Cheryl Nuttall
- License
- M33771
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M33771 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Glumac Engineers
- On San Francisco permits
- May 2016 to Oct 2017
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Skyline Construction (2), G Swanson Constr. Inc., Swinerton Builders
- Architects
- Martha Breed, Robert Bangham
- Engineers
- Joshua Mcmahan (3), Eugene Tuan
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 17, 2017 | Completed final sign-off Jan 2018 | 101 California St | Swinerton Builders | partial 17th flr t.i. - demolition of (e) offices. new construction is converting offices into open office area & converting conference rooms into new offices, includign partition, doors, millwork, mechanical, electrical & plumbing. no structural work to be performed. n/a maher ordinanceDetails
partial 17th flr t.i. - demolition of (e) offices. new construction is converting offices into open office area & converting conference rooms into new offices, includign partition, doors, millwork, mechanical, electrical & plumbing. no structural work to be performed. n/a maher ordinance | $150,000 |
| Jun 2, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 7/f & 7m- replacement of selected lighting, power outlets and hvac, new plumbing connection to break room and restroom. ref. to t.i. pa#2017-0524-7575. n/a ordinance #155-13. fire alarm/sprinklers deferred.Details
7/f & 7m- replacement of selected lighting, power outlets and hvac, new plumbing connection to break room and restroom. ref. to t.i. pa#2017-0524-7575. n/a ordinance #155-13. fire alarm/sprinklers deferred. | |
| May 3, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep.Details
6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep. | $3,000,000 |
| May 23, 2016 | Completed final sign-off May 2017 | 288 West Portal Av | G Swanson Constr. Inc. | remove all (e) offices, teller line, safety deposit lobby and public restrooms. provide new restrooms, new data and telecom room, new teller and teller areas, new offices, provide private backup house areas. update finishes in interior of vault. new atms and ada upgradesDetails
remove all (e) offices, teller line, safety deposit lobby and public restrooms. provide new restrooms, new data and telecom room, new teller and teller areas, new offices, provide private backup house areas. update finishes in interior of vault. new atms and ada upgrades | $850,000 |