4 permits since 2000 (engineer on 4 permits): 2 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 101 California St | Skyline Construction | 46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring.Details
46th floor: installation of 3 new pre-manufactured phone booths including seismic anchoring. | $45,000 |
| Aug 23, 2024 | Completed final sign-off Nov 2025 | 943 Stockton St | Mik Construction Inc | demo e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit)Details
demo e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit) | $478,009 |
| Oct 17, 2023 | Expired or cancelled cancelled Jun 2025 | 1 Lombard St | Adam Lewis Construction Company | interior of demo project includes removal of selected rooms; interior non-load bearing partitions, ceiling, finishes, interior doors; removal of select existing hvac equipment and ductowrk, electrical wiring, light fixtures, switches, outlets and conduit as required. removal of previously addedDetails
interior of demo project includes removal of selected rooms; interior non-load bearing partitions, ceiling, finishes, interior doors; removal of select existing hvac equipment and ductowrk, electrical wiring, light fixtures, switches, outlets and conduit as required. removal of previously added | $15,000 |
| Feb 23, 2016 | Completed final sign-off Feb 2018 | 800 Presidio Av | Fisher Development Inc | revision to addendum #1 pa#201204168406. changes to retaining wall planters at rear yard.Details
revision to addendum #1 pa#201204168406. changes to retaining wall planters at rear yard. |