All Best Buildrs.Inc./All Trusty Bldrs.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Jul 2026
- Last 24 months
- 11 permits filed
60 permits since 2000: 50 completed, 6 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 98 days from filing to permit and 351 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2023 | Completed final sign-off Feb 2025 | 231 Stratford Dr | interior remodeling. replace (e) windows per plan. reconfigure rear stair access to the backyard on the mainfloor.Details
interior remodeling. replace (e) windows per plan. reconfigure rear stair access to the backyard on the mainfloor. | $13,000 |
| Feb 3, 2017 | Completed final sign-off Oct 2018 | 543 Los Palmos Dr | enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint.Details
enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint. | $125,000 |
| Oct 17, 2008 | Completed final sign-off Mar 2009 | 4 Carnelian Wy | move wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. install hardwood floor in second floor. (lighting are all existing)Details
move wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. install hardwood floor in second floor. (lighting are all existing) | $35,000 |