Mik Construction Inc
- Based in
- Whittier
- On San Francisco permits
- Nov 2019 to Aug 2024
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2024 | Completed final sign-off Nov 2025 | 943 Stockton St | demo e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit)Details
demo e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit) | $478,009 |
| Jul 22, 2024 | Completed final sign-off Feb 2025 | 2300 Folsom St | modify (e) training tower platforms at all floors as necessary to raise guardrail to ada/safety compliant heights and repairsDetails
modify (e) training tower platforms at all floors as necessary to raise guardrail to ada/safety compliant heights and repairs | $105,964 |
| Nov 17, 2022 | Never finaled issued Jan 2023, no final | 25 Van Ness Av | remove and replace damaged sections of sidewalk, sidewalk is over an occupied basement.Details
remove and replace damaged sections of sidewalk, sidewalk is over an occupied basement. | $26,000 |
| Oct 3, 2022 | Completed final sign-off Nov 2023 | 11 South Van Ness Av | revision to bpa#201912139555, add covenience transaction pass-through @ lost & found room, installation of bullet resistant barriers @ hearing room desks, add new storage. no change to (e) occupancy & egress pass.Details
revision to bpa#201912139555, add covenience transaction pass-through @ lost & found room, installation of bullet resistant barriers @ hearing room desks, add new storage. no change to (e) occupancy & egress pass. | $295,584 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 1 South Van Ness Av | replace (e) lobby front doors and incidental works along south van ness side in acccordance with spec no. joc-j44-15Details
replace (e) lobby front doors and incidental works along south van ness side in acccordance with spec no. joc-j44-15 | $409,974 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 100 Larkin St | installation of a glass barricade for safety on the 5th floor bridgeDetails
installation of a glass barricade for safety on the 5th floor bridge | $220,131 |
| May 25, 2022 | Completed final sign-off Jan 2024 | 943 Stockton St | selective demo and new construction of selective demo and new construction remodel of (e) tenant space with new doors, windows, equipment finishes and storage casework, new lighting fixtures and power outlets, new sink & hvac registersDetails
selective demo and new construction of selective demo and new construction remodel of (e) tenant space with new doors, windows, equipment finishes and storage casework, new lighting fixtures and power outlets, new sink & hvac registers | $140,000 |
| Jun 17, 2021 | Completed final sign-off Apr 2022 | 49 South Van Ness Av | construct a concrete island in the 49svn basement for housing new parking control equipments. pay station will be seismically braced to the bldg in the elevator lobby in the basement. power and data connnection to parking equipment as necessary.Details
construct a concrete island in the 49svn basement for housing new parking control equipments. pay station will be seismically braced to the bldg in the elevator lobby in the basement. power and data connnection to parking equipment as necessary. | $40,000 |
| Dec 29, 2020 | Completed final sign-off Jun 2021 | 100 Larkin St | installation of glass partitions around 4/f atrium guardrails. life/safety issueDetails
installation of glass partitions around 4/f atrium guardrails. life/safety issue | $300,000 |
| Nov 20, 2020 | Never finaled issued Nov 2020, no final | 25 Van Ness Av | grindings of sidewalk pavement and re-apply waterproofing on sidewalk to protect basement rooms. (non structural pavement only)Details
grindings of sidewalk pavement and re-apply waterproofing on sidewalk to protect basement rooms. (non structural pavement only) | $250,000 |
| Dec 23, 2019 | Completed final sign-off Nov 2020 | 617 Mission St | 2nd & 3rd fl - renovation of existing office space & existing server room for the dept. of child support services. maher naDetails
2nd & 3rd fl - renovation of existing office space & existing server room for the dept. of child support services. maher na | $792,993 |
| Nov 15, 2019 | Never finaled issued Jan 2020, no final | 630 Valencia St | replacement of 25 foot sliding gate with new footing.Details
replacement of 25 foot sliding gate with new footing. | $110,000 |