Block 3507, lot 040
1455 Market St
- City’s use
- Commercial Office
- Built
- 1979
- Stories
- 22
- Building
- 1,320,000 sq ft
- Lot
- 131,147 sq ft
- Zoning
- C3G
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1455 Market St | floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.Details
floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed. | $225,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1455 Market St | floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electricDetails
floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric | $85,000 | |
| Aug 5, 2026 | In progress issued Aug 2026 | 1455 Market St | Bcci Construction Company | 5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work.Details
5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work. | $2,364,489 |
| May 14, 2026 | In progress filed May 2026, not yet issued | 1455 Market St | Bcci Construction Company | 4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be doneDetails
4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be done | |
| Mar 26, 2026 | In progress issued Sep 2026 | 1455 Market St | Bcci Construction Company | 7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required.Details
7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required. | $257,580 |
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 4th fl ref pa #2025-0723-1382: sprinkler ti. relocate 4. total 4Details
4th fl ref pa #2025-0723-1382: sprinkler ti. relocate 4. total 4 | $2,060 |
| Feb 11, 2026 | Completed final sign-off Feb 2026 | 1455 Market St | Convergint Technologies Llc | remove (e) analog addressable data card & replace with (n) addressable slc card. remove (e) field initiating devices with (n). install (n) control/synchronize module, 3 (n) high powered relay modules & 2 (n) duct smole detector. 4 (n) booster power supply. install 90 (n) ceiling mounted notificationDetails
remove (e) analog addressable data card & replace with (n) addressable slc card. remove (e) field initiating devices with (n). install (n) control/synchronize module, 3 (n) high powered relay modules & 2 (n) duct smole detector. 4 (n) booster power supply. install 90 (n) ceiling mounted notification | $70,000 |
| Jan 22, 2026 | Completed final sign-off Jan 2026 | 1455 Market St | Phase One Fire Life Safety Systems Inc | t.i. on the 4/f f/a scope. additional 23 speaker/strobes and 12 strobes to be installed and tied into the (e) fire alarm system. all (e) devices to remain as-is. ref 202506269593.Details
t.i. on the 4/f f/a scope. additional 23 speaker/strobes and 12 strobes to be installed and tied into the (e) fire alarm system. all (e) devices to remain as-is. ref 202506269593. | $9,268 |
| Jan 22, 2026 | Completed final sign-off Jan 2026 | 1455 Market St | Convergint Technologies Llc | new 2 way com emergency call station in 4th fl freight elevator lobby. ref #202506264593Details
new 2 way com emergency call station in 4th fl freight elevator lobby. ref #202506264593 | $7,200 |
| Nov 24, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Martinelli Environmental Graph | sign b-install 32 arylic stick on letters in front of buildling for "san francisco human services agency" share plans with 202511240324Details
sign b-install 32 arylic stick on letters in front of buildling for "san francisco human services agency" share plans with 202511240324 | $800 |
| Nov 24, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Martinelli Environmental Graph | sign a- to be installed double sided non electrical street facing blade sign for "san francisco human service agency"Details
sign a- to be installed double sided non electrical street facing blade sign for "san francisco human service agency" | $1,250 |
| Nov 19, 2025 | Completed final sign-off Dec 2025 | 1455 Market St | Convergint Technologies Llc | tenant improvement on the 18th fl. fire alarm scope update/add notification devices to to provide coverage fro the new floor plan. ref permit 202507110629Details
tenant improvement on the 18th fl. fire alarm scope update/add notification devices to to provide coverage fro the new floor plan. ref permit 202507110629 | $40,000 |
| Sep 11, 2025 | Completed final sign-off Mar 2026 | 1455 Market St | Bcci Construction Company | 4th fl ref pa # 2025-0626-9593: mep work to include new ducts for heating & cooling. new lighting & controls.Details
4th fl ref pa # 2025-0626-9593: mep work to include new ducts for heating & cooling. new lighting & controls. | |
| Aug 27, 2025 | In progress issued Sep 2025 | 1455 Market St | Bcci Construction Company | level 1: newly added scope of work consists of addition of a 2nd interior ramp at exit vestibule 1-003. converting of 2 (e) showers into toilet stalls & other minor shifts or adjustments to previously approved portion layout. newly added structural.Details
level 1: newly added scope of work consists of addition of a 2nd interior ramp at exit vestibule 1-003. converting of 2 (e) showers into toilet stalls & other minor shifts or adjustments to previously approved portion layout. newly added structural. | |
| Aug 25, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | level b1- added fire sprinklers 8, relcoate 348 and remove 17. 202506128525Details
level b1- added fire sprinklers 8, relcoate 348 and remove 17. 202506128525 | $142,500 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 1455 Market St | Bcci Construction Company | 18th fl ref pa # 2025-0711-0629. mep new ducts for heating & cooling. electrical lighting and controlsDetails
18th fl ref pa # 2025-0711-0629. mep new ducts for heating & cooling. electrical lighting and controls | $750,000 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 18th fl fire sprinkler ref pa 202507110629 relocate 104; add 1Details
18th fl fire sprinkler ref pa 202507110629 relocate 104; add 1 | $54,035 |
| Aug 19, 2025 | In progress issued Aug 2025 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 4th fl - fire sprinkler ti ref pa 202506269593 relocate 62Details
4th fl - fire sprinkler ti ref pa 202506269593 relocate 62 | $31,906 |
| Jul 23, 2025 | Completed final sign-off Sep 2026 | 1455 Market St | Bcci Construction Company | 4th/fl:consist of extending the (e) elevator that currently serves the second and third floors. bringing up to serve the 4th/fl. project includes new elevator vestibule on the 4th/fl.the elevator machine room and pit reside onthe 7th /fl.Details
4th/fl:consist of extending the (e) elevator that currently serves the second and third floors. bringing up to serve the 4th/fl. project includes new elevator vestibule on the 4th/fl.the elevator machine room and pit reside onthe 7th /fl. | $450,000 |
| Jul 23, 2025 | Completed final sign-off Jul 2026 | 1455 Market St | Bcci Construction Company | newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose.Details
newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose. | |
| Jul 21, 2025 | In progress issued Nov 2025 | 1455 Market St | Bcci Construction Company | 1/f: mep to support approved architectural. new ducts and hvac, lighting, and plumbing. ref# 202506128525.Details
1/f: mep to support approved architectural. new ducts and hvac, lighting, and plumbing. ref# 202506128525. | $750,000 |
| Jul 18, 2025 | Completed final sign-off Oct 2025 | 1455 Market St | Bcci Construction Company | 8th/fl:shall consist of demolition of finishes, and minimal new millwork, plumbing, power data receptacles, paint and flooring finish. no change to ceiling, lighting, life safety scope of work does not affect the path of travel.Details
8th/fl:shall consist of demolition of finishes, and minimal new millwork, plumbing, power data receptacles, paint and flooring finish. no change to ceiling, lighting, life safety scope of work does not affect the path of travel. | $106,000 |
| Jul 11, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Bcci Construction Company | 18th/fl shall consist of interior demo & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches. mep and fire sprinkler plan will be submitted as a seperate permitDetails
18th/fl shall consist of interior demo & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches. mep and fire sprinkler plan will be submitted as a seperate permit | $2,861,040 |
| Jun 26, 2025 | Completed final sign-off Mar 2026 | 1455 Market St | Bcci Construction Company | 4/f: interior demo and new construction of non-structural elements including but not limited to interior partitions.Details
4/f: interior demo and new construction of non-structural elements including but not limited to interior partitions. | $10,634,960 |
| Jun 12, 2025 | In progress issued Jul 2025 | 1455 Market St | Bcci Construction Company | level 1 interior demolition & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switchesDetails
level 1 interior demolition & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches | $6,953,380 |
| Dec 11, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Thomas Swan Sign Co Inc | ref. pa #201909171860: sign shown on sheet c59514-2 of ref pa #2019-0514-0552 is no longer on building; exterior frontage has reverted to existing condition shown on same sheet wth no sign shown; permit to document this conditon. (wall sign)Details
ref. pa #201909171860: sign shown on sheet c59514-2 of ref pa #2019-0514-0552 is no longer on building; exterior frontage has reverted to existing condition shown on same sheet wth no sign shown; permit to document this conditon. (wall sign) | $500 |
| Dec 11, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Thomas Swan Sign Co Inc | sign shown on sheet c59514-s2 of ref pa #201905140550 is no longer on building; permit to document that exterior has reverted to previously existing condition on pa #201905140550 (blade sign)Details
sign shown on sheet c59514-s2 of ref pa #201905140550 is no longer on building; permit to document that exterior has reverted to previously existing condition on pa #201905140550 (blade sign) | |
| Dec 4, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Sabah International Incorporated | 13/f: fire alarm tenant improvement for 202408289624 and 202411064476.Details
13/f: fire alarm tenant improvement for 202408289624 and 202411064476. | $18,490 |
| Nov 25, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Sabah International Incorporated | 12/f: fire alarm tenant improvement for 202408289622. all initianting devices shall be removed and replaced with new as (e) devices are becoming obsolete. a new loop card compatible with new deices, shall replace (e0 loop card in the 13/f facu.Details
12/f: fire alarm tenant improvement for 202408289622. all initianting devices shall be removed and replaced with new as (e) devices are becoming obsolete. a new loop card compatible with new deices, shall replace (e0 loop card in the 13/f facu. | $18,490 |
| Nov 25, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Sabah International Incorporated | 12-13/f: provide emergency communication system call boxes on 12/f passenger and frieght elevator lobby. on 13/f call boxes for passenger and frieight elevator lobby are (e) new call boxes at the 13/f shall be provided in stairs #1 & #2. ref t.i. 202408289622 & 202408289624.Details
12-13/f: provide emergency communication system call boxes on 12/f passenger and frieght elevator lobby. on 13/f call boxes for passenger and frieight elevator lobby are (e) new call boxes at the 13/f shall be provided in stairs #1 & #2. ref t.i. 202408289622 & 202408289624. | $18,490 |
| Nov 22, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | 13th floor: revision to approved mep permit. new lighting , power and fsd. pa#202410243691Details
13th floor: revision to approved mep permit. new lighting , power and fsd. pa#202410243691 | $45,000 |
| Nov 20, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 7th fl- ref pa # 2024-0828-9628 ti for (e) fire sprinkler system relocate 6 fire sprinklersDetails
7th fl- ref pa # 2024-0828-9628 ti for (e) fire sprinkler system relocate 6 fire sprinklers | $1,500 |
| Nov 19, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Sabah International Incorporated | tenant improvement on the 16th fl. fire alarm adding smoke detection per 1 new fire smoke damper, new control relay and monitor module to the open and closed state of fire smoke dampers. ref 202408068034Details
tenant improvement on the 16th fl. fire alarm adding smoke detection per 1 new fire smoke damper, new control relay and monitor module to the open and closed state of fire smoke dampers. ref 202408068034 | $18,240 |
| Nov 19, 2024 | Completed final sign-off Dec 2024 | 1455 Market St | Sabah International Incorporated | tenant improvemnt on the 17th fl. fire alarm adding smoke detection (2) new smoke damper, new control relay and monitor module for the open and closed state of the fire smoke dampler ref pa# 202408068080Details
tenant improvemnt on the 17th fl. fire alarm adding smoke detection (2) new smoke damper, new control relay and monitor module for the open and closed state of the fire smoke dampler ref pa# 202408068080 | $18,240 |
| Nov 15, 2024 | Completed final sign-off Dec 2024 | 1455 Market St | Sabah International Incorporated | 7th floor: tenant improvement for fire alarm taking place at the existing high-rise building. ref pa#202408289628.Details
7th floor: tenant improvement for fire alarm taking place at the existing high-rise building. ref pa#202408289628. | $18,240 |
| Nov 7, 2024 | Completed final sign-off Nov 2024 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 2nd floor: existing fire sprinkler system ti. add 1 sprinkler. added additional sprinkler to correct insufficent coverage. no ref pa #Details
2nd floor: existing fire sprinkler system ti. add 1 sprinkler. added additional sprinkler to correct insufficent coverage. no ref pa # | $640 |
| Nov 7, 2024 | Completed final sign-off Dec 2024 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 6-8/fl-ref 202101273470- (e) fire sprinkler system 1 added and 1 relocated fire sprinklerDetails
6-8/fl-ref 202101273470- (e) fire sprinkler system 1 added and 1 relocated fire sprinkler | |
| Nov 6, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | 13th flr. revision to permit 202408289624. revised scope on the 13th flr consists of changing (4) office rooms to conference rooms (3) office rooms to huddle rooms, (1) conference rooms to a huddle room. mep under separate permit.Details
13th flr. revision to permit 202408289624. revised scope on the 13th flr consists of changing (4) office rooms to conference rooms (3) office rooms to huddle rooms, (1) conference rooms to a huddle room. mep under separate permit. | |
| Oct 24, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 12/fl-ref 202408289622- mep submittal to support approved architectural permit new hvac ductwork electrical and lightingDetails
12/fl-ref 202408289622- mep submittal to support approved architectural permit new hvac ductwork electrical and lighting | $300,000 |
| Oct 24, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 13/fl-ref 202408289624- mep submittal to support approved architectural permit new hvac ductwork electrical and lightingDetails
13/fl-ref 202408289624- mep submittal to support approved architectural permit new hvac ductwork electrical and lighting | $300,000 |
| Oct 23, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Sabah International Incorporated | fire alarm floors 6- 8 taking place at the (e) building located at 1455 market st. ref pa# 2021-0127-3470Details
fire alarm floors 6- 8 taking place at the (e) building located at 1455 market st. ref pa# 2021-0127-3470 | $33,624 |
| Oct 21, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 7th fl: mechanical and electrical submittal to support approved drawings. new hvac and ductwork throughout the floor. new lighting and associated controls. ref 202408289628Details
7th fl: mechanical and electrical submittal to support approved drawings. new hvac and ductwork throughout the floor. new lighting and associated controls. ref 202408289628 | $1,200,000 |
| Sep 19, 2024 | Completed final sign-off Nov 2024 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 17/fl- ti 202408068080 (e) fire sprinkler system, 6 added, 46 relocated and 3 removed sprinklerDetails
17/fl- ti 202408068080 (e) fire sprinkler system, 6 added, 46 relocated and 3 removed sprinkler | $33,000 |
| Sep 19, 2024 | Completed final sign-off Nov 2024 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 16/fl- ti 202408068034 (e) fire sprinkler system, 2 added, 56 relocated and 5 removed sprinklerDetails
16/fl- ti 202408068034 (e) fire sprinkler system, 2 added, 56 relocated and 5 removed sprinkler | $37,000 |
| Sep 19, 2024 | Completed final sign-off Dec 2024 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 13/fl- ti 202408289624 (e) fire sprinkler system, 3 added, 37 relocatedDetails
13/fl- ti 202408289624 (e) fire sprinkler system, 3 added, 37 relocated | $26,000 |
| Sep 19, 2024 | Completed final sign-off Dec 2024 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 12/fl- ti 202408289622 (e) fire sprinkler system, 1 added, 38 relocated and 1 removed sprinklerDetails
12/fl- ti 202408289622 (e) fire sprinkler system, 1 added, 38 relocated and 1 removed sprinkler | $10,500 |
| Aug 29, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | ref 202408068080- 17/fl- mep submittal to support approved architectural permit. to incude (n) hvac ductwork, electrical lighting.Details
ref 202408068080- 17/fl- mep submittal to support approved architectural permit. to incude (n) hvac ductwork, electrical lighting. | $300,000 |
| Aug 29, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | ref 202408068034- 16/fl- mep submittal to support approved architectural permit. to incude (n) hvac ductwork, electrical lighting.Details
ref 202408068034- 16/fl- mep submittal to support approved architectural permit. to incude (n) hvac ductwork, electrical lighting. | $300,000 |
| Aug 28, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | 13th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & fire sprinkler deferred. demo under pa# 202406134362Details
13th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & fire sprinkler deferred. demo under pa# 202406134362 | $2,034,135 | |
| Aug 28, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 12th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & life safety deferred. demo under pa# 202406134352Details
12th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & life safety deferred. demo under pa# 202406134352 | $2,141,856 |
| Aug 28, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 7th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. . mep & fire sprinkler deferred. demo under pa# 202406204857Details
7th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. . mep & fire sprinkler deferred. demo under pa# 202406204857 | $2,267,237 |
| Aug 6, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Bcci Construction Company | interior demo and new const of non struc elements. partitions, doors, finishes, clg, lighting,mech, elec. restroom ada accesblty upgrades. mep and fire sprinkler sep permit. no change ext bldg,site, landscape,parking.ref 202406204857 path of travelDetails
interior demo and new const of non struc elements. partitions, doors, finishes, clg, lighting,mech, elec. restroom ada accesblty upgrades. mep and fire sprinkler sep permit. no change ext bldg,site, landscape,parking.ref 202406204857 path of travel | $1,987,509 |
| Aug 6, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Bcci Construction Company | 17th fl. interior demo & (n) const of non structural elements int parttions, doors, finishes, ceilings, lighting, mech & elec, outlets and switches, scope also includes restroom ada accessibility upgrades mep & fire sprinkler plans will be separate permit scope does not affect pot no ext bldg siteDetails
17th fl. interior demo & (n) const of non structural elements int parttions, doors, finishes, ceilings, lighting, mech & elec, outlets and switches, scope also includes restroom ada accessibility upgrades mep & fire sprinkler plans will be separate permit scope does not affect pot no ext bldg site | $1,826,657 |
| Jun 20, 2024 | Completed final sign-off Sep 2025 | 1455 Market St | Bcci Construction Company | floors 6-8: office ti with (n) non structural interior partitions. minor upgrades to path of travel. 7th floor restroom under this permit.Details
floors 6-8: office ti with (n) non structural interior partitions. minor upgrades to path of travel. 7th floor restroom under this permit. | $500,000 |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | 17th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not requiredDetails
17th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not required | $120,000 |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | floor 12: scope of work: demo of nonstructural partitions and associated power / data and finishes throughout 12th floor. space is correctly un-occupied. per ab-017: fire sprinklers and lifesafety to remain operational path of travel/ accessibility scope is not required.Details
floor 12: scope of work: demo of nonstructural partitions and associated power / data and finishes throughout 12th floor. space is correctly un-occupied. per ab-017: fire sprinklers and lifesafety to remain operational path of travel/ accessibility scope is not required. | $120,000 |
| Jun 13, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Bcci Construction Company | 7/f: ref 202406204857- scope of work shall consist of select demo of non structural partitions and associated power/data and finishes throughout 7/f. space is current unoccupied. per ab-017 fire sprinklers and life safety to remain operational. path of travel/accessibility scope is not req.Details
7/f: ref 202406204857- scope of work shall consist of select demo of non structural partitions and associated power/data and finishes throughout 7/f. space is current unoccupied. per ab-017 fire sprinklers and life safety to remain operational. path of travel/accessibility scope is not req. | $170,000 |
| Jun 13, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 16th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not requiredDetails
16th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not required | $120,000 |
| Jun 13, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 13th/f: scope of work consist of select dmo of non structural partitions and associated power/data and finishes throughout 13th fl. space is currently unoccupied per ab17. fire sprinklers and life safey to remain operational. path of travel accessibiolity scope is not req.Details
13th/f: scope of work consist of select dmo of non structural partitions and associated power/data and finishes throughout 13th fl. space is currently unoccupied per ab17. fire sprinklers and life safey to remain operational. path of travel accessibiolity scope is not req. | $120,000 |
| May 28, 2024 | In progress issued Jul 2024 | 1455 Market St | Bcci Construction Company | floors: 6/7/8 administrative permit to review modifications to smoke control report.Details
floors: 6/7/8 administrative permit to review modifications to smoke control report. | |
| Aug 18, 2022 | Never finaled issued Jun 2023, no final | 1455 Market St | Velex Inc | sprint - remove existing equipment, including electrical connections, off the existing rooftop telecommunications site. after removal, patch/restore to pre-project conditions.Details
sprint - remove existing equipment, including electrical connections, off the existing rooftop telecommunications site. after removal, patch/restore to pre-project conditions. | $12,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2021 | 1455 Market St | R L H Fire Protection Inc | fire sprinkler permit. relocate 2 pendent sprinklers on basement level 2. ti permit 2021 0217 4769Details
fire sprinkler permit. relocate 2 pendent sprinklers on basement level 2. ti permit 2021 0217 4769 | $1,000 |
| May 27, 2021 | Never finaled issued Jun 2021, no final | 1455 Market St | Sabah International Incorporated | ti# 2021-0127-3470 modify existing fire alarm system. add (36) high power control relays for fsd shutdown, (36) dual input modules for fsd status monitoringDetails
ti# 2021-0127-3470 modify existing fire alarm system. add (36) high power control relays for fsd shutdown, (36) dual input modules for fsd status monitoring | $46,104 |
| Feb 17, 2021 | Completed final sign-off Jan 2022 | 1455 Market St | Rudolph Commercial Interiors Inc, Rci | lower level 2: demo of non-load bearing walls and the remodel of the (e) gym and restrooms with new ada compliant showers, sink, countertop. new light fixtures, outlets and finishes.Details
lower level 2: demo of non-load bearing walls and the remodel of the (e) gym and restrooms with new ada compliant showers, sink, countertop. new light fixtures, outlets and finishes. | $209,611 |
| Jan 27, 2021 | Completed final sign-off Jan 2022 | 1455 Market St | Acco Engineered Systems Inc. Dba Acco En | (fl: 16,17,20) replacement of 36 pneumatic smoke dampers across 3 floors (12 per floor) with new, code compliant, electronically actuated smoke dampers.Details
(fl: 16,17,20) replacement of 36 pneumatic smoke dampers across 3 floors (12 per floor) with new, code compliant, electronically actuated smoke dampers. | $150,000 |
| Dec 15, 2020 | Never finaled issued Feb 2021, no final | 1455 Market St | Sabah International Incorporated | provide emergency 2-way communication system call boxes at the 18th & 19th floors passenger and freight elevator lobby.Details
provide emergency 2-way communication system call boxes at the 18th & 19th floors passenger and freight elevator lobby. | $14,665 |
| Dec 10, 2020 | Completed final sign-off Feb 2022 | 1455 Market St | Sabah International Incorporated | add (8) high power control relay for security door release no bldg permit # associated to this project.Details
add (8) high power control relay for security door release no bldg permit # associated to this project. | $11,744 |
| Jun 4, 2020 | Completed final sign-off Dec 2020 | 1455 Market St | sf abe program. barrier removal includes restriping of existing parking lots nad addition of required parking signage, as well as addition of accessible ev charging spaces. all new or revised mep. life safety work will be submitted separately. building fully sprinklered.Details
sf abe program. barrier removal includes restriping of existing parking lots nad addition of required parking signage, as well as addition of accessible ev charging spaces. all new or revised mep. life safety work will be submitted separately. building fully sprinklered. | $29,300 | |
| Mar 5, 2020 | Completed final sign-off Aug 2020 | 1455 Market St | Sabah International Incorporated | 17/f: as-built fire alarm for pa202001222451: modify (e) f/a system. remove (1) duct smoke detectors & (1) smoke detectoir, add (4) duct smoke detectors& (4) high power contral relays, (1)ceiling speaker/strobe.Details
17/f: as-built fire alarm for pa202001222451: modify (e) f/a system. remove (1) duct smoke detectors & (1) smoke detectoir, add (4) duct smoke detectors& (4) high power contral relays, (1)ceiling speaker/strobe. | |
| Mar 5, 2020 | Completed final sign-off Aug 2020 | 1455 Market St | Sabah International Incorporated | 20/f: as-built fire alarm for pa202001172156: modify (e) f/a system: remove (1) manual pull station, (1) duct smoke detector, (1) high power control relay, add (4) duct smoke detectors, (1) control relay, (2) high power control relays, (1) ceiling speaker/strobe.Details
20/f: as-built fire alarm for pa202001172156: modify (e) f/a system: remove (1) manual pull station, (1) duct smoke detector, (1) high power control relay, add (4) duct smoke detectors, (1) control relay, (2) high power control relays, (1) ceiling speaker/strobe. | |
| Mar 5, 2020 | Completed final sign-off Aug 2020 | 1455 Market St | Sabah International Incorporated | 16/f: as-built fire alarm for pa202001222450: modify (e) f/a system. remove (1) duct smoke detectors, (1) high power control relay. add (4) duct smoke detectors, (5) high power contral relays, (1) monitor modules, ((1) ceiling speaker/strobe.Details
16/f: as-built fire alarm for pa202001222450: modify (e) f/a system. remove (1) duct smoke detectors, (1) high power control relay. add (4) duct smoke detectors, (5) high power contral relays, (1) monitor modules, ((1) ceiling speaker/strobe. | |
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 1455 Market St | street spaceDetails
street space | ||
| Jan 23, 2020 | Completed final sign-off Aug 2020 | 1455 Market St | Principal Builders Inc. | 16th, 17th & 20th floors - administrative permit for dph review of micro kitchens. no work under this kpa. related ti work pa 2019-1101-6240202019-1101-6239 & 2019-1101-6242Details
16th, 17th & 20th floors - administrative permit for dph review of micro kitchens. no work under this kpa. related ti work pa 2019-1101-6240202019-1101-6239 & 2019-1101-6242 | |
| Jan 22, 2020 | Completed final sign-off Aug 2020 | 1455 Market St | Sabah International Incorporated | 17th flr-modify (e) fire alarm & 2-way comm sys. add (1) booster power supplies, (1) synchronization output module, (36) ceiling speaker/strobes, (36) smoke detectors, (5) high power control relays, (2) dual input modules, (2) rath call stations. replace (4) manual pull stations. ti #2019-1101-6239.Details
17th flr-modify (e) fire alarm & 2-way comm sys. add (1) booster power supplies, (1) synchronization output module, (36) ceiling speaker/strobes, (36) smoke detectors, (5) high power control relays, (2) dual input modules, (2) rath call stations. replace (4) manual pull stations. ti #2019-1101-6239. | $15,860 |
| Jan 22, 2020 | Completed final sign-off Jul 2020 | 1455 Market St | Sabah International Incorporated | 16th flr-modify (e) fire alarm & 2-way comm sys. add (1) booster power supplies, (36) ceiling speaker/strobes, (1) synchronization output module, (36) smoke detectors, (5) high power control relays, (2) dual input modules, (2) rath call stations. replace (4) manual pull stations. ti #2019-1101-6240.Details
16th flr-modify (e) fire alarm & 2-way comm sys. add (1) booster power supplies, (36) ceiling speaker/strobes, (1) synchronization output module, (36) smoke detectors, (5) high power control relays, (2) dual input modules, (2) rath call stations. replace (4) manual pull stations. ti #2019-1101-6240. | $14,300 |
| Jan 17, 2020 | Never finaled issued Feb 2020, no final | 1455 Market St | Sabah International Incorporated | ref pa 2019-1101-6242 modify (e) fire alarm & 2 way communication systems. add 2 booster power supplies, 1 synchronization output module, 37 ceiling speaker/strobes, 3 wall strobes, 33 smoke detectors, 4 duct smoke detectors, 10 high power control relays, 2 dual input modules, replace 5 manual pullDetails
ref pa 2019-1101-6242 modify (e) fire alarm & 2 way communication systems. add 2 booster power supplies, 1 synchronization output module, 37 ceiling speaker/strobes, 3 wall strobes, 33 smoke detectors, 4 duct smoke detectors, 10 high power control relays, 2 dual input modules, replace 5 manual pull | $16,444 |
| Dec 13, 2019 | Completed final sign-off Apr 2020 | 1455 Market St | R L H Fire Protection Inc | reposition fire sprinklers 182 uprights and 31 pendent spriklers 17th fl ref 201909192162Details
reposition fire sprinklers 182 uprights and 31 pendent spriklers 17th fl ref 201909192162 | $40,000 |
| Dec 13, 2019 | Completed final sign-off Apr 2020 | 1455 Market St | R L H Fire Protection Inc | reposition 175 uprights and 34 pendent sprinklers on the 20th fl ti 201909192163Details
reposition 175 uprights and 34 pendent sprinklers on the 20th fl ti 201909192163 | $40,000 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 1455 Market St | R L H Fire Protection Inc | fire sprinkler permit. install 179 upright sprinklers 29 pendent sprinlkers on th 16th fl ref 201909192159Details
fire sprinkler permit. install 179 upright sprinklers 29 pendent sprinlkers on th 16th fl ref 201909192159 | $40,000 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 1455 Market St | street spaceDetails
street space | ||
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 25, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | 16th fl ti mep for permit #201911026240 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.Details
16th fl ti mep for permit #201911026240 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting. | |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 1455 Market St | street spaceDetails
street space | ||
| Nov 1, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | level 17, interior construction of new non load bearing partitions, glazing, doors, millwork, lighting. associated elec, telecommunications, plumbing, mech and life safety will be difffered submittalsDetails
level 17, interior construction of new non load bearing partitions, glazing, doors, millwork, lighting. associated elec, telecommunications, plumbing, mech and life safety will be difffered submittals | $2,524,788 |
| Nov 1, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | level 16, int construction of new non load bearing partitons, glazing, door, millwork, lighting associated elec, av, telecommunications, plumbing, mech, life safety deferred submittalsDetails
level 16, int construction of new non load bearing partitons, glazing, door, millwork, lighting associated elec, av, telecommunications, plumbing, mech, life safety deferred submittals | $2,524,788 |
| Nov 1, 2019 | Completed final sign-off Jun 2020 | 1455 Market St | Principal Builders Inc. | level 20, int construction of new non load bearing partitons, glazing, door, millwork, lighting associated elec, av, telecommunications, plumbing, mech, life safety deferred submittalsDetails
level 20, int construction of new non load bearing partitons, glazing, door, millwork, lighting associated elec, av, telecommunications, plumbing, mech, life safety deferred submittals | $2,524,788 |
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 1455 Market St | street spaceDetails
street space | ||
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 1455 Market St | Sabah International Incorporated | floors 2 & 3: voluntary upgrade install 2 data call stations. maher n/a.Details
floors 2 & 3: voluntary upgrade install 2 data call stations. maher n/a. | $10,430 |
| Oct 3, 2019 | Completed final sign-off Aug 2023 | 1455 Market St | Sabah International Incorporated | as-built for pa 201905150668. add 4 high power control relays, 2 smoke detectors, 1 celing speaker strobesDetails
as-built for pa 201905150668. add 4 high power control relays, 2 smoke detectors, 1 celing speaker strobes | |
| Oct 3, 2019 | Completed final sign-off Mar 2020 | 1455 Market St | Sabah International Incorporated | 6th flr. add 2 control relays for stair door release. the devices are being added to (e) systemsDetails
6th flr. add 2 control relays for stair door release. the devices are being added to (e) systems | |
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 1455 Market St | street spaceDetails
street space | ||
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1455 Market St | Principal Builders Inc. | 17th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 17th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher naDetails
17th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 17th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher na | $140,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1455 Market St | Principal Builders Inc. | 20th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 20th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher naDetails
20th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 20th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher na | $140,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1455 Market St | Principal Builders Inc. | 16th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 16th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher naDetails
16th fl - demo of non-rated/non-load bearing partitions, glazing, doors, millwork on 16th fl. no work in core ceilings space to remain vacant under ab-017. ada addressed under future ti. maher na | $140,000 |
| Sep 17, 2019 | Never finaled issued Oct 2019, no final | 1455 Market St | Discount Signs & Neon Inc | revision to 201905140552 to show attachment method on projecting signDetails
revision to 201905140552 to show attachment method on projecting sign | |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 1455 Market St | Peninsula Fire Protection Inc | install fire suppression system to 16' x 4' hoods & ducts ref pa 2016-0805-4290Details
install fire suppression system to 16' x 4' hoods & ducts ref pa 2016-0805-4290 | $7,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 1455 Market St | Sabah International Incorporated | modify (e) fa system. relocate 1 fa control unit, add 1 annunicatorDetails
modify (e) fa system. relocate 1 fa control unit, add 1 annunicator | $23,968 |
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 1460 Mission St | per pa #201901251322, new ti at mission street ground floor, new address assigned as; 1460 mission street to apn 3507/040Details
per pa #201901251322, new ti at mission street ground floor, new address assigned as; 1460 mission street to apn 3507/040 | ||
| May 17, 2019 | Completed final sign-off Aug 2019 | 1455 Market St | Sabah International Incorporated | upgrade fire alarm system voluntary upgrade add 2 heat detectors, 4 control relays, 1 monitor moduleDetails
upgrade fire alarm system voluntary upgrade add 2 heat detectors, 4 control relays, 1 monitor module | $14,732 |
| May 15, 2019 | Completed final sign-off Aug 2023 | 1455 Market St | 2nd flr - fa ti ref 201901251322 add 4 booster pwr supply, 91 speaker strobes, 16 strobes, 29 speakers, 2 smk det, 2 control relay & 4 output module maher naDetails
2nd flr - fa ti ref 201901251322 add 4 booster pwr supply, 91 speaker strobes, 16 strobes, 29 speakers, 2 smk det, 2 control relay & 4 output module maher na | $69,872 | |
| May 14, 2019 | Expired or cancelled expired Nov 2024 | 1455 Market St | Discount Signs & Neon Inc | install (1) illuminated projecting electric double faced sign 110"x 30" (wework) n/a maherDetails
install (1) illuminated projecting electric double faced sign 110"x 30" (wework) n/a maher | $5,000 |
| May 14, 2019 | Completed final sign-off Jul 2019 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | 2nd flr, fire sprinkler t.i. relocate 200, add 37 and remove 55 sprinklers per tenant improvements, all in vault roomDetails
2nd flr, fire sprinkler t.i. relocate 200, add 37 and remove 55 sprinklers per tenant improvements, all in vault room | $75,000 |
| May 14, 2019 | Completed final sign-off Aug 2021 | 1455 Market St | Discount Signs & Neon Inc | install (1) illuminated projecting electric single faced sign 3'x14'5" (wework) n/a maherDetails
install (1) illuminated projecting electric single faced sign 3'x14'5" (wework) n/a maher | $4,000 |
| May 2, 2019 | Expired or cancelled cancelled Jan 2026 | 1455 Market St | Dome Construction Corp | 2/f:revision to 201901251322 changes to floor plan, occupancy calcs, meps to accomodate maher not reqDetails
2/f:revision to 201901251322 changes to floor plan, occupancy calcs, meps to accomodate maher not req | |
| Apr 19, 2019 | Completed final sign-off Aug 2019 | 1455 Market St | Sabah International Incorporated | ti 201812198730 modify (e) fire alarm system, relocate 1 wall speaker/strobe. remove 1 wall speaker/strobeDetails
ti 201812198730 modify (e) fire alarm system, relocate 1 wall speaker/strobe. remove 1 wall speaker/strobe | $8,152 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 1455 Market St | Honeywell International, Inc | fire alarm modifications: add the following - 7 ceiling speaker strobes, 2 ansul monitoring modules, 1 duct smoke detector, 1 control module. ref bldg pa #201608054290.Details
fire alarm modifications: add the following - 7 ceiling speaker strobes, 2 ansul monitoring modules, 1 duct smoke detector, 1 control module. ref bldg pa #201608054290. | $5,000 |
| Mar 13, 2019 | Never finaled issued Mar 2019, no final | 1455 Market St | Bcci Construction Company | 7th flr - provide power lighting and branch circuit maintain (e) power and signal outlets with additional new power branch circuiting and raceway system ref 201812198730 maher naDetails
7th flr - provide power lighting and branch circuit maintain (e) power and signal outlets with additional new power branch circuiting and raceway system ref 201812198730 maher na | $5,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 1455 Market St | Sabah International Incorporated | provide a fire alarm system upgrade this a a voluntary upgradeDetails
provide a fire alarm system upgrade this a a voluntary upgrade | $64,730 |
| Jan 25, 2019 | Completed final sign-off Jan 2020 | 1455 Market St | Dome Construction Corp | 2nd floor:54854 sq ft tenant improvement for office :mech, elec, plmg part of scope. fire life safety deffered/sep permits. n/a for maherDetails
2nd floor:54854 sq ft tenant improvement for office :mech, elec, plmg part of scope. fire life safety deffered/sep permits. n/a for maher | $7,000,000 |
| Jan 24, 2019 | Never finaled issued Jan 2019, no final | 1455 Market St | Sabah International Incorporated | as-builts for pa 201810233875. modify (e) fire alrm system to provide additional notification coverage for 13th flr t.i. add 5 duct smoke detectos, 8 control relays, 2 smoke detectorsDetails
as-builts for pa 201810233875. modify (e) fire alrm system to provide additional notification coverage for 13th flr t.i. add 5 duct smoke detectos, 8 control relays, 2 smoke detectors | |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 1455 Market St | Peninsula Fire Protection Inc | add 21 new heads below new drop ceiling per nfpa#13 ref 201608054290Details
add 21 new heads below new drop ceiling per nfpa#13 ref 201608054290 | $6,000 |
| Dec 19, 2018 | Expired or cancelled cancelled Jan 2026 | 1455 Market St | 7th fl modification of existing conference room. remove partition and add glazing storefront carpet and paintDetails
7th fl modification of existing conference room. remove partition and add glazing storefront carpet and paint | $30,000 | |
| Dec 19, 2018 | Completed final sign-off Aug 2019 | 1455 Market St | Bcci Construction Company | 7th fl modification of e conference eoom. remove parition and add glasing storefront, carpet paint. ada upgrades per pot per 11b-202.4at restroomsDetails
7th fl modification of e conference eoom. remove parition and add glasing storefront, carpet paint. ada upgrades per pot per 11b-202.4at restrooms | $30,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 1455 Market St | Sabah International Incorporated | 21st fl - modify existing fire alarm system. add 1 booster panel, 2 ceiling speaker, 11 celing speaker/strobes, 1 photoelectric smoke detector. ref pa 2018-1004-2270Details
21st fl - modify existing fire alarm system. add 1 booster panel, 2 ceiling speaker, 11 celing speaker/strobes, 1 photoelectric smoke detector. ref pa 2018-1004-2270 | $11,576 |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 1455 Market St | Sabah International Incorporated | provide emergency 2-way communication system and add communication boxes at 13th and 21st floors main elevator lobby and at the freight elevator lobby only. n/a for maher.Details
provide emergency 2-way communication system and add communication boxes at 13th and 21st floors main elevator lobby and at the freight elevator lobby only. n/a for maher. | $47,520 |
| Nov 26, 2018 | Never finaled issued Nov 2018, no final | 1455 Market St | R L H Fire Protection Inc | basement: fire sprinkler. relocate 13 and add 5 pendent sprinklers. ref app#201810102855. n/a for maherDetails
basement: fire sprinkler. relocate 13 and add 5 pendent sprinklers. ref app#201810102855. n/a for maher | $5,500 |
| Nov 20, 2018 | Completed final sign-off Nov 2022 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | 21st flr, fire sprinkler t.i. add 9, relocate 10 and plug 2 sprinklers to conform w/ new wall / ceiling layout of t.i. ref 201810032088. job # 18-743Details
21st flr, fire sprinkler t.i. add 9, relocate 10 and plug 2 sprinklers to conform w/ new wall / ceiling layout of t.i. ref 201810032088. job # 18-743 | $6,975 |
| Oct 23, 2018 | Completed final sign-off Dec 2018 | 1455 Market St | Sabah International Incorporated | ref pa# 2018-0731-5988.modify (e) fire alarm system. add (2) booster power supply, (7) duct smoke detector, (8) control relay, (3) manual pull station,(3) mini monitor module,(22) wall strobes,(1) ceiling strobe,(3) wall speaker,(2) ceiling speaker/stobes,(20) wall speaker/strobes.**maher n/a**Details
ref pa# 2018-0731-5988.modify (e) fire alarm system. add (2) booster power supply, (7) duct smoke detector, (8) control relay, (3) manual pull station,(3) mini monitor module,(22) wall strobes,(1) ceiling strobe,(3) wall speaker,(2) ceiling speaker/stobes,(20) wall speaker/strobes.**maher n/a** | $20,204 |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1455 Market St | Truebeck Construction | interior ti - upgrade (e) storage area finishes and lightingDetails
interior ti - upgrade (e) storage area finishes and lighting | $170,892 |
| Oct 4, 2018 | Never finaled issued Oct 2018, no final | 1455 Market St | Bcci Construction Company | 21st flr mepto support approved arch 201810032088 maher naDetails
21st flr mepto support approved arch 201810032088 maher na | $325,000 |
| Oct 3, 2018 | Completed final sign-off Apr 2019 | 1455 Market St | Bcci Construction Company | 21st fl - selective demo and build back of new office space including partitions, ceiling work, doors, glazing and finishes room 2108 is an a-2 dining area.Details
21st fl - selective demo and build back of new office space including partitions, ceiling work, doors, glazing and finishes room 2108 is an a-2 dining area. | $692,800 |
| Oct 1, 2018 | Completed final sign-off Jan 2019 | 1455 Market St | Novo Construction Inc | 6th floor: mech and elect for t.i. improvement. ref app#201809180598. n/a for maherDetails
6th floor: mech and elect for t.i. improvement. ref app#201809180598. n/a for maher | |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 1455 Market St | Bcci Construction Company | 13th flr- mep defferred submittal to previous approved arch set. new vav boxes, fan coil units, ac units & fsd's added ref 201807315988 maher naDetails
13th flr- mep defferred submittal to previous approved arch set. new vav boxes, fan coil units, ac units & fsd's added ref 201807315988 maher na | $560,000 |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | 13th flr - add 140, relocate 68 and plug 8 sprinklers to comform with new wall/ceiling layout of ti. ref 201807315988 maher naDetails
13th flr - add 140, relocate 68 and plug 8 sprinklers to comform with new wall/ceiling layout of ti. ref 201807315988 maher na | $88,800 |
| Sep 18, 2018 | Completed final sign-off Jan 2019 | 1455 Market St | Novo Construction Inc | 6th flr - ti work to include demo, new partiions, ceiling and finishes, light fixture, new glass partitions drywall partitions. mep under sep permit maher naDetails
6th flr - ti work to include demo, new partiions, ceiling and finishes, light fixture, new glass partitions drywall partitions. mep under sep permit maher na | $175,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2018 | 1455 Market St | Honeywell International, Inc | 7th flr - fire alarm modifications: add 2 smk det, and 1 ceiling mounted speaker ref 201804166463 maher naDetails
7th flr - fire alarm modifications: add 2 smk det, and 1 ceiling mounted speaker ref 201804166463 maher na | $1,848 |
| Aug 21, 2018 | Completed final sign-off Aug 2018 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | ref pa # 201807104082 t.i. 6th fl; add (10) and relocate (17) sprinklers to conform with the wall/ceiling layout of the t. i.Details
ref pa # 201807104082 t.i. 6th fl; add (10) and relocate (17) sprinklers to conform with the wall/ceiling layout of the t. i. | $9,075 |
| Aug 20, 2018 | Completed final sign-off Aug 2018 | 1455 Market St | Honeywell International, Inc | 6th flr - fire alarm modifications ref 201807104082. demo 25 ceiling mounted smk det for previous battery storage room. add 6 ceiling mounted speaker/strobes. add 2 wall mounted speaker/strobes. relocate 1 wall mnt speaker/strobe maher naDetails
6th flr - fire alarm modifications ref 201807104082. demo 25 ceiling mounted smk det for previous battery storage room. add 6 ceiling mounted speaker/strobes. add 2 wall mounted speaker/strobes. relocate 1 wall mnt speaker/strobe maher na | $4,928 |
| Jul 31, 2018 | Completed final sign-off Apr 2019 | 1455 Market St | Bcci Construction Company | 13th fl - ti includes new partitions, doors, glazing & finishes.Details
13th fl - ti includes new partitions, doors, glazing & finishes. | $2,900,000 |
| Jul 26, 2018 | Never finaled issued Sep 2018, no final | 1455 Market St | Bay Cities Pyrotector Inc | voluntary 1 for 1 replacement of halon tanks at 4 turbine generators w/ stat-x aerosal suppression systems, kidde aegis panels at 4 turbine generators w/ notifier rp 2002 surppression panels. reusing (e) devices. (e) flame detectors to remain as isDetails
voluntary 1 for 1 replacement of halon tanks at 4 turbine generators w/ stat-x aerosal suppression systems, kidde aegis panels at 4 turbine generators w/ notifier rp 2002 surppression panels. reusing (e) devices. (e) flame detectors to remain as is | $37,243 |
| Jul 23, 2018 | Completed final sign-off May 2019 | 1455 Market St | Novo Construction Inc | 6th fl: mep for tenant improvement. demo existing ductwork & vav box, new vav box duct work & diffusers. new electrical work. ref pa #201807104082. maher naDetails
6th fl: mep for tenant improvement. demo existing ductwork & vav box, new vav box duct work & diffusers. new electrical work. ref pa #201807104082. maher na | $15,000 |
| Jul 18, 2018 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | revised fire alarm as builts for 2018-0627-3112 per inspector's comments: move 1 strobe and change 4 strobes to 4 speaker/strobesDetails
revised fire alarm as builts for 2018-0627-3112 per inspector's comments: move 1 strobe and change 4 strobes to 4 speaker/strobes | $2,000 |
| Jul 10, 2018 | Completed final sign-off Nov 2018 | 1455 Market St | Novo Construction Inc | 6th fl - ti to include removal of selective drywall partitions, suspended ceiling, new glass partitions, drywall partitions and finished. mep under separate permitDetails
6th fl - ti to include removal of selective drywall partitions, suspended ceiling, new glass partitions, drywall partitions and finished. mep under separate permit | $489,203 |
| Jun 27, 2018 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | level a: fire alarm as builts for 2018-0406-5663 - add to original scope - 2 smk det, 1 control relay, 1 rib relayDetails
level a: fire alarm as builts for 2018-0406-5663 - add to original scope - 2 smk det, 1 control relay, 1 rib relay | $600 |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 1455 Market St | Bcci Construction Company | floor 13; demo of existing walls, doors, restroom plumbing fixtures, mech, equipment, electrical outlets ,floor, walls and ceiling finishesDetails
floor 13; demo of existing walls, doors, restroom plumbing fixtures, mech, equipment, electrical outlets ,floor, walls and ceiling finishes | $60,000 |
| Jun 4, 2018 | Completed final sign-off Oct 2018 | 1455 Market St | Enterprise Roofing Service Inc | reroofingDetails
reroofing | $1,019,574 |
| Jun 1, 2018 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | f/a modificatiom on level 16: install new auto -dialer and radio commmunicator, (3) control relays,(1) monitor module to send notification to central monitoring stationDetails
f/a modificatiom on level 16: install new auto -dialer and radio commmunicator, (3) control relays,(1) monitor module to send notification to central monitoring station | $2,032 |
| May 10, 2018 | Completed final sign-off Feb 2019 | 1455 Market St | City Building Inc. | 1st fl - ti to include demo of non-structural partitions. new non-structural partitions mep & fire life safety under separate permitDetails
1st fl - ti to include demo of non-structural partitions. new non-structural partitions mep & fire life safety under separate permit | $150,000 |
| Apr 18, 2018 | Completed final sign-off May 2025 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | 6th flr -revision to 201801249424 - ti. relocate 6 sprinklers to conform with the new wall.ceiling layout at the ti maher naDetails
6th flr -revision to 201801249424 - ti. relocate 6 sprinklers to conform with the new wall.ceiling layout at the ti maher na | $1,350 |
| Apr 17, 2018 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | revision to pa 2017-0807-4024 reflecting changes to the evacuation sequence of operationsDetails
revision to pa 2017-0807-4024 reflecting changes to the evacuation sequence of operations | |
| Apr 16, 2018 | Completed final sign-off Oct 2018 | 1455 Market St | City Building Inc. | 7th fl: minor interior remodel to add a private office and change existing light fixtures. maher naDetails
7th fl: minor interior remodel to add a private office and change existing light fixtures. maher na | $15,000 |
| Apr 11, 2018 | Never finaled issued Apr 2018, no final | 1455 Market St | Honeywell International, Inc | fire alarm modifications to level 6. add: 2 wall speaker/strobes, 1 ceiling speaker/strobes, 1 duct smoke detector, 1 control relay and relocate 2 wall speaker/strobes. permit no. 201801259510; architectural permit app#201801249424. n/a for maherDetails
fire alarm modifications to level 6. add: 2 wall speaker/strobes, 1 ceiling speaker/strobes, 1 duct smoke detector, 1 control relay and relocate 2 wall speaker/strobes. permit no. 201801259510; architectural permit app#201801249424. n/a for maher | $3,958 |
| Apr 10, 2018 | Never finaled issued Apr 2018, no final | 1455 Market St | street space permitDetails
street space permit | ||
| Apr 10, 2018 | Never finaled issued Apr 2018, no final | 1455 Market St | Honeywell International, Inc | 4th & 5th fl: (4) existing pneumatic dampers are being replaced with (4) new electric smoke dampers as part of maintenance program. existing dampers are very old hence not reliable. new smoke controll report provided maher naDetails
4th & 5th fl: (4) existing pneumatic dampers are being replaced with (4) new electric smoke dampers as part of maintenance program. existing dampers are very old hence not reliable. new smoke controll report provided maher na | $5,000 |
| Apr 10, 2018 | Never finaled issued Apr 2018, no final | 1455 Market St | Honeywell International, Inc | f/a modification on 4th & 5th fl: replace (4) rneumatic dampers w/electric. add (4) monitor module; (4) dual monitor modules; (8) aux relay; (2) enclosures. maher naDetails
f/a modification on 4th & 5th fl: replace (4) rneumatic dampers w/electric. add (4) monitor module; (4) dual monitor modules; (8) aux relay; (2) enclosures. maher na | $8,280 |
| Apr 10, 2018 | Completed final sign-off Sep 2018 | 1455 Market St | City Building Inc. | install 6' high windscreen barrier system at extg exterior breezeway seating area of sidewalk. n/a for maherDetails
install 6' high windscreen barrier system at extg exterior breezeway seating area of sidewalk. n/a for maher | $100,000 |
| Apr 6, 2018 | Completed final sign-off Apr 2018 | 1455 Market St | Honeywell International, Inc | as builts to pa 2017-0623-0167 changes to sequence of operations, relocated duct detector and module for fan shut offDetails
as builts to pa 2017-0623-0167 changes to sequence of operations, relocated duct detector and module for fan shut off | |
| Apr 6, 2018 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | level 2 - fire alarm modifications remove: 21 smk det, 7 duct smk det, 3 pull stations, 75 speakers, 56 strobes, 3 speaker/strobes, 8 control modules, 7 monitor modules. add: 6 wall strobes, 4 ceiling speaker.strobes, 5 smk det, 3 dual monitor modules, 1 monitor modules 2 control modules, 2 relays,Details
level 2 - fire alarm modifications remove: 21 smk det, 7 duct smk det, 3 pull stations, 75 speakers, 56 strobes, 3 speaker/strobes, 8 control modules, 7 monitor modules. add: 6 wall strobes, 4 ceiling speaker.strobes, 5 smk det, 3 dual monitor modules, 1 monitor modules 2 control modules, 2 relays, | $12,920 |
| Mar 19, 2018 | Never finaled issued Mar 2018, no final | 1455 Market St | R L H Fire Protection Inc | relocate 15 and add 3 pendant sprinklers delete 2 upright sprinklers on the 2nd level rev 201711143935Details
relocate 15 and add 3 pendant sprinklers delete 2 upright sprinklers on the 2nd level rev 201711143935 | $5,000 |
| Mar 5, 2018 | Completed final sign-off May 2025 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | f/s ti: 6th fl - add (3) and relocate (8) sprinklers to conform with the new wall/ceiling layout of the ti. ref #201801249424. maher naDetails
f/s ti: 6th fl - add (3) and relocate (8) sprinklers to conform with the new wall/ceiling layout of the ti. ref #201801249424. maher na | $3,375 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 1455 Market St | Certified Fire And Safety | install ul 300 ansul fire system to protect kitchen hood, cooking equipment, and air maid brand bleed off valve 201702038584- fire alarm separate permit.Details
install ul 300 ansul fire system to protect kitchen hood, cooking equipment, and air maid brand bleed off valve 201702038584- fire alarm separate permit. | $5,000 |
| Feb 16, 2018 | Never finaled issued Feb 2018, no final | 1455 Market St | street space permitDetails
street space permit | ||
| Jan 25, 2018 | Completed final sign-off Jun 2018 | 1455 Market St | Bcci Construction Company | 6th floor:: mep to support approved t.i. new light fixtures, outlets, relocate ducts, new crac unit, 1 vav and low pressure ductwork. ref app#201801249424. n/a for maher.Details
6th floor:: mep to support approved t.i. new light fixtures, outlets, relocate ducts, new crac unit, 1 vav and low pressure ductwork. ref app#201801249424. n/a for maher. | $90,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 1455 Market St | Bcci Construction Company | 6th floor: demo & build back ti to include new partitons and associated work. ref 201212196577; n/a maherDetails
6th floor: demo & build back ti to include new partitons and associated work. ref 201212196577; n/a maher | $341,845 |
| Jan 5, 2018 | Completed final sign-off Mar 2018 | 1455 Market St | Bcci Construction Company | 18th fl - partial ti add urinal to men's room, sink in mother's room, pendant lighting & two millwork benches.Details
18th fl - partial ti add urinal to men's room, sink in mother's room, pendant lighting & two millwork benches. | $42,592 |
| Dec 11, 2017 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | revision to 201708074024 reprogram sequence of operation. fire alarmDetails
revision to 201708074024 reprogram sequence of operation. fire alarm | $87,000 |
| Dec 8, 2017 | Completed final sign-off Nov 2018 | 1455 Market St | City Building Inc. | south side of bldg - 1st fl/lower level b upgrade the (e) facade of 1455 market st, ste 200. adding (n) store front windows. new storefront entrance and awning on mission st. new bldg lighting on 11 & mission. (n) drinking fountainDetails
south side of bldg - 1st fl/lower level b upgrade the (e) facade of 1455 market st, ste 200. adding (n) store front windows. new storefront entrance and awning on mission st. new bldg lighting on 11 & mission. (n) drinking fountain | $1,650,000 |
| Nov 22, 2017 | Completed final sign-off Feb 2018 | 1455 Market St | City Building Inc. | 7th fl: revision to pa #201705156621, to add glass doors to replace (e) wood doors, and to convert a private office into a small training room. no change to (e) occupncy or egress. maher naDetails
7th fl: revision to pa #201705156621, to add glass doors to replace (e) wood doors, and to convert a private office into a small training room. no change to (e) occupncy or egress. maher na | $15,000 |
| Nov 20, 2017 | Completed final sign-off Jan 2018 | 1455 Market St | Honeywell International, Inc | 7th floor fire alarm modifications: relcoate (1) strobe; add (1) smoke detector; (2) speakers. ref arch pa #201705156621. n/a maher ordinanceDetails
7th floor fire alarm modifications: relcoate (1) strobe; add (1) smoke detector; (2) speakers. ref arch pa #201705156621. n/a maher ordinance | $1,900 |
| Nov 14, 2017 | Completed final sign-off Aug 2018 | 1455 Market St | City Building Inc. | 1st fl ti to include consturction of new cold shell office space with new accessible restrooms and shower/changing room. building fully sprinklered all open area hvac, el, plumbing other than restrooms, will be stubbed for future tis. fire under separate permits all work is engineeredDetails
1st fl ti to include consturction of new cold shell office space with new accessible restrooms and shower/changing room. building fully sprinklered all open area hvac, el, plumbing other than restrooms, will be stubbed for future tis. fire under separate permits all work is engineered | $495,000 |
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 1455 Market St | Honeywell International, Inc | fa modication 4th fl add 3 duct detectors at fsd and heat pump 3 control relay at fso and heat pump, 1 dual monitor module at fsd, 1 pilot relay at fsd. ref mech pa #201703222097. maher not reqDetails
fa modication 4th fl add 3 duct detectors at fsd and heat pump 3 control relay at fso and heat pump, 1 dual monitor module at fsd, 1 pilot relay at fsd. ref mech pa #201703222097. maher not req | $7,242 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 1455 Market St | Honeywell International, Inc | fa modificiation on level 2 remove 1 speaker and 3 strobes, 1 strobe power supply, 6 control relays, 5 pilot relays, 5 dual monitor modules, 2 smoke detectors, 2 duct dectectors, 8 speaker strobes. ref #201707252821. maher naDetails
fa modificiation on level 2 remove 1 speaker and 3 strobes, 1 strobe power supply, 6 control relays, 5 pilot relays, 5 dual monitor modules, 2 smoke detectors, 2 duct dectectors, 8 speaker strobes. ref #201707252821. maher na | $18,150 |
| Nov 2, 2017 | Completed final sign-off Mar 2018 | 1455 Market St | Battalion One Fire Protection | sprinkler tenant improvement for new lessee, relocation of sprinkler heads ref 201612306266 maher not reqDetails
sprinkler tenant improvement for new lessee, relocation of sprinkler heads ref 201612306266 maher not req | $5,800 |
| Oct 13, 2017 | Completed final sign-off Nov 2017 | 1455 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinklerDetails
fire sprinkler | $8,500 |
| Sep 27, 2017 | Completed final sign-off Aug 2018 | 1455 Market St | City Building Inc. | demolish non structural partitons, acoustical ceilings, light fixtures, hvac units ductwork. sprinkler permit 201709138033Details
demolish non structural partitons, acoustical ceilings, light fixtures, hvac units ductwork. sprinkler permit 201709138033 | $250,000 |
| Sep 25, 2017 | Completed final sign-off Mar 2018 | 1455 Market St | The Lawson Roofing Co Inc. | reroofing. maher naDetails
reroofing. maher na | $361,512 |
| Sep 25, 2017 | Completed final sign-off Mar 2018 | 1455 Market St | Bay Cities Pyrotector Inc | level b: voluntary 1-for-1 replacement of 2 obsolete gemini fire suppression panels at two fuel vaults (level b) with (2) new kidde aegis 2.0 suppression panels. addition of 2 high pressure balls valves with limit switches. maher n/a.Details
level b: voluntary 1-for-1 replacement of 2 obsolete gemini fire suppression panels at two fuel vaults (level b) with (2) new kidde aegis 2.0 suppression panels. addition of 2 high pressure balls valves with limit switches. maher n/a. | $21,571 |
| Sep 15, 2017 | Completed final sign-off Oct 2017 | 1455 Market St | Honeywell International, Inc | fa modification on level 6 - remove 1 wall speaker/strobe, relocate 1 pendent speaker/strobes. ref pa 2017-0811-4665Details
fa modification on level 6 - remove 1 wall speaker/strobe, relocate 1 pendent speaker/strobes. ref pa 2017-0811-4665 | $514 |
| Sep 13, 2017 | Completed final sign-off May 2025 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | 2nd fl: change out 439 sprinklers and plug two in order to return to the shell system. maher naDetails
2nd fl: change out 439 sprinklers and plug two in order to return to the shell system. maher na | $54,000 |
| Sep 5, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | Bay Cities Pyrotector Inc | 9th floor: as built submittal for app#201704285143. n/a for maherDetails
9th floor: as built submittal for app#201704285143. n/a for maher | |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 1455 Market St | Anderson, Rowe & Buckley, Inc. | 6th fl: relocate 6 fire sprinklers & plug 2 fire sprinklers ref pa 2017-0811-4665Details
6th fl: relocate 6 fire sprinklers & plug 2 fire sprinklers ref pa 2017-0811-4665 | $1,500 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 1455 Market St | Bcci Construction Company | 6th fl - provided new power & branch circuiting to existing panel. maintain same existing power & signal outlets & provide new power branch circuiting & raceway systemsDetails
6th fl - provided new power & branch circuiting to existing panel. maintain same existing power & signal outlets & provide new power branch circuiting & raceway systems | $45,000 |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | Deb Construction Llc | 10th floor - install new lighting & lighting controls. ref pa#201610140269. n/a maher ordinanceDetails
10th floor - install new lighting & lighting controls. ref pa#201610140269. n/a maher ordinance | $6,000 |
| Aug 24, 2017 | Completed final sign-off Mar 2018 | 1455 Market St | Bcci Construction Company | 6th fl - demo ductwork per plans install low pressure ductwork per plans. relocate existing thermostat per plans. ref 2017-0811-4665. maherDetails
6th fl - demo ductwork per plans install low pressure ductwork per plans. relocate existing thermostat per plans. ref 2017-0811-4665. maher | $50,000 |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | Deb Construction Llc | 3rd floor - install new lighting & lighting controls. ref pa#201610140268. n/a maher ordinanceDetails
3rd floor - install new lighting & lighting controls. ref pa#201610140268. n/a maher ordinance | $3,000 |
| Aug 11, 2017 | Completed final sign-off Mar 2018 | 1455 Market St | Bcci Construction Company | 6th floor ti demo of partition walls & light fixtures, new lighting drywall partions near break room. mep on separate permit. sprinklers deferred.Details
6th floor ti demo of partition walls & light fixtures, new lighting drywall partions near break room. mep on separate permit. sprinklers deferred. | $90,750 |
| Aug 7, 2017 | Completed final sign-off Jul 2018 | 1455 Market St | Honeywell International, Inc | re-program sequence of operation for fire alarms for the entire building. maher naDetails
re-program sequence of operation for fire alarms for the entire building. maher na | $87,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 1455 Market St | Deb Construction Llc | basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13Details
basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13 | $425,000 |
| Jul 13, 2017 | Never finaled issued Jul 2017, no final | 1455 Market St | Bcci Construction Company | 19th floor: t.i. includes new door, sidelite, pendant lighting and millwork benches. n/a for maher.Details
19th floor: t.i. includes new door, sidelite, pendant lighting and millwork benches. n/a for maher. | $60,000 |
| Jun 23, 2017 | Never finaled issued Jun 2017, no final | 1455 Market St | Honeywell International, Inc | fire alarm ti on level 3, street level suite "b"; install (3) speaker/strobes; (1) dual monitor module; 1 duct detector, 1 control module. ref pa 2017-0203-8584. maher naDetails
fire alarm ti on level 3, street level suite "b"; install (3) speaker/strobes; (1) dual monitor module; 1 duct detector, 1 control module. ref pa 2017-0203-8584. maher na | $3,084 |
| Jun 9, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | City Building Inc. | exterior facade alteration consisting of a new structural band with overhead infrared electric heaters. electrical work defered. maher naDetails
exterior facade alteration consisting of a new structural band with overhead infrared electric heaters. electrical work defered. maher na | $106,000 |
| May 15, 2017 | Completed final sign-off Feb 2018 | 1455 Market St | City Building Inc. | 7th fl: minor remodel to convert storage & accessory spaces to offices at suites 731/733 and 726. amep plans, fire sprinklers and alarms under separate permit. maher naDetails
7th fl: minor remodel to convert storage & accessory spaces to offices at suites 731/733 and 726. amep plans, fire sprinklers and alarms under separate permit. maher na | $200,000 |
| Apr 28, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | Bay Cities Pyrotector Inc | 9th floor (roof): 1) voluntary one for one replacement of 4 obsolete fire suppression panels at 4 turbine generators with 4 new suppression panels. 2) one horn/strobe, one pull station and one disable switch with new devices. n/a for maherDetails
9th floor (roof): 1) voluntary one for one replacement of 4 obsolete fire suppression panels at 4 turbine generators with 4 new suppression panels. 2) one horn/strobe, one pull station and one disable switch with new devices. n/a for maher | $44,425 |
| Mar 22, 2017 | Never finaled issued Mar 2017, no final | 1455 Market St | Legacy Mechanical & Energy Services, Inc | 4th flr: provide and install (2) 4 ton wbhp, water pump, osa fan, ductwork and diffusers on grilles. maher naDetails
4th flr: provide and install (2) 4 ton wbhp, water pump, osa fan, ductwork and diffusers on grilles. maher na | $30,000 |
| Mar 3, 2017 | Completed final sign-off Sep 2017 | 1455 Market St | Creative Works | roof -install new iot antenna to (e) mount on roof. attach kerlink radio unit to (e) mount & run catse cable to nearest electrical outlet. ** maher: n/a **Details
roof -install new iot antenna to (e) mount on roof. attach kerlink radio unit to (e) mount & run catse cable to nearest electrical outlet. ** maher: n/a ** | $1,100 |
| Feb 24, 2017 | Completed final sign-off Apr 2017 | 1455 Market St | R L H Fire Protection Inc | 4th floor: fire sprinkler - relocate 2 pendent sprinklers ref 201701257927 maher naDetails
4th floor: fire sprinkler - relocate 2 pendent sprinklers ref 201701257927 maher na | $1,000 |
| Feb 21, 2017 | Expired or cancelled cancelled Jan 2026 | 1455 Market St | install 10' pip mast on (e) roof to p, whip antenna to be mounted to new 10' pipe. attach kerlink radio unit to pipe mast and run cat 5e cable to nearest electrical outlet. maher naDetails
install 10' pip mast on (e) roof to p, whip antenna to be mounted to new 10' pipe. attach kerlink radio unit to pipe mast and run cat 5e cable to nearest electrical outlet. maher na | $1,100 | |
| Feb 21, 2017 | Completed final sign-off Apr 2017 | 1455 Market St | Honeywell International, Inc | 4/f- add 1 ceiling speaker strobe in the restroom ref 201701257927. n/a ordinance #155-13Details
4/f- add 1 ceiling speaker strobe in the restroom ref 201701257927. n/a ordinance #155-13 | $510 |
| Feb 16, 2017 | Completed final sign-off Mar 2017 | 1455 Market St | Honeywell International, Inc | 1/f l3- install (8) ceiling speaker/strobes, (1) dual monitro module at kitchen hood, (1) duct smoke detector at makeup air unit, (1) cm at make up air unit, (1) cm at vav overide, replace (2) smoke detectors at main shaft return air duct. t.i. pa#201606069181. n/a ordinance #155-13Details
1/f l3- install (8) ceiling speaker/strobes, (1) dual monitro module at kitchen hood, (1) duct smoke detector at makeup air unit, (1) cm at make up air unit, (1) cm at vav overide, replace (2) smoke detectors at main shaft return air duct. t.i. pa#201606069181. n/a ordinance #155-13 | $7,000 |
| Feb 14, 2017 | Completed final sign-off Mar 2017 | 1455 Market St | International Fire Equip | install ul300 fire system. ref pa 2016-0919-8064Details
install ul300 fire system. ref pa 2016-0919-8064 | $6,000 |
| Feb 3, 2017 | Completed final sign-off Apr 2018 | 1455 Market St | provide mep. revision to pa#201605026268 and refer to architectural pa#201612306266. n/a ordinance #155-13Details
provide mep. revision to pa#201605026268 and refer to architectural pa#201612306266. n/a ordinance #155-13 | ||
| Jan 25, 2017 | Completed final sign-off Apr 2017 | 1455 Market St | Principal Builders Inc. | barrier removal to provide a new all gender restroom and upgrades hvac and electrical work to accomodate change from (e) use to as storage to restroom. maher naDetails
barrier removal to provide a new all gender restroom and upgrades hvac and electrical work to accomodate change from (e) use to as storage to restroom. maher na | $14,000 |
| Jan 25, 2017 | Never finaled issued Jan 2017, no final | 1455 Market St | Honeywell International, Inc | floors 12 & 22: to confirm existing door lock hardwareDetails
floors 12 & 22: to confirm existing door lock hardware | |
| Jan 6, 2017 | Completed final sign-off Mar 2017 | 1455 Market St | Honeywell International, Inc | replace wall strobe and ceiling speaker with wall speaker/strobe in each of (4) restrooms. add 4 new wall speaker/strobes. ref pa 2016-1014-0268, 3rd floor and 2016-1014-0269, 10th floor; n/a maherDetails
replace wall strobe and ceiling speaker with wall speaker/strobe in each of (4) restrooms. add 4 new wall speaker/strobes. ref pa 2016-1014-0268, 3rd floor and 2016-1014-0269, 10th floor; n/a maher | $2,000 |
| Dec 30, 2016 | Completed final sign-off Apr 2018 | 1455 Market St | revision to 201605026268 - new set of arch plans. 1st floor new restaurant ti for suite 3b includes new non structural partitions, finishes, flooring & wall tile & ceilings. all new mep and fire under separate permit. maher naDetails
revision to 201605026268 - new set of arch plans. 1st floor new restaurant ti for suite 3b includes new non structural partitions, finishes, flooring & wall tile & ceilings. all new mep and fire under separate permit. maher na | ||
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 1455 Market St | Vkk Signmakers Inc. | install hanging double faced electric sign into (e) support maher naDetails
install hanging double faced electric sign into (e) support maher na | $20,000 |
| Oct 14, 2016 | Completed final sign-off Sep 2017 | 1455 Market St | Deb Construction Llc | 10th fl barrier removal and build back of new compliant restrooms. all new or revised mep and l/s under sep permit bldg fully sprinklered ) maher not reqDetails
10th fl barrier removal and build back of new compliant restrooms. all new or revised mep and l/s under sep permit bldg fully sprinklered ) maher not req | $120,000 |
| Oct 14, 2016 | Completed final sign-off Sep 2017 | 1455 Market St | Deb Construction Llc | level 3 barrier removal constructing new compliant restrooms. all new or revised mep and l/s work will be design build and submitted for permit and separately building full sprinkleredDetails
level 3 barrier removal constructing new compliant restrooms. all new or revised mep and l/s work will be design build and submitted for permit and separately building full sprinklered | $80,000 |
| Oct 13, 2016 | Expired or cancelled withdrawn Dec 2016 | 1455 Market St | 1st floor - mechanical, electrical and plumbing for ref pa 2016-0805-4290 (new restaurant) (new demising wall under 2014-0724-2073). maher naDetails
1st floor - mechanical, electrical and plumbing for ref pa 2016-0805-4290 (new restaurant) (new demising wall under 2014-0724-2073). maher na | $200,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.