James Ng
- Listed as
- engineer
- Firm
- San Francisco Public Works
- On San Francisco permits
- Oct 2014 to Jun 2021
7 permits since 2000 (engineer on 7 permits): 5 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 7, 2021 | Completed final sign-off Apr 2025 | 970 47th Av | Treaty Construction | erect 1-story type-v, new golf clubhouse building consisting of a pro ship, bar, kitchen, dining area, office, & restrooms. includes excavation, site work, utilities, structural steel & concrete, carpentry, plumbing, electrical, & mehcanical.Details
erect 1-story type-v, new golf clubhouse building consisting of a pro ship, bar, kitchen, dining area, office, & restrooms. includes excavation, site work, utilities, structural steel & concrete, carpentry, plumbing, electrical, & mehcanical. | $1,500,000 |
| Nov 15, 2019 | Never finaled issued Dec 2019, no final | 100 Larkin St | basement/lower level only: selective demo of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout.Details
basement/lower level only: selective demo of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout. | $600,000 | |
| Apr 16, 2018 | Completed final sign-off Oct 2018 | 1455 Market St | City Building Inc. | 7th fl: minor interior remodel to add a private office and change existing light fixtures. maher naDetails
7th fl: minor interior remodel to add a private office and change existing light fixtures. maher na | $15,000 |
| Nov 22, 2017 | Completed final sign-off Feb 2018 | 1455 Market St | City Building Inc. | 7th fl: revision to pa #201705156621, to add glass doors to replace (e) wood doors, and to convert a private office into a small training room. no change to (e) occupncy or egress. maher naDetails
7th fl: revision to pa #201705156621, to add glass doors to replace (e) wood doors, and to convert a private office into a small training room. no change to (e) occupncy or egress. maher na | $15,000 |
| Dec 19, 2016 | Expired or cancelled cancelled Jan 2026 | 170 Otis St | demo of existing offices and conference rooms, finishes, celing tiles, plumbing fix. new offices, conf rooms, ceiling tiles, finishes, breakroom, plumbing fix, all gender restroom. targeting leed silver. electrical under separate permitDetails
demo of existing offices and conference rooms, finishes, celing tiles, plumbing fix. new offices, conf rooms, ceiling tiles, finishes, breakroom, plumbing fix, all gender restroom. targeting leed silver. electrical under separate permit | $1,634,659 | |
| Oct 24, 2016 | Completed final sign-off Jul 2017 | 1 Dr. Carlton B. Goodlett Pl | 3rd floor tenant improvements to revert a server room back to office use (previously converted to server room from office). work includes selective demolitoin, electrical, mechanical, repair/patching of walls & ceiling, flooring & painting. interior work only, no exterior work. n/a ordinance #155-13Details
3rd floor tenant improvements to revert a server room back to office use (previously converted to server room from office). work includes selective demolitoin, electrical, mechanical, repair/patching of walls & ceiling, flooring & painting. interior work only, no exterior work. n/a ordinance #155-13 | $144,000 | |
| Oct 8, 2014 | Completed final sign-off Oct 2017 | 444 Stockton St | Clw Builders Inc | replace (e) supply and exhaust fans, and upgrade (e) co maniting system.Details
replace (e) supply and exhaust fans, and upgrade (e) co maniting system. | $350,000 |