Candace Chan
- Listed as
- architect
- Firm
- Revel Architecture And Design
- Based in
- Sf
- On San Francisco permits
- Feb 2024 to Sep 2026
61 permits since 2000 (architect on 61 permits): 44 completed, 16 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 185 Berry St | 1st fl, ste 140 - interior construction of non-structural elements including interior partitions, doors, finishes, ceiling, and lighting. does not affect plumbing, fixtures quantitits, occupancy or path of travel.Details
1st fl, ste 140 - interior construction of non-structural elements including interior partitions, doors, finishes, ceiling, and lighting. does not affect plumbing, fixtures quantitits, occupancy or path of travel. | $182,000 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 185 Berry St | Hathaway Dinwiddie Co. | revision to open permit#202602125816, design changes, revised evcs stall location.Details
revision to open permit#202602125816, design changes, revised evcs stall location. | |
| Aug 4, 2026 | In progress issued Aug 2026 | 300 Mission St | M C S Construction Services | 6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel includedDetails
6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included | |
| Jul 20, 2026 | In progress issued Jul 2026 | 500 Howard St | floors: 2, 4, 6, 7: anchoring of (e) modules phone booths in (e) office.Details
floors: 2, 4, 6, 7: anchoring of (e) modules phone booths in (e) office. | $135,000 | |
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 680 Folsom St | 8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work includedDetails
8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included | $120,000 | |
| May 11, 2026 | In progress issued May 2026 | 650 California St | Skyline Construction | 12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred.Details
12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred. | $1,630,160 |
| Apr 1, 2026 | Completed final sign-off Jun 2026 | 595 Market St | Dome Construction Corp | 12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039Details
12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039 | $200,000 |
| Feb 26, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferredDetails
20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred | $1,168,299 |
| Dec 22, 2025 | In progress issued Mar 2026 | 300 Mission St | M C S Construction Services | 6th fl: tenant improvement. selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings & lighting. restroom upgrades are included. no exterior work. pot approved under separate permit.Details
6th fl: tenant improvement. selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings & lighting. restroom upgrades are included. no exterior work. pot approved under separate permit. | $940,000 |
| Dec 17, 2025 | Completed final sign-off Mar 2026 | 595 Market St | Dome Construction Corp | 12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permitDetails
12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permit | $350,000 |
| Dec 17, 2025 | Completed final sign-off Mar 2026 | 595 Market St | Dome Construction Corp | 13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work.Details
13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work. | $630,000 |
| Dec 17, 2025 | Completed final sign-off Mar 2026 | 595 Market St | Dome Construction Corp | 12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work.Details
12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work. | $700,000 |
| Dec 17, 2025 | Completed final sign-off Jul 2026 | 300 Mission St | M C S Construction Services | 11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress.Details
11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress. | $75,000 |
| Dec 16, 2025 | In progress filed Dec 2025, not yet issued | 595 Market St | 11th fl, suite 1150: scope of work on the 11th floor, shall consist of interior demolition of non-structural elements including interior partitions, finishes, and llightinh. construction of new glazing wall, lighting, and finishes. mep under a seperate permit.Details
11th fl, suite 1150: scope of work on the 11th floor, shall consist of interior demolition of non-structural elements including interior partitions, finishes, and llightinh. construction of new glazing wall, lighting, and finishes. mep under a seperate permit. | $133,000 | |
| Dec 11, 2025 | In progress issued Jan 2026 | 1 Market St | Clune Construction Company L P | 13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018Details
13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018 | $1,880,900 |
| Dec 8, 2025 | In progress issued Mar 2026 | 185 Berry St | Hathaway Dinwiddie Co. | provide new exit passageway at ground floorDetails
provide new exit passageway at ground floor | $250,000 |
| Sep 5, 2025 | In progress issued Nov 2025 | 88 Stevenson St | tenant improvement consisting of lim9ited interior demo new construction of non structural elements including interior partitions, doors, finishes, ceiling, lighting, mech, electrical outlets and switchesDetails
tenant improvement consisting of lim9ited interior demo new construction of non structural elements including interior partitions, doors, finishes, ceiling, lighting, mech, electrical outlets and switches | $882,000 | |
| Sep 4, 2025 | Completed final sign-off Jul 2026 | 333 Bush St | Source Planning And Construction Inc | floor/20- ste 2020 consist of minor demo of non structural elements including paritions doors, lighting and ceiling. construction at pantry and copy area. (n) ceiling, lighting and finishes. mep , life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel.Details
floor/20- ste 2020 consist of minor demo of non structural elements including paritions doors, lighting and ceiling. construction at pantry and copy area. (n) ceiling, lighting and finishes. mep , life and safety sprinkler under seperate permit. includes restroom upgrades and path of travel. | $250,000 |
| Aug 27, 2025 | In progress issued Sep 2025 | 1455 Market St | Bcci Construction Company | level 1: newly added scope of work consists of addition of a 2nd interior ramp at exit vestibule 1-003. converting of 2 (e) showers into toilet stalls & other minor shifts or adjustments to previously approved portion layout. newly added structural.Details
level 1: newly added scope of work consists of addition of a 2nd interior ramp at exit vestibule 1-003. converting of 2 (e) showers into toilet stalls & other minor shifts or adjustments to previously approved portion layout. newly added structural. | |
| Aug 4, 2025 | Completed final sign-off Jun 2026 | 410 Townsend St | San Francisco Commercial Builders Inc | 3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom upgrade. mep and fire life safety will be deferred submittal.Details
3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom upgrade. mep and fire life safety will be deferred submittal. | $213,630 |
| Jul 23, 2025 | Completed final sign-off Feb 2026 | 185 Berry St | Hathaway Dinwiddie Co. | #3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing fixture quantities, occupant load calculations, or path of travel.Details
#3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing fixture quantities, occupant load calculations, or path of travel. | $131,148 |
| Jul 23, 2025 | Completed final sign-off Jul 2026 | 1455 Market St | Bcci Construction Company | newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose.Details
newly added scope of work on the 4th and 5th floor consist of enclosing the (e) conveniecne internal stair with non-structural interior partitions. newly added mechanical and electrical modifications will be made to accommodate the in kind stair enclose. | |
| Jul 22, 2025 | Completed final sign-off Feb 2026 | 185 Berry St | Hathaway Dinwiddie Co. | #4000 -patch and repair finishes impacted by interior demo and adddition of new lighting.Details
#4000 -patch and repair finishes impacted by interior demo and adddition of new lighting. | $90,000 |
| Jul 22, 2025 | Completed final sign-off Jun 2026 | 410 Townsend St | San Francisco Commercial Builders Inc | 2nd/f: new demsing wall to separate e) full floor tenant to 2 suites #201 & 202. new pantry & upgrade to e) shower at #202. new floor 2 restroom & building path of travel mep deferred.Details
2nd/f: new demsing wall to separate e) full floor tenant to 2 suites #201 & 202. new pantry & upgrade to e) shower at #202. new floor 2 restroom & building path of travel mep deferred. | $213,630 |
| Jul 17, 2025 | Completed final sign-off Sep 2025 | 595 Market St | 25th fl: installation of life safety and seismic requirements for (2) phone booths in and existing office. does not affect existing layout occupancy or egress. path of travel under previously approved pa # 2023-0307-3171. restroom under 2022-0913-2378.(no mech-e)Details
25th fl: installation of life safety and seismic requirements for (2) phone booths in and existing office. does not affect existing layout occupancy or egress. path of travel under previously approved pa # 2023-0307-3171. restroom under 2022-0913-2378.(no mech-e) | $25,000 | |
| Jul 11, 2025 | Completed final sign-off Feb 2026 | 1455 Market St | Bcci Construction Company | 18th/fl shall consist of interior demo & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches. mep and fire sprinkler plan will be submitted as a seperate permitDetails
18th/fl shall consist of interior demo & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches. mep and fire sprinkler plan will be submitted as a seperate permit | $2,861,040 |
| Jun 26, 2025 | Completed final sign-off Mar 2026 | 1455 Market St | Bcci Construction Company | 4/f: interior demo and new construction of non-structural elements including but not limited to interior partitions.Details
4/f: interior demo and new construction of non-structural elements including but not limited to interior partitions. | $10,634,960 |
| Jun 12, 2025 | In progress issued Jul 2025 | 1455 Market St | Bcci Construction Company | level 1 interior demolition & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switchesDetails
level 1 interior demolition & new construction of non structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches | $6,953,380 |
| May 1, 2025 | Completed final sign-off Jan 2026 | 333 Bush St | Source Planning And Construction Inc | 7/f: demo of non-structural elements. construction of (2) all gender restrooms, wellness room, lounge, (2) phone rooms, finsihes, ceilings, and lighting. mep, life safety, sprinkler under separate permit. path of travel and restrooms approved # 202308305609 and 202409261645.Details
7/f: demo of non-structural elements. construction of (2) all gender restrooms, wellness room, lounge, (2) phone rooms, finsihes, ceilings, and lighting. mep, life safety, sprinkler under separate permit. path of travel and restrooms approved # 202308305609 and 202409261645. | $350,000 |
| Apr 16, 2025 | Completed final sign-off Dec 2025 | 333 Bush St | Source Planning And Construction Inc | suite 2500 25th fl: interior demo of non structural element including but not limited to partitions, doors, finishes, lighting, mech & elec. construct 5 new offices and 1 wellness room. mep & life safety & sprinkler plans to be submitted seperately. no ext bldg,site landscape use or parking proposedDetails
suite 2500 25th fl: interior demo of non structural element including but not limited to partitions, doors, finishes, lighting, mech & elec. construct 5 new offices and 1 wellness room. mep & life safety & sprinkler plans to be submitted seperately. no ext bldg,site landscape use or parking proposed | $235,000 |
| Apr 11, 2025 | Completed final sign-off Aug 2025 | 333 Bush St | Source Planning And Construction Inc | scope of work on 11th fl . interior demo of non structural elements. construction of new offices, conference rooms, break areas and storage. new ceilings, lighting and finishes throughout. mep, fire alarm, sprinkler will be separate permit. path of travel previously approved 202308305609Details
scope of work on 11th fl . interior demo of non structural elements. construction of new offices, conference rooms, break areas and storage. new ceilings, lighting and finishes throughout. mep, fire alarm, sprinkler will be separate permit. path of travel previously approved 202308305609 | $1,200,000 |
| Mar 26, 2025 | Completed final sign-off Sep 2025 | 333 Bush St | Source Planning And Construction Inc | 7/f suite 750 - interior demolition of non-structural walls, door, and frame. existing flooring, ceiling, lighting to remain. space is currently vacant and unoccupied. path of travel scope not required per ab-017Details
7/f suite 750 - interior demolition of non-structural walls, door, and frame. existing flooring, ceiling, lighting to remain. space is currently vacant and unoccupied. path of travel scope not required per ab-017 | $5,000 |
| Mar 21, 2025 | Expired or cancelled withdrawn Apr 2026 | 500 Beach St | 1/f: renovations of (e) restrooms on fl 1 including new fixtures, lighting, and finishes. no structural work. full path of travel and trestroom upgrades for ste 112. electrical deferred.Details
1/f: renovations of (e) restrooms on fl 1 including new fixtures, lighting, and finishes. no structural work. full path of travel and trestroom upgrades for ste 112. electrical deferred. | $125,000 | |
| Nov 6, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | 13th flr. revision to permit 202408289624. revised scope on the 13th flr consists of changing (4) office rooms to conference rooms (3) office rooms to huddle rooms, (1) conference rooms to a huddle room. mep under separate permit.Details
13th flr. revision to permit 202408289624. revised scope on the 13th flr consists of changing (4) office rooms to conference rooms (3) office rooms to huddle rooms, (1) conference rooms to a huddle room. mep under separate permit. | |
| Oct 25, 2024 | Completed final sign-off Apr 2025 | 44 Montgomery St | M C S Construction Services | 28th fl- int demo of non struc elements incl but not necessarily limited to int partitions, doors, finishes, ceilings, lighting, plumbing, mechanical & elec plans will be submitted separately. sprinkler ref 202410173126.Details
28th fl- int demo of non struc elements incl but not necessarily limited to int partitions, doors, finishes, ceilings, lighting, plumbing, mechanical & elec plans will be submitted separately. sprinkler ref 202410173126. | $140,000 |
| Oct 24, 2024 | Completed final sign-off Mar 2025 | 44 Montgomery St | Novo Construction Inc | 30/f: (ste 3000) demo of partitions, power, lighting, ceiling grid, millwork, and finishes. construction of new partitions, power, lighting, finishes, and millwork. including corridor and restroom ada upgrades. mep, fire life safety, and sprinkler system mods are to be separate and deferred permits.Details
30/f: (ste 3000) demo of partitions, power, lighting, ceiling grid, millwork, and finishes. construction of new partitions, power, lighting, finishes, and millwork. including corridor and restroom ada upgrades. mep, fire life safety, and sprinkler system mods are to be separate and deferred permits. | $800,000 |
| Oct 3, 2024 | Completed final sign-off Jan 2025 | 580 California St | Skyline Construction | 14th fl. consist of interior demo and construction of non-structural elements including but not limited to interior partitions, doors,& elec outlets mechanincal, elec and plumbing will be under sep permit, scope does not affect fixture quantiites, occ load calcs or path of travel no exterior bldgDetails
14th fl. consist of interior demo and construction of non-structural elements including but not limited to interior partitions, doors,& elec outlets mechanincal, elec and plumbing will be under sep permit, scope does not affect fixture quantiites, occ load calcs or path of travel no exterior bldg | $110,000 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 225 Bush St | Richlen Construction | ste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit onlyDetails
ste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only | |
| Sep 26, 2024 | Completed final sign-off Aug 2025 | 333 Bush St | Source Planning And Construction Inc | scope of work on 7th floor interior demolition of non-structural elements. construction at new interior partitions. new break, copy room. 5 phone rooms and u conferences. mep, life safety and sprinkler plans will be separate permit. path of travel previously approved 202308305609Details
scope of work on 7th floor interior demolition of non-structural elements. construction at new interior partitions. new break, copy room. 5 phone rooms and u conferences. mep, life safety and sprinkler plans will be separate permit. path of travel previously approved 202308305609 | $650,000 |
| Aug 28, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 12th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & life safety deferred. demo under pa# 202406134352Details
12th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & life safety deferred. demo under pa# 202406134352 | $2,141,856 |
| Aug 28, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | 13th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & fire sprinkler deferred. demo under pa# 202406134362Details
13th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. restroom ada accessibility upgrades. mep & fire sprinkler deferred. demo under pa# 202406134362 | $2,034,135 | |
| Aug 28, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 7th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. . mep & fire sprinkler deferred. demo under pa# 202406204857Details
7th fl: interior demolition & new construction of non-structural elements including & not limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches. . mep & fire sprinkler deferred. demo under pa# 202406204857 | $2,267,237 |
| Aug 6, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Bcci Construction Company | interior demo and new const of non struc elements. partitions, doors, finishes, clg, lighting,mech, elec. restroom ada accesblty upgrades. mep and fire sprinkler sep permit. no change ext bldg,site, landscape,parking.ref 202406204857 path of travelDetails
interior demo and new const of non struc elements. partitions, doors, finishes, clg, lighting,mech, elec. restroom ada accesblty upgrades. mep and fire sprinkler sep permit. no change ext bldg,site, landscape,parking.ref 202406204857 path of travel | $1,987,509 |
| Aug 5, 2024 | Completed final sign-off May 2025 | 747 Front St | San Francisco Commercial Builders Inc | ground fl change of use from gym to coffee shop ti to include minor electrical and plumbing. (n) pass through window.Details
ground fl change of use from gym to coffee shop ti to include minor electrical and plumbing. (n) pass through window. | $75,000 |
| Jul 24, 2024 | In progress issued Aug 2024 | 225 Bush St | Richlen Construction | suite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit.Details
suite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit. | $322,998 |
| Jun 13, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 16th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not requiredDetails
16th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not required | $120,000 |
| Jun 13, 2024 | Completed final sign-off Jan 2025 | 1455 Market St | Bcci Construction Company | 7/f: ref 202406204857- scope of work shall consist of select demo of non structural partitions and associated power/data and finishes throughout 7/f. space is current unoccupied. per ab-017 fire sprinklers and life safety to remain operational. path of travel/accessibility scope is not req.Details
7/f: ref 202406204857- scope of work shall consist of select demo of non structural partitions and associated power/data and finishes throughout 7/f. space is current unoccupied. per ab-017 fire sprinklers and life safety to remain operational. path of travel/accessibility scope is not req. | $170,000 |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | floor 12: scope of work: demo of nonstructural partitions and associated power / data and finishes throughout 12th floor. space is correctly un-occupied. per ab-017: fire sprinklers and lifesafety to remain operational path of travel/ accessibility scope is not required.Details
floor 12: scope of work: demo of nonstructural partitions and associated power / data and finishes throughout 12th floor. space is correctly un-occupied. per ab-017: fire sprinklers and lifesafety to remain operational path of travel/ accessibility scope is not required. | $120,000 |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 1455 Market St | Bcci Construction Company | 17th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not requiredDetails
17th floor- soft demo to include non structural partitions and associated power/data and finishes throughout un occupied floor. ab-017 -fire sprinklers and life safety to remain operational path of travel/accessibility not required | $120,000 |
| Jun 13, 2024 | Completed final sign-off Feb 2025 | 1455 Market St | Bcci Construction Company | 13th/f: scope of work consist of select dmo of non structural partitions and associated power/data and finishes throughout 13th fl. space is currently unoccupied per ab17. fire sprinklers and life safey to remain operational. path of travel accessibiolity scope is not req.Details
13th/f: scope of work consist of select dmo of non structural partitions and associated power/data and finishes throughout 13th fl. space is currently unoccupied per ab17. fire sprinklers and life safey to remain operational. path of travel accessibiolity scope is not req. | $120,000 |
| May 28, 2024 | Completed final sign-off Nov 2024 | 625 02nd St | Source Planning And Construction Inc | provide new lighting and branch circuiting to existing panel. provide ca title 24 compiance formsDetails
provide new lighting and branch circuiting to existing panel. provide ca title 24 compiance forms | $243,750 |
| May 8, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Source Planning And Construction Inc | floor 11: interior demo & new construction of non structural elements including doors, finishes & lighting. no exterior bldf, site, landscape use or parking changes proposed. scope does not affect fixture quantities, occupant load, calcs or p.o.t. rrs on previosly approved pa# 2024-0321-8357.Details
floor 11: interior demo & new construction of non structural elements including doors, finishes & lighting. no exterior bldf, site, landscape use or parking changes proposed. scope does not affect fixture quantities, occupant load, calcs or p.o.t. rrs on previosly approved pa# 2024-0321-8357. | $195,000 |
| Mar 21, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Source Planning And Construction Inc | 11/f ti: interior demo and new construction of non-structural elements including but not limited to interior partitions, doors, finishes, celings, deferred mep.Details
11/f ti: interior demo and new construction of non-structural elements including but not limited to interior partitions, doors, finishes, celings, deferred mep. | $287,300 |
| Mar 7, 2024 | Completed final sign-off Nov 2024 | 625 02nd St | Source Planning And Construction Inc | 4th floor -office ti- limited demo of non-structural partitions & associated power/data, ceiling items & finishes throughout. space is currently unoccupied. no exterior building, site, landscape, use or parking changes are proposed. fire sprinkler modification. permit #202403067182Details
4th floor -office ti- limited demo of non-structural partitions & associated power/data, ceiling items & finishes throughout. space is currently unoccupied. no exterior building, site, landscape, use or parking changes are proposed. fire sprinkler modification. permit #202403067182 | $527,939 |
| Feb 28, 2024 | Completed final sign-off Jun 2024 | 201 Mission St | Richlen Construction | interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.Details
interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit. | $158,000 |
| Feb 28, 2024 | Completed final sign-off Jun 2024 | 201 Mission St | Richlen Construction | interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.Details
interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit. | $60,000 |
| Feb 22, 2024 | Completed final sign-off May 2024 | 580 California St | Skyline Construction | 18/f: limited demo of non-structural partitions with associated power data, ceiling items & finishes throughout space is current unoccupied per ab-017:occupancy/exiting to be addressed udner sep permit;f/s & l/s to remain operation;path of travel/accessibilty scope is not req.mep deffered.f/s sep paDetails
18/f: limited demo of non-structural partitions with associated power data, ceiling items & finishes throughout space is current unoccupied per ab-017:occupancy/exiting to be addressed udner sep permit;f/s & l/s to remain operation;path of travel/accessibilty scope is not req.mep deffered.f/s sep pa | $100,000 |
| Feb 14, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities orDetails
18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or | $216,353 |
| Feb 9, 2024 | Completed final sign-off Jun 2024 | 601 California St | Peacock Construction | 6th fl tenant improvement of an existing vacant suite. new offices & conference rooms. new or alterations to meps, sprinklers & life safety will be under separate permits.Details
6th fl tenant improvement of an existing vacant suite. new offices & conference rooms. new or alterations to meps, sprinklers & life safety will be under separate permits. | $348,202 |
| Feb 9, 2024 | In progress issued Feb 2024 | 221 Main St | Source Planning And Construction Inc | 12th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred.Details
12th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred. | $229,327 |
| Feb 9, 2024 | In progress issued Feb 2024 | 221 Main St | Source Planning And Construction Inc | 5th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred.Details
5th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred. | $217,534 |