Back to bathroom remodel contractors
All Best Buildrs.Inc./All Trusty Bldrs.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Jul 2026
- Last 24 months
- 11 permits filed
60 permits since 2000: 50 completed, 6 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 in progress. Typically 12 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2026 | In progress issued Jan 2026 | 200 Cayuga Av | 1st fl: remodel (e) kitchen, laundry, bathrooms and new wetbar. 2nd fl: remodel (e) bathroom. add new bath and skylights.Details
1st fl: remodel (e) kitchen, laundry, bathrooms and new wetbar. 2nd fl: remodel (e) bathroom. add new bath and skylights. | $188,900 |
| Apr 22, 2025 | Completed final sign-off Mar 2026 | 2258 34th Av | relocate kitchen add a full bathroom at 2nd flrDetails
relocate kitchen add a full bathroom at 2nd flr | $5,000 |
| Dec 16, 2024 | Completed final sign-off Mar 2026 | 2258 34th Av | remove all sheetrock of the 2nd floor, add lights and outles, replace rusted drain lines, fill insulation, cover new sheetrock and paint. second floor kitchen and bathrooms(2) remodel in kindDetails
remove all sheetrock of the 2nd floor, add lights and outles, replace rusted drain lines, fill insulation, cover new sheetrock and paint. second floor kitchen and bathrooms(2) remodel in kind | $40,000 |
| Sep 9, 2021 | Completed final sign-off Jun 2022 | 734 27th Av | revision to 201303182425, 1st fl convert 1/2 bath to full, add storage and closets. 2nd fl reconfigure walls and relocate fire place. 3rd fl reconfigure laundry and closetsDetails
revision to 201303182425, 1st fl convert 1/2 bath to full, add storage and closets. 2nd fl reconfigure walls and relocate fire place. 3rd fl reconfigure laundry and closets | $25,000 |
| Jul 9, 2021 | Completed final sign-off Feb 2022 | 2501 Cabrillo St | remodel (e) kitchen, bathroom. construct 1 full bathroom & install new lighting. all work on 2nd floor.Details
remodel (e) kitchen, bathroom. construct 1 full bathroom & install new lighting. all work on 2nd floor. | $32,000 |
| May 14, 2018 | Completed final sign-off Apr 2019 | 379 15th Av | remodel two full bathrooms, one in each unit.Details
remodel two full bathrooms, one in each unit. | $12,000 |
| May 4, 2018 | Completed final sign-off Aug 2021 | 1600 36th Av | 1st fl: convert existing office room to new bedroom. relocate bathroom and closet. 2nd fl: remove the non-bearing wall between kitchen & dining area. add new tube skylight. relocate the toilet and add new window at lightwell location.Details
1st fl: convert existing office room to new bedroom. relocate bathroom and closet. 2nd fl: remove the non-bearing wall between kitchen & dining area. add new tube skylight. relocate the toilet and add new window at lightwell location. | $150,000 |
| Feb 3, 2017 | Completed final sign-off Oct 2018 | 543 Los Palmos Dr | enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint.Details
enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint. | $125,000 |
| Jun 23, 2016 | Completed final sign-off Feb 2017 | 1738 29th Av | ground floor remodel only: add 1 new full bathroom, one bedroom and play room. relocate the (e) washer/dryer & laundry sinkDetails
ground floor remodel only: add 1 new full bathroom, one bedroom and play room. relocate the (e) washer/dryer & laundry sink | $30,000 |
| Nov 18, 2015 | Completed final sign-off Jan 2016 | 80 Springfield Dr | add new full bathroom @ ground floor.Details
add new full bathroom @ ground floor. | $8,000 |
| Mar 18, 2013 | Completed final sign-off Jun 2022 | 734 27th Av | horizontal addition @ rear & 1-story vertical addition over (e) 2-story bldg & rearrange kitchen & bathroom's location. construct 3'-0" height retaining wall @ backyard.Details
horizontal addition @ rear & 1-story vertical addition over (e) 2-story bldg & rearrange kitchen & bathroom's location. construct 3'-0" height retaining wall @ backyard. | $100,000 |
| Feb 13, 2012 | Completed final sign-off Mar 2012 | 1931 42nd Av | comply with complaint #201074726. 1)legalize one bed room, one full bath room, and upgrade one bed room at ground floor. 2)remove illegal addition at rear bldg.Details
comply with complaint #201074726. 1)legalize one bed room, one full bath room, and upgrade one bed room at ground floor. 2)remove illegal addition at rear bldg. | $28,000 |
| Dec 10, 2010 | Completed final sign-off Mar 2011 | 2578 42nd Av | remodel kitchen & 2 bathrooms, paint interior, re-finish floor. kitchen: at least 50% high efficacy (by wattage), bathroom: high efficacy or occupancy sensor.Details
remodel kitchen & 2 bathrooms, paint interior, re-finish floor. kitchen: at least 50% high efficacy (by wattage), bathroom: high efficacy or occupancy sensor. | $4,000 |
| Oct 17, 2008 | Completed final sign-off Mar 2009 | 4 Carnelian Wy | move wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. install hardwood floor in second floor. (lighting are all existing)Details
move wall at ground floor between entry and garage. 2nd fl remodel bath, kitchen, add island and cabinets, remove bearing wall between kitchen and living room, replace handrail at 3rd fl stair. install hardwood floor in second floor. (lighting are all existing) | $35,000 |