Lourdes Garcia
- Listed as
- architect, authorized agent-others
- Firm
- Garcia Studio Architects
- Based in
- San Francisco
- On San Francisco permits
- Sep 2008 to Nov 2019
13 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit): 8 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 2340 San Jose Av | provide towable modular office trailer with prefab ramp, portable toilets and handwashing station, towable fuel generator, towable light towers, water tank for potable water, temp fence around fuel generator, signage, elec for exterior work maher not reqDetails
provide towable modular office trailer with prefab ramp, portable toilets and handwashing station, towable fuel generator, towable light towers, water tank for potable water, temp fence around fuel generator, signage, elec for exterior work maher not req | $60,000 | |
| Sep 30, 2019 | Completed final sign-off Dec 2019 | 2340 San Jose Av | new chain link vehicle & ped gate. grading & paving for accessible ped asphalt. re-striping & new curb stops for 33 parking path. temp 6'-0" high fence, mobile lighting spacesDetails
new chain link vehicle & ped gate. grading & paving for accessible ped asphalt. re-striping & new curb stops for 33 parking path. temp 6'-0" high fence, mobile lighting spaces | $90,000 | |
| Jul 23, 2019 | Never finaled issued Sep 2019, no final | 1011 Turk St | int renovations to break room, storage, tech rm and eoc support room in the 1st flr of (e) bldDetails
int renovations to break room, storage, tech rm and eoc support room in the 1st flr of (e) bld | $185,000 | |
| Mar 8, 2017 | Completed final sign-off Jul 2017 | 597 Connecticut St | Saturn Construction Co | kitchen remodel to new location, new opening in interior wallDetails
kitchen remodel to new location, new opening in interior wall | $15,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 547 Connecticut St | Saturn Construction Co | administration permit. change address at pa# 2016/04/28/5985 from 549 connecticut street to 547 connecticut street.Details
administration permit. change address at pa# 2016/04/28/5985 from 549 connecticut street to 547 connecticut street. | |
| Apr 28, 2016 | Completed final sign-off Jan 2017 | 549 Connecticut St | Saturn Construction Co | per ordinance 43-14. legalization of new kitchen in basement and legalization of (e) in law unit.Details
per ordinance 43-14. legalization of new kitchen in basement and legalization of (e) in law unit. | $17,000 |
| Jan 22, 2016 | Completed final sign-off Jan 2017 | 549 Connecticut St | Saturn Construction Co | interior remodel of entry level, relocate existing bathroom, add dormers to existing roof, interior remodel of level 2, add 1 bathroom & 1 bedroom.Details
interior remodel of entry level, relocate existing bathroom, add dormers to existing roof, interior remodel of level 2, add 1 bathroom & 1 bedroom. | $185,000 |
| Dec 11, 2015 | Completed final sign-off Jan 2017 | 549 Connecticut St | Saturn Construction Co | 128 sq ft fill-in addition at rear and interior basement remodel. fill-in of (e) rear open area under cantilevered room built on columns. interior basement remodel is relocation of (e) bathroom and laundryDetails
128 sq ft fill-in addition at rear and interior basement remodel. fill-in of (e) rear open area under cantilevered room built on columns. interior basement remodel is relocation of (e) bathroom and laundry | $350,000 |
| Jun 4, 2015 | Never finaled issued Aug 2016, no final | 528 Connecticut St | J & T Diodati Construction | extg garage alteration and new garage door relocation.Details
extg garage alteration and new garage door relocation. | $15,000 |
| Apr 14, 2014 | Completed final sign-off Nov 2014 | 597 Connecticut St | Saturn Construction Co | fill-in (e) rear deck under canelevered room. interior remodel of (e) basement to include new (3) bedrooms and (2) baths. interior remodel of (e) ground level bathroom and addition of interior stair. no change to exterior stair at rear.Details
fill-in (e) rear deck under canelevered room. interior remodel of (e) basement to include new (3) bedrooms and (2) baths. interior remodel of (e) ground level bathroom and addition of interior stair. no change to exterior stair at rear. | $200,000 |
| Feb 25, 2014 | Completed final sign-off Jun 2014 | 138 27th St | A L Martin Construction | remodel of existing bathroom to combine 2 into 1.Details
remodel of existing bathroom to combine 2 into 1. | $40,000 |
| Feb 16, 2012 | Completed final sign-off May 2012 | 3345 22nd St | Loughran Construction Inc. | comply with nov# 201055108 dated 7/3/2010-replace back stairs due to code violation. replace in kind.Details
comply with nov# 201055108 dated 7/3/2010-replace back stairs due to code violation. replace in kind. | $32,000 |
| Sep 23, 2008 | Expired or cancelled expired Oct 2012 | 86 Theresa St | 734 sq ft. rear addition (interior renovation of existing house) under seperate permit. addition includes new living space & office.Details
734 sq ft. rear addition (interior renovation of existing house) under seperate permit. addition includes new living space & office. | $180,000 |