All Best Buildrs.Inc./All Trusty Bldrs.

Contractor license
909984
State license record
Based in
San Francisco
On San Francisco permits
Jul 2008 to Jul 2026
Last 24 months
11 permits filed

60 permits since 2000: 50 completed, 6 in progress, 4 never finaled.

Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 2Stairs 3Kitchen remodel 12Bathroom remodel 14
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 16, 2026In progress
issued Jul 2026
685 27th Avrev to pa# 2025-0829-4284: revised structural footing along line 1 and 8.
Details
Permit
202607165149
Status
issued
Filed
Jul 16, 2026
Permit issued
Jul 20, 2026
Declared cost
$10
Address
685 27th Av

rev to pa# 2025-0829-4284: revised structural footing along line 1 and 8.

Open the permit page

$10
Jul 10, 2026In progress
issued Jul 2026
2258 34th Avremove existing fire place in 2nd floor and install a new electrical fire place in the middle of the north wall in the living room. replace 9 pieces of interior/back windows.
Details
Permit
202607104853
Status
issued
Filed
Jul 10, 2026
Permit issued
Jul 10, 2026
Declared cost
$5,000
Address
2258 34th Av

remove existing fire place in 2nd floor and install a new electrical fire place in the middle of the north wall in the living room. replace 9 pieces of interior/back windows.

Open the permit page

$5,000
May 4, 2026In progress
issued Jun 2026
200 Cayuga Avrevision to pa # 202601063329. replace existing windows at sunroom. rebuild existing garage. repair dry rot at existing south low roof.
Details
Permit
202605040624
Status
issued
Filed
May 4, 2026
Permit issued
Jun 12, 2026
Declared cost
$70,030
Address
200 Cayuga Av

revision to pa # 202601063329. replace existing windows at sunroom. rebuild existing garage. repair dry rot at existing south low roof.

Open the permit page

$70,030
Apr 6, 2026Completed
final sign-off Apr 2026
930 Sutter Stto obtain final inspection for work approved under pa# 201601288233. all work is approved.
Details
Permit
202604068984
Status
complete
Filed
Apr 6, 2026
Permit issued
Apr 6, 2026
Final sign-off
Apr 13, 2026
Address
930 Sutter St

to obtain final inspection for work approved under pa# 201601288233. all work is approved.

Open the permit page

Jan 28, 2026Completed
final sign-off Mar 2026
930 Sutter Strecommencement and completion of work approved under pa# 201806293452
Details
Permit
202601284762
Status
complete
Filed
Jan 28, 2026
Permit issued
Jan 28, 2026
Final sign-off
Mar 20, 2026
Declared cost
$38,000
Address
930 Sutter St

recommencement and completion of work approved under pa# 201806293452

Open the permit page

$38,000
Jan 6, 2026In progress
issued Jan 2026
200 Cayuga Av1st fl: remodel (e) kitchen, laundry, bathrooms and new wetbar. 2nd fl: remodel (e) bathroom. add new bath and skylights.
Details
Permit
202601063329
Status
issued
Filed
Jan 6, 2026
Permit issued
Jan 28, 2026
Declared cost
$188,900
Address
200 Cayuga Av

1st fl: remodel (e) kitchen, laundry, bathrooms and new wetbar. 2nd fl: remodel (e) bathroom. add new bath and skylights.

Open the permit page

$188,900
Sep 18, 2025In progress
issued Jun 2026
687 27th Avadd 3rd & 4th flr addition to (e) 2-story bldg that will consist of a 3-bedroom unit. excavate under rear of the 2nd flr & into basement to create a (n) 504 sq.st. one bedroom apartment. convert 2nd flr living space into a 2-new bedroom flat. replace cement plaster, cornice and add new wood facade..
Details
Permit
202508294284
Status
issued
Filed
Sep 18, 2025
Permit issued
Jun 12, 2026
Declared cost
$800,000
Address
687 27th Av

add 3rd & 4th flr addition to (e) 2-story bldg that will consist of a 3-bedroom unit. excavate under rear of the 2nd flr & into basement to create a (n) 504 sq.st. one bedroom apartment. convert 2nd flr living space into a 2-new bedroom flat. replace cement plaster, cornice and add new wood facade..

Open the permit page

$800,000
Sep 17, 2025In progress
issued Sep 2025
360 Hyde Stcomply with nov 202430311 demolition of a partition wall. remove awning and raised platform.
Details
Permit
202509175550
Status
issued
Filed
Sep 17, 2025
Permit issued
Sep 23, 2025
Declared cost
$500
Address
360 Hyde St

comply with nov 202430311 demolition of a partition wall. remove awning and raised platform.

Open the permit page

$500
Sep 17, 2025Completed
final sign-off Oct 2025
447 Silver Avreplace all kitchen cabinets and countertop in the kitchen
Details
Permit
202509175553
Status
complete
Filed
Sep 17, 2025
Permit issued
Sep 17, 2025
Final sign-off
Oct 21, 2025
Declared cost
$5,000
Address
447 Silver Av

replace all kitchen cabinets and countertop in the kitchen

Open the permit page

$5,000
Apr 22, 2025Completed
final sign-off Mar 2026
2258 34th Avrelocate kitchen add a full bathroom at 2nd flr
Details
Permit
202504224995
Status
complete
Filed
Apr 22, 2025
Permit issued
Apr 29, 2025
Final sign-off
Mar 20, 2026
Declared cost
$5,000
Address
2258 34th Av

relocate kitchen add a full bathroom at 2nd flr

Open the permit page

$5,000
Dec 16, 2024Completed
final sign-off Mar 2026
2258 34th Avremove all sheetrock of the 2nd floor, add lights and outles, replace rusted drain lines, fill insulation, cover new sheetrock and paint. second floor kitchen and bathrooms(2) remodel in kind
Details
Permit
202412166893
Status
complete
Filed
Dec 16, 2024
Permit issued
Dec 16, 2024
Final sign-off
Mar 20, 2026
Declared cost
$40,000
Address
2258 34th Av

remove all sheetrock of the 2nd floor, add lights and outles, replace rusted drain lines, fill insulation, cover new sheetrock and paint. second floor kitchen and bathrooms(2) remodel in kind

Open the permit page

$40,000
Feb 6, 2024Completed
final sign-off Jun 2024
1596 28th Avinstall hydronic heating system in the 3 units only; all previous work under permit # 202111233056
Details
Permit
202402065368
Status
complete
Filed
Feb 6, 2024
Permit issued
Feb 21, 2024
Final sign-off
Jun 3, 2024
Declared cost
$15,000
Address
1596 28th Av

install hydronic heating system in the 3 units only; all previous work under permit # 202111233056

Open the permit page

$15,000
Dec 4, 2023Completed
final sign-off Feb 2025
231 Stratford Drinterior remodeling. replace (e) windows per plan. reconfigure rear stair access to the backyard on the mainfloor.
Details
Permit
202312041866
Status
complete
Filed
Dec 4, 2023
Permit issued
Mar 11, 2024
Final sign-off
Feb 25, 2025
Declared cost
$13,000
Address
231 Stratford Dr

interior remodeling. replace (e) windows per plan. reconfigure rear stair access to the backyard on the mainfloor.

Open the permit page

$13,000
Aug 31, 2023Completed
final sign-off Mar 2026
2258 34th Avin respose to 2022-011286enf enforcement by planning dept. to legalize unauthorized dwelling unit at 1st fl. legalize unpermitted structure due to removal of the (e) beam and post on the 1st fl. front facade remain no change.
Details
Permit
202308315692
Status
complete
Filed
Aug 31, 2023
Permit issued
Jul 5, 2024
Final sign-off
Mar 20, 2026
Declared cost
$50,000
Address
2258 34th Av

in respose to 2022-011286enf enforcement by planning dept. to legalize unauthorized dwelling unit at 1st fl. legalize unpermitted structure due to removal of the (e) beam and post on the 1st fl. front facade remain no change.

Open the permit page

$50,000
Jun 15, 2023Completed
final sign-off Feb 2024
84 Whitney Stin revision to #202104078081. change the rafters from lvl 1-3/4"x9-1/4" to double lvl 1-3/4"x4-5/8" rafters for the addition roof. (btwn grid a.3 to b)
Details
Permit
202306150200
Status
complete
Filed
Jun 15, 2023
Permit issued
Jun 15, 2023
Final sign-off
Feb 8, 2024
Declared cost
$200
Address
84 Whitney St

in revision to #202104078081. change the rafters from lvl 1-3/4"x9-1/4" to double lvl 1-3/4"x4-5/8" rafters for the addition roof. (btwn grid a.3 to b)

Open the permit page

$200
Nov 10, 2022Never finaled
issued Oct 2023, no final
242 West Portal Avabe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe # 202001160981
Details
Permit
202211106273
Status
issued
Filed
Nov 10, 2022
Permit issued
Oct 4, 2023
Address
242 West Portal Av

abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe # 202001160981

Open the permit page

Nov 10, 2022Never finaled
issued Oct 2023, no final
244 West Portal Avabe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe #202001160982
Details
Permit
202211106274
Status
issued
Filed
Nov 10, 2022
Permit issued
Oct 4, 2023
Address
244 West Portal Av

abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe #202001160982

Open the permit page

Nov 10, 2022Never finaled
issued Oct 2023, no final
240 West Portal Avabe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe# 202001160980
Details
Permit
202211106271
Status
issued
Filed
Nov 10, 2022
Permit issued
Oct 4, 2023
Address
240 West Portal Av

abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe# 202001160980

Open the permit page

Jun 13, 2022Completed
final sign-off Jul 2022
820 Battery Stadd (1) lavatory for child in toilet and 1 lavatory in classroom area for accessibility
Details
Permit
202206136223
Status
complete
Filed
Jun 13, 2022
Permit issued
Jun 16, 2022
Final sign-off
Jul 29, 2022
Declared cost
$10,000
Address
820 Battery St

add (1) lavatory for child in toilet and 1 lavatory in classroom area for accessibility

Open the permit page

$10,000
Nov 23, 2021Completed
final sign-off Jun 2024
1598 28th Avaddition a new adu at the first floor.
Details
Permit
202111233056
Status
complete
Filed
Nov 23, 2021
Permit issued
May 11, 2022
Final sign-off
Jun 4, 2024
Declared cost
$328,000
Address
1598 28th Av

addition a new adu at the first floor.

Open the permit page

$328,000
Sep 9, 2021Completed
final sign-off Jun 2022
734 27th Avrevision to 201303182425, 1st fl convert 1/2 bath to full, add storage and closets. 2nd fl reconfigure walls and relocate fire place. 3rd fl reconfigure laundry and closets
Details
Permit
202109098035
Status
complete
Filed
Sep 9, 2021
Permit issued
Oct 7, 2021
Final sign-off
Jun 14, 2022
Declared cost
$25,000
Address
734 27th Av

revision to 201303182425, 1st fl convert 1/2 bath to full, add storage and closets. 2nd fl reconfigure walls and relocate fire place. 3rd fl reconfigure laundry and closets

Open the permit page

$25,000
Jul 9, 2021Completed
final sign-off Feb 2022
2501 Cabrillo Stremodel (e) kitchen, bathroom. construct 1 full bathroom & install new lighting. all work on 2nd floor.
Details
Permit
202107094032
Status
complete
Filed
Jul 9, 2021
Permit issued
Sep 2, 2021
Final sign-off
Feb 22, 2022
Declared cost
$32,000
Address
2501 Cabrillo St

remodel (e) kitchen, bathroom. construct 1 full bathroom & install new lighting. all work on 2nd floor.

Open the permit page

$32,000
Apr 7, 2021Completed
final sign-off Feb 2024
84 Whitney Stkitchen renovation, second floor addition, and dormer office space addition
Details
Permit
202104078081
Status
complete
Filed
Apr 7, 2021
Permit issued
Dec 14, 2022
Final sign-off
Feb 8, 2024
Declared cost
$350,000
Address
84 Whitney St

kitchen renovation, second floor addition, and dormer office space addition

Open the permit page

$350,000
Mar 12, 2021Completed
final sign-off Jul 2021
1435 41st Avadd new deck at rear yard.
Details
Permit
202103126499
Status
complete
Filed
Mar 12, 2021
Permit issued
Apr 22, 2021
Final sign-off
Jul 21, 2021
Declared cost
$10,000
Address
1435 41st Av

add new deck at rear yard.

Open the permit page

$10,000
Sep 27, 2020Completed
final sign-off Jan 2022
734 27th Avreplace retaining wall at rear & add concrete steps.
Details
Permit
202009275178
Status
complete
Filed
Sep 27, 2020
Permit issued
Jan 21, 2021
Final sign-off
Jan 6, 2022
Declared cost
$35,000
Address
734 27th Av

replace retaining wall at rear & add concrete steps.

Open the permit page

$35,000
Jul 13, 2020Completed
final sign-off Dec 2020
751 26th Avinkind replacement of stucco siding (315 sqft) on front with new waterproofing, replace all existing 11 front windows with aluminum-clad wood casement windows. no muntins nor grid pattern on the windows.
Details
Permit
202007130067
Status
complete
Filed
Jul 13, 2020
Permit issued
Aug 29, 2020
Final sign-off
Dec 24, 2020
Declared cost
$45,000
Address
751 26th Av

inkind replacement of stucco siding (315 sqft) on front with new waterproofing, replace all existing 11 front windows with aluminum-clad wood casement windows. no muntins nor grid pattern on the windows.

Open the permit page

$45,000
Jan 17, 2020Completed
final sign-off Jan 2022
734 27th Avreplace stucco on front elevation due to dry rot/ weatherproofing. front to be replaced in kind stucco entire front of building 25' x 25'
Details
Permit
202001172206
Status
complete
Filed
Jan 17, 2020
Permit issued
Jan 17, 2020
Final sign-off
Jan 6, 2022
Declared cost
$3,000
Address
734 27th Av

replace stucco on front elevation due to dry rot/ weatherproofing. front to be replaced in kind stucco entire front of building 25' x 25'

Open the permit page

$3,000
Aug 8, 2019Completed
final sign-off Nov 2023
555 Ofarrell Strevision to 2016012235814 revise layout in units 3 & 4. revise escape/rescue winodwn path to public way for units 4, 6, 7 per dbi information sheet eg-05.
Details
Permit
201908088256
Status
complete
Filed
Aug 8, 2019
Permit issued
Nov 22, 2019
Final sign-off
Nov 29, 2023
Address
555 Ofarrell St

revision to 2016012235814 revise layout in units 3 & 4. revise escape/rescue winodwn path to public way for units 4, 6, 7 per dbi information sheet eg-05.

Open the permit page

Jun 13, 2019Completed
final sign-off Oct 2019
581 Arguello Blreplace 4 front windows (wood clad)
Details
Permit
201906133372
Status
complete
Filed
Jun 13, 2019
Permit issued
Jun 13, 2019
Final sign-off
Oct 18, 2019
Declared cost
$4,000
Address
581 Arguello Bl

replace 4 front windows (wood clad)

Open the permit page

$4,000
Mar 21, 2019Completed
final sign-off Aug 2021
1600 36th Avrev to pa# 201805048220; install hydrolic heathing system to replace gas furnance, no other work scope.
Details
Permit
201903215903
Status
complete
Filed
Mar 21, 2019
Permit issued
Mar 22, 2019
Final sign-off
Aug 31, 2021
Declared cost
$8,500
Address
1600 36th Av

rev to pa# 201805048220; install hydrolic heathing system to replace gas furnance, no other work scope.

Open the permit page

$8,500
Feb 14, 2019Completed
final sign-off Apr 2020
841 Shrader Stinterior work: remove interior wall at 2nd fl. add sky lights, replace doors at 2nd fl. deck repair dry rot at study
Details
Permit
201902142939
Status
complete
Filed
Feb 14, 2019
Permit issued
Aug 12, 2019
Final sign-off
Apr 6, 2020
Declared cost
$75,000
Address
841 Shrader St

interior work: remove interior wall at 2nd fl. add sky lights, replace doors at 2nd fl. deck repair dry rot at study

Open the permit page

$75,000
Sep 18, 2018Completed
final sign-off Dec 2022
50 Reardon Rdrevision to 201609087102, 201609087103, 201609087104, 201609087105 soft story retrofit (4)
Details
Permit
201809180555
Status
complete
Filed
Sep 18, 2018
Permit issued
Oct 2, 2018
Final sign-off
Dec 20, 2022
Address
50 Reardon Rd

revision to 201609087102, 201609087103, 201609087104, 201609087105 soft story retrofit (4)

Open the permit page

Aug 28, 2018Completed
final sign-off Aug 2021
1600 36th Avrepair about 25 sf dry rot exterior wall on 36th ave. replace 17 windows, wood casement at front and side, vinyl at rear.
Details
Permit
201808288590
Status
complete
Filed
Aug 28, 2018
Permit issued
Aug 28, 2018
Final sign-off
Aug 31, 2021
Declared cost
$10,000
Address
1600 36th Av

repair about 25 sf dry rot exterior wall on 36th ave. replace 17 windows, wood casement at front and side, vinyl at rear.

Open the permit page

$10,000
May 14, 2018Completed
final sign-off Apr 2019
379 15th Avremodel two full bathrooms, one in each unit.
Details
Permit
201805148980
Status
complete
Filed
May 14, 2018
Permit issued
May 14, 2018
Final sign-off
Apr 2, 2019
Declared cost
$12,000
Address
379 15th Av

remodel two full bathrooms, one in each unit.

Open the permit page

$12,000
May 4, 2018Completed
final sign-off Aug 2021
1600 36th Av1st fl: convert existing office room to new bedroom. relocate bathroom and closet. 2nd fl: remove the non-bearing wall between kitchen & dining area. add new tube skylight. relocate the toilet and add new window at lightwell location.
Details
Permit
201805048220
Status
complete
Filed
May 4, 2018
Permit issued
May 14, 2018
Final sign-off
Aug 31, 2021
Declared cost
$150,000
Address
1600 36th Av

1st fl: convert existing office room to new bedroom. relocate bathroom and closet. 2nd fl: remove the non-bearing wall between kitchen & dining area. add new tube skylight. relocate the toilet and add new window at lightwell location.

Open the permit page

$150,000
Mar 16, 2018Completed
final sign-off Jun 2023
555 Ofarrell Stvoluntary strengthening - upgrade 3 concrete shear walls at gr fl. ref 201612235814 for adu renovation work. maher n/a
Details
Permit
201803163857
Status
complete
Filed
Mar 16, 2018
Permit issued
Jan 10, 2020
Final sign-off
Jun 26, 2023
Declared cost
$20,000
Address
555 Ofarrell St

voluntary strengthening - upgrade 3 concrete shear walls at gr fl. ref 201612235814 for adu renovation work. maher n/a

Open the permit page

$20,000
Feb 16, 2018Completed
final sign-off Oct 2018
3830 Noriega Strevision to structural permit # 2016-1104-1970. revised foundation plan at front facade. revised beam @ front facade/per site review. remove non-strl box awning @ front. re # 2016-1024-0989.
Details
Permit
201802161602
Status
complete
Filed
Feb 16, 2018
Permit issued
Feb 20, 2018
Final sign-off
Oct 15, 2018
Address
3830 Noriega St

revision to structural permit # 2016-1104-1970. revised foundation plan at front facade. revised beam @ front facade/per site review. remove non-strl box awning @ front. re # 2016-1024-0989.

Open the permit page

Feb 3, 2017Completed
final sign-off Oct 2018
543 Los Palmos Drenclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint.
Details
Permit
201702038564
Status
complete
Filed
Feb 3, 2017
Permit issued
May 12, 2017
Final sign-off
Oct 31, 2018
Declared cost
$125,000
Address
543 Los Palmos Dr

enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint.

Open the permit page

$125,000
Dec 23, 2016Completed
final sign-off Nov 2023
555 Ofarrell Strenovation of existing residential bldg ground floor, add 7 adu, struct reinf as required per code, mech, elect, plumb as required per code. seismic strengthing per application 2018-0316-3857.
Details
Permit
201612235814
Status
complete
Filed
Dec 23, 2016
Permit issued
Jan 8, 2019
Final sign-off
Nov 29, 2023
Declared cost
$150,000
Address
555 Ofarrell St

renovation of existing residential bldg ground floor, add 7 adu, struct reinf as required per code, mech, elect, plumb as required per code. seismic strengthing per application 2018-0316-3857.

Open the permit page

$150,000
Nov 4, 2016Completed
final sign-off Oct 2018
3830 Noriega Ststructural work - drawings and calculations for ref 2016-1102-1167 and 2016-1024-0989 (proposed childcare)
Details
Permit
201611041970
Status
complete
Filed
Nov 4, 2016
Permit issued
Dec 15, 2017
Final sign-off
Oct 15, 2018
Declared cost
$25,000
Address
3830 Noriega St

structural work - drawings and calculations for ref 2016-1102-1167 and 2016-1024-0989 (proposed childcare)

Open the permit page

$25,000
Nov 2, 2016Completed
final sign-off Oct 2018
3830 Noriega Stfront facade to receive new windows and doors, insulated wall, new exterior finishes and planter. associated with 2016-1024-0989.
Details
Permit
201611021767
Status
complete
Filed
Nov 2, 2016
Permit issued
Dec 15, 2017
Final sign-off
Oct 15, 2018
Declared cost
$57,300
Address
3830 Noriega St

front facade to receive new windows and doors, insulated wall, new exterior finishes and planter. associated with 2016-1024-0989.

Open the permit page

$57,300
Oct 24, 2016Completed
final sign-off Oct 2018
3830 Noriega Strepair rear facade (new window and finish) & interior ti for childcare use. required fire alarm under deferred submittal.
Details
Permit
201610240989
Status
complete
Filed
Oct 24, 2016
Permit issued
Dec 15, 2017
Final sign-off
Oct 15, 2018
Declared cost
$243,700
Address
3830 Noriega St

repair rear facade (new window and finish) & interior ti for childcare use. required fire alarm under deferred submittal.

Open the permit page

$243,700
Sep 8, 2016Completed
final sign-off Nov 2018
71 Reardon Rdvoluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.
Details
Permit
201609087101
Status
complete
Filed
Sep 8, 2016
Permit issued
Aug 27, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
71 Reardon Rd

voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
145 Kiska Rdsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **
Details
Permit
201609087104
Status
complete
Filed
Sep 8, 2016
Permit issued
Sep 7, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
145 Kiska Rd

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
54 Reardon Rdvoluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.
Details
Permit
201609087100
Status
complete
Filed
Sep 8, 2016
Permit issued
Aug 27, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
54 Reardon Rd

voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
95 Reardon Rdsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **
Details
Permit
201609087102
Status
complete
Filed
Sep 8, 2016
Permit issued
Sep 7, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
95 Reardon Rd

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
26 Reardon Rdvoluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.
Details
Permit
201609087096
Status
complete
Filed
Sep 8, 2016
Permit issued
Aug 27, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
26 Reardon Rd

voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
50 Reardon Rdsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code.
Details
Permit
201609087103
Status
complete
Filed
Sep 8, 2016
Permit issued
Sep 7, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
50 Reardon Rd

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code.

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
10 Reardon Rdvoluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.
Details
Permit
201609087099
Status
complete
Filed
Sep 8, 2016
Permit issued
Aug 27, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
10 Reardon Rd

voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.

Open the permit page

$15,000
Sep 8, 2016Completed
final sign-off Nov 2018
135 Kiska Rdsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **
Details
Permit
201609087105
Status
complete
Filed
Sep 8, 2016
Permit issued
Sep 7, 2018
Final sign-off
Nov 26, 2018
Declared cost
$15,000
Address
135 Kiska Rd

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **

Open the permit page

$15,000
Jun 23, 2016Completed
final sign-off Feb 2017
1738 29th Avground floor remodel only: add 1 new full bathroom, one bedroom and play room. relocate the (e) washer/dryer & laundry sink
Details
Permit
201606230681
Status
complete
Filed
Jun 23, 2016
Permit issued
Aug 19, 2016
Final sign-off
Feb 17, 2017
Declared cost
$30,000
Address
1738 29th Av

ground floor remodel only: add 1 new full bathroom, one bedroom and play room. relocate the (e) washer/dryer & laundry sink

Open the permit page

$30,000
Nov 18, 2015Completed
final sign-off Jan 2016
80 Springfield Dradd new full bathroom @ ground floor.
Details
Permit
201511182953
Status
complete
Filed
Nov 18, 2015
Permit issued
Dec 2, 2015
Final sign-off
Jan 22, 2016
Declared cost
$8,000
Address
80 Springfield Dr

add new full bathroom @ ground floor.

Open the permit page

$8,000
Aug 19, 2013Never finaled
issued Aug 2013, no final
2450 Fulton Streplace 6 side window, u-factor 0.40 max.
Details
Permit
201308194691
Status
issued
Filed
Aug 19, 2013
Permit issued
Aug 19, 2013
Declared cost
$10,000
Address
2450 Fulton St

replace 6 side window, u-factor 0.40 max.

Open the permit page

$10,000
Mar 18, 2013Completed
final sign-off Jun 2022
734 27th Avhorizontal addition @ rear & 1-story vertical addition over (e) 2-story bldg & rearrange kitchen & bathroom's location. construct 3'-0" height retaining wall @ backyard.
Details
Permit
201303182425
Status
complete
Filed
Mar 18, 2013
Permit issued
Aug 9, 2016
Final sign-off
Jun 28, 2022
Declared cost
$100,000
Address
734 27th Av

horizontal addition @ rear & 1-story vertical addition over (e) 2-story bldg & rearrange kitchen & bathroom's location. construct 3'-0" height retaining wall @ backyard.

Open the permit page

$100,000
Feb 13, 2012Completed
final sign-off Mar 2012
1931 42nd Avcomply with complaint #201074726. 1)legalize one bed room, one full bath room, and upgrade one bed room at ground floor. 2)remove illegal addition at rear bldg.
Details
Permit
201202134021
Status
complete
Filed
Feb 13, 2012
Permit issued
Feb 13, 2012
Final sign-off
Mar 1, 2012
Declared cost
$28,000
Address
1931 42nd Av

comply with complaint #201074726. 1)legalize one bed room, one full bath room, and upgrade one bed room at ground floor. 2)remove illegal addition at rear bldg.

Open the permit page

$28,000
Apr 1, 2011Completed
final sign-off Sep 2011
215 Fremont Stspace 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking.
Details
Permit
201104013276
Status
complete
Filed
Apr 1, 2011
Permit issued
Apr 4, 2011
Final sign-off
Sep 9, 2011
Declared cost
$5,000
Address
215 Fremont St

space 5b: commercial ti in existing space for new cafe tenant at ground fl. coffee/sandwich shop. new customer area. new appliances. no on site cooking.

Open the permit page

$5,000
Dec 10, 2010Completed
final sign-off Mar 2011
2578 42nd Avremodel kitchen & 2 bathrooms, paint interior, re-finish floor. kitchen: at least 50% high efficacy (by wattage), bathroom: high efficacy or occupancy sensor.
Details
Permit
201012106526
Status
complete
Filed
Dec 10, 2010
Permit issued
Dec 10, 2010
Final sign-off
Mar 15, 2011
Declared cost
$4,000
Address
2578 42nd Av

remodel kitchen & 2 bathrooms, paint interior, re-finish floor. kitchen: at least 50% high efficacy (by wattage), bathroom: high efficacy or occupancy sensor.

Open the permit page

$4,000
Nov 3, 2010Completed
final sign-off Mar 2011
2578 42nd Avreplace 1 kitchen window, 4x4
Details
Permit
201011034278
Status
complete
Filed
Nov 3, 2010
Permit issued
Nov 3, 2010
Final sign-off
Mar 15, 2011
Declared cost
$500
Address
2578 42nd Av

replace 1 kitchen window, 4x4

Open the permit page

$500
Oct 17, 2008Completed
final sign-off Mar 2009
4 Carnelian Wymove wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. install hardwood floor in second floor. (lighting are all existing)
Details
Permit
200810174507
Status
complete
Filed
Oct 17, 2008
Permit issued
Oct 17, 2008
Final sign-off
Mar 4, 2009
Declared cost
$35,000
Address
4 Carnelian Wy

move wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. install hardwood floor in second floor. (lighting are all existing)

Open the permit page

$35,000
Jul 30, 2008Completed
final sign-off Dec 2008
470 West Portal Avsplit existing classroom r113 and staffrooom r211: provide new 1 hour rated wall. relocate e light fixtures, provide additional light switch. provide hornstrobe device at new spaces as required.
Details
Permit
200807307948
Status
complete
Filed
Jul 30, 2008
Permit issued
Jul 30, 2008
Final sign-off
Dec 15, 2008
Declared cost
$15,000
Address
470 West Portal Av

split existing classroom r113 and staffrooom r211: provide new 1 hour rated wall. relocate e light fixtures, provide additional light switch. provide hornstrobe device at new spaces as required.

Open the permit page

$15,000