Block 0263, lot 011
101 California St
- City’s use
- Commercial Office
- Built
- 1983
- Stories
- 48
- Building
- 1,300,000 sq ft
- Lot
- 75,625 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2026 | In progress issued Oct 2026 | 101 California St | Bcci Construction Company | 25/f: removal of stand alone wall in pantry. removal & replacement of millwork & associated finishes. wall covering installation at reception.Details
25/f: removal of stand alone wall in pantry. removal & replacement of millwork & associated finishes. wall covering installation at reception. | $139,500 |
| Sep 30, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494Details
46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494 | $35,000 |
| Sep 30, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369Details
39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369 | $35,000 |
| Sep 29, 2026 | In progress issued Sep 2026 | 101 California St | Pyro-Comm Systems, Inc. | 13th floor - 2 way com system alteration. add 2 call stations, 2 way-comm signature. ref pa 202511260514Details
13th floor - 2 way com system alteration. add 2 call stations, 2 way-comm signature. ref pa 202511260514 | $1,200 |
| Sep 29, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884Details
10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884 | $35,000 |
| Sep 25, 2026 | In progress issued Nov 2026 | 101 California St | Swinerton Builders | 24 & 25/fl: ti, non-structural partitions, ceilings, fixtures, finishes & associated mep.Details
24 & 25/fl: ti, non-structural partitions, ceilings, fixtures, finishes & associated mep. | $6,700,000 |
| Sep 18, 2026 | Completed final sign-off Oct 2026 | 101 California St | Hp Build | 45th floor: reference#202607305820 mechanical and electrical for the projectDetails
45th floor: reference#202607305820 mechanical and electrical for the project | $44,335 |
| Aug 27, 2026 | In progress issued Sep 2026 | 101 California St | Source Planning And Construction Inc | 47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits.Details
47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits. | $202,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 101 California St | Hathaway Dinwiddie Co. | revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only).Details
revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only). | $3,000 |
| Jul 30, 2026 | Completed final sign-off Oct 2026 | 101 California St | Hp Build | 45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072Details
45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072 | $254,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th and 28th floors: mep submittal to support approved arch. permit. #202607175188Details
27th and 28th floors: mep submittal to support approved arch. permit. #202607175188 | $202,000 |
| Jul 27, 2026 | In progress issued Aug 2026 | 101 California St | Skyline Construction | 46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring.Details
46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring. | $45,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491Details
39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491 | $202,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 101 California St | Source Planning And Construction Inc | 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491Details
45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491 | $202,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout.Details
27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout. | $751,283 |
| Jul 10, 2026 | In progress issued Jul 2026 | 101 California St | Hathaway Dinwiddie Co. | 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope.Details
12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. | $5,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 101 California St | Dpr Construction A | 15/f - ste 1500: deferred mep work for permit# 202604018658Details
15/f - ste 1500: deferred mep work for permit# 202604018658 | $320,000 |
| Jun 25, 2026 | In progress issued Aug 2026 | 101 California St | 10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491Details
10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491 | $58,220 | |
| Jun 18, 2026 | In progress issued Jun 2026 | 101 California St | Source Planning And Construction Inc | 46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishesDetails
46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes | $250,000 |
| Jun 18, 2026 | Completed final sign-off Oct 2026 | 101 California St | Skyline Construction | 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbingDetails
33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing | $1,583,313 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550)Details
25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550) | |
| Jun 1, 2026 | In progress issued Jul 2026 | 101 California St | Skyline Construction | floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.Details
floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. | $38,000 |
| May 22, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1Details
12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1 | $15,000 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke controlDetails
11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control | $399,334 |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishesDetails
13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes | $399,334 |
| Apr 21, 2026 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 25/fl- ref 202602025031 to include mepDetails
25/fl- ref 202602025031 to include mep | |
| Apr 17, 2026 | Completed final sign-off Aug 2026 | 101 California St | Pyro-Comm Systems, Inc. | 43rd floor. modifyting existing fire alarm sytem install 2 pull sstation to the 2-way-comm emergency system. no t.i. involved.Details
43rd floor. modifyting existing fire alarm sytem install 2 pull sstation to the 2-way-comm emergency system. no t.i. involved. | $3,000 |
| Apr 15, 2026 | Completed final sign-off Nov 2026 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm voluntary 2-way replacement for like for like basis.Details
fire alarm voluntary 2-way replacement for like for like basis. | $10,000 |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088Details
28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088 | $460,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 101 California St | Hathaway Dinwiddie Co. | revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associated meps.Details
revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associated meps. | $68,000 |
| Apr 7, 2026 | In progress issued May 2026 | 101 California St | Hathaway Dinwiddie Co. | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14thDetails
13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th | $143,772 |
| Apr 1, 2026 | Completed final sign-off Nov 2026 | 101 California St | Dpr Construction A | 15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately.Details
15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately. | $1,968,546 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 101 California St | Hp Build | 24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.Details
24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 101 California St | Hp Build | 16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.Details
16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 11, 2026 | Completed final sign-off Jul 2026 | 101 California St | Hp Build | 9th flr: suite 925: mech + electrical for 202512051085Details
9th flr: suite 925: mech + electrical for 202512051085 | $750,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 101 California St | Bcci Construction Company | 44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lightingDetails
44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting | $501,665 |
| Feb 6, 2026 | Completed final sign-off Mar 2026 | 101 California St | Golden Gate Fire Protection Inc | 24th/fl: relocate 181 upright sprinklers on the 24th floor for demo.Details
24th/fl: relocate 181 upright sprinklers on the 24th floor for demo. | $25,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitionsDetails
25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions | $120,000 |
| Dec 8, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations.Details
new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. | $1,000,000 |
| Dec 5, 2025 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred.Details
28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred. | $850,000 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 101 California St | Hp Build | 9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred.Details
9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred. | $875,500 |
| Dec 3, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mepDetails
11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,500,000 |
| Dec 3, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior workDetails
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work | $9,700,000 |
| Dec 1, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mepDetails
14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,600,000 |
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 101 California St | Bcci Construction Company | 43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain)Details
43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain) | $8,018,885 |
| Nov 26, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep.Details
13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep. | $8,800,000 |
| Nov 19, 2025 | Completed final sign-off Dec 2025 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm as built 2 ceiling strobes to be added to the phone booths. ref pa 202506138659Details
fire alarm as built 2 ceiling strobes to be added to the phone booths. ref pa 202506138659 | |
| Nov 5, 2025 | Completed final sign-off Dec 2025 | 101 California St | Hp Build | g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835Details
g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835 | $3,000 |
| Oct 23, 2025 | Completed final sign-off Aug 2026 | 101 California St | Pyro-Comm Systems, Inc. | 34th fl. fire alarm 1 2-way call station: 1 remote power supply, 23 ceiling speaker strobes, 10 strobes,2 call stations, 39 smoke detectors, 6 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 202505206899Details
34th fl. fire alarm 1 2-way call station: 1 remote power supply, 23 ceiling speaker strobes, 10 strobes,2 call stations, 39 smoke detectors, 6 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 202505206899 | $8,000 |
| Oct 23, 2025 | Completed final sign-off Aug 2026 | 101 California St | Pyro-Comm Systems, Inc. | 35th fl. fire alarm 1-2 way 1 smoke supply 31 ceiling speaker strobes, 10 strobes, 2 call stations, 39 smoke detectors, 5 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 2025-0519-6756Details
35th fl. fire alarm 1-2 way 1 smoke supply 31 ceiling speaker strobes, 10 strobes, 2 call stations, 39 smoke detectors, 5 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 2025-0519-6756 | $8,000 |
| Oct 6, 2025 | In progress issued Oct 2025 | 101 California St | Source Planning And Construction Inc | 8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8Details
8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8 | |
| Sep 18, 2025 | Completed final sign-off Apr 2026 | 101 California St | Bcci Construction Company | 35/f:deferred submittal at mep ref#202505196756Details
35/f:deferred submittal at mep ref#202505196756 | $1,677,600 |
| Sep 18, 2025 | Completed final sign-off Apr 2026 | 101 California St | Bcci Construction Company | 35/f: deferred submittal of structural drawings ref#2025-0519-66756Details
35/f: deferred submittal of structural drawings ref#2025-0519-66756 | $50,000 |
| Sep 18, 2025 | Completed final sign-off Apr 2026 | 101 California St | Bcci Construction Company | 34th floor: deferred submittal of mep. ref pa #202505206899Details
34th floor: deferred submittal of mep. ref pa #202505206899 | $1,677,600 |
| Sep 12, 2025 | Completed final sign-off Oct 2025 | 101 California St | Brandex Corp | revision 202507181106- structural attachment detailDetails
revision 202507181106- structural attachment detail | $3,000 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 101 California St | Ayoob & Peery Plumbing Co Inc | 35th fl- ref pa # 2025-0519-6756 add 43 relocate 179 fire sprinkler ti. job #25-652Details
35th fl- ref pa # 2025-0519-6756 add 43 relocate 179 fire sprinkler ti. job #25-652 | $137,884 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 101 California St | Ayoob & Peery Plumbing Co Inc | 34th fl: add 26, relocate 209, fire spprinkler per ti . job 25-652, ref 202505206899Details
34th fl: add 26, relocate 209, fire spprinkler per ti . job 25-652, ref 202505206899 | $145,959 |
| Aug 14, 2025 | In progress issued Aug 2025 | 101 California St | Source Planning And Construction Inc | the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710.Details
the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710. | |
| Jul 18, 2025 | Completed final sign-off Oct 2025 | 101 California St | Brandex Corp | suite 1050:to erect non electrical and non-illuminated blade sign. ( avotoasty) project includes 2 identical signs. sign a and sign bDetails
suite 1050:to erect non electrical and non-illuminated blade sign. ( avotoasty) project includes 2 identical signs. sign a and sign b | $3,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 101 California St | Gci, Inc | 25th/f: partial t.i. of a single suite of an e) high riseDetails
25th/f: partial t.i. of a single suite of an e) high rise | $150,000 |
| Jul 3, 2025 | Completed final sign-off Aug 2025 | 101 California St | Golden Gate Fire Protection Inc | 8th fl - relocate 34 uprights, 17 pendents, & 13 concealed pendents. ref pa 202412126710Details
8th fl - relocate 34 uprights, 17 pendents, & 13 concealed pendents. ref pa 202412126710 | $14,750 |
| Jun 27, 2025 | In progress issued Jul 2025 | 101 California St | C B F Inc | 42/f new power & signal devices. ref ti 202504164515Details
42/f new power & signal devices. ref ti 202504164515 | $10,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 9th fl: ste 910 & 925 consist of int.demo non-structral elements including int. partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. suites are currently vacant. per admin. bulletin ab-017 ooc/exiting tobe addressed under separate permit; fs & l/s to remain operationalDetails
9th fl: ste 910 & 925 consist of int.demo non-structral elements including int. partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. suites are currently vacant. per admin. bulletin ab-017 ooc/exiting tobe addressed under separate permit; fs & l/s to remain operational | $10,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 11th fl: consist of int.demo non-structural elements including interior partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. floors are currently vacant. per admin. bulletin ab-017 ooc/exiting to be addressed under separate permit; f/s & l/s to remain operationalDetails
11th fl: consist of int.demo non-structural elements including interior partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. floors are currently vacant. per admin. bulletin ab-017 ooc/exiting to be addressed under separate permit; f/s & l/s to remain operational | $20,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 12th fl consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. noDetails
12th fl consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. no | $20,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 13th floor; consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd.Details
13th floor; consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. | $20,000 |
| Jun 13, 2025 | Completed final sign-off Dec 2025 | 101 California St | Pyro-Comm Systems, Inc. | 8f ref pa #2024-1212-6710: fire alarm 11 speaker strobes, 5 strobes, 4 relay modules, 3 duct detectors will be added. 11 smoke detectors were relocatedDetails
8f ref pa #2024-1212-6710: fire alarm 11 speaker strobes, 5 strobes, 4 relay modules, 3 duct detectors will be added. 11 smoke detectors were relocated | $6,000 |
| Jun 6, 2025 | Completed final sign-off Jul 2025 | 101 California St | Golden Gate Fire Protection Inc | 13th floor: fire sprinkler demo. relocate 181 uprightsDetails
13th floor: fire sprinkler demo. relocate 181 uprights | $45,250 |
| Jun 6, 2025 | Completed final sign-off Jul 2025 | 101 California St | Golden Gate Fire Protection Inc | fire sprinkler demo, rel0cate 181 uprights on the 12 th flDetails
fire sprinkler demo, rel0cate 181 uprights on the 12 th fl | $45,250 |
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 101 California St | Golden Gate Fire Protection Inc | 42/f: relocate 19 pendents. ref permit 202504164515.Details
42/f: relocate 19 pendents. ref permit 202504164515. | $4,750 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 101 California St | Golden Gate Fire Protection Inc | fire sprinkler demo; relocate 15 uprights on the 9th floor. fire sprinkler demo; relocate 181 uprights on the 11th floor.Details
fire sprinkler demo; relocate 15 uprights on the 9th floor. fire sprinkler demo; relocate 181 uprights on the 11th floor. | $49,000 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 101 California St | Pyro-Comm Systems, Inc. | 42nd/fl: 1 speaker strobe, 2 strobes, and 2 smoke detectors to be relocated.Details
42nd/fl: 1 speaker strobe, 2 strobes, and 2 smoke detectors to be relocated. | $2,000 |
| May 23, 2025 | Completed final sign-off Jun 2025 | 101 California St | Pyro-Comm Systems, Inc. | suite 4200: asbuilt to show correct soo showing the solid tone and not a voice message. ref 2025-0307-1821, 2025-0514-6432Details
suite 4200: asbuilt to show correct soo showing the solid tone and not a voice message. ref 2025-0307-1821, 2025-0514-6432 | |
| May 20, 2025 | Completed final sign-off Aug 2026 | 101 California St | Bcci Construction Company | 34th ti (n) non-structural partitions, lighting, ceiling, finishes, mep; mep structural deferredDetails
34th ti (n) non-structural partitions, lighting, ceiling, finishes, mep; mep structural deferred | $3,308,600 |
| May 19, 2025 | Completed final sign-off Aug 2026 | 101 California St | Bcci Construction Company | 35th fl - interior office ti. new non load bearing partitions, ceilings, doors & finishes. mep deferredDetails
35th fl - interior office ti. new non load bearing partitions, ceilings, doors & finishes. mep deferred | $3,308,600 |
| May 19, 2025 | In progress issued Jun 2025 | 101 California St | Acme Pacific Repairs, Inc | unit #300: replacing (e) evo event 48e electric cooktop model #10-0148-evt w/ new evo event 48e plus electric cooktop model #10-0600-evt. inkind. install per manufacturer's installaion instructions.Details
unit #300: replacing (e) evo event 48e electric cooktop model #10-0148-evt w/ new evo event 48e plus electric cooktop model #10-0600-evt. inkind. install per manufacturer's installaion instructions. | $67,125 |
| May 14, 2025 | Completed final sign-off Jun 2025 | 101 California St | Pyro-Comm Systems, Inc. | suite 2800; fire alarm 2 relay modules will be added for door release and av shunt. ref#: 202504285353Details
suite 2800; fire alarm 2 relay modules will be added for door release and av shunt. ref#: 202504285353 | $1,000 |
| May 14, 2025 | Completed final sign-off Jun 2025 | 101 California St | Pyro-Comm Systems, Inc. | suite#: 4200; as built to show correct soo showing the temporal tone and not a voice message. ref#: 202503071821.Details
suite#: 4200; as built to show correct soo showing the temporal tone and not a voice message. ref#: 202503071821. | |
| Apr 28, 2025 | In progress issued Apr 2025 | 101 California St | Source Planning And Construction Inc | 28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades.Details
28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades. | $50,000 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 101 California St | Richlen Construction | suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred.Details
suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred. | $422,171 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 101 California St | Hp Build | 42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electricalDetails
42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electrical | $25,061 |
| Mar 19, 2025 | Completed final sign-off Mar 2026 | 101 California St | Skyline Construction | 34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234Details
34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 | |
| Mar 19, 2025 | Completed final sign-off Mar 2026 | 101 California St | Skyline Construction | 35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234Details
35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 | |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 101 California St | Mcclure Electric Inc | 42nd fl: title 24 lighting compliance ref pa #2024-1218-7060 & 2024-1218-7066Details
42nd fl: title 24 lighting compliance ref pa #2024-1218-7060 & 2024-1218-7066 | $17,476 |
| Mar 14, 2025 | Expired or cancelled cancelled Dec 2025 | 101 California St | Anderson, Rowe & Buckley, Inc. | demo permit - existing sprinkler system relocated 129 sprinklers on 34th fl; relocated 129 sprinklers on 35th flDetails
demo permit - existing sprinkler system relocated 129 sprinklers on 34th fl; relocated 129 sprinklers on 35th fl | $62,000 |
| Mar 13, 2025 | Completed final sign-off Mar 2025 | 101 California St | Pyro-Comm Systems, Inc. | 28th fl - fire alarm 1 smoke detector and 1 ceiling speaker strobe to be added to provide proper coverage ref pa 202412187047Details
28th fl - fire alarm 1 smoke detector and 1 ceiling speaker strobe to be added to provide proper coverage ref pa 202412187047 | $1,000 |
| Mar 7, 2025 | Completed final sign-off Jun 2025 | 101 California St | Pyro-Comm Systems, Inc. | suite #4200: fire alarm: 2 ceiling speaker strobes to be added to provide proper coverage. ref pa #202412187066Details
suite #4200: fire alarm: 2 ceiling speaker strobes to be added to provide proper coverage. ref pa #202412187066 | $1,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2025 | 101 California St | Golden Gate Fire Protection Inc | 26th fl - as built for permit 202410213332 show heads that are hard piped for final inspectionDetails
26th fl - as built for permit 202410213332 show heads that are hard piped for final inspection | $1,000 |
| Feb 21, 2025 | Completed final sign-off Dec 2025 | 101 California St | Hp Build | ti fitout of (e) 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of useDetails
ti fitout of (e) 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of use | $42,500 |
| Feb 20, 2025 | Completed final sign-off Mar 2025 | 101 California St | Pioneer Fire Inc. | 42nd/f ste 4200: relocate 5 pendents, 4 semi recessed. ref to t.i. 202412187066Details
42nd/f ste 4200: relocate 5 pendents, 4 semi recessed. ref to t.i. 202412187066 | $2,000 |
| Feb 11, 2025 | Completed final sign-off Feb 2025 | 101 California St | Pyro-Comm Systems, Inc. | 19/f - fire alarm as built. 1 duct detector and relay module was removed for fcu-2 as it never existed. 1 smoke detector added to idf room. ref f/a permit 202412247370.Details
19/f - fire alarm as built. 1 duct detector and relay module was removed for fcu-2 as it never existed. 1 smoke detector added to idf room. ref f/a permit 202412247370. | |
| Jan 23, 2025 | Completed final sign-off Mar 2025 | 101 California St | Hp Build | mechanical and electrical work (ste 1925/19th fl) ref 2024.1121.5485Details
mechanical and electrical work (ste 1925/19th fl) ref 2024.1121.5485 | $105,000 |
| Jan 6, 2025 | Completed final sign-off Mar 2025 | 101 California St | Mcclure Electric Inc | 19/f suite 1925 - title 24 compliance for lighting and power. ref pa 202411215485.Details
19/f suite 1925 - title 24 compliance for lighting and power. ref pa 202411215485. | $36,448 |
| Jan 6, 2025 | Completed final sign-off Feb 2025 | 101 California St | Pyro-Comm Systems, Inc. | 19/f suite 1925: fire alarm - 4 smoke detectors, 3 speaker strobes, 2 speakers, 1 strobe to be added to provide proper coverage. ref pa# 202411215485Details
19/f suite 1925: fire alarm - 4 smoke detectors, 3 speaker strobes, 2 speakers, 1 strobe to be added to provide proper coverage. ref pa# 202411215485 | $2,000 |
| Dec 26, 2024 | Completed final sign-off Jan 2025 | 101 California St | Pioneer Fire Inc. | relocate (3) uprights, convert (7) uprights to pendents gcti #2024-1121-5485 19th fl.Details
relocate (3) uprights, convert (7) uprights to pendents gcti #2024-1121-5485 19th fl. | $2,500 |
| Dec 24, 2024 | Completed final sign-off Feb 2025 | 101 California St | Pyro-Comm Systems, Inc. | 19th floor. fire alarm: 11 smoke detectors, 2 duct detectors, 4 relay modules, 14 speaker strobes, 1 speaker, 13 should be added to provide proper coverage. pa#: 202410112776Details
19th floor. fire alarm: 11 smoke detectors, 2 duct detectors, 4 relay modules, 14 speaker strobes, 1 speaker, 13 should be added to provide proper coverage. pa#: 202410112776 | $8,000 |
| Dec 18, 2024 | Completed final sign-off Apr 2025 | 101 California St | Source Planning And Construction Inc | minor interior demolition of non structural elements including interior partitions, doors, finishes. new interior demising partitions and finishes. current vacant. mech,elec, life safety and sprinkler modifications under sep and deferred permit. no exterior building, site, landscape, use or parkingDetails
minor interior demolition of non structural elements including interior partitions, doors, finishes. new interior demising partitions and finishes. current vacant. mech,elec, life safety and sprinkler modifications under sep and deferred permit. no exterior building, site, landscape, use or parking | $48,000 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 101 California St | Hp Build | 42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits.Details
42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits. | $75,000 |
| Dec 18, 2024 | Completed final sign-off Jul 2025 | 101 California St | Hp Build | 42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals.Details
42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals. | $250,000 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 101 California St | Skyline Construction | 17/fl- evacation signageDetails
17/fl- evacation signage | $1,500 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 101 California St | Skyline Construction | 18/fl- evacation signageDetails
18/fl- evacation signage | $1,500 |
| Dec 12, 2024 | In progress issued Apr 2025 | 101 California St | Source Planning And Construction Inc | 8/fl- selective interior demo in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building, site , landscape use or parking and building structure are proposedDetails
8/fl- selective interior demo in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building, site , landscape use or parking and building structure are proposed | $2,500,000 |
| Dec 11, 2024 | Completed final sign-off Oct 2025 | 101 California St | Bcci Construction Company | 26th fl - revision for pa 202406204908 deferred mep for ti permit 202405142058. no exterior workDetails
26th fl - revision for pa 202406204908 deferred mep for ti permit 202405142058. no exterior work | $75,000 |
| Dec 10, 2024 | Completed final sign-off Dec 2024 | 101 California St | fire sprinkler relocate 4 sprinklers in the 20th fl restrooms ti 202408209067Details
fire sprinkler relocate 4 sprinklers in the 20th fl restrooms ti 202408209067 | $1,000 | |
| Dec 6, 2024 | Completed final sign-off May 2025 | 101 California St | Bcci Construction Company | revision to 202405142058. updated finishes, new lighting, fixture replacement in kind. work at elevator lobby removed. mep deferredDetails
revision to 202405142058. updated finishes, new lighting, fixture replacement in kind. work at elevator lobby removed. mep deferred | $50,000 |
| Dec 5, 2024 | Completed final sign-off Mar 2025 | 101 California St | Hp Build | ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018Details
ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018 | $11,000 |
| Dec 3, 2024 | Completed final sign-off Jan 2025 | 101 California St | Pioneer Fire Inc. | 19th fl suite 1950 - fire sprinkler t.i. due to demo back to warm shellDetails
19th fl suite 1950 - fire sprinkler t.i. due to demo back to warm shell | $3,000 |
| Nov 22, 2024 | Completed final sign-off Mar 2025 | 101 California St | Pioneer Fire Inc. | 19th floor: relocate 16 pendents, repipe existing 37 drops with pendents to uprights, add 11 uprights. ref to t.i. 202410112776Details
19th floor: relocate 16 pendents, repipe existing 37 drops with pendents to uprights, add 11 uprights. ref to t.i. 202410112776 | $12,800 |
| Nov 21, 2024 | Completed final sign-off Mar 2025 | 101 California St | Hp Build | suite 1925. scope of work on the 19th flr consist of interior demolition of mon-structural elements including but not neccessarily limited to interior partitions, doors, finishes, ceiling, lighting, power and data, construction including new interior of non structural partitions, doors, finishes,Details
suite 1925. scope of work on the 19th flr consist of interior demolition of mon-structural elements including but not neccessarily limited to interior partitions, doors, finishes, ceiling, lighting, power and data, construction including new interior of non structural partitions, doors, finishes, | $475,000 |
| Nov 20, 2024 | Completed final sign-off Jan 2025 | 101 California St | Pyro-Comm Systems, Inc. | 18th fl ref pa #202408027822 fire alarm 1 remote power supply, 28 speakers strobes, 29 speakers, 9 strobes, 32 smoke detectors, 6 duct detectors, 12 relay modules, 2 monitor module to be added to provide proper coverage.Details
18th fl ref pa #202408027822 fire alarm 1 remote power supply, 28 speakers strobes, 29 speakers, 9 strobes, 32 smoke detectors, 6 duct detectors, 12 relay modules, 2 monitor module to be added to provide proper coverage. | $14,000 |
| Nov 18, 2024 | Completed final sign-off Jan 2025 | 101 California St | Pyro-Comm Systems, Inc. | 17th fl ref pa #202407267324 fire alarm 1 remote power supply, 28 speakers strobes, 27 speakers, 12 strobes, 37 smoke detectors, 9 duct detectors, 15 relay modules, 1 monitor module to be added to provide proper coverage.Details
17th fl ref pa #202407267324 fire alarm 1 remote power supply, 28 speakers strobes, 27 speakers, 12 strobes, 37 smoke detectors, 9 duct detectors, 15 relay modules, 1 monitor module to be added to provide proper coverage. | $15,000 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl.Details
rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl. | $19,272 |
| Oct 21, 2024 | Completed final sign-off Mar 2025 | 101 California St | Golden Gate Fire Protection Inc | 26th floor. relocate 221 pendent sprinklers and relocate 9 uprights.Details
26th floor. relocate 221 pendent sprinklers and relocate 9 uprights. | $57,500 |
| Oct 11, 2024 | Completed final sign-off Mar 2025 | 101 California St | Source Planning And Construction Inc | 19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinkleredDetails
19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered | $1,675,000 |
| Sep 23, 2024 | Completed final sign-off Dec 2024 | 101 California St | 18th fl fire sprinkler permit relocate 180 add 23 and delete 55 sprinklers. ref ti 202408027822Details
18th fl fire sprinkler permit relocate 180 add 23 and delete 55 sprinklers. ref ti 202408027822 | $52,000 | |
| Sep 20, 2024 | Completed final sign-off Nov 2024 | 101 California St | fire sprinler permit. relocate 179, add 41 and delete 37 sprinklers on the 17/f. t.i #202407267324Details
fire sprinler permit. relocate 179, add 41 and delete 37 sprinklers on the 17/f. t.i #202407267324 | $62,000 | |
| Sep 17, 2024 | Completed final sign-off Feb 2025 | 101 California St | Novo Construction Inc | 25th fl, ste 2575 revision to pa 20221228954 & 202403016889 to show interior of suite 2575 not in scope of workDetails
25th fl, ste 2575 revision to pa 20221228954 & 202403016889 to show interior of suite 2575 not in scope of work | |
| Sep 16, 2024 | Completed final sign-off Dec 2024 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm: 2 smoke detectors, 3 duct detectors, 5 relay modules, 4 ceiling speaker strobes, 5 ceiling strobes to be added to provide proper coverage. ref#: 202407267334Details
fire alarm: 2 smoke detectors, 3 duct detectors, 5 relay modules, 4 ceiling speaker strobes, 5 ceiling strobes to be added to provide proper coverage. ref#: 202407267334 | $6,000 |
| Sep 11, 2024 | Completed final sign-off Dec 2024 | 101 California St | Pioneer Fire Inc. | 25th fl. relocate 15 pendents, 9 uprights ref pa 202408078129Details
25th fl. relocate 15 pendents, 9 uprights ref pa 202408078129 | $4,800 |
| Sep 10, 2024 | In progress issued Sep 2024 | 101 California St | Source Planning And Construction Inc | demolition of interior walls, floor and wall finishes in a portion of floor 19, compliance with ab-017.Details
demolition of interior walls, floor and wall finishes in a portion of floor 19, compliance with ab-017. | $45,000 |
| Sep 5, 2024 | Completed final sign-off Feb 2025 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm 2 call stations2 power supply 48 smoke detectors, 11 duct detectors, 2 monitor modules, 13 relay modules, 40 ceiling speaker strobes, 1 ceiling speaker, 33 ceiling strobes to be added to proved proper covarage ref pa# 2024-0514-2058Details
fire alarm 2 call stations2 power supply 48 smoke detectors, 11 duct detectors, 2 monitor modules, 13 relay modules, 40 ceiling speaker strobes, 1 ceiling speaker, 33 ceiling strobes to be added to proved proper covarage ref pa# 2024-0514-2058 | $20,000 |
| Sep 4, 2024 | Completed final sign-off Oct 2024 | 101 California St | Ayoob & Peery Plumbing Co Inc | ref 202404250708- record as built for 202407085937. updated drawing for adjusted pioping plan and final sprinklers head positions per inspectors requestDetails
ref 202404250708- record as built for 202407085937. updated drawing for adjusted pioping plan and final sprinklers head positions per inspectors request | |
| Aug 30, 2024 | Completed final sign-off Oct 2024 | 101 California St | Pribuss Engineering Inc | gc pa# 202406053739. fire sprinkler t.i on 21/f. total 333 heads.Details
gc pa# 202406053739. fire sprinkler t.i on 21/f. total 333 heads. | $168,165 |
| Aug 26, 2024 | Completed final sign-off Dec 2024 | 101 California St | Novo Construction Inc | new construction for glazing wall in existing conference room 1 green wall on th 8th fl. scope of work includes construction on on structural wall, millwork and finishes.Details
new construction for glazing wall in existing conference room 1 green wall on th 8th fl. scope of work includes construction on on structural wall, millwork and finishes. | $45,511 |
| Aug 22, 2024 | Completed final sign-off Apr 2025 | 101 California St | Source Planning And Construction Inc | ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491Details
ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491 | $30,000 |
| Aug 22, 2024 | Completed final sign-off Aug 2024 | 101 California St | Pyro-Comm Systems, Inc. | 1 smoke detector and 2 ceiling speaker strobes to be added for proper coverage ref pa#: 202212228954 & 2023-1019-9039Details
1 smoke detector and 2 ceiling speaker strobes to be added for proper coverage ref pa#: 202212228954 & 2023-1019-9039 | $1,500 |
| Aug 20, 2024 | Completed final sign-off Jan 2025 | 101 California St | Skyline Construction | scope of work includes bringing restroom and hines.com drinking fountains on the 20th fl. to full accessiblity compliance demo of restrooms partitions, finishes and plumbing fitures to be replaced with new mep and fire safety and sprinkler system modifications will be defferredDetails
scope of work includes bringing restroom and hines.com drinking fountains on the 20th fl. to full accessiblity compliance demo of restrooms partitions, finishes and plumbing fitures to be replaced with new mep and fire safety and sprinkler system modifications will be defferred | $375,000 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 101 California St | Gci, Inc | 25th floor: t.i. new non-load bearing interior walls, lighting, finishes and mep.Details
25th floor: t.i. new non-load bearing interior walls, lighting, finishes and mep. | $1,500,000 |
| Aug 2, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | 18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type)Details
18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type) | $4,483,300 |
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | 17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mepDetails
17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep | $4,483,300 |
| Jul 26, 2024 | Completed final sign-off Feb 2025 | 101 California St | Novo Construction Inc | 25th fl - revision to pa 202310199039 electrical/lighting for ti ref pa 20221228954/202403016889Details
25th fl - revision to pa 202310199039 electrical/lighting for ti ref pa 20221228954/202403016889 | |
| Jul 25, 2024 | In progress issued Sep 2024 | 101 California St | Pyro-Comm Systems, Inc. | 21/f: fire alarm- 1 remote power supply, 31 ceiling speaker strobes, 2 wall speaker strobes, 8 ceiling strobes, 32 smoke detectors, 10 duct detectors, 13 relay modules, 1 control module, and 1 monitor module to be added. ref pa# 202406053739Details
21/f: fire alarm- 1 remote power supply, 31 ceiling speaker strobes, 2 wall speaker strobes, 8 ceiling strobes, 32 smoke detectors, 10 duct detectors, 13 relay modules, 1 control module, and 1 monitor module to be added. ref pa# 202406053739 | $10,000 |
| Jul 18, 2024 | Completed final sign-off Aug 2024 | 101 California St | Pioneer Fire Inc. | 25th fl- ref pa# 2024-0301-6889 relocate 5 pendents, convert 2 uprights to pendentDetails
25th fl- ref pa# 2024-0301-6889 relocate 5 pendents, convert 2 uprights to pendent | $2,000 |
| Jul 16, 2024 | Completed final sign-off Jan 2025 | 101 California St | Skyline Construction | bring restroos and drinking fountains on 17th fl to full accessibility compliance. demo of restroom partitons, finishes, plumb fixt. to be replaced w new. mep, ls/sprinkler deferred. permit shall provide apprd docs to show restroom/drking fountain full complaince for future ti's 17th flDetails
bring restroos and drinking fountains on 17th fl to full accessibility compliance. demo of restroom partitons, finishes, plumb fixt. to be replaced w new. mep, ls/sprinkler deferred. permit shall provide apprd docs to show restroom/drking fountain full complaince for future ti's 17th fl | $140,000 |
| Jul 8, 2024 | In progress issued Jul 2024 | 101 California St | Ayoob & Peery Plumbing Co Inc | 27/f: add (39), relocate (72) fire sprinklers per t.i. job #24-644. ref bpa# 202404250708Details
27/f: add (39), relocate (72) fire sprinklers per t.i. job #24-644. ref bpa# 202404250708 | $68,942 |
| Jun 26, 2024 | In progress issued Jul 2024 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm 7 strobes, 14 speaker strobes, 21 speakers, 18 smoke detectors to e added to provide proper coverage. ref pa 202404250708Details
fire alarm 7 strobes, 14 speaker strobes, 21 speakers, 18 smoke detectors to e added to provide proper coverage. ref pa 202404250708 | $9,000 |
| Jun 20, 2024 | In progress issued Jul 2024 | 101 California St | Bcci Construction Company | 26/f: deferred mep for tenant improvement permit 202405142058. no exterior work.Details
26/f: deferred mep for tenant improvement permit 202405142058. no exterior work. | $500,000 |
| Jun 20, 2024 | Completed final sign-off Jul 2024 | 101 California St | Pyro-Comm Systems, Inc. | 2 strobes, 3 speaker strobes, 5 smoke detectors to be added to provide proper coverage ref pa# 2024-0515-2153Details
2 strobes, 3 speaker strobes, 5 smoke detectors to be added to provide proper coverage ref pa# 2024-0515-2153 | $1,500 |
| Jun 13, 2024 | Completed final sign-off Aug 2024 | 101 California St | Skyline Construction | g/f suite 175: addition of new countertop convention oven for cooking frozen cookie dough in an (e) bank. cookies will not be for retail sale. this is the only cooking that will occur on site. refer to permit 202405152153 for original build out.Details
g/f suite 175: addition of new countertop convention oven for cooking frozen cookie dough in an (e) bank. cookies will not be for retail sale. this is the only cooking that will occur on site. refer to permit 202405152153 for original build out. | $1,500 |
| Jun 11, 2024 | In progress issued Jun 2024 | 101 California St | Golden Gate Fire Protection Inc | relocate 18 pendent sprinklers on the 1st fl ref 202405152153Details
relocate 18 pendent sprinklers on the 1st fl ref 202405152153 | $4,500 |
| Jun 5, 2024 | Completed final sign-off Jul 2025 | 101 California St | Clune Construction Company L P | 21st fl full floor ti mep upgrades includedDetails
21st fl full floor ti mep upgrades included | $8,789,816 |
| May 30, 2024 | Completed final sign-off Jan 2025 | 101 California St | Golden Gate Sign Company Inc. | 1 atm surround citizens bankDetails
1 atm surround citizens bank | $5,000 |
| May 30, 2024 | Completed final sign-off Jan 2025 | 101 California St | Golden Gate Sign Company Inc. | 2 electric wall sign "citizens"Details
2 electric wall sign "citizens" | $15,000 |
| May 28, 2024 | Completed final sign-off Jan 2025 | 101 California St | Golden Gate Sign Company Inc. | install 2x (n) awnings non printed facing courtyard non illuminated w/ dimensions 4'x 8-1'x 2' projection. share plans with 202405283068Details
install 2x (n) awnings non printed facing courtyard non illuminated w/ dimensions 4'x 8-1'x 2' projection. share plans with 202405283068 | $5,000 |
| May 28, 2024 | Completed final sign-off Jan 2025 | 101 California St | Golden Gate Sign Company Inc. | install 3x (n) awnings non printed facing street non illuminated w/ dimensions 4'x 9-11'x 2' projectionDetails
install 3x (n) awnings non printed facing street non illuminated w/ dimensions 4'x 9-11'x 2' projection | $10,000 |
| May 15, 2024 | Completed final sign-off Aug 2024 | 101 California St | Skyline Construction | ground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm.Details
ground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm. | $365,636 |
| May 14, 2024 | Completed final sign-off May 2025 | 101 California St | Bcci Construction Company | 26th:renovation of full floor existing b occupancy space proposed tenant improvement work includes demo of interior non structural partitions, ceilings, lighting & finishes. construction of new non load bearing partitions, mech,plumb, elec and communciation,ceiling systems with new lighting,flooringDetails
26th:renovation of full floor existing b occupancy space proposed tenant improvement work includes demo of interior non structural partitions, ceilings, lighting & finishes. construction of new non load bearing partitions, mech,plumb, elec and communciation,ceiling systems with new lighting,flooring | $2,500,000 |
| May 2, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | interior demo of non structural elemenets including but not limited to interior paritions, doors, finishes, ceilings, lighting, mech, elec outlets,switches.perm ab017 occupancy/exiting under sep permit. fs, ls to remain operational. pot accessibility scope noto req. no ext blg,site,landscape, use orDetails
interior demo of non structural elemenets including but not limited to interior paritions, doors, finishes, ceilings, lighting, mech, elec outlets,switches.perm ab017 occupancy/exiting under sep permit. fs, ls to remain operational. pot accessibility scope noto req. no ext blg,site,landscape, use or | $180,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 101 California St | Skyline Construction | 17/f: interior demo of non-structural elements including but limited to int. partitions, doors, finishes, ceilings, lighting, mech and electrical outlets. per admin. bulletin ab107: occupancy/exiting to be addressed under separate permit, f/s & l/s to remain operational, p.o.t/accessibility scope isDetails
17/f: interior demo of non-structural elements including but limited to int. partitions, doors, finishes, ceilings, lighting, mech and electrical outlets. per admin. bulletin ab107: occupancy/exiting to be addressed under separate permit, f/s & l/s to remain operational, p.o.t/accessibility scope is | $180,000 |
| May 2, 2024 | Completed final sign-off Jun 2024 | 101 California St | Clune Construction Company L P | 21/f- soft demo to remove partitions, fixtures and finishesDetails
21/f- soft demo to remove partitions, fixtures and finishes | $125,000 |
| Apr 26, 2024 | Expired or cancelled cancelled Nov 2024 | 101 California St | Anderson, Rowe & Buckley, Inc. | demo permit provide upright shell protection (e) fire sprinkler system 17th fl-129 spkers. 18th fl- 129 spkers. total 258 spkrsDetails
demo permit provide upright shell protection (e) fire sprinkler system 17th fl-129 spkers. 18th fl- 129 spkers. total 258 spkrs | $62,000 |
| Apr 25, 2024 | Completed final sign-off Oct 2024 | 101 California St | Novo Construction Inc | 27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lightingDetails
27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting | $1,967,498 |
| Apr 19, 2024 | Completed final sign-off May 2024 | 101 California St | Golden Gate Fire Protection Inc | demo 1 sprinkler head on the 8th floor, ste 800.Details
demo 1 sprinkler head on the 8th floor, ste 800. | $620 |
| Apr 16, 2024 | Completed final sign-off Apr 2024 | 101 California St | Pyro-Comm Systems, Inc. | ref pa# 2021-0114-2747 fire alarm as built based on field markups. 1 heat detector has been added.Details
ref pa# 2021-0114-2747 fire alarm as built based on field markups. 1 heat detector has been added. | |
| Apr 2, 2024 | Completed final sign-off Apr 2024 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm as built, as built to show 1 added relay module for music shutdown in club house ref pa## 2023-1215-2592Details
fire alarm as built, as built to show 1 added relay module for music shutdown in club house ref pa## 2023-1215-2592 | |
| Mar 1, 2024 | Completed final sign-off Feb 2025 | 101 California St | Novo Construction Inc | revision to pa#202212228954. adding a demising wall to create 2 separate suites. work includes adding new partitions suite entry doors, and relocating lighting and power/data mep and fls are deferred permits.Details
revision to pa#202212228954. adding a demising wall to create 2 separate suites. work includes adding new partitions suite entry doors, and relocating lighting and power/data mep and fls are deferred permits. | |
| Jan 19, 2024 | Completed final sign-off Feb 2024 | 101 California St | Pyro-Comm Systems, Inc. | 28th fl: revision to pa# 202312041869. 4 smoke detectors & 4 ceiling speaker strobes to be added to provide proper coverage.Details
28th fl: revision to pa# 202312041869. 4 smoke detectors & 4 ceiling speaker strobes to be added to provide proper coverage. | $3,000 |
| Jan 10, 2024 | In progress issued Jan 2024 | 101 California St | Golden Gate Fire Protection Inc | basement level 1 and 2: extg fire sprinkler system. t.i. ev -charging areas. 94 sprnklers. (nfpa 13 extra hazard grp 2) - installation for ev charger coverage, installed under electrical permit, not required at the time of ev charger install. ref elec pn: 202301128317Details
basement level 1 and 2: extg fire sprinkler system. t.i. ev -charging areas. 94 sprnklers. (nfpa 13 extra hazard grp 2) - installation for ev charger coverage, installed under electrical permit, not required at the time of ev charger install. ref elec pn: 202301128317 | $59,000 |
| Dec 15, 2023 | Completed final sign-off Apr 2024 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm 2 smoke detectors and 1 relay module for the turnstile to be added to provide proper coverage 2nd open to 1st fl; ref pa 2023-0905-5912Details
fire alarm 2 smoke detectors and 1 relay module for the turnstile to be added to provide proper coverage 2nd open to 1st fl; ref pa 2023-0905-5912 | $1,600 |
| Dec 4, 2023 | Completed final sign-off Jan 2024 | 101 California St | Pyro-Comm Systems, Inc. | 25/f-ste 2575: 9 speaker strobes, 3 strobes, 12 smoke detectors, 1 heat detector to be added to provide proper coverage. ref pa# 202211106261.Details
25/f-ste 2575: 9 speaker strobes, 3 strobes, 12 smoke detectors, 1 heat detector to be added to provide proper coverage. ref pa# 202211106261. | $8,000 |
| Dec 4, 2023 | Completed final sign-off Jan 2024 | 101 California St | Pyro-Comm Systems, Inc. | 28/f-ste 2870: 9 speaker strobes, 2 strobes, 1 smoke detector to be added to provide proper coverage. ref pa# 202310058086.Details
28/f-ste 2870: 9 speaker strobes, 2 strobes, 1 smoke detector to be added to provide proper coverage. ref pa# 202310058086. | $10,609 |
| Nov 28, 2023 | Completed final sign-off Jan 2024 | 101 California St | Golden Gate Fire Protection Inc | 28th fl: fire spinklers ti. relocate 13 uprights and 7 pendents in suite 2870. ref 202310058086.Details
28th fl: fire spinklers ti. relocate 13 uprights and 7 pendents in suite 2870. ref 202310058086. | $12,400 |
| Nov 17, 2023 | Completed final sign-off Nov 2023 | 101 California St | Pyro-Comm Systems, Inc. | 30/f: f/a, 9-ceiling speaker strobes, 3-ceiling strobes & 1-relay module for door release to be added to provide property coverage. ref bpa#202308295499Details
30/f: f/a, 9-ceiling speaker strobes, 3-ceiling strobes & 1-relay module for door release to be added to provide property coverage. ref bpa#202308295499 | $3,000 |
| Nov 2, 2023 | Completed final sign-off Jun 2024 | 101 California St | Source Planning And Construction Inc | 8th fl-ste 800: scope of work consist of enclosing an open area and creating a conference room. minimal demolition to coat closed partions doors and lights, act ceiling.Details
8th fl-ste 800: scope of work consist of enclosing an open area and creating a conference room. minimal demolition to coat closed partions doors and lights, act ceiling. | $180,000 |
| Oct 20, 2023 | Never finaled issued Nov 2023, no final | 101 California St | Source Planning And Construction Inc | 30/f: mechanical/electrical, ref bpa#202308295499Details
30/f: mechanical/electrical, ref bpa#202308295499 | $170,000 |
| Oct 19, 2023 | Completed final sign-off Feb 2024 | 101 California St | Novo Construction Inc | 14/f: revision to bpa#202211106261, to remove 14/f from scope of workDetails
14/f: revision to bpa#202211106261, to remove 14/f from scope of work | |
| Oct 19, 2023 | Never finaled issued Oct 2023, no final | 101 California St | Novo Construction Inc | 8/f: electrical for restroom upgrades, ref bpa#202309206978Details
8/f: electrical for restroom upgrades, ref bpa#202309206978 | $10,000 |
| Oct 19, 2023 | Never finaled issued Oct 2023, no final | 101 California St | Novo Construction Inc | 9/f: electrical for restroom upgrades, ref bpa#202211106261Details
9/f: electrical for restroom upgrades, ref bpa#202211106261 | $10,000 |
| Oct 19, 2023 | Completed final sign-off Feb 2025 | 101 California St | Novo Construction Inc | 25/f: mechanical/electrical for t.i., ref bpa#202212228954Details
25/f: mechanical/electrical for t.i., ref bpa#202212228954 | $150,000 |
| Oct 19, 2023 | Completed final sign-off Feb 2025 | 101 California St | Novo Construction Inc | 25/f: mechanical/electrical for restrooms, ref bpa#202211106261Details
25/f: mechanical/electrical for restrooms, ref bpa#202211106261 | $7,000 |
| Oct 18, 2023 | Completed final sign-off Feb 2024 | 101 California St | Novo Construction Inc | 28/f: mechanical and electrical work for tenant improvement on the 28th fl ref 202212218831Details
28/f: mechanical and electrical work for tenant improvement on the 28th fl ref 202212218831 | $75,000 |
| Oct 5, 2023 | Completed final sign-off Apr 2024 | 101 California St | Gci, Inc | ste 2870: scope of work on the 28th fl consists of interior demolition of non-structural elements including-interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlet switches.Details
ste 2870: scope of work on the 28th fl consists of interior demolition of non-structural elements including-interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlet switches. | $125,000 |
| Sep 20, 2023 | Completed final sign-off Feb 2024 | 101 California St | Novo Construction Inc | 8/f: bring restrooms & drinking fountains to full compliance. demo of rr partitions, finishes & plumbing fixtures to be replaced w/new mech, elec, l/s & sprinkler system modification will be deferred submittals. this permit shall provided stamped docs to show restrooms & drinking fountains full compDetails
8/f: bring restrooms & drinking fountains to full compliance. demo of rr partitions, finishes & plumbing fixtures to be replaced w/new mech, elec, l/s & sprinkler system modification will be deferred submittals. this permit shall provided stamped docs to show restrooms & drinking fountains full comp | $125,000 |
| Sep 19, 2023 | Completed final sign-off Feb 2024 | 101 California St | Pioneer Fire Inc. | 28th fl - relocate 19 pendents, remove 9 pendents. ref pa 2022-1221-8831Details
28th fl - relocate 19 pendents, remove 9 pendents. ref pa 2022-1221-8831 | $7,100 |
| Sep 19, 2023 | Completed final sign-off Feb 2024 | 101 California St | Pioneer Fire Inc. | 8th, 9th, 25th fl: relocate 12 pendents. gc ti# 202211106261.Details
8th, 9th, 25th fl: relocate 12 pendents. gc ti# 202211106261. | $3,000 |
| Sep 19, 2023 | Completed final sign-off Sep 2024 | 101 California St | Pioneer Fire Inc. | relocate (21) pendents, add (3) uprights, convert (53) pendents to uprights remove (2) pendentsDetails
relocate (21) pendents, add (3) uprights, convert (53) pendents to uprights remove (2) pendents | $15,800 |
| Sep 19, 2023 | Completed final sign-off Nov 2023 | 101 California St | Pioneer Fire Inc. | 30/f: relocate 61 pendents, add 5 uprights, remove 6 pendents, ref pa# 202308295499.Details
30/f: relocate 61 pendents, add 5 uprights, remove 6 pendents, ref pa# 202308295499. | $14,400 |
| Sep 11, 2023 | Completed final sign-off Oct 2023 | 101 California St | Priority Architectural Graphics Dba Prio | 1st & 2nd fl - 10 evacuation plan maps for fire review onlyDetails
1st & 2nd fl - 10 evacuation plan maps for fire review only | $4,250 |
| Sep 5, 2023 | Completed final sign-off Apr 2024 | 101 California St | Hp Build | 2/f new coffee bar, seating, window bar, security gate, mep.Details
2/f new coffee bar, seating, window bar, security gate, mep. | $176,000 |
| Aug 29, 2023 | Completed final sign-off Feb 2024 | 101 California St | Source Planning And Construction Inc | 30th fl ste 3070 & 3000 - combining suites 3070 & 3000 to create one. demo includes non-structural elements, interior partitions, doors, finishes, ceiling, lighting, power/data. construction includes (n) non-structural partitions, doors, finishes, millwork, ceiling, lighting, power & data. allDetails
30th fl ste 3070 & 3000 - combining suites 3070 & 3000 to create one. demo includes non-structural elements, interior partitions, doors, finishes, ceiling, lighting, power/data. construction includes (n) non-structural partitions, doors, finishes, millwork, ceiling, lighting, power & data. all | $950,000 |
| Aug 9, 2023 | Completed final sign-off Sep 2023 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm asbuilt. as built to show added relay module for pine st door release. reference pa 202201125830.Details
fire alarm asbuilt. as built to show added relay module for pine st door release. reference pa 202201125830. | |
| Jun 30, 2023 | Completed final sign-off Aug 2023 | 101 California St | Pyro-Comm Systems, Inc. | 7th fl: 1 power supply, 23 smoke detectors, 9 9 duct detectors, 1 control module, 12 relay modules, 20 ceiling speaker strobes, 7 ceiling strobes,6 ceiling speakersDetails
7th fl: 1 power supply, 23 smoke detectors, 9 9 duct detectors, 1 control module, 12 relay modules, 20 ceiling speaker strobes, 7 ceiling strobes,6 ceiling speakers | $20,000 |
| Jun 29, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | Turner Construction Co | rev to pa 202006198935 to address new stair landings. exterior work.Details
rev to pa 202006198935 to address new stair landings. exterior work. | |
| Jun 13, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | Turner Construction Co | replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935Details
replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935 | |
| Jun 13, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | interior cold formed steel framing package 1 ref pa 2020-0619-8935Details
interior cold formed steel framing package 1 ref pa 2020-0619-8935 | $333,950 | |
| Jun 13, 2023 | Expired or cancelled cancelled Jan 2026 | 101 California St | Turner Construction Co | cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935Details
cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935 | $1,220,734 |
| Jun 9, 2023 | Never finaled issued Aug 2023, no final | 101 California St | Priority Architectural Graphics Dba Prio | placing excuavation route signage in buildingDetails
placing excuavation route signage in building | $1,700 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 101 California St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 51 pendent sprinker and 126 upright on the 7/f. t.i ref pa# 202305057217, 202209152536, 202208231049, 202212198637Details
fire sprinklers: relocate 51 pendent sprinker and 126 upright on the 7/f. t.i ref pa# 202305057217, 202209152536, 202208231049, 202212198637 | $110,625 |
| May 5, 2023 | Completed final sign-off Sep 2023 | 101 California St | Novo Construction Inc | 7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637Details
7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637 | |
| Mar 24, 2023 | Completed final sign-off Aug 2023 | 101 California St | Bcci Construction Company | 31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130Details
31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130 | $12,000 |
| Mar 10, 2023 | Completed final sign-off Nov 2025 | 101 California St | Source Planning And Construction Inc | evc station installationDetails
evc station installation | |
| Mar 7, 2023 | Completed final sign-off Jun 2023 | 101 California St | Novo Construction Inc | 3/f: administrative revision to pa 2022-0516-4290 to remove mep & fire life safety under separate permit from issued application per field inspector. no plansDetails
3/f: administrative revision to pa 2022-0516-4290 to remove mep & fire life safety under separate permit from issued application per field inspector. no plans | |
| Mar 2, 2023 | Never finaled issued Mar 2023, no final | 101 California St | Source Planning And Construction Inc | 30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support.Details
30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support. | |
| Jan 18, 2023 | Completed final sign-off Feb 2023 | 101 California St | Pyro-Comm Systems, Inc. | modification to (e) fire alarm system. pyro-comm systems, inc. will design & provide following material (1) remote power supply, (29) smoke detectors (smoke detector in common area to match (e) bldg design) (12) duct detectors, (13) relay modules, (34) ceiling speaker/strobe, (22) ceiling strobe...Details
modification to (e) fire alarm system. pyro-comm systems, inc. will design & provide following material (1) remote power supply, (29) smoke detectors (smoke detector in common area to match (e) bldg design) (12) duct detectors, (13) relay modules, (34) ceiling speaker/strobe, (22) ceiling strobe... | $19,000 |
| Jan 10, 2023 | Never finaled issued Jan 2023, no final | 101 California St | Pyro-Comm Systems, Inc. | 30/f: f/a addition to the (e) f/a system - 8 smoke detectors, 10 ceiling speaker strobes, and 4 ceiling strobes to be added to provide proper coverage. ref permit 202211166644Details
30/f: f/a addition to the (e) f/a system - 8 smoke detectors, 10 ceiling speaker strobes, and 4 ceiling strobes to be added to provide proper coverage. ref permit 202211166644 | $6,000 |
| Jan 5, 2023 | Completed final sign-off May 2023 | 101 California St | Pyro-Comm Systems, Inc. | fire alarm as builts to show 4 added wp wall speaker strobes, 1 added wall speaker strobe, deleted 1 duct detector and relay for ac-r-1 5 deleted smoke detectors made new smokes existing show heat in elevator equipment room as (e) ref pa 2022-0504-3525Details
fire alarm as builts to show 4 added wp wall speaker strobes, 1 added wall speaker strobe, deleted 1 duct detector and relay for ac-r-1 5 deleted smoke detectors made new smokes existing show heat in elevator equipment room as (e) ref pa 2022-0504-3525 | |
| Dec 27, 2022 | Completed final sign-off Feb 2023 | 101 California St | fire sprinkler relocate 59, add 11, delete 10 pendant sprinklers on the 30th fl. t.i. #202211166644Details
fire sprinkler relocate 59, add 11, delete 10 pendant sprinklers on the 30th fl. t.i. #202211166644 | $30,000 | |
| Dec 22, 2022 | Completed final sign-off Feb 2025 | 101 California St | Novo Construction Inc | 25/flr suite 2575: demo of non-structural paritions,doors,finishes, ceiling/ lighting, construction of new partitions, doors & frames, power & tele/data. act auite is vacant. mep & l/s under separate permit. dos not affect fixture qty, occ load or pot. no ext work.Details
25/flr suite 2575: demo of non-structural paritions,doors,finishes, ceiling/ lighting, construction of new partitions, doors & frames, power & tele/data. act auite is vacant. mep & l/s under separate permit. dos not affect fixture qty, occ load or pot. no ext work. | $650,000 |
| Dec 21, 2022 | Completed final sign-off Feb 2024 | 101 California St | Novo Construction Inc | 28/f: demo nonstructural interior partitions, doors, finishes, ceiling/lighting, millwork/finishes. mep l/s, sprinklers under separate permit.does not affect fixture quantities, occupancy load/pot.Details
28/f: demo nonstructural interior partitions, doors, finishes, ceiling/lighting, millwork/finishes. mep l/s, sprinklers under separate permit.does not affect fixture quantities, occupancy load/pot. | $295,000 |
| Dec 19, 2022 | Completed final sign-off Jan 2023 | 101 California St | Golden Gate Fire Protection Inc | 14/f fire sprinkers: relocate 194 pendent sprinklers for 14/f demo permit.Details
14/f fire sprinkers: relocate 194 pendent sprinklers for 14/f demo permit. | $99,750 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pyro-Comm Systems, Inc. (36), Hp Build (20), Novo Construction Inc (20), Source Planning And Construction Inc (20), Skyline Construction (16), Bcci Construction Company (15), Golden Gate Fire Protection Inc (14), Hathaway Dinwiddie Co. (12), Pioneer Fire Inc. (10), Ayoob & Peery Plumbing Co Inc (4), Golden Gate Sign Company Inc. (4), Gci, Inc (3), Turner Construction Co (3), Anderson, Rowe & Buckley, Inc. (2), Brandex Corp (2), Clune Construction Company L P (2), Dpr Construction A (2), Mcclure Electric Inc (2), Priority Architectural Graphics Dba Prio (2), Acme Pacific Repairs, Inc, C B F Inc, Pribuss Engineering Inc, Richlen Construction, Swinerton Builders
- Architects
- Sashikala Murthy (22), Stephani Kwan (13), Scott Clement (12), Luda Hoe (6), Breck Polley (4), Michael Dubitsky (4), Gregory Mottola (3), Jin Park (3), Ashley Miller (2), Katharine Dwyer (2), Victoria Salgado (2), Alla Elkina, Ariane Lebrilla, Bert Deviterbo, Christopher Jordan Malabed, Daniel Pamperin, Dean Macy, Lawrence Digennaro, Pamela Robinson, William Raymond Turner
- Engineers
- Amit Wadhwa (14), Levi G. Abarte (11), Stephen Shaffer (7), Alan Charles Burr (4), Sherry Chaumpluke (3), Carl Milsum (2), Dean Macy (2), Habtom Nugusse Tewelde (2), Prabhjeet Grewal (2), Vincent Gerace (2), Alan Robinson, Alex Filatov, Alexander Pacheco, Andrew Ostrovski, Ashley Miller, Bradley R. Shade, Carlos Chang, Chongsheng Feng, Christopher Gleich, Edward Rivera, Edward Rivera, Jesus B Cabellon Jr, Jillian P. Moritz, Kevin O'keefe, Lars P. Mortensen, Luda Hoe, Madison Roberts, Scott E Clement, Thomas Castle, Wesley Lawson, William Hadinger, Xuong Quach
- Authorized agents
- Joyce Mizuhara (2)
- Designers
- Michael Joseph Donahue (10), Golden Gate Fire (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.