 | Completed final sign-off Jul 2010 | 23 Presidio Av | remodel 3 bathrm, 1 powder rm. addition of a new (2nd) powder rm in basement. re-configuration of master bedrm. add media rm & laundry (in basement). new central air furnace, new hot water heater, re-configure new stair to rear yard, partial foundation upgrades. overall painting & floorDetails
remodel 3 bathrm, 1 powder rm. addition of a new (2nd) powder rm in basement. re-configuration of master bedrm. add media rm & laundry (in basement). new central air furnace, new hot water heater, re-configure new stair to rear yard, partial foundation upgrades. overall painting & floor | $225,000 |
| Sep 30, 2009 | Completed final sign-off Dec 2009 | 3156 Turk St | remodel kitchen in existing location. shorten the height of 1 existing window.Details
remodel kitchen in existing location. shorten the height of 1 existing window. | $14,000 |
| Sep 15, 2009 | Completed final sign-off Jun 2010 | 123 Locust St | extension of existing deck. refinish all existing deck surfaces. remodel kitchen & 2 bathrooms, cabinets for laundry in garage level. new central air furnace. refinish (paint, wood floor) of all finish in existing house.Details
extension of existing deck. refinish all existing deck surfaces. remodel kitchen & 2 bathrooms, cabinets for laundry in garage level. new central air furnace. refinish (paint, wood floor) of all finish in existing house. | $180,000 |
| Oct 1, 2008 | Completed final sign-off Jun 2009 | 37 Presidio Av | partial interior renovation - relocate & replace main furnace & water heater, remodel 4 existing bathrooms, add 1 new bathroom (convert from bedroom) on third floor, replace 4 windows with same style, size in same locations. basement remodel after foudnation upgrade under separate permit.Details
partial interior renovation - relocate & replace main furnace & water heater, remodel 4 existing bathrooms, add 1 new bathroom (convert from bedroom) on third floor, replace 4 windows with same style, size in same locations. basement remodel after foudnation upgrade under separate permit. | $95,000 |
| Jan 16, 2008 | Completed final sign-off May 2008 | 3730 Clay St | remodel entire kitchen on 1st floor including 1. small modification to breakfast & dining room- relocate non-bearing wall. 2. replace/enlarge 2 windows & replace door w/new window.Details
remodel entire kitchen on 1st floor including 1. small modification to breakfast & dining room- relocate non-bearing wall. 2. replace/enlarge 2 windows & replace door w/new window. | $85,000 |