Block 0354, lot 001
100 Larkin St
- City’s use
- Commercial Office
- Built
- 1900
- Lot
- 90,256 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
54 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 100 Larkin St | removal of existing 42 atrium smoke exhaust fans and replacement with 42 new atrium smoke exhaust fans due to equipment obsolescence.Details
removal of existing 42 atrium smoke exhaust fans and replacement with 42 new atrium smoke exhaust fans due to equipment obsolescence. | $5,000,000 | |
| Jan 30, 2026 | Completed final sign-off Mar 2026 | 100 Larkin St | Svala Construction Inc | revision to 202512192263. removal of 3 of the 5 originally permitted safety floor grilles.Details
revision to 202512192263. removal of 3 of the 5 originally permitted safety floor grilles. | $15,000 |
| Dec 19, 2025 | Completed final sign-off Mar 2026 | 100 Larkin St | Svala Construction Inc | installation of safety floor grilles at selected floor openings on 3rd and 4th floor of main library. floor grilles are a safety measure to prevent people from jumping off the (e) guard rails.Details
installation of safety floor grilles at selected floor openings on 3rd and 4th floor of main library. floor grilles are a safety measure to prevent people from jumping off the (e) guard rails. | $175,000 |
| Dec 9, 2025 | Completed final sign-off Apr 2026 | 100 Larkin St | Svala Construction Inc | laminated glass safety barriers will be bolted to the existing metal guardrailsDetails
laminated glass safety barriers will be bolted to the existing metal guardrails | $490,000 |
| Dec 9, 2025 | Completed final sign-off Apr 2026 | 100 Larkin St | Svala Construction Inc | 3rd & 4th fl - installation of laminated glass safety barriers around the central curved atrium floor opening at the 3rd & 4th fl of the main library. laminated glass safety barriers will be bolted to the existing metal guardrails.Details
3rd & 4th fl - installation of laminated glass safety barriers around the central curved atrium floor opening at the 3rd & 4th fl of the main library. laminated glass safety barriers will be bolted to the existing metal guardrails. | $180,000 |
| Sep 16, 2025 | In progress issued Jul 2026 | 100 Larkin St | Pioneer Contractors Inc | replacement of roofing membrane, replace sealant around skylights and curtainwall, replace plumbing drains as need on roof drainsDetails
replacement of roofing membrane, replace sealant around skylights and curtainwall, replace plumbing drains as need on roof drains | $4,000,000 |
| Feb 1, 2024 | In progress issued Jun 2025 | 100 Larkin St | Siemens Industry, Inc. | upgrade the 7 fire alarm system panels. add a cellular dialer, replace cards in (e) annuciator and to replace initiating devices and modules at their (e) location.Details
upgrade the 7 fire alarm system panels. add a cellular dialer, replace cards in (e) annuciator and to replace initiating devices and modules at their (e) location. | $145,000 |
| Nov 9, 2022 | Completed final sign-off Oct 2023 | 100 Larkin St | Siemens Industry, Inc. | fire only work for the "taling books" remodel on 1/f; 3 strobes are added and 2 s/d are relocated. rep pa# 202111152364Details
fire only work for the "taling books" remodel on 1/f; 3 strobes are added and 2 s/d are relocated. rep pa# 202111152364 | $2,500 |
| Oct 27, 2022 | Completed final sign-off Jul 2024 | 100 Larkin St | Value Fire Protection Inc | relocate (4) (e) sprinkler heads & add (1) to accommodate wall layout for t.i.Details
relocate (4) (e) sprinkler heads & add (1) to accommodate wall layout for t.i. | $5,800 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 100 Larkin St | Mik Construction Inc | installation of a glass barricade for safety on the 5th floor bridgeDetails
installation of a glass barricade for safety on the 5th floor bridge | $220,131 |
| Nov 15, 2021 | Completed final sign-off Dec 2024 | 100 Larkin St | Ccsf Dpw-Bbr Steamfitters/Plumbers | non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvacDetails
non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvac | $679,125 |
| Dec 29, 2020 | Completed final sign-off Jun 2021 | 100 Larkin St | Mik Construction Inc | installation of glass partitions around 4/f atrium guardrails. life/safety issueDetails
installation of glass partitions around 4/f atrium guardrails. life/safety issue | $300,000 |
| Dec 28, 2020 | Completed final sign-off Sep 2023 | 100 Larkin St | Siemens Industry, Inc. | fire alarm work the "elevator upgrade" project on floor 1; additions are 1 heat detector and 13 relay modules. these drawings are to be reviewed by sagiv (sffd) as he performed the job's pre-application.Details
fire alarm work the "elevator upgrade" project on floor 1; additions are 1 heat detector and 13 relay modules. these drawings are to be reviewed by sagiv (sffd) as he performed the job's pre-application. | $7,135 |
| Nov 2, 2020 | Completed final sign-off Aug 2023 | 100 Larkin St | R L H Fire Protection Inc | fire sprinkler elevator modernization. remove all the fire sprinklers, pipe, hangers, and bracing at top of all elevator shafts and machine rooms except elevator 7 machine room.Details
fire sprinkler elevator modernization. remove all the fire sprinklers, pipe, hangers, and bracing at top of all elevator shafts and machine rooms except elevator 7 machine room. | $2,500 |
| Aug 31, 2020 | Never finaled issued Sep 2020, no final | 100 Larkin St | Siemens Industry, Inc. | fire only additions of 2 speaker strobes for the floor 1 sorting room, no reference permitDetails
fire only additions of 2 speaker strobes for the floor 1 sorting room, no reference permit | $1,270 |
| Nov 15, 2019 | Never finaled issued Dec 2019, no final | 100 Larkin St | basement/lower level only: selective demo of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout.Details
basement/lower level only: selective demo of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout. | $600,000 | |
| Apr 5, 2019 | Completed final sign-off Jun 2022 | 100 Larkin St | minor barrier removal and finishes, replacement associated with elevator modernization n/a maherDetails
minor barrier removal and finishes, replacement associated with elevator modernization n/a maher | $70,000 | |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 100 Larkin St | Robert A. Bothman, Inc. | install projector and motion sensor on top of libraryDetails
install projector and motion sensor on top of library | $80,000 |
| Jan 17, 2017 | Never finaled issued Jan 2017, no final | 100 Larkin St | Siemens Industry, Inc. | on 2nd floor - fire alarm work to replace an existing smoke detector with a heart detector for the "maker space". maher naDetails
on 2nd floor - fire alarm work to replace an existing smoke detector with a heart detector for the "maker space". maher na | $610 |
| Jan 9, 2017 | Never finaled issued Feb 2017, no final | 100 Larkin St | demolish existing walls and doors and replace with new walls and doors in kind. maher not reqDetails
demolish existing walls and doors and replace with new walls and doors in kind. maher not req | $25,000 | |
| Dec 1, 2016 | Completed final sign-off Oct 2017 | 100 Larkin St | remove & replace ceiling light fixtures at lower level conference room. including switches & conduits. all new lights are led. maher naDetails
remove & replace ceiling light fixtures at lower level conference room. including switches & conduits. all new lights are led. maher na | $15,000 | |
| Apr 22, 2016 | Completed final sign-off Oct 2018 | 100 Larkin St | Siemens Industry, Inc. | fire alarm drawing revisions to indicate "as built" installation as requested by the sffd testing inspectors, for the "teen center" ti remodel on floor 2. ref pa 2014-0304-9796. maher naDetails
fire alarm drawing revisions to indicate "as built" installation as requested by the sffd testing inspectors, for the "teen center" ti remodel on floor 2. ref pa 2014-0304-9796. maher na | |
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 100 Larkin St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | 1st fl: move 33 sprinkler heads to new location per new ceiling layout. no new heads. maher not req. change from "ordinary hazard" to "light hazard" (no more bookstacks).Details
1st fl: move 33 sprinkler heads to new location per new ceiling layout. no new heads. maher not req. change from "ordinary hazard" to "light hazard" (no more bookstacks). | $30,000 |
| Apr 3, 2015 | Never finaled issued May 2015, no final | 100 Larkin St | Chiang C M Construction Inc. | interior signage upgrade maher - not req'dDetails
interior signage upgrade maher - not req'd | $95,000 |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 100 Larkin St | International Fire Inc | revision to pa# 2014 0924 7191 revised matrix & add special note per fire inspector request maher - not req'dDetails
revision to pa# 2014 0924 7191 revised matrix & add special note per fire inspector request maher - not req'd | |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 100 Larkin St | International Fire Inc | revision to pa# 2015 0206 7708 revised matrix & add special note per fire inspector request maher - not req'dDetails
revision to pa# 2015 0206 7708 revised matrix & add special note per fire inspector request maher - not req'd | |
| Feb 19, 2015 | Completed final sign-off Apr 2016 | 100 Larkin St | Siemens Industry, Inc. | fire alarm work for teen center ti project on floor 2. additions are 8 smoke detectors to complete full area coverage as originally shown 201411242292- construction plan 201403049796. compliance with maher ordinance 155-13 not required.Details
fire alarm work for teen center ti project on floor 2. additions are 8 smoke detectors to complete full area coverage as originally shown 201411242292- construction plan 201403049796. compliance with maher ordinance 155-13 not required. | $4,000 |
| Feb 6, 2015 | Completed final sign-off Mar 2015 | 100 Larkin St | International Fire Inc | 6th floor -as-builts to pa #2014.0318.1051 - delete 2 exist & 2 new smoke detectors from 4 offices, revised matrix. n/a maher ordinanceDetails
6th floor -as-builts to pa #2014.0318.1051 - delete 2 exist & 2 new smoke detectors from 4 offices, revised matrix. n/a maher ordinance | |
| Nov 24, 2014 | Completed final sign-off Apr 2016 | 100 Larkin St | Siemens Industry, Inc. | add 9 smoke detectors, 3 pull stations, 1 pad-4, 13 relay modules, 13 speaker strobes. ref pa 2014.03049796. compliance with maher ordinance no 155-13 not required.Details
add 9 smoke detectors, 3 pull stations, 1 pad-4, 13 relay modules, 13 speaker strobes. ref pa 2014.03049796. compliance with maher ordinance no 155-13 not required. | $17,550 |
| Sep 24, 2014 | Completed final sign-off Mar 2015 | 100 Larkin St | International Fire Inc | 4 notification appliances and 1 sync module installed to exist circuit. 1 exist smoke det will be relocated, 4 new smokes installed, tie in to existing control unit. t.i. pa #201406198900. compliance with maher ordinance 155-13 not required.Details
4 notification appliances and 1 sync module installed to exist circuit. 1 exist smoke det will be relocated, 4 new smokes installed, tie in to existing control unit. t.i. pa #201406198900. compliance with maher ordinance 155-13 not required. | $1,800 |
| Aug 12, 2014 | Completed final sign-off Feb 2015 | 100 Larkin St | International Fire Inc | 6th floor sprinkler t.i.: install 10 fire sprinkler heads maher 155-13 not reqDetails
6th floor sprinkler t.i.: install 10 fire sprinkler heads maher 155-13 not req | $10,000 |
| Aug 7, 2014 | Completed final sign-off May 2015 | 100 Larkin St | Siemens Industry, Inc. | 5th floor installation of new notification devices in the new literacy center connected to a new power supply. maher n/a. ref.appl. 2014.0401.2210.Details
5th floor installation of new notification devices in the new literacy center connected to a new power supply. maher n/a. ref.appl. 2014.0401.2210. | $7,000 |
| Jul 25, 2014 | Never finaled issued Jul 2014, no final | 100 Larkin St | Johnson Controls Fire | 5th floor:partial renovation of extg main library. relocate and add fire sprinklers per new ceiling plan for literacy center for a total of 32 sprinkler heads . ref app#201404012210. n/a for the maher ordinance #155-13Details
5th floor:partial renovation of extg main library. relocate and add fire sprinklers per new ceiling plan for literacy center for a total of 32 sprinkler heads . ref app#201404012210. n/a for the maher ordinance #155-13 | $9,500 |
| Jun 19, 2014 | Never finaled issued Jul 2014, no final | 100 Larkin St | partial renovation of 6th floor office space. work includes installation of new walls, windows, and finishes. reconfiguration of existing electrical, mechanical. fire alarm and sprinkler system under seperate permits.Details
partial renovation of 6th floor office space. work includes installation of new walls, windows, and finishes. reconfiguration of existing electrical, mechanical. fire alarm and sprinkler system under seperate permits. | $200,000 | |
| Apr 1, 2014 | Never finaled issued Jul 2014, no final | 100 Larkin St | partial renovation 5th fl. work includes reconf of (e) elec, mech w0rk. installtion of (n) study rooms,office, copy room, break room & learning lab. installation of (n) finishes including flooring, paint & glaze. fire sprinkler & fire alarm under separate appln. n/a ordinance #155-13Details
partial renovation 5th fl. work includes reconf of (e) elec, mech w0rk. installtion of (n) study rooms,office, copy room, break room & learning lab. installation of (n) finishes including flooring, paint & glaze. fire sprinkler & fire alarm under separate appln. n/a ordinance #155-13 | $600,000 | |
| Mar 21, 2014 | Completed final sign-off May 2014 | 100 Larkin St | International Fire Inc | relocate 3 existing pendents and center two existing pendents in new ceiling grid to accommodate the new tenant improvement.Details
relocate 3 existing pendents and center two existing pendents in new ceiling grid to accommodate the new tenant improvement. | $6,500 |
| Mar 18, 2014 | Completed final sign-off Apr 2015 | 100 Larkin St | International Fire Inc | due to the interior tenant improvement on the 6th flr, in fully sprinkled bldg, 2 ext horn/strobes will be relocated to new locaitons & reconnect to ext. control panel located on 1st flr, ti ap# 201403049789Details
due to the interior tenant improvement on the 6th flr, in fully sprinkled bldg, 2 ext horn/strobes will be relocated to new locaitons & reconnect to ext. control panel located on 1st flr, ti ap# 201403049789 | $1,000 |
| Mar 4, 2014 | Completed final sign-off May 2016 | 100 Larkin St | tenant improvement for teen ctr at 2/fl. selective interior demo of(e)bldg, construction of new offices,sound booth,video recording booth,maker space(arts&crafts) single user restroom w/updated mech,plumbing,elec sys. fire sprinkler and fire alarm revisions under separate application.Details
tenant improvement for teen ctr at 2/fl. selective interior demo of(e)bldg, construction of new offices,sound booth,video recording booth,maker space(arts&crafts) single user restroom w/updated mech,plumbing,elec sys. fire sprinkler and fire alarm revisions under separate application. | $1,800,000 | |
| Mar 4, 2014 | Never finaled issued Apr 2014, no final | 100 Larkin St | 6th floor - demolitoin of (e) offices, ceiling tile, & flooring. installation of new walls to create new offices, new carpet, gypsum board ceiling, & relocation of (e) lights. new mechnaical supply & return grills to be installed. selective disposal &/or relocation of accessories for ada upgrade.Details
6th floor - demolitoin of (e) offices, ceiling tile, & flooring. installation of new walls to create new offices, new carpet, gypsum board ceiling, & relocation of (e) lights. new mechnaical supply & return grills to be installed. selective disposal &/or relocation of accessories for ada upgrade. | $112,000 | |
| Dec 12, 2013 | Never finaled issued Dec 2013, no final | 100 Larkin St | installation of demountable wall to separate 2 office departments. this wall will provide 18"min. clear opening at top throughout length of wll. wall will be equipped with power & data receptacles. elective disposal & or relocation accessories for ada upgrade.Details
installation of demountable wall to separate 2 office departments. this wall will provide 18"min. clear opening at top throughout length of wll. wall will be equipped with power & data receptacles. elective disposal & or relocation accessories for ada upgrade. | $40,000 | |
| Jan 31, 2008 | Completed final sign-off Apr 2008 | 100 Larkin St | D.F.P.F Corp Dba Fine Line Construction | revision to mech-fire dumpers intalled hvac. revision to application 200602174942. renovation on 1st floor only. (provide 4 fire rated damper).Details
revision to mech-fire dumpers intalled hvac. revision to application 200602174942. renovation on 1st floor only. (provide 4 fire rated damper). | $7,000 |
| Aug 20, 2007 | Expired or cancelled expired Jan 2011 | 100 Larkin St | D.F.P.F Corp Dba Fine Line Construction | revision permit 2006/02/17/4942. change of room name and non-rated wall assembly. room was changed from storage to bookstackDetails
revision permit 2006/02/17/4942. change of room name and non-rated wall assembly. room was changed from storage to bookstack | |
| Jun 1, 2007 | Expired or cancelled expired Jan 2011 | 100 Larkin St | Pacific Coast Sales & Service Inc | add 2 new vfd's to existing fans (sf-1 & sf-1a) in basement.Details
add 2 new vfd's to existing fans (sf-1 & sf-1a) in basement. | $80,000 |
| Feb 8, 2007 | Expired or cancelled expired Oct 2008 | 100 Larkin St | Value Fire Protection Inc | tenant improvements, sprinkler modification, 5 adds & 5 relocates in main floorDetails
tenant improvements, sprinkler modification, 5 adds & 5 relocates in main floor | $2,000 |
| Feb 17, 2006 | Completed final sign-off Jun 2008 | 100 Larkin St | scope consists of 1st floor renovation of main library. tenant improvments and installation of sorting machine, automated storage and retrievel machine by logistex (under different permit). no exterior work.Details
scope consists of 1st floor renovation of main library. tenant improvments and installation of sorting machine, automated storage and retrievel machine by logistex (under different permit). no exterior work. | $2,800,000 | |
| Mar 16, 2005 | Completed final sign-off Jul 2005 | 100 Larkin St | Pacific Coast Sales & Service Inc | replace/repair motor of one fan. installing (2) 150 hp vfd drivesDetails
replace/repair motor of one fan. installing (2) 150 hp vfd drives | $120,000 |
| Oct 20, 2003 | Completed final sign-off Nov 2003 | 100 Larkin St | Gallieria, Inc/Trico Cons | overhead coiling door, supplied structural components.Details
overhead coiling door, supplied structural components. | |
| May 30, 2003 | Completed final sign-off Nov 2003 | 100 Larkin St | Gallieria, Inc/Trico Cons | relocate exit door and intall new roll up door. connection to fire alarm separate permitDetails
relocate exit door and intall new roll up door. connection to fire alarm separate permit | |
| May 7, 2003 | Never finaled issued May 2003, no final | 100 Larkin St | sstreet spaceDetails
sstreet space | ||
| Feb 5, 2001 | Expired or cancelled cancelled Oct 2024 | 100 Larkin St | Siemens Bldg Technologies | renew application 200005109515 for final inspection onlyDetails
renew application 200005109515 for final inspection only | |
| Nov 1, 2000 | Completed final sign-off Mar 2001 | 100 Larkin St | interior renovation of 365 sq.ft. exist space for relocation of booksales areaDetails
interior renovation of 365 sq.ft. exist space for relocation of booksales area | $15,000 | |
| Jul 20, 2000 | Completed final sign-off Oct 2000 | 30 Grove St | Decker Electric Co Inc Electrical Contra | add 4 life safety speaker/strobes as per/plansDetails
add 4 life safety speaker/strobes as per/plans | $900 |
| Jun 27, 2000 | Completed final sign-off Oct 2000 | 30 Grove St | Superior Automatic Sprinkler | rework 1 crops for new walls and ceilingDetails
rework 1 crops for new walls and ceiling | $1,000 |
| Apr 17, 2000 | Completed final sign-off Oct 2000 | 30 Grove St | Plant Construction | interior renovation of personnel offices and gift shop on 2nd floorDetails
interior renovation of personnel offices and gift shop on 2nd floor | $120,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Siemens Industry, Inc. (9), International Fire Inc (7), Svala Construction Inc (4), D.F.P.F Corp Dba Fine Line Construction (2), Gallieria, Inc/Trico Cons (2), Mik Construction Inc (2), Pacific Coast Sales & Service Inc (2), Value Fire Protection Inc (2), Ccsf Dpw-Bbr Steamfitters/Plumbers, Chiang C M Construction Inc., Decker Electric Co Inc Electrical Contra, Johnson Controls Fire, Pioneer Contractors Inc, Plant Construction, R L H Fire Protection Inc, Robert A. Bothman, Inc., Siemens Bldg Technologies, Steven Yeung Inc Dba Chung Wah Plbg&Fire, Superior Automatic Sprinkler
- Architects
- Julia Laue (4), Ivan Romero (2), Andrew Sohn, Irene Aguino, James Engler, Matthew Wong, Philip Thwin, Will Kwan
- Engineers
- Thomas Hadley (2), C Hi Keong Iao, Earl John Gaffud, Eli Margalit, Erel Betser, Ivan Romero, James Ng, Kent K Minh, Lar Fagerstrom, Mohan Sabapathy, Rebecca Keating, Terry Wong
- Authorized agent-otherss
- Peter Li
Find contractors for work like this