- On San Francisco permits
- Sep 2004 to May 2019
10 permits since 2000 (engineer on 8 permits, architect on 1 permit, authorized agent-others on 1 permit): 7 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- City Building Inc. (2), Ccsf Dpw-Bbr Steamfitters/Plumbers, Nicole's Work Inc, U S Electric Technologies Inc.
- Architects
- Jane Chan Architecture (2), Ignatius Tsang, Marilyn Thompson, Paul Travis
- Engineers
- James Ng (2), Eugene Ling, Kelvin Day, Noreen Chan, Ricky Choi
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 4
- Other or unknown 5
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2019 | Expired or cancelled expired Jun 2020 | 1700 25th St | pre-fabricated trailer, provide wood deck accessible ramp and stairs. provide power, water & sewer connections.Details
pre-fabricated trailer, provide wood deck accessible ramp and stairs. provide power, water & sewer connections. | $50,000 | |
| Apr 16, 2018 | Completed final sign-off Oct 2018 | 1455 Market St | City Building Inc. | 7th fl: minor interior remodel to add a private office and change existing light fixtures. maher naDetails
7th fl: minor interior remodel to add a private office and change existing light fixtures. maher na | $15,000 |
| Apr 3, 2018 | Never finaled issued Dec 2018, no final | 1701 Jerrold Av | U S Electric Technologies Inc. | supply and install of one new 15.5 kw genset installed outdoors. tank is built in with the unit. n/a for maherDetails
supply and install of one new 15.5 kw genset installed outdoors. tank is built in with the unit. n/a for maher | $60,000 |
| Dec 14, 2017 | Never finaled issued Dec 2017, no final | 1650 Mission St | Ccsf Dpw-Bbr Steamfitters/Plumbers | ste 101a - selective demo: partitions,floor,ceiling & restaruant fixtures. alterations to portions of (e) floor plan, new partitions/ceiling. refurbish int fixtures; partial replacement of gyp sheathing & paint. minot restrm fixture replacement add sink. make ada compliant - all gender signage...Details
ste 101a - selective demo: partitions,floor,ceiling & restaruant fixtures. alterations to portions of (e) floor plan, new partitions/ceiling. refurbish int fixtures; partial replacement of gyp sheathing & paint. minot restrm fixture replacement add sink. make ada compliant - all gender signage... | $145,000 |
| Nov 22, 2017 | Completed final sign-off Feb 2018 | 1455 Market St | City Building Inc. | 7th fl: revision to pa #201705156621, to add glass doors to replace (e) wood doors, and to convert a private office into a small training room. no change to (e) occupncy or egress. maher naDetails
7th fl: revision to pa #201705156621, to add glass doors to replace (e) wood doors, and to convert a private office into a small training room. no change to (e) occupncy or egress. maher na | $15,000 |
| Dec 1, 2016 | Completed final sign-off Oct 2017 | 100 Larkin St | remove & replace ceiling light fixtures at lower level conference room. including switches & conduits. all new lights are led. maher naDetails
remove & replace ceiling light fixtures at lower level conference room. including switches & conduits. all new lights are led. maher na | $15,000 | |
| Aug 6, 2014 | Completed final sign-off Jan 2016 | 1295 Shafter Av | Nicole's Work Inc | revision to 201312234936, as per fire marshall's request, need as-built showing 60 gallon tank, katty hall; maher n/aDetails
revision to 201312234936, as per fire marshall's request, need as-built showing 60 gallon tank, katty hall; maher n/a | |
| Dec 23, 2013 | Completed final sign-off Jan 2016 | 1295 Shafter Av | replacement of the existing generator and installing the new main switch panel per pg&e specs. compliance with ordinance no. 155-13 not required.fire station 17.Details
replacement of the existing generator and installing the new main switch panel per pg&e specs. compliance with ordinance no. 155-13 not required.fire station 17. | $250,000 | |
| Feb 1, 2012 | Completed final sign-off Mar 2013 | 1011 Turk St | demo wall partitions, door, laundry hook-ups, drain lines, casework, drop ceil. resheath 5/8" type x gyp bd. electrical - install ups, trasformer, panel, breakers. air cond. unit install for electrical room. pre-action fire spr s/s for electrical room. sprinkler and fire alarm under separate appl.Details
demo wall partitions, door, laundry hook-ups, drain lines, casework, drop ceil. resheath 5/8" type x gyp bd. electrical - install ups, trasformer, panel, breakers. air cond. unit install for electrical room. pre-action fire spr s/s for electrical room. sprinkler and fire alarm under separate appl. | $400,000 | |
| Sep 27, 2004 | Completed final sign-off Feb 2007 | 201 Ofarrell St | revision to pa 0#200401023280-replace 2 chvron frames at 1st flr with 2 moment framesDetails