Block 0759, lot 001
1011 Turk St
- City’s use
- Miscellaneous/Mixed-Use
- Built
- 1900
- Lot
- 245,778 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
53 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2026 | In progress filed May 2026, not yet issued | 1011 Turk St | this project replaces electrical distribution such as switchboard and motor control centers and provides a working sequence plan for temporary power to have the entire facility operational during construction.Details
this project replaces electrical distribution such as switchboard and motor control centers and provides a working sequence plan for temporary power to have the entire facility operational during construction. | $3,000,000 | |
| Nov 6, 2025 | In progress filed Nov 2025, not yet issued | 1011 Turk St | this project replaces hvac equipment/system and provides limited tenant improvements including modification of selected interior door for equipment passage.Details
this project replaces hvac equipment/system and provides limited tenant improvements including modification of selected interior door for equipment passage. | $3,600,000 | |
| Sep 22, 2025 | In progress filed Sep 2025, not yet issued | 1011 Turk St | ups replacements including batteries with structural anchrage & removed of existing equipement. installation of nw transformer & removal of existing tranformer, removed of existing mechanical unit & intallation of new ac unit, cutting & patching of finshes, fire partitions & fire rate doorsDetails
ups replacements including batteries with structural anchrage & removed of existing equipement. installation of nw transformer & removal of existing tranformer, removed of existing mechanical unit & intallation of new ac unit, cutting & patching of finshes, fire partitions & fire rate doors | $1,195,498 | |
| Jun 23, 2025 | Completed final sign-off Jun 2026 | 1011 Turk St | revision to 202408289678 - reduction of scope of work. remove ev charger load from (e) super critical panel "elscb" and relocate to non-critical panel. install (1) 75 kva transformer, (1) 400a panel, (2) ev chargers, and replace (5) existing ev chargers. all work performed in parking garage.Details
revision to 202408289678 - reduction of scope of work. remove ev charger load from (e) super critical panel "elscb" and relocate to non-critical panel. install (1) 75 kva transformer, (1) 400a panel, (2) ev chargers, and replace (5) existing ev chargers. all work performed in parking garage. | ||
| Apr 22, 2025 | Completed final sign-off Sep 2025 | 1011 Turk St | Cosco Fire Protection Inc. | 1st fl: revision to pa 202504093997 extending existing fire alarm system by adding a new relay module to badge reader control panel to unlock the doors located entry door room #101a, vent #room 103, corridor room 126, dining room 118a, dispatch room 216 1st and 2nd doorDetails
1st fl: revision to pa 202504093997 extending existing fire alarm system by adding a new relay module to badge reader control panel to unlock the doors located entry door room #101a, vent #room 103, corridor room 126, dining room 118a, dispatch room 216 1st and 2nd door | |
| Apr 9, 2025 | Completed final sign-off Sep 2025 | 1011 Turk St | Cosco Fire Protection Inc. | adding a fire alarm relay module to control an egress door at room#113 on the 1st floorDetails
adding a fire alarm relay module to control an egress door at room#113 on the 1st floor | $11,670 |
| Aug 28, 2024 | Completed final sign-off Jun 2026 | 1011 Turk St | remove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garageDetails
remove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garage | $202,000 | |
| Feb 21, 2024 | In progress issued Feb 2024 | 1011 Turk St | Intrepid Electronic Systems Inc | fire alarm scope is on 2nd floor dispatch operations area as builts, ref 202309015795Details
fire alarm scope is on 2nd floor dispatch operations area as builts, ref 202309015795 | |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 1011 Turk St | Intrepid Electronic Systems Inc | fire alarm scope is on 2nd fl. dispatch operations area safe-off and demo out 9 devices to accomodate tenant improvement install new nac panel and 14 new nac devices, 2 smoke detectors and control of 2 new fsds. ref pa 202201065473Details
fire alarm scope is on 2nd fl. dispatch operations area safe-off and demo out 9 devices to accomodate tenant improvement install new nac panel and 14 new nac devices, 2 smoke detectors and control of 2 new fsds. ref pa 202201065473 | $12,000 |
| Jul 24, 2023 | Completed final sign-off Feb 2024 | 1011 Turk St | Buhler Commercial | work scope under revision (#3) of permit #2022.0106.5473 is the addition of idf room #242. to project renovation currently under construction. minor revisions that occured during construction included for reference.Details
work scope under revision (#3) of permit #2022.0106.5473 is the addition of idf room #242. to project renovation currently under construction. minor revisions that occured during construction included for reference. | $12,000 |
| Mar 20, 2023 | Completed final sign-off Jan 2024 | 1011 Turk St | Custom Fire Protection Inc | modification to the existing fire sprinkler system for new offices and ceiling elevations.Details
modification to the existing fire sprinkler system for new offices and ceiling elevations. | $24,627 |
| Mar 31, 2022 | Completed final sign-off Apr 2022 | 1011 Turk St | Cosco Fire Protection Inc. | fire as-built drawing. to submit in order to sign out the issued permit. ref pa# 202102184964.Details
fire as-built drawing. to submit in order to sign out the issued permit. ref pa# 202102184964. | |
| Jan 6, 2022 | Completed final sign-off Feb 2024 | 1011 Turk St | Buhler Commercial | t.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor.Details
t.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor. | $4,000,000 |
| Feb 25, 2021 | Completed final sign-off Sep 2021 | 1011 Turk St | Custom Fire Protection Inc | remove existing sprinkler at the top of elevator hoistway and plug off.Details
remove existing sprinkler at the top of elevator hoistway and plug off. | $4,987 |
| Feb 18, 2021 | Completed final sign-off Mar 2022 | 1011 Turk St | Cosco Fire Protection Inc. | design, permit, parts & labor, test for elevator modernization cosco fire protection shall provide consultation design installation and equipment per the contractual agreements of the project name & project number identifier within the title blockconsisting but not limited to the following ...Details
design, permit, parts & labor, test for elevator modernization cosco fire protection shall provide consultation design installation and equipment per the contractual agreements of the project name & project number identifier within the title blockconsisting but not limited to the following ... | $29,500 |
| May 12, 2020 | Completed final sign-off Apr 2022 | 1011 Turk St | modernization of an existing elevator. (n) car controller, car guides, power unit, elevator door operator & hardware, car operating panel, position indicators, signal fixtures, landing system, and wiring, (n) disconnect switch, power-feeders, gfci receptacles & machine room lightingDetails
modernization of an existing elevator. (n) car controller, car guides, power unit, elevator door operator & hardware, car operating panel, position indicators, signal fixtures, landing system, and wiring, (n) disconnect switch, power-feeders, gfci receptacles & machine room lighting | $520,646 | |
| Dec 24, 2019 | Completed final sign-off Jun 2022 | 950 Golden Gate Av | Pacific Auxiliary Fire Alarm | fire alarm, new notifier nfs-320 is being provided as part of this building's renovation. the owner has electrical to voluntary replace the existing fire alarm system. new panel & cellular communicator and new devices.**maher n/a**Details
fire alarm, new notifier nfs-320 is being provided as part of this building's renovation. the owner has electrical to voluntary replace the existing fire alarm system. new panel & cellular communicator and new devices.**maher n/a** | $25,648 |
| Sep 11, 2019 | Completed final sign-off Aug 2023 | 950 Golden Gate Av | Value Fire Protection Inc | overhead fire sprinkler installation ref pa 2018-0409-5869Details
overhead fire sprinkler installation ref pa 2018-0409-5869 | $24,500 |
| Aug 22, 2019 | Expired or cancelled cancelled Aug 2023 | 950 Golden Gate Av | Robert A. Bothman, Inc. | fire sprinkler system install underground permit already pulledDetails
fire sprinkler system install underground permit already pulled | $50,000 |
| Jul 23, 2019 | Never finaled issued Sep 2019, no final | 1011 Turk St | int renovations to break room, storage, tech rm and eoc support room in the 1st flr of (e) bldDetails
int renovations to break room, storage, tech rm and eoc support room in the 1st flr of (e) bld | $185,000 | |
| Apr 30, 2019 | Completed final sign-off Aug 2023 | 950 Golden Gate Av | Robert A. Bothman, Inc. | install new fire service water underground from meter to building riser. ref site pa201804095869. maher n/a.Details
install new fire service water underground from meter to building riser. ref site pa201804095869. maher n/a. | $50,000 |
| Nov 20, 2018 | Never finaled issued Dec 2018, no final | 1003 Turk St | Robert A. Bothman, Inc., Azul Works, Inc. | demolish two story type v construction (office) building at 1003 turk street.Details
demolish two story type v construction (office) building at 1003 turk street. | $104,000 |
| Nov 20, 2018 | Never finaled issued Dec 2018, no final | 1003 Turk St | Robert A. Bothman, Inc., Azul Works, Inc. | demolish one story type v construction (storage) building at 1003 turk street.Details
demolish one story type v construction (storage) building at 1003 turk street. | $74,000 |
| Nov 20, 2018 | Never finaled issued Dec 2018, no final | 1016 Laguna St | Robert A. Bothman, Inc., Azul Works, Inc. | demolish one story type v construction (office/classroom) building at 1016 laguna streetDetails
demolish one story type v construction (office/classroom) building at 1016 laguna street | $71,000 |
| Nov 20, 2018 | Never finaled issued Dec 2018, no final | 1003 Turk St | Robert A. Bothman, Inc., Azul Works, Inc. | demolish two story type v construction (office/bleacher storage) building at 1003 turk street.Details
demolish two story type v construction (office/bleacher storage) building at 1003 turk street. | $128,000 |
| Nov 20, 2018 | Never finaled issued Dec 2018, no final | 1016 Laguna St | Robert A. Bothman, Inc., Azul Works, Inc. | demolish one story type v construction (restroom) building at 1016 laguna streetDetails
demolish one story type v construction (restroom) building at 1016 laguna street | $69,000 |
| Apr 9, 2018 | Completed final sign-off Jan 2024 | 950 Golden Gate Av | to erect 1 story, 1 basement, type v-b, community center & storage. (a-3,s-2) ** maher: n/a **Details
to erect 1 story, 1 basement, type v-b, community center & storage. (a-3,s-2) ** maher: n/a ** | $15,000,000 | |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 1011 Turk St | tenant improvement 2nd fl training rm 251-b, training managers 251-c. maher naDetails
tenant improvement 2nd fl training rm 251-b, training managers 251-c. maher na | $103,000 | |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 1011 Turk St | t.i. to rooms 102 and 251a to facilitate (n) training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a.Details
t.i. to rooms 102 and 251a to facilitate (n) training room furniture installation. including finishes, electrical and metal framing/gyp brd work. maher n/a. | $150,000 | |
| Sep 24, 2014 | Completed final sign-off Feb 2016 | 1011 Turk St | Intelligent Technologies & Services Inc | 2 new novec 1230 systems, 18 smoke detectors, 7 notification devices. 1 remote annunciator, 23 modules and 6 manual release stations. n/a maher ordinance. preaction/wet sprinkler system shall remain in rooms.Details
2 new novec 1230 systems, 18 smoke detectors, 7 notification devices. 1 remote annunciator, 23 modules and 6 manual release stations. n/a maher ordinance. preaction/wet sprinkler system shall remain in rooms. | $35,000 |
| May 1, 2013 | Never finaled issued May 2013, no final | 1011 Turk St | renovate extg 2nd floor admin. office. construction of new office (216a,216b). construction of new glazed partition. relocate electrical outlets and motion sensor. replace light fixtures with led light.Details
renovate extg 2nd floor admin. office. construction of new office (216a,216b). construction of new glazed partition. relocate electrical outlets and motion sensor. replace light fixtures with led light. | $154,184 | |
| Sep 14, 2012 | Completed final sign-off Mar 2013 | 1011 Turk St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. remove 3 existing pendent sprinklers and replace with uprights off new total pacDetails
fire sprinkler system upgrade. remove 3 existing pendent sprinklers and replace with uprights off new total pac | $1,545 |
| Aug 15, 2012 | Never finaled issued Aug 2012, no final | 1011 Turk St | Intelligent Technologies & Services Inc | 1st floor-clean agent fire suppression & pre action detection & controls for ups room a & bDetails
1st floor-clean agent fire suppression & pre action detection & controls for ups room a & b | $14,275 |
| Jul 17, 2012 | Completed final sign-off Mar 2013 | 1011 Turk St | Cosco Fire Protection Inc. | on 1st floor and 1 strobe, 1 duct detector and 2 monitor modules. relocate 2 strobesDetails
on 1st floor and 1 strobe, 1 duct detector and 2 monitor modules. relocate 2 strobes | $5,500 |
| Feb 1, 2012 | Completed final sign-off Mar 2013 | 1011 Turk St | demo wall partitions, door, laundry hook-ups, drain lines, casework, drop ceil. resheath 5/8" type x gyp bd. electrical - install ups, trasformer, panel, breakers. air cond. unit install for electrical room. pre-action fire spr s/s for electrical room. sprinkler and fire alarm under separate appl.Details
demo wall partitions, door, laundry hook-ups, drain lines, casework, drop ceil. resheath 5/8" type x gyp bd. electrical - install ups, trasformer, panel, breakers. air cond. unit install for electrical room. pre-action fire spr s/s for electrical room. sprinkler and fire alarm under separate appl. | $400,000 | |
| Apr 6, 2010 | Completed final sign-off Apr 2010 | 1011 Turk St | Potter Fire Protection | relocate 2 fire sprinkler heads in restroom on the 1st floorDetails
relocate 2 fire sprinkler heads in restroom on the 1st floor | $980 |
| Jun 3, 2009 | Completed final sign-off Feb 2010 | 1011 Turk St | R L H Fire Protection Inc | t.i. upgrade of (e) fire sprinkler system. relocate 2 pendents sprinkler heads.Details
t.i. upgrade of (e) fire sprinkler system. relocate 2 pendents sprinkler heads. | $1,000 |
| Jan 12, 2009 | Completed final sign-off Apr 2011 | 1011 Turk St | R L H Fire Protection Inc | 2nd floor-t.i. upgrade of (e) fire sprinkler system. relocate 2 pendent heads and add 2 pendent headsDetails
2nd floor-t.i. upgrade of (e) fire sprinkler system. relocate 2 pendent heads and add 2 pendent heads | $1,000 |
| Dec 4, 2008 | Completed final sign-off Apr 2011 | 1011 Turk St | Signawest Systems Inc | extend existing fire alarm notification circuit to new strobe devicer on second floor.Details
extend existing fire alarm notification circuit to new strobe devicer on second floor. | $2,680 |
| Nov 5, 2008 | Completed final sign-off Apr 2011 | 1011 Turk St | selective interior demolition of an (e) bldg. (2/fl). construction of (n) partition. construction of (n) breakrm., office & conf. rm. painting of (n) & (e) walls & suffit. relocation of electrical outlets, lighting & lighting controls. fire alarm & sprinkler under separation permit.Details
selective interior demolition of an (e) bldg. (2/fl). construction of (n) partition. construction of (n) breakrm., office & conf. rm. painting of (n) & (e) walls & suffit. relocation of electrical outlets, lighting & lighting controls. fire alarm & sprinkler under separation permit. | $500,000 | |
| Feb 28, 2008 | Completed final sign-off Apr 2011 | 1011 Turk St | Vila Construction Co | revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes.Details
revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes. | |
| Feb 5, 2008 | Expired or cancelled expired Nov 2009 | 1011 Turk St | Potter Fire Protection | relocate (32) and plug (2) fire sprinklers on 1st floor.Details
relocate (32) and plug (2) fire sprinklers on 1st floor. | $8,000 |
| Jan 29, 2008 | Expired or cancelled expired Nov 2009 | 1011 Turk St | Pacific Auxiliary Fire Alarm | 1st floor - addition of 3 strobes,3 horn/strobes to the existing fire alarm system.Details
1st floor - addition of 3 strobes,3 horn/strobes to the existing fire alarm system. | $3,300 |
| Oct 30, 2007 | Never finaled issued Nov 2007, no final | 1011 Turk St | Vila Construction Co | demolition on ground floor: interior walls, remove casework, doors, frames, exterior wall furring below windows, office wall fixtures (whiteboard, tackboards, etc), tv monitors & brackets, carpet & wall base, acoustical ceiling tiles. soft demo.Details
demolition on ground floor: interior walls, remove casework, doors, frames, exterior wall furring below windows, office wall fixtures (whiteboard, tackboards, etc), tv monitors & brackets, carpet & wall base, acoustical ceiling tiles. soft demo. | $75,000 |
| Sep 18, 2007 | Never finaled issued Feb 2008, no final | 1011 Turk St | modifications include demolition of partitions, portions of existing mechanical and electrical systems, construction of new conference room w/ audio visual system, new exterior exit stairs and upgrading existing ada components.modify (e) sprinkler &fire alarm systems.Details
modifications include demolition of partitions, portions of existing mechanical and electrical systems, construction of new conference room w/ audio visual system, new exterior exit stairs and upgrading existing ada components.modify (e) sprinkler &fire alarm systems. | ||
| Mar 3, 2004 | Completed final sign-off Mar 2004 | 1016 Laguna St | renew appl#200007185423 for final inspectionDetails
renew appl#200007185423 for final inspection | ||
| May 13, 2002 | Completed final sign-off Jan 2003 | 1003 Turk St | Lc General Engineering & Construction | remove interior remove roof and top floor remove 1/2of basement close (e) openings w/concrete or cmvDetails
remove interior remove roof and top floor remove 1/2of basement close (e) openings w/concrete or cmv | |
| Apr 13, 2001 | Never finaled issued Apr 2001, no final | 1016 Laguna St | street space permitDetails
street space permit | ||
| Mar 9, 2001 | Expired or cancelled expired Jul 2002 | 1003 Turk St | provide 2 new wood exit stairs from the bldg. for use while adjacent bldg. under construction.Details
provide 2 new wood exit stairs from the bldg. for use while adjacent bldg. under construction. | ||
| Dec 11, 2000 | Never finaled issued Dec 2000, no final | 1016 Laguna St | street space.Details
street space. | ||
| Oct 20, 2000 | Expired or cancelled expired Dec 2001 | 1003 Turk St | 2 new electrical panels, new lights for one rm. new electrical outlets for 2 rm. new communicationsDetails
2 new electrical panels, new lights for one rm. new electrical outlets for 2 rm. new communications | ||
| Jul 20, 2000 | Expired or cancelled expired Nov 2000 | 1011 Turk St | Allied Fire Protection | basement fire sprinkler plan. alteration to sprinkler plan.Details
basement fire sprinkler plan. alteration to sprinkler plan. | $1,000 |
| Jul 18, 2000 | Expired or cancelled expired Mar 2004 | 1016 Laguna St | Seto's Construction Co | gen renovation for accessibility,roofing replacement,handicap rampDetails
gen renovation for accessibility,roofing replacement,handicap ramp |
Find contractors for work like this