Block 0263, lot 011
101 California St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 46th fl - deferred elec -common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606183494 | $35,000 |
| Sep 30, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 39th fl - common restroom upgrade: lighting with associated circuits and controls; power and signals with associated circuits and wiring. reference arch permit # 202607225369 | $35,000 |
| Sep 29, 2026 | In progress | 101 California St | Pyro-Comm Systems, Inc. | 13th floor - 2 way com system alteration. add 2 call stations, 2 way-comm signature. ref pa 202511260514 | $1,200 |
| Sep 29, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 10th fl - common restroom upgarde: lighting w/associated circuits & controls; power & signal w/associated circuits and wiring. ref pa 202606253884 | $35,000 |
| Sep 25, 2026 | In progress | 101 California St | 24 & 25/fl: ti, non-structural partitions, ceilings, fixtures, finishes & associated mep. | $6,700,000 | |
| Sep 18, 2026 | In progress | 101 California St | Hp Build | 45th floor: reference#202607305820 mechanical and electrical for the project | $44,335 |
| Aug 27, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 47th fl common area restrooms. shall consist of interior demolition and construction of non structural elements including interoir partitions, finishes, ceilings, lighting and fixtures. mep and fire sprinkler drawings submitted as deferred permits. | $202,000 |
| Aug 4, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual scope. (interior only). | $3,000 |
| Jul 30, 2026 | In progress | 101 California St | Hp Build | 45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072 | $254,000 |
| Jul 28, 2026 | In progress | 101 California St | Bcci Construction Company | 27th and 28th floors: mep submittal to support approved arch. permit. #202607175188 | $202,000 |
| Jul 27, 2026 | In progress | 101 California St | Skyline Construction | 46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring. | $45,000 |
| Jul 22, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491 | $202,000 |
| Jul 22, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491 | $202,000 |
| Jul 17, 2026 | In progress | 101 California St | Bcci Construction Company | 27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout. | $751,283 |
| Jul 10, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. | $5,000 |
| Jun 29, 2026 | In progress | 101 California St | Dpr Construction A | 15/f - ste 1500: deferred mep work for permit# 202604018658 | $320,000 |
| Jun 25, 2026 | In progress | 101 California St | 10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491 | $58,220 | |
| Jun 18, 2026 | In progress | 101 California St | Skyline Construction | 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing | $1,583,313 |
| Jun 18, 2026 | In progress | 101 California St | Source Planning And Construction Inc | 46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes | $250,000 |
| Jun 5, 2026 | Completed | 101 California St | Hp Build | 25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550) | |
| Jun 1, 2026 | In progress | 101 California St | Skyline Construction | floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. | $38,000 |
| May 22, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair framing support & operable partition support, as shown on s2.0 and s2.1 | $15,000 |
| May 1, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes | $399,334 |
| May 1, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control | $399,334 |
| Apr 21, 2026 | Completed | 101 California St | Hp Build | 25/fl- ref 202602025031 to include mep | |
| Apr 17, 2026 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 43rd floor. modifyting existing fire alarm sytem install 2 pull sstation to the 2-way-comm emergency system. no t.i. involved. | $3,000 |
| Apr 15, 2026 | In progress | 101 California St | Pyro-Comm Systems, Inc. | fire alarm voluntary 2-way replacement for like for like basis. | $10,000 |
| Apr 10, 2026 | Completed | 101 California St | Hp Build | 28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088 | $460,000 |
| Apr 7, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th | $143,772 |
| Apr 7, 2026 | In progress | 101 California St | Hathaway Dinwiddie Co. | revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associated meps. | $68,000 |
| Apr 1, 2026 | In progress | 101 California St | Dpr Construction A | 15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately. | $1,968,546 |
| Mar 13, 2026 | Completed | 101 California St | Hp Build | 16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 13, 2026 | Completed | 101 California St | Hp Build | 24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. | $80,000 |
| Mar 11, 2026 | Completed | 101 California St | Hp Build | 9th flr: suite 925: mech + electrical for 202512051085 | $750,000 |
| Mar 2, 2026 | In progress | 101 California St | Bcci Construction Company | 44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting | $501,665 |
| Feb 6, 2026 | Completed | 101 California St | Golden Gate Fire Protection Inc | 24th/fl: relocate 181 upright sprinklers on the 24th floor for demo. | $25,000 |
| Feb 2, 2026 | Completed | 101 California St | Hp Build | 25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions | $120,000 |
| Dec 8, 2025 | In progress | 101 California St | Hathaway Dinwiddie Co. | new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. | $1,000,000 |
| Dec 5, 2025 | Completed | 101 California St | Hp Build | 9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred. | $875,500 |
| Dec 5, 2025 | Completed | 101 California St | Hp Build | 28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred. | $850,000 |
| Dec 3, 2025 | In progress | 101 California St | Hathaway Dinwiddie Co. | 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work | $9,700,000 |
| Dec 3, 2025 | In progress | 101 California St | Hathaway Dinwiddie Co. | 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,500,000 |
| Dec 1, 2025 | In progress | 101 California St | Hathaway Dinwiddie Co. | 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,600,000 |
| Nov 26, 2025 | Completed | 101 California St | Bcci Construction Company | 43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain) | $8,018,885 |
| Nov 26, 2025 | In progress | 101 California St | Hathaway Dinwiddie Co. | 13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep. | $8,800,000 |
| Nov 19, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm as built 2 ceiling strobes to be added to the phone booths. ref pa 202506138659 | |
| Nov 5, 2025 | Completed | 101 California St | Hp Build | g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835 | $3,000 |
| Oct 23, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 34th fl. fire alarm 1 2-way call station: 1 remote power supply, 23 ceiling speaker strobes, 10 strobes,2 call stations, 39 smoke detectors, 6 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 202505206899 | $8,000 |
| Oct 23, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 35th fl. fire alarm 1-2 way 1 smoke supply 31 ceiling speaker strobes, 10 strobes, 2 call stations, 39 smoke detectors, 5 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 2025-0519-6756 | $8,000 |
| Oct 6, 2025 | In progress | 101 California St | Source Planning And Construction Inc | 8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8 | |
| Sep 18, 2025 | Completed | 101 California St | Bcci Construction Company | 35/f:deferred submittal at mep ref#202505196756 | $1,677,600 |
| Sep 18, 2025 | Completed | 101 California St | Bcci Construction Company | 34th floor: deferred submittal of mep. ref pa #202505206899 | $1,677,600 |
| Sep 18, 2025 | Completed | 101 California St | Bcci Construction Company | 35/f: deferred submittal of structural drawings ref#2025-0519-66756 | $50,000 |
| Sep 12, 2025 | Completed | 101 California St | Brandex Corp | revision 202507181106- structural attachment detail | $3,000 |
| Sep 10, 2025 | Completed | 101 California St | Ayoob & Peery Plumbing Co Inc | 35th fl- ref pa # 2025-0519-6756 add 43 relocate 179 fire sprinkler ti. job #25-652 | $137,884 |
| Sep 10, 2025 | Completed | 101 California St | Ayoob & Peery Plumbing Co Inc | 34th fl: add 26, relocate 209, fire spprinkler per ti . job 25-652, ref 202505206899 | $145,959 |
| Aug 14, 2025 | In progress | 101 California St | Source Planning And Construction Inc | the beam strengthening is no longer needed for the scope of work in kind to permit: 202412126710. | |
| Jul 18, 2025 | Completed | 101 California St | Brandex Corp | suite 1050:to erect non electrical and non-illuminated blade sign. ( avotoasty) project includes 2 identical signs. sign a and sign b | $3,000 |
| Jul 9, 2025 | In progress | 101 California St | Gci, Inc | 25th/f: partial t.i. of a single suite of an e) high rise | $150,000 |
| Jul 3, 2025 | Completed | 101 California St | Golden Gate Fire Protection Inc | 8th fl - relocate 34 uprights, 17 pendents, & 13 concealed pendents. ref pa 202412126710 | $14,750 |
| Jun 27, 2025 | In progress | 101 California St | C B F Inc | 42/f new power & signal devices. ref ti 202504164515 | $10,000 |
| Jun 17, 2025 | Completed | 101 California St | Novo Construction Inc | 11th fl: consist of int.demo non-structural elements including interior partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. floors are currently vacant. per admin. bulletin ab-017 ooc/exiting to be addressed under separate permit; f/s & l/s to remain operational | $20,000 |
| Jun 17, 2025 | Completed | 101 California St | Novo Construction Inc | 13th floor; consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. | $20,000 |
| Jun 17, 2025 | Completed | 101 California St | Novo Construction Inc | 9th fl: ste 910 & 925 consist of int.demo non-structral elements including int. partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. suites are currently vacant. per admin. bulletin ab-017 ooc/exiting tobe addressed under separate permit; fs & l/s to remain operational | $10,000 |
| Jun 17, 2025 | Completed | 101 California St | Novo Construction Inc | 12th fl consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. no | $20,000 |
| Jun 13, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 8f ref pa #2024-1212-6710: fire alarm 11 speaker strobes, 5 strobes, 4 relay modules, 3 duct detectors will be added. 11 smoke detectors were relocated | $6,000 |
| Jun 6, 2025 | Completed | 101 California St | Golden Gate Fire Protection Inc | fire sprinkler demo, rel0cate 181 uprights on the 12 th fl | $45,250 |
| Jun 6, 2025 | Completed | 101 California St | Golden Gate Fire Protection Inc | 13th floor: fire sprinkler demo. relocate 181 uprights | $45,250 |
| Jun 5, 2025 | Completed | 101 California St | Golden Gate Fire Protection Inc | 42/f: relocate 19 pendents. ref permit 202504164515. | $4,750 |
| Jun 4, 2025 | Completed | 101 California St | Golden Gate Fire Protection Inc | fire sprinkler demo; relocate 15 uprights on the 9th floor. fire sprinkler demo; relocate 181 uprights on the 11th floor. | $49,000 |
| May 23, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | suite 4200: asbuilt to show correct soo showing the solid tone and not a voice message. ref 2025-0307-1821, 2025-0514-6432 | |
| May 23, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 42nd/fl: 1 speaker strobe, 2 strobes, and 2 smoke detectors to be relocated. | $2,000 |
| May 20, 2025 | Completed | 101 California St | Bcci Construction Company | 34th ti (n) non-structural partitions, lighting, ceiling, finishes, mep; mep structural deferred | $3,308,600 |
| May 19, 2025 | In progress | 101 California St | Acme Pacific Repairs, Inc | unit #300: replacing (e) evo event 48e electric cooktop model #10-0148-evt w/ new evo event 48e plus electric cooktop model #10-0600-evt. inkind. install per manufacturer's installaion instructions. | $67,125 |
| May 19, 2025 | Completed | 101 California St | Bcci Construction Company | 35th fl - interior office ti. new non load bearing partitions, ceilings, doors & finishes. mep deferred | $3,308,600 |
| May 14, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | suite#: 4200; as built to show correct soo showing the temporal tone and not a voice message. ref#: 202503071821. | |
| May 14, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | suite 2800; fire alarm 2 relay modules will be added for door release and av shunt. ref#: 202504285353 | $1,000 |
| Apr 28, 2025 | In progress | 101 California St | Source Planning And Construction Inc | 28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades. | $50,000 |
| Apr 16, 2025 | Completed | 101 California St | Richlen Construction | suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred. | $422,171 |
| Mar 24, 2025 | Completed | 101 California St | Hp Build | 42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electrical | $25,061 |
| Mar 19, 2025 | Completed | 101 California St | Skyline Construction | 34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 | |
| Mar 19, 2025 | Completed | 101 California St | Mcclure Electric Inc | 42nd fl: title 24 lighting compliance ref pa #2024-1218-7060 & 2024-1218-7066 | $17,476 |
| Mar 19, 2025 | Completed | 101 California St | Skyline Construction | 35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 | |
| Mar 14, 2025 | Expired or cancelled | 101 California St | Anderson, Rowe & Buckley, Inc. | demo permit - existing sprinkler system relocated 129 sprinklers on 34th fl; relocated 129 sprinklers on 35th fl | $62,000 |
| Mar 13, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 28th fl - fire alarm 1 smoke detector and 1 ceiling speaker strobe to be added to provide proper coverage ref pa 202412187047 | $1,000 |
| Mar 7, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | suite #4200: fire alarm: 2 ceiling speaker strobes to be added to provide proper coverage. ref pa #202412187066 | $1,000 |
| Feb 27, 2025 | Completed | 101 California St | Golden Gate Fire Protection Inc | 26th fl - as built for permit 202410213332 show heads that are hard piped for final inspection | $1,000 |
| Feb 21, 2025 | Completed | 101 California St | Hp Build | ti fitout of (e) 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of use | $42,500 |
| Feb 20, 2025 | Completed | 101 California St | Pioneer Fire Inc. | 42nd/f ste 4200: relocate 5 pendents, 4 semi recessed. ref to t.i. 202412187066 | $2,000 |
| Feb 11, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 19/f - fire alarm as built. 1 duct detector and relay module was removed for fcu-2 as it never existed. 1 smoke detector added to idf room. ref f/a permit 202412247370. | |
| Jan 23, 2025 | Completed | 101 California St | Hp Build | mechanical and electrical work (ste 1925/19th fl) ref 2024.1121.5485 | $105,000 |
| Jan 6, 2025 | Completed | 101 California St | Mcclure Electric Inc | 19/f suite 1925 - title 24 compliance for lighting and power. ref pa 202411215485. | $36,448 |
| Jan 6, 2025 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 19/f suite 1925: fire alarm - 4 smoke detectors, 3 speaker strobes, 2 speakers, 1 strobe to be added to provide proper coverage. ref pa# 202411215485 | $2,000 |
| Dec 26, 2024 | Completed | 101 California St | Pioneer Fire Inc. | relocate (3) uprights, convert (7) uprights to pendents gcti #2024-1121-5485 19th fl. | $2,500 |
| Dec 24, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 19th floor. fire alarm: 11 smoke detectors, 2 duct detectors, 4 relay modules, 14 speaker strobes, 1 speaker, 13 should be added to provide proper coverage. pa#: 202410112776 | $8,000 |
| Dec 18, 2024 | Completed | 101 California St | Hp Build | 42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits. | $75,000 |
| Dec 18, 2024 | Completed | 101 California St | Source Planning And Construction Inc | minor interior demolition of non structural elements including interior partitions, doors, finishes. new interior demising partitions and finishes. current vacant. mech,elec, life safety and sprinkler modifications under sep and deferred permit. no exterior building, site, landscape, use or parking | $48,000 |
| Dec 18, 2024 | Completed | 101 California St | Hp Build | 42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals. | $250,000 |
| Dec 13, 2024 | Completed | 101 California St | Skyline Construction | 17/fl- evacation signage | $1,500 |
| Dec 13, 2024 | Completed | 101 California St | Skyline Construction | 18/fl- evacation signage | $1,500 |
| Dec 12, 2024 | In progress | 101 California St | Source Planning And Construction Inc | 8/fl- selective interior demo in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building, site , landscape use or parking and building structure are proposed | $2,500,000 |
| Dec 11, 2024 | Completed | 101 California St | Bcci Construction Company | 26th fl - revision for pa 202406204908 deferred mep for ti permit 202405142058. no exterior work | $75,000 |
| Dec 10, 2024 | Completed | 101 California St | R L H Fire Protection Inc | fire sprinkler relocate 4 sprinklers in the 20th fl restrooms ti 202408209067 | $1,000 |
| Dec 6, 2024 | Completed | 101 California St | Bcci Construction Company | revision to 202405142058. updated finishes, new lighting, fixture replacement in kind. work at elevator lobby removed. mep deferred | $50,000 |
| Dec 5, 2024 | Completed | 101 California St | Hp Build | ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018 | $11,000 |
| Dec 3, 2024 | Completed | 101 California St | Pioneer Fire Inc. | 19th fl suite 1950 - fire sprinkler t.i. due to demo back to warm shell | $3,000 |
| Nov 22, 2024 | Completed | 101 California St | Pioneer Fire Inc. | 19th floor: relocate 16 pendents, repipe existing 37 drops with pendents to uprights, add 11 uprights. ref to t.i. 202410112776 | $12,800 |
| Nov 21, 2024 | Completed | 101 California St | Hp Build | suite 1925. scope of work on the 19th flr consist of interior demolition of mon-structural elements including but not neccessarily limited to interior partitions, doors, finishes, ceiling, lighting, power and data, construction including new interior of non structural partitions, doors, finishes, | $475,000 |
| Nov 20, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 18th fl ref pa #202408027822 fire alarm 1 remote power supply, 28 speakers strobes, 29 speakers, 9 strobes, 32 smoke detectors, 6 duct detectors, 12 relay modules, 2 monitor module to be added to provide proper coverage. | $14,000 |
| Nov 18, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 17th fl ref pa #202407267324 fire alarm 1 remote power supply, 28 speakers strobes, 27 speakers, 12 strobes, 37 smoke detectors, 9 duct detectors, 15 relay modules, 1 monitor module to be added to provide proper coverage. | $15,000 |
| Oct 25, 2024 | Completed | 101 California St | Skyline Construction | rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl. | $19,272 |
| Oct 21, 2024 | Completed | 101 California St | Golden Gate Fire Protection Inc | 26th floor. relocate 221 pendent sprinklers and relocate 9 uprights. | $57,500 |
| Oct 11, 2024 | Completed | 101 California St | Source Planning And Construction Inc | 19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered | $1,675,000 |
| Sep 23, 2024 | Completed | 101 California St | R L H Fire Protection Inc | 18th fl fire sprinkler permit relocate 180 add 23 and delete 55 sprinklers. ref ti 202408027822 | $52,000 |
| Sep 20, 2024 | Completed | 101 California St | R L H Fire Protection Inc | fire sprinler permit. relocate 179, add 41 and delete 37 sprinklers on the 17/f. t.i #202407267324 | $62,000 |
| Sep 17, 2024 | Completed | 101 California St | Novo Construction Inc | 25th fl, ste 2575 revision to pa 20221228954 & 202403016889 to show interior of suite 2575 not in scope of work | |
| Sep 16, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm: 2 smoke detectors, 3 duct detectors, 5 relay modules, 4 ceiling speaker strobes, 5 ceiling strobes to be added to provide proper coverage. ref#: 202407267334 | $6,000 |
| Sep 11, 2024 | Completed | 101 California St | Pioneer Fire Inc. | 25th fl. relocate 15 pendents, 9 uprights ref pa 202408078129 | $4,800 |
| Sep 10, 2024 | In progress | 101 California St | Source Planning And Construction Inc | demolition of interior walls, floor and wall finishes in a portion of floor 19, compliance with ab-017. | $45,000 |
| Sep 5, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm 2 call stations2 power supply 48 smoke detectors, 11 duct detectors, 2 monitor modules, 13 relay modules, 40 ceiling speaker strobes, 1 ceiling speaker, 33 ceiling strobes to be added to proved proper covarage ref pa# 2024-0514-2058 | $20,000 |
| Sep 4, 2024 | Completed | 101 California St | Ayoob & Peery Plumbing Co Inc | ref 202404250708- record as built for 202407085937. updated drawing for adjusted pioping plan and final sprinklers head positions per inspectors request | |
| Aug 30, 2024 | Completed | 101 California St | Pribuss Engineering Inc | gc pa# 202406053739. fire sprinkler t.i on 21/f. total 333 heads. | $168,165 |
| Aug 26, 2024 | Completed | 101 California St | Novo Construction Inc | new construction for glazing wall in existing conference room 1 green wall on th 8th fl. scope of work includes construction on on structural wall, millwork and finishes. | $45,511 |
| Aug 22, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 1 smoke detector and 2 ceiling speaker strobes to be added for proper coverage ref pa#: 202212228954 & 2023-1019-9039 | $1,500 |
| Aug 22, 2024 | Completed | 101 California St | Source Planning And Construction Inc | ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491 | $30,000 |
| Aug 20, 2024 | Completed | 101 California St | Skyline Construction | scope of work includes bringing restroom and hines.com drinking fountains on the 20th fl. to full accessiblity compliance demo of restrooms partitions, finishes and plumbing fitures to be replaced with new mep and fire safety and sprinkler system modifications will be defferred | $375,000 |
| Aug 7, 2024 | Completed | 101 California St | Gci, Inc | 25th floor: t.i. new non-load bearing interior walls, lighting, finishes and mep. | $1,500,000 |
| Aug 2, 2024 | Completed | 101 California St | Skyline Construction | 18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type) | $4,483,300 |
| Jul 26, 2024 | Completed | 101 California St | Novo Construction Inc | 25th fl - revision to pa 202310199039 electrical/lighting for ti ref pa 20221228954/202403016889 | |
| Jul 26, 2024 | Completed | 101 California St | Skyline Construction | 17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep | $4,483,300 |
| Jul 25, 2024 | In progress | 101 California St | Pyro-Comm Systems, Inc. | 21/f: fire alarm- 1 remote power supply, 31 ceiling speaker strobes, 2 wall speaker strobes, 8 ceiling strobes, 32 smoke detectors, 10 duct detectors, 13 relay modules, 1 control module, and 1 monitor module to be added. ref pa# 202406053739 | $10,000 |
| Jul 18, 2024 | Completed | 101 California St | Pioneer Fire Inc. | 25th fl- ref pa# 2024-0301-6889 relocate 5 pendents, convert 2 uprights to pendent | $2,000 |
| Jul 16, 2024 | Completed | 101 California St | Skyline Construction | bring restroos and drinking fountains on 17th fl to full accessibility compliance. demo of restroom partitons, finishes, plumb fixt. to be replaced w new. mep, ls/sprinkler deferred. permit shall provide apprd docs to show restroom/drking fountain full complaince for future ti's 17th fl | $140,000 |
| Jul 8, 2024 | In progress | 101 California St | Ayoob & Peery Plumbing Co Inc | 27/f: add (39), relocate (72) fire sprinklers per t.i. job #24-644. ref bpa# 202404250708 | $68,942 |
| Jun 26, 2024 | In progress | 101 California St | Pyro-Comm Systems, Inc. | fire alarm 7 strobes, 14 speaker strobes, 21 speakers, 18 smoke detectors to e added to provide proper coverage. ref pa 202404250708 | $9,000 |
| Jun 20, 2024 | In progress | 101 California St | Bcci Construction Company | 26/f: deferred mep for tenant improvement permit 202405142058. no exterior work. | $500,000 |
| Jun 20, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 2 strobes, 3 speaker strobes, 5 smoke detectors to be added to provide proper coverage ref pa# 2024-0515-2153 | $1,500 |
| Jun 13, 2024 | Completed | 101 California St | Skyline Construction | g/f suite 175: addition of new countertop convention oven for cooking frozen cookie dough in an (e) bank. cookies will not be for retail sale. this is the only cooking that will occur on site. refer to permit 202405152153 for original build out. | $1,500 |
| Jun 11, 2024 | In progress | 101 California St | Golden Gate Fire Protection Inc | relocate 18 pendent sprinklers on the 1st fl ref 202405152153 | $4,500 |
| Jun 5, 2024 | Completed | 101 California St | Clune Construction Company L P | 21st fl full floor ti mep upgrades included | $8,789,816 |
| May 30, 2024 | Completed | 101 California St | Golden Gate Sign Company Inc. | 2 electric wall sign "citizens" | $15,000 |
| May 30, 2024 | Completed | 101 California St | Golden Gate Sign Company Inc. | 1 atm surround citizens bank | $5,000 |
| May 28, 2024 | Completed | 101 California St | Golden Gate Sign Company Inc. | install 3x (n) awnings non printed facing street non illuminated w/ dimensions 4'x 9-11'x 2' projection | $10,000 |
| May 28, 2024 | Completed | 101 California St | Golden Gate Sign Company Inc. | install 2x (n) awnings non printed facing courtyard non illuminated w/ dimensions 4'x 8-1'x 2' projection. share plans with 202405283068 | $5,000 |
| May 15, 2024 | Completed | 101 California St | Skyline Construction | ground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm. | $365,636 |
| May 14, 2024 | Completed | 101 California St | Bcci Construction Company | 26th:renovation of full floor existing b occupancy space proposed tenant improvement work includes demo of interior non structural partitions, ceilings, lighting & finishes. construction of new non load bearing partitions, mech,plumb, elec and communciation,ceiling systems with new lighting,flooring | $2,500,000 |
| May 2, 2024 | Completed | 101 California St | Skyline Construction | interior demo of non structural elemenets including but not limited to interior paritions, doors, finishes, ceilings, lighting, mech, elec outlets,switches.perm ab017 occupancy/exiting under sep permit. fs, ls to remain operational. pot accessibility scope noto req. no ext blg,site,landscape, use or | $180,000 |
| May 2, 2024 | Completed | 101 California St | Clune Construction Company L P | 21/f- soft demo to remove partitions, fixtures and finishes | $125,000 |
| May 2, 2024 | Completed | 101 California St | Skyline Construction | 17/f: interior demo of non-structural elements including but limited to int. partitions, doors, finishes, ceilings, lighting, mech and electrical outlets. per admin. bulletin ab107: occupancy/exiting to be addressed under separate permit, f/s & l/s to remain operational, p.o.t/accessibility scope is | $180,000 |
| Apr 26, 2024 | Expired or cancelled | 101 California St | Anderson, Rowe & Buckley, Inc. | demo permit provide upright shell protection (e) fire sprinkler system 17th fl-129 spkers. 18th fl- 129 spkers. total 258 spkrs | $62,000 |
| Apr 25, 2024 | Completed | 101 California St | Novo Construction Inc | 27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting | $1,967,498 |
| Apr 19, 2024 | Completed | 101 California St | Golden Gate Fire Protection Inc | demo 1 sprinkler head on the 8th floor, ste 800. | $620 |
| Apr 16, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | ref pa# 2021-0114-2747 fire alarm as built based on field markups. 1 heat detector has been added. | |
| Apr 2, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm as built, as built to show 1 added relay module for music shutdown in club house ref pa## 2023-1215-2592 | |
| Mar 1, 2024 | Completed | 101 California St | Novo Construction Inc | revision to pa#202212228954. adding a demising wall to create 2 separate suites. work includes adding new partitions suite entry doors, and relocating lighting and power/data mep and fls are deferred permits. | |
| Jan 19, 2024 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 28th fl: revision to pa# 202312041869. 4 smoke detectors & 4 ceiling speaker strobes to be added to provide proper coverage. | $3,000 |
| Jan 10, 2024 | In progress | 101 California St | Golden Gate Fire Protection Inc | basement level 1 and 2: extg fire sprinkler system. t.i. ev -charging areas. 94 sprnklers. (nfpa 13 extra hazard grp 2) - installation for ev charger coverage, installed under electrical permit, not required at the time of ev charger install. ref elec pn: 202301128317 | $59,000 |
| Dec 15, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm 2 smoke detectors and 1 relay module for the turnstile to be added to provide proper coverage 2nd open to 1st fl; ref pa 2023-0905-5912 | $1,600 |
| Dec 4, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 25/f-ste 2575: 9 speaker strobes, 3 strobes, 12 smoke detectors, 1 heat detector to be added to provide proper coverage. ref pa# 202211106261. | $8,000 |
| Dec 4, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 28/f-ste 2870: 9 speaker strobes, 2 strobes, 1 smoke detector to be added to provide proper coverage. ref pa# 202310058086. | $10,609 |
| Nov 28, 2023 | Completed | 101 California St | Golden Gate Fire Protection Inc | 28th fl: fire spinklers ti. relocate 13 uprights and 7 pendents in suite 2870. ref 202310058086. | $12,400 |
| Nov 17, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 30/f: f/a, 9-ceiling speaker strobes, 3-ceiling strobes & 1-relay module for door release to be added to provide property coverage. ref bpa#202308295499 | $3,000 |
| Nov 2, 2023 | Completed | 101 California St | Source Planning And Construction Inc | 8th fl-ste 800: scope of work consist of enclosing an open area and creating a conference room. minimal demolition to coat closed partions doors and lights, act ceiling. | $180,000 |
| Oct 20, 2023 | In progress | 101 California St | Source Planning And Construction Inc | 30/f: mechanical/electrical, ref bpa#202308295499 | $170,000 |
| Oct 19, 2023 | Completed | 101 California St | Novo Construction Inc | 14/f: revision to bpa#202211106261, to remove 14/f from scope of work | |
| Oct 19, 2023 | In progress | 101 California St | Novo Construction Inc | 8/f: electrical for restroom upgrades, ref bpa#202309206978 | $10,000 |
| Oct 19, 2023 | Completed | 101 California St | Novo Construction Inc | 25/f: mechanical/electrical for t.i., ref bpa#202212228954 | $150,000 |
| Oct 19, 2023 | Completed | 101 California St | Novo Construction Inc | 25/f: mechanical/electrical for restrooms, ref bpa#202211106261 | $7,000 |
| Oct 19, 2023 | In progress | 101 California St | Novo Construction Inc | 9/f: electrical for restroom upgrades, ref bpa#202211106261 | $10,000 |
| Oct 18, 2023 | Completed | 101 California St | Novo Construction Inc | 28/f: mechanical and electrical work for tenant improvement on the 28th fl ref 202212218831 | $75,000 |
| Oct 5, 2023 | Completed | 101 California St | Gci, Inc | ste 2870: scope of work on the 28th fl consists of interior demolition of non-structural elements including-interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlet switches. | $125,000 |
| Sep 20, 2023 | Completed | 101 California St | Novo Construction Inc | 8/f: bring restrooms & drinking fountains to full compliance. demo of rr partitions, finishes & plumbing fixtures to be replaced w/new mech, elec, l/s & sprinkler system modification will be deferred submittals. this permit shall provided stamped docs to show restrooms & drinking fountains full comp | $125,000 |
| Sep 19, 2023 | Completed | 101 California St | Pioneer Fire Inc. | 8th, 9th, 25th fl: relocate 12 pendents. gc ti# 202211106261. | $3,000 |
| Sep 19, 2023 | Completed | 101 California St | Pioneer Fire Inc. | relocate (21) pendents, add (3) uprights, convert (53) pendents to uprights remove (2) pendents | $15,800 |
| Sep 19, 2023 | Completed | 101 California St | Pioneer Fire Inc. | 28th fl - relocate 19 pendents, remove 9 pendents. ref pa 2022-1221-8831 | $7,100 |
| Sep 19, 2023 | Completed | 101 California St | Pioneer Fire Inc. | 30/f: relocate 61 pendents, add 5 uprights, remove 6 pendents, ref pa# 202308295499. | $14,400 |
| Sep 11, 2023 | Completed | 101 California St | Priority Architectural Graphics Dba Prio | 1st & 2nd fl - 10 evacuation plan maps for fire review only | $4,250 |
| Sep 5, 2023 | Completed | 101 California St | Hp Build | 2/f new coffee bar, seating, window bar, security gate, mep. | $176,000 |
| Aug 29, 2023 | Completed | 101 California St | Source Planning And Construction Inc | 30th fl ste 3070 & 3000 - combining suites 3070 & 3000 to create one. demo includes non-structural elements, interior partitions, doors, finishes, ceiling, lighting, power/data. construction includes (n) non-structural partitions, doors, finishes, millwork, ceiling, lighting, power & data. all | $950,000 |
| Aug 9, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm asbuilt. as built to show added relay module for pine st door release. reference pa 202201125830. | |
| Jun 30, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | 7th fl: 1 power supply, 23 smoke detectors, 9 9 duct detectors, 1 control module, 12 relay modules, 20 ceiling speaker strobes, 7 ceiling strobes,6 ceiling speakers | $20,000 |
| Jun 29, 2023 | Expired or cancelled | 101 California St | Turner Construction Co | rev to pa 202006198935 to address new stair landings. exterior work. | |
| Jun 13, 2023 | Expired or cancelled | 101 California St | interior cold formed steel framing package 1 ref pa 2020-0619-8935 | $333,950 | |
| Jun 13, 2023 | Expired or cancelled | 101 California St | Turner Construction Co | cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935 | $1,220,734 |
| Jun 13, 2023 | Expired or cancelled | 101 California St | Turner Construction Co | replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935 | |
| Jun 9, 2023 | Never finaled | 101 California St | Priority Architectural Graphics Dba Prio | placing excuavation route signage in building | $1,700 |
| Jun 1, 2023 | Completed | 101 California St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 51 pendent sprinker and 126 upright on the 7/f. t.i ref pa# 202305057217, 202209152536, 202208231049, 202212198637 | $110,625 |
| May 5, 2023 | Completed | 101 California St | Novo Construction Inc | 7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637 | |
| Mar 24, 2023 | Completed | 101 California St | Bcci Construction Company | 31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130 | $12,000 |
| Mar 10, 2023 | Completed | 101 California St | Source Planning And Construction Inc | evc station installation | |
| Mar 7, 2023 | Completed | 101 California St | Novo Construction Inc | 3/f: administrative revision to pa 2022-0516-4290 to remove mep & fire life safety under separate permit from issued application per field inspector. no plans | |
| Mar 2, 2023 | Never finaled | 101 California St | Source Planning And Construction Inc | 30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support. | |
| Jan 18, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | modification to (e) fire alarm system. pyro-comm systems, inc. will design & provide following material (1) remote power supply, (29) smoke detectors (smoke detector in common area to match (e) bldg design) (12) duct detectors, (13) relay modules, (34) ceiling speaker/strobe, (22) ceiling strobe... | $19,000 |
| Jan 10, 2023 | Never finaled | 101 California St | Pyro-Comm Systems, Inc. | 30/f: f/a addition to the (e) f/a system - 8 smoke detectors, 10 ceiling speaker strobes, and 4 ceiling strobes to be added to provide proper coverage. ref permit 202211166644 | $6,000 |
| Jan 5, 2023 | Completed | 101 California St | Pyro-Comm Systems, Inc. | fire alarm as builts to show 4 added wp wall speaker strobes, 1 added wall speaker strobe, deleted 1 duct detector and relay for ac-r-1 5 deleted smoke detectors made new smokes existing show heat in elevator equipment room as (e) ref pa 2022-0504-3525 | |
| Dec 27, 2022 | Completed | 101 California St | R L H Fire Protection Inc | fire sprinkler relocate 59, add 11, delete 10 pendant sprinklers on the 30th fl. t.i. #202211166644 | $30,000 |
| Dec 22, 2022 | Completed | 101 California St | Novo Construction Inc | 25/flr suite 2575: demo of non-structural paritions,doors,finishes, ceiling/ lighting, construction of new partitions, doors & frames, power & tele/data. act auite is vacant. mep & l/s under separate permit. dos not affect fixture qty, occ load or pot. no ext work. | $650,000 |
| Dec 21, 2022 | Completed | 101 California St | Novo Construction Inc | 28/f: demo nonstructural interior partitions, doors, finishes, ceiling/lighting, millwork/finishes. mep l/s, sprinklers under separate permit.does not affect fixture quantities, occupancy load/pot. | $295,000 |
| Dec 19, 2022 | Completed | 101 California St | Golden Gate Fire Protection Inc | 14/f fire sprinkers: relocate 194 pendent sprinklers for 14/f demo permit. | $99,750 |
| Dec 19, 2022 | Completed | 101 California St | Novo Construction Inc | 7/f: revision to bpa#20208231049, revise floor plan to add break area, remove built in booht, plotter room to change to storage. | $100,000 |