Back to bathroom remodel contractors
L And D Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jun 2011
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2010 | Completed final sign-off Dec 2010 | 2850 Steiner St | remodel bathroom, replacing flooring, sink, toilet and tub.Details
remodel bathroom, replacing flooring, sink, toilet and tub. | $10,000 |
| Sep 15, 2009 | Completed final sign-off Jun 2010 | 123 Locust St | extension of existing deck. refinish all existing deck surfaces. remodel kitchen & 2 bathrooms, cabinets for laundry in garage level. new central air furnace. refinish (paint, wood floor) of all finish in existing house.Details
extension of existing deck. refinish all existing deck surfaces. remodel kitchen & 2 bathrooms, cabinets for laundry in garage level. new central air furnace. refinish (paint, wood floor) of all finish in existing house. | $180,000 |
| Oct 1, 2008 | Completed final sign-off Jun 2009 | 37 Presidio Av | partial interior renovation - relocate & replace main furnace & water heater, remodel 4 existing bathrooms, add 1 new bathroom (convert from bedroom) on third floor, replace 4 windows with same style, size in same locations. basement remodel after foudnation upgrade under separate permit.Details
partial interior renovation - relocate & replace main furnace & water heater, remodel 4 existing bathrooms, add 1 new bathroom (convert from bedroom) on third floor, replace 4 windows with same style, size in same locations. basement remodel after foudnation upgrade under separate permit. | $95,000 |