Block 3710, lot 018
300 Mission St
- City’s use
- Commercial Office
- Built
- 1967
- Stories
- 24
- Rooms
- 44 bathrooms
- Building
- 730,136 sq ft
- Lot
- 31,419 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 300 Mission St | 3/f: partial floor interior ti | $600,000 | |
| Nov 3, 2026 | In progress filed Nov 2026, not yet issued | 300 Mission St | Skyline Construction | 16th and 17th floors: health department permit only to review existing break rooms. ref pa #202512302939Details
16th and 17th floors: health department permit only to review existing break rooms. ref pa #202512302939 | |
| Sep 30, 2026 | In progress issued Sep 2026 | 300 Mission St | Rapid Fire Safety&Security Llc Dba Pafa | provide 2025 cbc i010.2.12.1 compliance for a new tenant that is going to lock- elev. lobby doors on fl 14. the bldg is an existing hi-rise w/c has on exisitng bldg wide 2-way comm system. the existing system is absolutly is no longer supported by the mfg.Details
provide 2025 cbc i010.2.12.1 compliance for a new tenant that is going to lock- elev. lobby doors on fl 14. the bldg is an existing hi-rise w/c has on exisitng bldg wide 2-way comm system. the existing system is absolutly is no longer supported by the mfg. | $11,170 |
| Sep 16, 2026 | In progress issued Sep 2026 | 300 Mission St | Source Planning And Construction Inc | 14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633Details
14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633 | $50,000 |
| Sep 15, 2026 | Completed final sign-off Oct 2026 | 300 Mission St | Source Planning And Construction Inc | 14th - floor (5) evacuation maps.Details
14th - floor (5) evacuation maps. | $3,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 300 Mission St | M C S Construction Services | ref permit#202512222450. deferred mech + elec. permit. mech: new vav box + ductwork to serve 9 nes office + storage rooms. new restroom grilles in place of existing elec. new power + singal devices throught space. new t24(2022) compliant light + controlsDetails
ref permit#202512222450. deferred mech + elec. permit. mech: new vav box + ductwork to serve 9 nes office + storage rooms. new restroom grilles in place of existing elec. new power + singal devices throught space. new t24(2022) compliant light + controls | $70,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 300 Mission St | M C S Construction Services | 6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel includedDetails
6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included | |
| Jul 30, 2026 | In progress issued Jul 2026 | 300 Mission St | Field Construction Inc. | basemen restroom exhaust air fan upgrade. new exhaust fan is being provided to replace existing exhaust fan. no new fsas are being added.Details
basemen restroom exhaust air fan upgrade. new exhaust fan is being provided to replace existing exhaust fan. no new fsas are being added. | $80,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 300 Mission St | Source Planning And Construction Inc | 14th floor: electrical for pa #202605201633 project.Details
14th floor: electrical for pa #202605201633 project. | $573,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 300 Mission St | Source Planning And Construction Inc | 14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room.Details
14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room. | $513,000 |
| May 20, 2026 | In progress issued Jun 2026 | 300 Mission St | Source Planning And Construction Inc | 14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred.Details
14 fl: interior tenant improvement which includes multi-use men and women restrooms, new partitions, finishes, light fixtures, ceiling,assembly, millwork and plumbing fixtures. mep deferred. | $2,000,000 |
| May 14, 2026 | In progress issued Oct 2026 | 300 Mission St | Gci, Inc | ev charging stations w/structural supportDetails
ev charging stations w/structural support | $150,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 300 Mission St | Rapid Fire Safety&Security Llc Dba Pafa | 6th floor. 2 way emergency comminication system. tenant improvmenet. add 1 call station 6th fl elevator lobby to existing jeron system ref 202512222450Details
6th floor. 2 way emergency comminication system. tenant improvmenet. add 1 call station 6th fl elevator lobby to existing jeron system ref 202512222450 | $4,500 |
| Mar 26, 2026 | Completed final sign-off Oct 2026 | 300 Mission St | M C S Construction Services | 11/f: deferred electrical permit for ti bpa 202512171972. new power and signal devices througthout space. new 2022 t24 compliant lighting and control.Details
11/f: deferred electrical permit for ti bpa 202512171972. new power and signal devices througthout space. new 2022 t24 compliant lighting and control. | $45,250 |
| Mar 9, 2026 | Completed final sign-off May 2026 | 300 Mission St | Novo Construction Inc | 22nd floor: minor interior t.i. new partitions and finishesDetails
22nd floor: minor interior t.i. new partitions and finishes | $157,680 |
| Dec 30, 2025 | In progress issued Feb 2026 | 300 Mission St | Skyline Construction | tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included.Details
tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included. | $160,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 300 Mission St | M C S Construction Services | 6th fl: tenant improvement. selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings & lighting. restroom upgrades are included. no exterior work. pot approved under separate permit.Details
6th fl: tenant improvement. selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings & lighting. restroom upgrades are included. no exterior work. pot approved under separate permit. | $940,000 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 50 Beale St | Quality Telecom Consultants | to obtain final inspection for work approved under pa# 202307101731. all work is complete.Details
to obtain final inspection for work approved under pa# 202307101731. all work is complete. | |
| Dec 17, 2025 | Completed final sign-off Jul 2026 | 300 Mission St | M C S Construction Services | 11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress.Details
11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress. | $75,000 |
| Nov 17, 2025 | Completed final sign-off Jul 2026 | 300 Mission St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti adding 2 relays to existing notifier nfs2 3030 fire alarm system for (8) door holder release.Details
fire alarm ti adding 2 relays to existing notifier nfs2 3030 fire alarm system for (8) door holder release. | $6,925 |
| Jul 16, 2025 | Completed final sign-off Sep 2025 | 300 Mission St | Rapid Fire Safety&Security Llc Dba Pafa | 15th floor; fire alarm ti: adding 3 smoke detectors, 1 power supply, 42 speaker-strobes, 7 speakers and 1 strobe to existing notifier nfs2-3030 fire alarm system. ref#: 202504285307.Details
15th floor; fire alarm ti: adding 3 smoke detectors, 1 power supply, 42 speaker-strobes, 7 speakers and 1 strobe to existing notifier nfs2-3030 fire alarm system. ref#: 202504285307. | $27,405 |
| Jul 1, 2025 | Completed final sign-off Oct 2025 | 300 Mission St | mep for 202504285307 15th flDetails
mep for 202504285307 15th fl | $1,350,000 | |
| Jun 18, 2025 | Completed final sign-off Aug 2025 | 300 Mission St | 15/f: t.i. fire sprinklers. add 33, relocate 66 and delete 06 fire sprinklers. ref#: 202504285307Details
15/f: t.i. fire sprinklers. add 33, relocate 66 and delete 06 fire sprinklers. ref#: 202504285307 | $38,000 | |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 300 Mission St | Field Construction Inc. | 15/f: interior ti including multi-use men and women restrooms, new partitions, finsihes, light fixutres, ceiling assemblies, millwork, and plumbing fixtures. mep and fire life safety under separate permit.Details
15/f: interior ti including multi-use men and women restrooms, new partitions, finsihes, light fixutres, ceiling assemblies, millwork, and plumbing fixtures. mep and fire life safety under separate permit. | $2,000,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2025 | 300 Mission St | Golden Gate Fire Protection Inc | per inspector's request, delete 1 concealed pendents on the 22/f. ref 2023-1103-0104Details
per inspector's request, delete 1 concealed pendents on the 22/f. ref 2023-1103-0104 | $1,000 |
| Apr 7, 2025 | Completed final sign-off Oct 2025 | 50 Beale St | Pyro-Comm Systems, Inc. | to obtain a final inspection for work approved under pa # 2019-0201-1833. all work completeDetails
to obtain a final inspection for work approved under pa # 2019-0201-1833. all work complete | |
| Apr 7, 2025 | Completed final sign-off Oct 2025 | 50 Beale St | Pyro-Comm Systems, Inc. | to obtain a final inspection for work approved under pa # 2019-0201-1831. all work completeDetails
to obtain a final inspection for work approved under pa # 2019-0201-1831. all work complete | |
| Dec 5, 2024 | Completed final sign-off Jan 2025 | 300 Mission St | M C S Construction Services | 20th fl- deferred mechanical & electrical ref pa # 2024-0813-8510 & 2024-1015-2929. mechanical: demo & install low side by ductwork per revised owner layout. electrical: new power & signal devices. new lighting & controlsDetails
20th fl- deferred mechanical & electrical ref pa # 2024-0813-8510 & 2024-1015-2929. mechanical: demo & install low side by ductwork per revised owner layout. electrical: new power & signal devices. new lighting & controls | $65,000 |
| Oct 30, 2024 | Completed final sign-off Nov 2024 | 300 Mission St | Golden Gate Fire Protection Inc | fire sprinkler t.i; relocate 2 pendents & 2 uprights on the 20/fDetails
fire sprinkler t.i; relocate 2 pendents & 2 uprights on the 20/f | $1,000 |
| Oct 15, 2024 | Completed final sign-off Jan 2025 | 300 Mission St | M C S Construction Services | 20th fl- revision to pa # 2024-0813-8510 adding suite 2049. mep deferredDetails
20th fl- revision to pa # 2024-0813-8510 adding suite 2049. mep deferred | |
| Sep 24, 2024 | Completed final sign-off Jan 2025 | 50 Beale St | Pyro-Comm Systems, Inc. | 20th floor- fire alarm: 1 duct detector, 2 relay modules - av shutdown and hvac shudder and 1 ceiling speaker strobe to be added. pa ref#: 202408138510Details
20th floor- fire alarm: 1 duct detector, 2 relay modules - av shutdown and hvac shudder and 1 ceiling speaker strobe to be added. pa ref#: 202408138510 | $1,500 |
| Sep 10, 2024 | In progress issued Sep 2024 | 50 Beale St | Pyro-Comm Systems, Inc. | lobby-ref 201902011833- fire alarm as built to show (3) additional duct detectors and 3 additional relay module for fsdDetails
lobby-ref 201902011833- fire alarm as built to show (3) additional duct detectors and 3 additional relay module for fsd | |
| Aug 19, 2024 | Completed final sign-off Sep 2024 | 50 Beale St | Field Construction Inc. | ref pa # 2024-0613-4353 adminstrative permit to correct the floor number from 12th fl to 13th flDetails
ref pa # 2024-0613-4353 adminstrative permit to correct the floor number from 12th fl to 13th fl | |
| Aug 13, 2024 | Completed final sign-off Jan 2025 | 300 Mission St | M C S Construction Services | 20/f. t.i single tenant floor, include builidng new non structural partitions. new and revised mep, life safety and sprinler if needed under sep permit.Details
20/f. t.i single tenant floor, include builidng new non structural partitions. new and revised mep, life safety and sprinler if needed under sep permit. | $815,000 |
| Jul 17, 2024 | Completed final sign-off Jul 2024 | 300 Mission St | Pyro-Comm Systems, Inc. | fire alarm as-built to show added smoke detector in sump pump room. other devices are shown with correct addresses as in field. basement area. ref pa# 202308164567.Details
fire alarm as-built to show added smoke detector in sump pump room. other devices are shown with correct addresses as in field. basement area. ref pa# 202308164567. | |
| Jun 13, 2024 | Completed final sign-off Sep 2024 | 50 Beale St | Field Construction Inc. | 12th/fl- office ti to include upgrades to ceo office , mech and electrical upgrades, non structural work, soft demo.Details
12th/fl- office ti to include upgrades to ceo office , mech and electrical upgrades, non structural work, soft demo. | $184,000 |
| Mar 11, 2024 | Completed final sign-off May 2024 | 300 Mission St | Pioneer Fire Inc. | 12/f: relocate (10) pendents, add (1) upright.Details
12/f: relocate (10) pendents, add (1) upright. | $500 |
| Mar 7, 2024 | Completed final sign-off Jul 2024 | 50 Beale St | Field Construction Inc. | ref t.i. 202402055218. mech reroute (e) duct, add van & ductwork, add new transfer air. power, lighting & signal, plumbing for breakroom applicancesDetails
ref t.i. 202402055218. mech reroute (e) duct, add van & ductwork, add new transfer air. power, lighting & signal, plumbing for breakroom applicances | |
| Mar 5, 2024 | Completed final sign-off May 2024 | 300 Mission St | Pyro-Comm Systems, Inc. | 1 ceiling strobe and 1 relay module for av shutdown to be added to provide proper coverage ref 202402055218Details
1 ceiling strobe and 1 relay module for av shutdown to be added to provide proper coverage ref 202402055218 | $1,000 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 300 Mission St | Field Construction Inc. | 12/f: interior ti: demo and construction of non-structural partitions, ceilings, lighting, millwork, and finishes.Details
12/f: interior ti: demo and construction of non-structural partitions, ceilings, lighting, millwork, and finishes. | $189,000 |
| Nov 3, 2023 | Never finaled issued Nov 2023, no final | 300 Mission St | Golden Gate Fire Protection Inc | work on 21st, 22nd, and 23rd flr. fire sprinkler t.i.; relocate 4 concealed pendents on the 21st flr. relocate 4 concealed pendents on the 22nd flr. relocate 2 concealed pendents on the 23rd flr. ref: ti: 202303093402Details
work on 21st, 22nd, and 23rd flr. fire sprinkler t.i.; relocate 4 concealed pendents on the 21st flr. relocate 4 concealed pendents on the 22nd flr. relocate 2 concealed pendents on the 23rd flr. ref: ti: 202303093402 | $6,200 |
| Sep 28, 2023 | Completed final sign-off Oct 2023 | 300 Mission St | Pyro-Comm Systems, Inc. | ste 1500: fire alarm - all notification and initiating devices will be removed to provide minimal coverage for unoccupied suite 1500. ref pa# 202306281088.Details
ste 1500: fire alarm - all notification and initiating devices will be removed to provide minimal coverage for unoccupied suite 1500. ref pa# 202306281088. | $1,000 |
| Sep 15, 2023 | Completed final sign-off Apr 2024 | 50 Beale St | Ayoob & Peery Plumbing Co Inc | basement: add 4, relocate 40 fire sprinklers per ti. ref permit 202204293259Details
basement: add 4, relocate 40 fire sprinklers per ti. ref permit 202204293259 | $27,328 |
| Sep 14, 2023 | Completed final sign-off Nov 2023 | 300 Mission St | M C S Construction Services | suite 1500: deferred electrical permit-under main archtectural permit 202306281088. no exterior work. new lighting to "white box" space (interior office).Details
suite 1500: deferred electrical permit-under main archtectural permit 202306281088. no exterior work. new lighting to "white box" space (interior office). | $83,735 |
| Aug 16, 2023 | Completed final sign-off Jul 2024 | 300 Mission St | Pyro-Comm Systems, Inc. | fire alarm 1 duct detector, 1 relay module, 5 ceiling strobes, 8 ceiling speaker strobeDetails
fire alarm 1 duct detector, 1 relay module, 5 ceiling strobes, 8 ceiling speaker strobe | $5,000 |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 50 Beale St | Gci, Inc | to obtain final inspection for work approved under pa #201902011831 and 201902011833.Details
to obtain final inspection for work approved under pa #201902011831 and 201902011833. | |
| Jul 25, 2023 | Never finaled issued Jul 2023, no final | 300 Mission St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only demo plan. turning pendents to upgright protection for suite 1500 15th fl k17 heads to be modify (23-1540Details
fire sprinkler only demo plan. turning pendents to upgright protection for suite 1500 15th fl k17 heads to be modify (23-1540 | $73,500 |
| Jul 10, 2023 | Expired or cancelled expired Jan 2026 | 50 Beale St | Quality Telecom Consultants | verizon project install 2 microwave dishes, 2 odus, 2 pipe to pipe mounts, 2 cat 6 cables, 2 adapter boxesDetails
verizon project install 2 microwave dishes, 2 odus, 2 pipe to pipe mounts, 2 cat 6 cables, 2 adapter boxes | $15,000 |
| Jun 28, 2023 | Completed final sign-off Nov 2023 | 300 Mission St | M C S Construction Services | suite 1500: ab017: removal of non-structural paritions, light fixtures millwork, plumbing, fixtures and finishes, new light fixtures throughout ab-017 exception to requirements for disabled access to vacant spaces suite to remain unoccupiedDetails
suite 1500: ab017: removal of non-structural paritions, light fixtures millwork, plumbing, fixtures and finishes, new light fixtures throughout ab-017 exception to requirements for disabled access to vacant spaces suite to remain unoccupied | $410,000 |
| Jun 5, 2023 | Completed final sign-off Jun 2023 | 300 Mission St | Pyro-Comm Systems, Inc. | 23/f: fire alarm t.i.: addition of 1 ceiling speaker strobe and relocation of 1 ceiling speaker strobe. ref 202303093402.Details
23/f: fire alarm t.i.: addition of 1 ceiling speaker strobe and relocation of 1 ceiling speaker strobe. ref 202303093402. | $500 |
| May 3, 2023 | Completed final sign-off Jun 2023 | 300 Mission St | Golden Gate Fire Protection Inc | 21/f, 22/f & 23/f: f/s, t.i.- 21/f-relocate 13 pendents & 2 uprights; 22/f-relocate 33 pendents & 9 uprights; 23/f-27 pendents & 4 uprights. ref bpa#202303093402Details
21/f, 22/f & 23/f: f/s, t.i.- 21/f-relocate 13 pendents & 2 uprights; 22/f-relocate 33 pendents & 9 uprights; 23/f-27 pendents & 4 uprights. ref bpa#202303093402 | $59,520 |
| Mar 9, 2023 | Completed final sign-off Jul 2023 | 300 Mission St | Skyline Construction | minor modifications to the offices of a single tenant spread across 3 fls. level 21,22,23. totaling approx 8600 sq ft. including demo of partitions and removal of finishes, build back of 24 new offices and 2-3 new conference roomsDetails
minor modifications to the offices of a single tenant spread across 3 fls. level 21,22,23. totaling approx 8600 sq ft. including demo of partitions and removal of finishes, build back of 24 new offices and 2-3 new conference rooms | $2,200,000 |
| Jun 23, 2022 | Never finaled issued Jul 2022, no final | 50 Beale St | Gci, Inc | to obtain final inspection for work approved under pa# 201902011483 & 201902011833. all work is complete.Details
to obtain final inspection for work approved under pa# 201902011483 & 201902011833. all work is complete. | |
| Jun 23, 2022 | Never finaled issued Jul 2022, no final | 50 Beale St | Gci, Inc | to obtain final inspection for work approved under pa# 201805310662 & 201811065071.Details
to obtain final inspection for work approved under pa# 201805310662 & 201811065071. | |
| Apr 29, 2022 | Completed final sign-off Sep 2024 | 50 Beale St | Field Construction Inc. | interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical.Details
interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical. | $391,000 |
| Apr 6, 2022 | Completed final sign-off Jun 2023 | 50 Beale St | Ravig Inc Dba Salient Global Technologi | verizon: modification to cell site. removing and replacing 3 (e) antennas and port covers with 3 new antennas and port covers. r/r 6 (e) raycap 6627 surge suppressers.Details
verizon: modification to cell site. removing and replacing 3 (e) antennas and port covers with 3 new antennas and port covers. r/r 6 (e) raycap 6627 surge suppressers. | $40,000 |
| Feb 16, 2022 | Completed final sign-off Mar 2022 | 300 Mission St | Pyro-Comm Systems, Inc. | 9/f: fire alarm 2-way. 2 call stations will be added in the service and passenger elevator lobbies. ref. permit 202110221000.Details
9/f: fire alarm 2-way. 2 call stations will be added in the service and passenger elevator lobbies. ref. permit 202110221000. | $1,000 |
| Dec 17, 2021 | Expired or cancelled cancelled Jan 2026 | 300 Mission St | Skyline Construction | ref to 2021 0210 4399 (restroom & parking). t.i. on 19th fl: demo on selected conference rm and addition of partition, millwork @ select rms. interior t.i. included new lighting, finishes, select ceilimg. all alteration are interior only.Details
ref to 2021 0210 4399 (restroom & parking). t.i. on 19th fl: demo on selected conference rm and addition of partition, millwork @ select rms. interior t.i. included new lighting, finishes, select ceilimg. all alteration are interior only. | $180,000 |
| Nov 16, 2021 | Completed final sign-off Nov 2021 | 300 Mission St | Anderson, Rowe & Buckley, Inc. | t.i. of (e) fire sprinkler system. relocate 9 sprinklers. ref pa 202110221000.Details
t.i. of (e) fire sprinkler system. relocate 9 sprinklers. ref pa 202110221000. | $5,000 |
| Oct 22, 2021 | Completed final sign-off Apr 2022 | 300 Mission St | Principal Builders Inc. | 9th floor t.i. work includes non - structural partitions, doors, ceiling, lighting, millwork and associated me.Details
9th floor t.i. work includes non - structural partitions, doors, ceiling, lighting, millwork and associated me. | $483,513 |
| Oct 21, 2021 | Completed final sign-off Nov 2021 | 300 Mission St | Golden Gate Fire Protection Inc | fire sprinklers relocate 2 pendent sprinklers and 8 uprights on the 19th fl. ref pa 202109138274.Details
fire sprinklers relocate 2 pendent sprinklers and 8 uprights on the 19th fl. ref pa 202109138274. | $2,500 |
| Oct 12, 2021 | Never finaled issued Nov 2021, no final | 300 Mission St | Martin Sign Co Inc. | 19th floor: fabrication & installation of 4 evacuation map signage.Details
19th floor: fabrication & installation of 4 evacuation map signage. | $1,103 |
| Oct 12, 2021 | Never finaled issued Nov 2021, no final | 300 Mission St | Martin Sign Co Inc. | 18th floor: fabrication & installation of 4 evacuation map signage for the 18th floorDetails
18th floor: fabrication & installation of 4 evacuation map signage for the 18th floor | $1,103 |
| Sep 13, 2021 | Never finaled issued Oct 2021, no final | 300 Mission St | Skyline Construction | 19/f: elimination of conf rooms for larger lobby & larger conf room, wall layout, lighting, finishes, added single unisex restroom. rev. to 202102104399.Details
19/f: elimination of conf rooms for larger lobby & larger conf room, wall layout, lighting, finishes, added single unisex restroom. rev. to 202102104399. | $180,000 |
| Aug 18, 2021 | Completed final sign-off Aug 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | 21/f: as builts added 3 relay modules, added high candella speaker strobe, removed 1 speaker strobe. ref 202105190614Details
21/f: as builts added 3 relay modules, added high candella speaker strobe, removed 1 speaker strobe. ref 202105190614 | $1,500 |
| Jul 27, 2021 | Completed final sign-off Aug 2021 | 300 Mission St | Certified Fire And Safety | as built to permit 2021-0422-9201 ul 300 ansul fire system. addition of 2 nozzlesDetails
as built to permit 2021-0422-9201 ul 300 ansul fire system. addition of 2 nozzles | |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 300 Mission St | Golden Gate Fire Protection Inc | fire sprinkers: as built to pa# 2021-0304-5924; delete 4 concealed sprinkers on the 18th and 19th flooors.Details
fire sprinkers: as built to pa# 2021-0304-5924; delete 4 concealed sprinkers on the 18th and 19th flooors. | $1,000 |
| Jul 15, 2021 | Never finaled issued Aug 2021, no final | 300 Mission St | Skyline Builders | ti for 18th fl scope includes construction of roof space, collab space and breakroom. interior only e service core elements including stairs, elevators, mep shafts to remain as is.Details
ti for 18th fl scope includes construction of roof space, collab space and breakroom. interior only e service core elements including stairs, elevators, mep shafts to remain as is. | $90,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 50 Beale St | Ca United Mechanical, Inc | install new water source heat pump unitDetails
install new water source heat pump unit | $20,000 |
| Jun 4, 2021 | Completed final sign-off Mar 2022 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm: 1 power supply, 1 control module, 2 relay module, 20 ceiling strobes, 38 ceiling sprinkler strobes, 1 walll speaker strobe, 2 wall weather-proof speaker strobes to be added to provide proper coverage. 1 2-way call station will also be added in 18 fl elevator lobby.Details
fire alarm: 1 power supply, 1 control module, 2 relay module, 20 ceiling strobes, 38 ceiling sprinkler strobes, 1 walll speaker strobe, 2 wall weather-proof speaker strobes to be added to provide proper coverage. 1 2-way call station will also be added in 18 fl elevator lobby. | $20,000 |
| Jun 3, 2021 | Completed final sign-off Mar 2022 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm. 1 remote power supply, 1 smoke detector, 1 control module, 1 relay module, 31 ceiling strobes, 41 celing speaker strobes, and 1 wall speaker strobe to be added to provide proper coverage.Details
fire alarm. 1 remote power supply, 1 smoke detector, 1 control module, 1 relay module, 31 ceiling strobes, 41 celing speaker strobes, and 1 wall speaker strobe to be added to provide proper coverage. | $20,000 |
| May 19, 2021 | Completed final sign-off Aug 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | ti fire alarm project on 1st floor 2 duct detectors 2 relays 1 monitor module 7 strobesDetails
ti fire alarm project on 1st floor 2 duct detectors 2 relays 1 monitor module 7 strobes | $9,800 |
| May 3, 2021 | Never finaled issued Jun 2021, no final | 50 Beale St | Pyro-Comm Systems, Inc. | modify existing fire alarm system, new devices added for proper coverage: (2) duct detectors, (1) monitor module, (2) relay modules, (2) strobes (ceiling), (5) speaker/strobes; ref ti # 2019 1121 7838Details
modify existing fire alarm system, new devices added for proper coverage: (2) duct detectors, (1) monitor module, (2) relay modules, (2) strobes (ceiling), (5) speaker/strobes; ref ti # 2019 1121 7838 | $1,500 |
| Apr 22, 2021 | Never finaled issued Jun 2021, no final | 300 Mission St | Certified Fire And Safety | install ul300 ansul fire system to protect kitchen hood + cooking equipment; ref# 2019 1205 8768Details
install ul300 ansul fire system to protect kitchen hood + cooking equipment; ref# 2019 1205 8768 | $5,000 |
| Apr 15, 2021 | Never finaled issued May 2021, no final | 300 Mission St | Pioneer Fire Inc. | convert (14) upright sprinklers to pendent sprinklers. remove (2) upright sprinklers; gcti# 2019 1205 8768Details
convert (14) upright sprinklers to pendent sprinklers. remove (2) upright sprinklers; gcti# 2019 1205 8768 | |
| Mar 22, 2021 | Expired or cancelled withdrawn Jul 2021 | 300 Mission St | reroofing. existing roofing fully removal & replacement. including main roof, penthouse roof, cooling tower roof & bulkhead roof. includes plumbing.Details
reroofing. existing roofing fully removal & replacement. including main roof, penthouse roof, cooling tower roof & bulkhead roof. includes plumbing. | $350,000 | |
| Mar 4, 2021 | Completed final sign-off Sep 2021 | 300 Mission St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 87 pendents and relocate 186 uprights on the 18th floor. relocate 101 pendents and relocate 185 uprights on the 19th floor. end of line and earthquake bracing will be upgraded. t.i. # 2021-02-10-4403 18th floor 2021-02-10-4399 19th floorDetails
fire sprinklers; relocate 87 pendents and relocate 186 uprights on the 18th floor. relocate 101 pendents and relocate 185 uprights on the 19th floor. end of line and earthquake bracing will be upgraded. t.i. # 2021-02-10-4403 18th floor 2021-02-10-4399 19th floor | $279,500 |
| Feb 18, 2021 | Completed final sign-off Apr 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | as-built to show 2 added devices and relocation of devices per the field. 51 ceiling speaker strobes, 26 ceiling strobes, 1 relay module, 1 control module, replace 1 new panel, replace 2 wall speaker strobes. permit reference 2020-0626-9232Details
as-built to show 2 added devices and relocation of devices per the field. 51 ceiling speaker strobes, 26 ceiling strobes, 1 relay module, 1 control module, replace 1 new panel, replace 2 wall speaker strobes. permit reference 2020-0626-9232 | |
| Feb 18, 2021 | Completed final sign-off May 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm asbuilt; asbuilts to show 2 added devices and relocation of devices per the field. all new and existing devices to be connected to existing facu. 45 new strobes, 2 weather proof strobes, 13 ceiling strobe, 7 relay module, 1 control module, 2 duct detector, 1 nac panel. permit reference...Details
fire alarm asbuilt; asbuilts to show 2 added devices and relocation of devices per the field. all new and existing devices to be connected to existing facu. 45 new strobes, 2 weather proof strobes, 13 ceiling strobe, 7 relay module, 1 control module, 2 duct detector, 1 nac panel. permit reference... | |
| Feb 18, 2021 | Completed final sign-off Apr 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm asbuilt; asbuilts to show 2 added devices and relocation of devices per the field. all new devices will be connected to the existing facp. permit reference # 2020-0626-9235Details
fire alarm asbuilt; asbuilts to show 2 added devices and relocation of devices per the field. all new devices will be connected to the existing facp. permit reference # 2020-0626-9235 | |
| Feb 18, 2021 | Completed final sign-off May 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm asbuilts; asbuilts to 2 added devices and relocation of devices per the field. all new and existing devices to be connected to existing facu, 52 new speaker strobes, 26 new ceiling strobes, 1 relay module, 1 nac panel, 1 control module. premit referenc # 2020-0626-9234Details
fire alarm asbuilts; asbuilts to 2 added devices and relocation of devices per the field. all new and existing devices to be connected to existing facu, 52 new speaker strobes, 26 new ceiling strobes, 1 relay module, 1 nac panel, 1 control module. premit referenc # 2020-0626-9234 | |
| Feb 10, 2021 | Never finaled issued Apr 2021, no final | 300 Mission St | Skyline Construction | 18th floor: t.i. construction of conference space, collaboration space and break room. interior only. all alterations are interior only. extg service core elements to remain the same elevator/mep shaft. fire life safty seperate permit.Details
18th floor: t.i. construction of conference space, collaboration space and break room. interior only. all alterations are interior only. extg service core elements to remain the same elevator/mep shaft. fire life safty seperate permit. | $2,950,000 |
| Feb 10, 2021 | Never finaled issued Apr 2021, no final | 300 Mission St | Skyline Construction | 19th fl: tenant improvement to construct conference spaces, collab spaces & break room. upgrade finishes only. all interior. existing service core element to remain. mep, fire safety under separate permit.Details
19th fl: tenant improvement to construct conference spaces, collab spaces & break room. upgrade finishes only. all interior. existing service core element to remain. mep, fire safety under separate permit. | $2,825,000 |
| Jan 15, 2021 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 23rd fl: adminstrative permit to document a-2 assembly occupancy on floor per fire inspector. a-2 assembly was not on application for previously approved permit. ref pa# 201911147260Details
23rd fl: adminstrative permit to document a-2 assembly occupancy on floor per fire inspector. a-2 assembly was not on application for previously approved permit. ref pa# 201911147260 | |
| Dec 11, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21-23 floors: mechanical only revision to pa#202001131758, 201912270760, 201912270762, to include smoke control report, fsd schedule and smoke control sequence of operations.Details
21-23 floors: mechanical only revision to pa#202001131758, 201912270760, 201912270762, to include smoke control report, fsd schedule and smoke control sequence of operations. | |
| Nov 5, 2020 | Completed final sign-off Mar 2021 | 300 Mission St | Martin Sign Co Inc. | fabrication and installation of evacuation maps for the 16th and 17th floorsDetails
fabrication and installation of evacuation maps for the 16th and 17th floors | |
| Nov 5, 2020 | Never finaled issued Dec 2020, no final | 300 Mission St | Sign Of Light | install 2 illuminated single faced wall signs: "mendocino farms, sandwich market"Details
install 2 illuminated single faced wall signs: "mendocino farms, sandwich market" | $8,000 |
| Oct 29, 2020 | Never finaled issued Jun 2022, no final | 50 Beale St | Emcor Services/Mesa Energy Systems Inc | roof: replace (e) cooling tower and pumps or roofDetails
roof: replace (e) cooling tower and pumps or roof | $300,000 |
| Oct 23, 2020 | Completed final sign-off Mar 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm; 1 duct detector to be added to existing facuDetails
fire alarm; 1 duct detector to be added to existing facu | |
| Sep 26, 2020 | Completed final sign-off Feb 2021 | 300 Mission St | Ayoob & Peery Plumbing Co Inc | 20-23/f: fire sprinkler as-built for: 20/f bpa#202003106692; 21/f 202003106685; 22/f 201912109149; 23/f 201912109151Details
20-23/f: fire sprinkler as-built for: 20/f bpa#202003106692; 21/f 202003106685; 22/f 201912109149; 23/f 201912109151 | |
| Sep 15, 2020 | Expired or cancelled cancelled Jul 2023 | 300 Mission St | Ayoob & Peery Plumbing Co Inc | 21st fl, 22nd fl, floor stair: add fourteen (14) sprinklers to conform with the wall/ceiling layout of the tenant improvement. ref 202008081410Details
21st fl, 22nd fl, floor stair: add fourteen (14) sprinklers to conform with the wall/ceiling layout of the tenant improvement. ref 202008081410 | $7,350 |
| Aug 8, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | added a stair entrance enclosure guardrail on levels 21 thru 23 with access control swing gate at each level. level 23: guardrail height has increased to 6'-0" h, added top cap to the guardrail, increased the guardrail glass thickness.revision to bpa#2019/0924/2474.Details
added a stair entrance enclosure guardrail on levels 21 thru 23 with access control swing gate at each level. level 23: guardrail height has increased to 6'-0" h, added top cap to the guardrail, increased the guardrail glass thickness.revision to bpa#2019/0924/2474. | |
| Aug 6, 2020 | Completed final sign-off Mar 2022 | 50 Beale St | Pyro-Comm Systems, Inc. | fire sprinkler permit.4 existing ceiling speaker strobes to be relocated. 5 existing smoke detectors to be dropped and rehung to existing facu.Details
fire sprinkler permit.4 existing ceiling speaker strobes to be relocated. 5 existing smoke detectors to be dropped and rehung to existing facu. | $1,000 |
| Aug 6, 2020 | Completed final sign-off Mar 2022 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm. 4 existing ceiling speaker strobes will be relocated and 5 existing smoke detectors are to be dropped and re-tranged to existing facu.Details
fire alarm. 4 existing ceiling speaker strobes will be relocated and 5 existing smoke detectors are to be dropped and re-tranged to existing facu. | $1,000 |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 14, 2020 | Completed final sign-off Jan 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | 16/f fire alarm: 45 ceiling speaker strobes, 4 wall speaker strobes, 27 ceiling strobes, 1 wall strobe, etc. & 1 2-way comm call station to be added to (e) facu.Details
16/f fire alarm: 45 ceiling speaker strobes, 4 wall speaker strobes, 27 ceiling strobes, 1 wall strobe, etc. & 1 2-way comm call station to be added to (e) facu. | $38,500 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 50 Beale St | Pyro-Comm Systems, Inc. | 17/f fire alarm: 1 call station, 48 ceiling speaker strobes, 2 wall speaker strobes, 29 ceiling strobes, 1 wall strobe etc to be added to (e) facu.Details
17/f fire alarm: 1 call station, 48 ceiling speaker strobes, 2 wall speaker strobes, 29 ceiling strobes, 1 wall strobe etc to be added to (e) facu. | $40,000 |
| Jun 30, 2020 | Completed final sign-off Apr 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | 23rd floor: fire alarm 45 ceiling speaker strobes, 2 weatherproof ceiling strobes, 13 ceiling strobes, and 2 duct detectors to be added to extg facu.Details
23rd floor: fire alarm 45 ceiling speaker strobes, 2 weatherproof ceiling strobes, 13 ceiling strobes, and 2 duct detectors to be added to extg facu. | $31,000 |
| Jun 30, 2020 | Completed final sign-off Nov 2020 | 50 Beale St | Golden Gate Fire Protection Inc | fire sprinkler relocate 83 pendent sprinklers and relcocate 205 uprights on the 16th fl. relocate 102 pendant sprinklers and relocate 209 uprights on the 17th fl. ref 202003167119 16th, 202005287958 17thDetails
fire sprinkler relocate 83 pendent sprinklers and relcocate 205 uprights on the 16th fl. relocate 102 pendant sprinklers and relocate 209 uprights on the 17th fl. ref 202003167119 16th, 202005287958 17th | $248,000 |
| Jun 26, 2020 | Completed final sign-off Apr 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | 20th flr, fire alarm - 48 ceiling speaker strobes, 25 ceiling strobes to be added to (e) facu. 1 call station will be added to (e) facu. ref t.i. 201911217836.Details
20th flr, fire alarm - 48 ceiling speaker strobes, 25 ceiling strobes to be added to (e) facu. 1 call station will be added to (e) facu. ref t.i. 201911217836. | $38,500 |
| Jun 26, 2020 | Completed final sign-off Apr 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | 22nd flr, fire alarm - 48 ceiling speaker strobes, 25 ceiling strobes, 4 wall speakers to be added to (e) facu. 1 call station will be added to (e) 2-way system. ref t.i. 201911217838, maher n/a.Details
22nd flr, fire alarm - 48 ceiling speaker strobes, 25 ceiling strobes, 4 wall speakers to be added to (e) facu. 1 call station will be added to (e) 2-way system. ref t.i. 201911217838, maher n/a. | $38,500 |
| Jun 26, 2020 | Completed final sign-off Apr 2021 | 50 Beale St | Pyro-Comm Systems, Inc. | 21st flr, fire alarm - 50 ceiling speaker strobes, 25 ceiling strobes to be added to (e) facu. 1 call station will be added to (e) 2-way system. ref t.i. 201911217840. maher n/a.Details
21st flr, fire alarm - 50 ceiling speaker strobes, 25 ceiling strobes to be added to (e) facu. 1 call station will be added to (e) 2-way system. ref t.i. 201911217840. maher n/a. | $38,500 |
| May 28, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Skyline Construction | 17/f: construction of conference spaces, collaboration space, break room. all alteration interior only. (e) service core elements including stairs, elevators & mep shafts to remain, fire life safety under sep permit. maher n/a.Details
17/f: construction of conference spaces, collaboration space, break room. all alteration interior only. (e) service core elements including stairs, elevators & mep shafts to remain, fire life safety under sep permit. maher n/a. | $3,200,000 |
| Mar 16, 2020 | Never finaled issued Jun 2020, no final | 50 Beale St | Anderson, Rowe & Buckley, Inc. | 5th fl - installing (n) duct and hvac as shown 5m2.1Details
5th fl - installing (n) duct and hvac as shown 5m2.1 | $5,000 |
| Mar 16, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Skyline Construction | 16/f: construction of conference spaces, collaboration space. all alteration interior only. (e) service core elecments including stairs, elevators & mep shafts to remain, fire left safety under sep permit. maher n/a.Details
16/f: construction of conference spaces, collaboration space. all alteration interior only. (e) service core elecments including stairs, elevators & mep shafts to remain, fire left safety under sep permit. maher n/a. | $3,200,000 |
| Mar 10, 2020 | Completed final sign-off Nov 2020 | 300 Mission St | Ayoob & Peery Plumbing Co Inc | 21st fl - add 89, relocates 53, plug 26 and change out 141 sprinklers in order to conform with the new wall/ceiling layout of ti ref pa 2019-0924-2474Details
21st fl - add 89, relocates 53, plug 26 and change out 141 sprinklers in order to conform with the new wall/ceiling layout of ti ref pa 2019-0924-2474 | $58,650 |
| Mar 10, 2020 | Completed final sign-off Nov 2020 | 300 Mission St | Ayoob & Peery Plumbing Co Inc | 20th fl - add 111, relocate 62 and change out 89 sprinklers in order to conform with the new wall/ceiling layout of the ti ref pa 2019-0924-2474Details
20th fl - add 111, relocate 62 and change out 89 sprinklers in order to conform with the new wall/ceiling layout of the ti ref pa 2019-0924-2474 | $72,225 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 50 Beale St | M C S Construction Services | ground floor retail repositiong #2: commercial interior demo only of flooring partitions and ceilngs, minor build back to a closet space. maher n/a.Details
ground floor retail repositiong #2: commercial interior demo only of flooring partitions and ceilngs, minor build back to a closet space. maher n/a. | $58,000 |
| Mar 2, 2020 | Completed final sign-off Aug 2020 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm on 14th fl: 5 ceiling strobes, 16 ceiling speakers, 1 monitor modules and power supply to be added to existing facu.Details
fire alarm on 14th fl: 5 ceiling strobes, 16 ceiling speakers, 1 monitor modules and power supply to be added to existing facu. | $12,000 |
| Feb 26, 2020 | Never finaled issued Feb 2020, no final | 50 Beale St | Pioneer Fire Inc. | fire sprinklers return to warm shell on ground fl.Details
fire sprinklers return to warm shell on ground fl. | $9,000 |
| Feb 10, 2020 | Never finaled issued Feb 2020, no final | 300 Mission St | Skyline Construction | demo of interior non bearing wall partitions, doors, lighting fixtures, floor finishes, plumbing fixtures on levels 16-19. no change in use or exterior scope. fire ls and proposed ti buildout under sep permit ab-017Details
demo of interior non bearing wall partitions, doors, lighting fixtures, floor finishes, plumbing fixtures on levels 16-19. no change in use or exterior scope. fire ls and proposed ti buildout under sep permit ab-017 | $750,000 |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 50 Beale St | Golden Gate Fire Protection Inc | fire sprinkler; relocate 256 upright sprinklers on the 16th fl. relocate 273 upright sprinkler on the 17th fl.Details
fire sprinkler; relocate 256 upright sprinklers on the 16th fl. relocate 273 upright sprinkler on the 17th fl. | $264,500 |
| Feb 6, 2020 | Completed final sign-off Oct 2020 | 50 Beale St | Golden Gate Fire Protection Inc | fire sprinkler; relocate 264 upright sprinklers on the 18th fl. relocate 266 upright sprinkler on the 19th fl.Details
fire sprinkler; relocate 264 upright sprinklers on the 18th fl. relocate 266 upright sprinkler on the 19th fl. | $264,500 |
| Jan 22, 2020 | Never finaled issued Jan 2020, no final | 50 Beale St | street space | ||
| Jan 21, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | floors 20-23; structural deferred submittal for approved arch plans ref pa# 201911217836, 201911217840, 201911217838, 2019111147260 n/a maherDetails
floors 20-23; structural deferred submittal for approved arch plans ref pa# 201911217836, 201911217840, 201911217838, 2019111147260 n/a maher | $15,000 |
| Jan 13, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 20th fl mep deferred submittal to support approved arch stet. demo and install new vav bo es and ductwork ref 201911217836Details
20th fl mep deferred submittal to support approved arch stet. demo and install new vav bo es and ductwork ref 201911217836 | $200,000 |
| Jan 13, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21st fl mep deferred submittal to support approved arch stet. demo and install new vav boxes and ductwork. ref 201911217840Details
21st fl mep deferred submittal to support approved arch stet. demo and install new vav boxes and ductwork. ref 201911217840 | $200,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 50 Beale St | Michilli Inc | administrative permit to memorialize 2019005402 cva for massage use at fitness club permitted under app#201809129843. no work under this permit. prev approved by healthDetails
administrative permit to memorialize 2019005402 cva for massage use at fitness club permitted under app#201809129843. no work under this permit. prev approved by health | |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 50 Beale St | Skyline Construction | 3rd floor: revision to pa #2019-0613-3291: addition of fireman's control panelDetails
3rd floor: revision to pa #2019-0613-3291: addition of fireman's control panel | $20,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 22nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911217838. maher naDetails
22nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911217838. maher na | $200,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 23nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911147260. maher naDetails
23nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911147260. maher na | $200,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2020 | 50 Beale St | Skyline Construction | 14th floor: office ti. changing 4 offices into 2 conference room. demo interior underpinned partition. mep includedDetails
14th floor: office ti. changing 4 offices into 2 conference room. demo interior underpinned partition. mep included | $2,000,000 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 50 Beale St | Michilli Inc | admistrative permit to record and memorialize sffd signature and approval of ab-005 in pa20190916168 for occupant load of yoga/cyclingg/group fitness studio. no work under this permitDetails
admistrative permit to record and memorialize sffd signature and approval of ab-005 in pa20190916168 for occupant load of yoga/cyclingg/group fitness studio. no work under this permit | |
| Dec 10, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Ayoob & Peery Plumbing Co Inc | fire sprinklers on 23rd fl: add 166, relocate 143, plug 43 and change out 28 sprinklers per ti. reference pa# 2019-1114-7260 job#: 19-708Details
fire sprinklers on 23rd fl: add 166, relocate 143, plug 43 and change out 28 sprinklers per ti. reference pa# 2019-1114-7260 job#: 19-708 | $125,625 |
| Dec 10, 2019 | Completed final sign-off Jan 2021 | 300 Mission St | Ayoob & Peery Plumbing Co Inc | fire sprinklers on 22nd fl: add 145, relocate 107, plug 35 and change out 53 sprinklers per ti. reference pa# 2019-1121-7838 job#: 19-708Details
fire sprinklers on 22nd fl: add 145, relocate 107, plug 35 and change out 53 sprinklers per ti. reference pa# 2019-1121-7838 job#: 19-708 | $112,125 |
| Dec 5, 2019 | Completed final sign-off Aug 2021 | 300 Mission St | Northern Sun Associates | #102: tenant improvement of existing bldg into restaurant: mep work for new restaurant. maher naDetails
#102: tenant improvement of existing bldg into restaurant: mep work for new restaurant. maher na | $500,000 |
| Nov 26, 2019 | Never finaled issued Nov 2019, no final | 50 Beale St | Michilli Inc | floors 1,2.3: rev to pa201809129843 - clarify labeling on fire fight control panel and sequences of operation to show compliance with smoke controle narrative. maher n/a.Details
floors 1,2.3: rev to pa201809129843 - clarify labeling on fire fight control panel and sequences of operation to show compliance with smoke controle narrative. maher n/a. | |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 20th fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinkleredDetails
20th fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinklered | $4,200,000 |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 22nd fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinkleredDetails
22nd fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinklered | $4,200,000 |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21st fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinkleredDetails
21st fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinklered | $4,200,000 |
| Nov 14, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | ti on 23rd fl to consist of new non-structural partitions. mep & fire life safety under separate permit.Details
ti on 23rd fl to consist of new non-structural partitions. mep & fire life safety under separate permit. | $4,200,000 |
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 50 Beale St | street space | ||
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 50 Beale St | street space | ||
| Nov 8, 2019 | Expired or cancelled withdrawn Dec 2019 | 50 Beale St | Pyro-Comm Systems, Inc. | new two-way communication elevator landing emergency communication system.Details
new two-way communication elevator landing emergency communication system. | $5,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Field Construction Inc. | addition of ventilation fan to existing as meter room in basementDetails
addition of ventilation fan to existing as meter room in basement | $50,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Pyro-Comm Systems, Inc. | ref pa# 201909181908; this is a addition of new two way communication elevator landing emergency communication system to (e) facuDetails
ref pa# 201909181908; this is a addition of new two way communication elevator landing emergency communication system to (e) facu | $3,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Field Construction Inc. | mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing.Details
mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing. | $5,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 50 Beale St | street space/mta meters | ||
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm as built drwgs to remove 5 relay modules from the fire alarm control unit. ref pa 2019-1010-4099Details
fire alarm as built drwgs to remove 5 relay modules from the fire alarm control unit. ref pa 2019-1010-4099 | |
| Oct 10, 2019 | Completed final sign-off Dec 2020 | 50 Beale St | Pyro-Comm Systems, Inc. | 3/f: fire alarm: 1 duct detector, 1 ceiling-speaker strobe to be added to existing facuDetails
3/f: fire alarm: 1 duct detector, 1 ceiling-speaker strobe to be added to existing facu | $1,500 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 50 Beale St | Pyro-Comm Systems, Inc. | 3 manual pull stations, 19 smoke detectors, 1 heat detector, 64 ceiling speaker strobes, 2 speaker wall strobes, 6 ceiling strobes, 1 weather proof ceiling speaker strobe, 4 weather proof, wall strobes, 4 weather proof speaker wall strobes, 2 ceiling speaker strobes to be added to (e) facu ref paDetails
3 manual pull stations, 19 smoke detectors, 1 heat detector, 64 ceiling speaker strobes, 2 speaker wall strobes, 6 ceiling strobes, 1 weather proof ceiling speaker strobe, 4 weather proof, wall strobes, 4 weather proof speaker wall strobes, 2 ceiling speaker strobes to be added to (e) facu ref pa | $66,000 |
| Sep 24, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab andDetails
deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab and | $1,110,270 |
| Sep 18, 2019 | Never finaled issued Sep 2019, no final | 50 Beale St | Paganini Electric Corp(See Signatories) | add emergency 2-way communication system call stations to new riser to serve future tenants locked elevator lobby locations per cbc 1008.1.9.12 item 5. maher naDetails
add emergency 2-way communication system call stations to new riser to serve future tenants locked elevator lobby locations per cbc 1008.1.9.12 item 5. maher na | $100,000 |
| Sep 18, 2019 | Never finaled issued Sep 2019, no final | 50 Beale St | street space w/mta | ||
| Sep 16, 2019 | Never finaled issued Sep 2019, no final | 50 Beale St | Michilli Inc | rev to pa# 201809129843; work included revi to inteior partition configuration & doorsDetails
rev to pa# 201809129843; work included revi to inteior partition configuration & doors | |
| Jul 19, 2019 | Never finaled issued Oct 2019, no final | 50 Beale St | Sign Of Light | install (2) electric double faced projecting sign "equinox"Details
install (2) electric double faced projecting sign "equinox" | $7,000 |
| Jul 19, 2019 | Never finaled issued Oct 2019, no final | 50 Beale St | Sign Of Light | install electric single faced wall sign "equinox"Details
install electric single faced wall sign "equinox" | $4,000 |
| Jul 16, 2019 | Never finaled issued Jul 2019, no final | 50 Beale St | street space | ||
| Jun 18, 2019 | Completed final sign-off Feb 2020 | 50 Beale St | ti/upgrade of existing fire sprinkler system - 274 relocate pendent, 58 additional pendent, 5 deleted, 24 relcoate upright, 10 additional upright, 40 deleted upright. ref pa 2018-0912-9843Details
ti/upgrade of existing fire sprinkler system - 274 relocate pendent, 58 additional pendent, 5 deleted, 24 relcoate upright, 10 additional upright, 40 deleted upright. ref pa 2018-0912-9843 | $79,500 | |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 50 Beale St | Skyline Construction | ref pa# 201903145206; ahu replacement on 3rd fl.Details
ref pa# 201903145206; ahu replacement on 3rd fl. | $510,000 |
| May 10, 2019 | Completed final sign-off Jul 2019 | 50 Beale St | Pyro-Comm Systems, Inc. | 3rd floor: 3 return air smoke detectors, 1 duct detector, 28 ceiling mount speaker/srobes, 5 ceiling mount strobes. t.i app#201903145206 n/a for maherDetails
3rd floor: 3 return air smoke detectors, 1 duct detector, 28 ceiling mount speaker/srobes, 5 ceiling mount strobes. t.i app#201903145206 n/a for maher | $18,500 |
| Apr 29, 2019 | Expired or cancelled cancelled Jan 2026 | 50 Beale St | Emcor Services/Mesa Energy Systems Inc | install modular chiller on 24th fl | $150,000 |
| Apr 8, 2019 | Completed final sign-off Oct 2019 | 50 Beale St | Skyline Construction | rev to pa# 201903145206; beam penetrations at 4th fl. framing plan for 3rd fl. tenant improvementsDetails
rev to pa# 201903145206; beam penetrations at 4th fl. framing plan for 3rd fl. tenant improvements | $20,000 |
| Apr 5, 2019 | Never finaled issued Apr 2019, no final | 50 Beale St | street space | ||
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 50 Beale St | Pyro-Comm Systems, Inc. | 1st fl - fire alarm 4 ceiling speaker/strobes to be added to existing facu ref pa 201810163352Details
1st fl - fire alarm 4 ceiling speaker/strobes to be added to existing facu ref pa 201810163352 | $2,000 |
| Apr 2, 2019 | Completed final sign-off Jul 2019 | 50 Beale St | ti upgrade of the e fire sprinkler system 61 relocate pendent sprinklers, 5 additional pend sprklrs, 5 addi pend sprks, 18 relocate, 3 additional upright spr, 6 deletedDetails
ti upgrade of the e fire sprinkler system 61 relocate pendent sprinklers, 5 additional pend sprklrs, 5 addi pend sprks, 18 relocate, 3 additional upright spr, 6 deleted | $18,200 | |
| Mar 29, 2019 | Completed final sign-off Apr 2019 | 50 Beale St | Anderson, Rowe & Buckley, Inc. | 4th fl 9 relocated sprinklers ref pa 2019-0207-2307, 5th fl - 7 added sprinklers, 38 relocated sprinklers ref pa 2019-0202-2305 existing fire sprinkler system tiDetails
4th fl 9 relocated sprinklers ref pa 2019-0207-2307, 5th fl - 7 added sprinklers, 38 relocated sprinklers ref pa 2019-0202-2305 existing fire sprinkler system ti | $27,000 |
| Mar 26, 2019 | Completed final sign-off Apr 2019 | 50 Beale St | ti upgrade of the (e) fire sprinklers system relocate pendent. add pendent relocate upright 1 additional uprightDetails
ti upgrade of the (e) fire sprinklers system relocate pendent. add pendent relocate upright 1 additional upright | $1,500 | |
| Mar 21, 2019 | Completed final sign-off Oct 2019 | 50 Beale St | Skyline Construction | 3/f: mechanical, electrical & plumbing plans for pa201903145206. maher n/a.Details
3/f: mechanical, electrical & plumbing plans for pa201903145206. maher n/a. | |
| Mar 14, 2019 | Completed final sign-off Oct 2019 | 50 Beale St | Skyline Construction | ti of 3rd fl: construction of new meeting rooms, pantry & gender neutral restrooms. mep/fire under sep permit. maher naDetails
ti of 3rd fl: construction of new meeting rooms, pantry & gender neutral restrooms. mep/fire under sep permit. maher na | $1,500,000 |
| Mar 14, 2019 | Completed final sign-off Jun 2019 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm ti 7 smoke detectors, 13 speaker strobes, 2 speakers, 2 strobes hooked up to e facu ref 201901301581Details
fire alarm ti 7 smoke detectors, 13 speaker strobes, 2 speakers, 2 strobes hooked up to e facu ref 201901301581 | $11,500 |
| Feb 28, 2019 | Completed final sign-off Mar 2019 | 50 Beale St | Pioneer Fire Inc. | relocate 2 uprights, relcoate 12 pendents add 5 pendents removed 8 pendents ref 201901301581Details
relocate 2 uprights, relcoate 12 pendents add 5 pendents removed 8 pendents ref 201901301581 | $20,147 |
| Feb 13, 2019 | Completed final sign-off Mar 2019 | 50 Beale St | Skender Construction Llc | revision to ti #201807063865. existing building does not have 2-way communication in place and has release button for egress, removing 2-way communication call out. unable to comply with cbc 1010.1.9.12 - disable card readers and unlock doors until 2 way comm is installed under separate permit.Details
revision to ti #201807063865. existing building does not have 2-way communication in place and has release button for egress, removing 2-way communication call out. unable to comply with cbc 1010.1.9.12 - disable card readers and unlock doors until 2 way comm is installed under separate permit. | |
| Feb 7, 2019 | Completed final sign-off Jun 2019 | 50 Beale St | Cahill Contractors Llc. | interior renovation of level 4, including light demo. and minor lalyout changes of office spaces and new lighting maher n/aDetails
interior renovation of level 4, including light demo. and minor lalyout changes of office spaces and new lighting maher n/a | $100,000 |
| Feb 7, 2019 | Completed final sign-off Jun 2019 | 50 Beale St | Cahill Contractors Llc. | interior renovation of level 5 including light demo of private offices and installation of minor lighting upgrades, branch power upgrades, server room upgradesDetails
interior renovation of level 5 including light demo of private offices and installation of minor lighting upgrades, branch power upgrades, server room upgrades | $200,000 |
| Feb 1, 2019 | Completed final sign-off May 2019 | 50 Beale St | Pyro-Comm Systems, Inc. | 4th fl - fire alarm ti 9 ceiling strobe/sprinklers to be added to existing facu ref pa 2019-0117-0570Details
4th fl - fire alarm ti 9 ceiling strobe/sprinklers to be added to existing facu ref pa 2019-0117-0570 | $4,500 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm ti for east lobby - adding 2 relay for security override, and 5 audio/visual devices to be hooked up to (e) facu. ref pa #201809281790Details
fire alarm ti for east lobby - adding 2 relay for security override, and 5 audio/visual devices to be hooked up to (e) facu. ref pa #201809281790 | $3,000 |
| Feb 1, 2019 | Completed final sign-off May 2019 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm ti for 5th fl - adding 2 smoke detectors, 15 speaker stroes and 12 strobes to be hooked up to (e) facu. ref pa #201901160526Details
fire alarm ti for 5th fl - adding 2 smoke detectors, 15 speaker stroes and 12 strobes to be hooked up to (e) facu. ref pa #201901160526 | $7,000 |
| Feb 1, 2019 | Never finaled issued Feb 2019, no final | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm ti for west lobby - adding 2 relay for security override, and 3 audio/visual devices to be hooked up to (e) facu. ref pa #201809281790Details
fire alarm ti for west lobby - adding 2 relay for security override, and 3 audio/visual devices to be hooked up to (e) facu. ref pa #201809281790 | $3,000 |
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 50 Beale St | 3rd floor: demo of existing partitions, doors, millwork, electrical, plumbing, ceiling light, 4 finishes, new demising partisions, doors & finishes no structural work to be performed - maher n/aDetails
3rd floor: demo of existing partitions, doors, millwork, electrical, plumbing, ceiling light, 4 finishes, new demising partisions, doors & finishes no structural work to be performed - maher n/a | $450,000 | |
| Jan 22, 2019 | Never finaled issued Feb 2019, no final | 50 Beale St | Arco Murray Design Build | 10th fl - plumbing work for related mep and ti ref pa 2018-1016-3352 and 2018-1031-4645Details
10th fl - plumbing work for related mep and ti ref pa 2018-1016-3352 and 2018-1031-4645 | |
| Jan 17, 2019 | Completed final sign-off Jun 2019 | 50 Beale St | Cahill Contractors Llc. | interior renovation of level 4 including light demolition and minor layout changes of office spaces, and new lighting. maher naDetails
interior renovation of level 4 including light demolition and minor layout changes of office spaces, and new lighting. maher na | $40,000 |
| Jan 16, 2019 | Completed final sign-off Jun 2019 | 50 Beale St | Cahill Contractors Llc. | interior renoavtion of (e) office space w/ light demo of private offices and installation of portable sound booths and open workstationsDetails
interior renoavtion of (e) office space w/ light demo of private offices and installation of portable sound booths and open workstations | $60,000 |
| Dec 14, 2018 | Completed final sign-off Feb 2019 | 50 Beale St | Arco Murray Design Build | 10th floor: changing training room to open office. revision to app#201810163352. n/a for maher.Details
10th floor: changing training room to open office. revision to app#201810163352. n/a for maher. | |
| Dec 11, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Michilli Inc | ti to (e) retail space to create membership & retail sales area of adjacent gym. interior work only. includes new flooring ceiling & finishesDetails
ti to (e) retail space to create membership & retail sales area of adjacent gym. interior work only. includes new flooring ceiling & finishes | $250,000 |
| Dec 10, 2018 | Completed final sign-off Feb 2019 | 50 Beale St | Pioneer Fire Inc. | relocate 50 concealers add 10 concealers remove 2 concealers ref 201809281790Details
relocate 50 concealers add 10 concealers remove 2 concealers ref 201809281790 | $59,034 |
| Dec 5, 2018 | Completed final sign-off Feb 2019 | 50 Beale St | Pyro-Comm Systems, Inc. | fire alarm ti tenth floor- add 1 smoke detector, 24 speaker strobes, 13 strobes to be hooked up to e fire alarm panel. ref 201810163352Details
fire alarm ti tenth floor- add 1 smoke detector, 24 speaker strobes, 13 strobes to be hooked up to e fire alarm panel. ref 201810163352 | $19,000 |
| Nov 16, 2018 | Completed final sign-off Jan 2019 | 50 Beale St | Anderson, Rowe & Buckley, Inc. | 10th fl - existing fire sprinkler system ti, 73 relocated sprinklers, 50 added sprinklers, ref pa 2018-1016-3352Details
10th fl - existing fire sprinkler system ti, 73 relocated sprinklers, 50 added sprinklers, ref pa 2018-1016-3352 | $63,000 |
| Nov 6, 2018 | Never finaled issued Jan 2019, no final | 50 Beale St | Gci, Inc | exterior "living wall" project w/ associated electrical, plumbing and structural steel frameDetails
exterior "living wall" project w/ associated electrical, plumbing and structural steel frame | $26,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 50 Beale St | Arco Murray Design Build | 10th fl: mep for 201810163352. maher naDetails
10th fl: mep for 201810163352. maher na | $800,000 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 50 Beale St | Arco Murray Design Build | tenant improvement to include new non-structural partitions. mep & fire life safety under separate permitDetails
tenant improvement to include new non-structural partitions. mep & fire life safety under separate permit | $2,500,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 50 Beale St | Field Construction Inc. | demo of stair #5: stair #5 extends from 1st to 2nd floor only, demo only, no exerior scope, structural demo only. demo per ab-017. infill of 2nd floor will be under seperate t.i. permit. n/a for maherDetails
demo of stair #5: stair #5 extends from 1st to 2nd floor only, demo only, no exerior scope, structural demo only. demo per ab-017. infill of 2nd floor will be under seperate t.i. permit. n/a for maher | $25,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 50 Beale St | street space | ||
| Sep 28, 2018 | Never finaled issued Nov 2018, no final | 50 Beale St | Gci, Inc | interior tenant improvement lobby remodel, including all new finishes & lighting. no structural. no exterior work. maher naDetails
interior tenant improvement lobby remodel, including all new finishes & lighting. no structural. no exterior work. maher na | $1,519,200 |
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Skender Construction Llc | 9th flr - 5 evac maps. 2018.0706.3865 maher naDetails
9th flr - 5 evac maps. 2018.0706.3865 maher na | $500 |
| Sep 13, 2018 | Completed final sign-off Sep 2018 | 50 Beale St | Pyro-Comm Systems, Inc. | 2/f: f/a t.i.: add 1 new rps, 5 smoke detectors, 7 audible/visual devices to be hooked up to the (e) facu. ref t.i. pa201806252791. maher n/a.Details
2/f: f/a t.i.: add 1 new rps, 5 smoke detectors, 7 audible/visual devices to be hooked up to the (e) facu. ref t.i. pa201806252791. maher n/a. | $7,000 |
| Sep 13, 2018 | Completed final sign-off Oct 2018 | 50 Beale St | Pyro-Comm Systems, Inc. | 3/f: f/a t.i.: add 1 rps, 1 smoke detector, 4 new audible/visual devices to be hooked up to the (e) facu. ref t.i. pa201806252793. maher n/a.Details
3/f: f/a t.i.: add 1 rps, 1 smoke detector, 4 new audible/visual devices to be hooked up to the (e) facu. ref t.i. pa201806252793. maher n/a. | $4,500 |
| Sep 13, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | 3/f:revision to 201806252793. demolition of concrete pads, curbs, and struc slab infill. floor is currently partially occupied. sprinkler modification under sep permit ti for new unoccupied suite in future sep permit per ab-017. maher n/a.Details
3/f:revision to 201806252793. demolition of concrete pads, curbs, and struc slab infill. floor is currently partially occupied. sprinkler modification under sep permit ti for new unoccupied suite in future sep permit per ab-017. maher n/a. | |
| Sep 13, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | revision to 201806252791. demolition of concrete pads, curbs, and struc slab infill. new partitions added to electrical room floor current unoccupied ti life safety and sprinkler modification under sep permit per ab-017Details
revision to 201806252791. demolition of concrete pads, curbs, and struc slab infill. new partitions added to electrical room floor current unoccupied ti life safety and sprinkler modification under sep permit per ab-017 | |
| Sep 13, 2018 | Completed final sign-off Oct 2018 | 50 Beale St | Pyro-Comm Systems, Inc. | 1/f: f/a t.i.: add 1 rps, 7 new audible devices to be hood up to the (e) facu. ref t.i. pa201807134497. maher n/a.Details
1/f: f/a t.i.: add 1 rps, 7 new audible devices to be hood up to the (e) facu. ref t.i. pa201807134497. maher n/a. | $5,500 |
| Sep 12, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | ground floor - fireproofing abatement of existing steel columns due to presence of asbestos. apply new fireproofing to replace existing. revision to pa# 201807134497 special inspection is requiredDetails
ground floor - fireproofing abatement of existing steel columns due to presence of asbestos. apply new fireproofing to replace existing. revision to pa# 201807134497 special inspection is required | |
| Sep 12, 2018 | Never finaled issued Apr 2019, no final | 50 Beale St | Michilli Inc | change of use from office to retail/gym of 23,673 sf tenant improvements to parts of 1st,2nd,3rd floors for proposed health & fitness club w/ associated retail & business areas. improvements include interior non-load bearing partitions, mep & structural workDetails
change of use from office to retail/gym of 23,673 sf tenant improvements to parts of 1st,2nd,3rd floors for proposed health & fitness club w/ associated retail & business areas. improvements include interior non-load bearing partitions, mep & structural work | $1,500,000 |
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 300 Mission St | per pa #201807134497, add two new addresses to commercial space at block 3710, lot 018 as; 300, 308 mission streetDetails
per pa #201807134497, add two new addresses to commercial space at block 3710, lot 018 as; 300, 308 mission street | ||
| Aug 24, 2018 | Completed final sign-off Oct 2018 | 50 Beale St | Pyro-Comm Systems, Inc. | 9th fl - fire alarm ti, adding 1 rps, 1 smoke detector and 55 audio/visual devices. ref pa 2018-0706-3865. n/a for maher.Details
9th fl - fire alarm ti, adding 1 rps, 1 smoke detector and 55 audio/visual devices. ref pa 2018-0706-3865. n/a for maher. | $30,000 |
| Aug 13, 2018 | Completed final sign-off Nov 2022 | 50 Beale St | Ayoob & Peery Plumbing Co Inc | 2nd fl; ref pa#201806252791; change out fire sprinklers per t.i. (15 change outs)Details
2nd fl; ref pa#201806252791; change out fire sprinklers per t.i. (15 change outs) | $3,375 |
| Aug 13, 2018 | Completed final sign-off Nov 2022 | 50 Beale St | Ayoob & Peery Plumbing Co Inc | 3rd fl: change out (58) fire sprinklers per t.i. bpa#201806252793Details
3rd fl: change out (58) fire sprinklers per t.i. bpa#201806252793 | $13,050 |
| Jul 26, 2018 | Completed final sign-off Aug 2018 | 50 Beale St | Ayoob & Peery Plumbing Co Inc | ground fl: change out fire sprinklers per tenant improvements. (change out 67) #18-690. ref #201807134497.Details
ground fl: change out fire sprinklers per tenant improvements. (change out 67) #18-690. ref #201807134497. | $15,075 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pyro-Comm Systems, Inc. (46), Bcci Construction Company (17), Skyline Construction (16), Field Construction Inc. (13), M C S Construction Services (11), Ayoob & Peery Plumbing Co Inc (10), Golden Gate Fire Protection Inc (10), Gci, Inc (6), Michilli Inc (6), Anderson, Rowe & Buckley, Inc. (5), Pioneer Fire Inc. (5), Source Planning And Construction Inc (5), Arco Murray Design Build (4), Cahill Contractors Llc. (4), Rapid Fire Safety&Security Llc Dba Pafa (4), Martin Sign Co Inc. (3), Sign Of Light (3), Certified Fire And Safety (2), Emcor Services/Mesa Energy Systems Inc (2), Quality Telecom Consultants (2), Skender Construction Llc (2), Ca United Mechanical, Inc, Northern Sun Associates, Novo Construction Inc, Paganini Electric Corp(See Signatories), Principal Builders Inc., Ravig Inc Dba Salient Global Technologi, Skyline Builders
- Architects
- Joseph Remling (11), William Raymond Turner (7), Stanley Lew (4), Candace Chan (3), George Soskin (3), Lawrence Smith (3), Claudette Bleijenberg (2), Duncan Ballash (2), Melissa Hanley (2), Annie K Lo, Ariane Lebrilla, Brain Corbett, George Sam Phillips-Sorich, Patrick Daly
- Engineers
- Edward Rivera (7), Stephen Shaffer (7), Xuong Quach (6), Joshua Mcmahan (5), Guil Orihuela (4), Mohit Kotecha (4), Ramson E Paulus (4), Madison Ryutaro Roberts (3), Kylie Lo (2), Rey Solidum (2), Bradley Hollub, Claudette Bleijenberg, Dean Macy, Edward Rivera, Eric C Taylor, Gerald Gonzales, Glen Hunt, James R. Spore, Jesus B Cabellon Jr, Joshua Mcmmahan, Julian White, Julian White, Lars P. Mortensen, Michael Chapman, Paul R. Kiley, Prabhjeet Grewal, Richard Jones, Rodolfo Bustos, William Hadinger
- Attorneys
- Rey Solidum
- Authorized agents
- Brittany Vanisko (2), Alex Morin, Andrew Yin, Dillon Peisson, Shane Snyder
- Designers
- Ayoob & Peery Plumbing, Derek Shackley, Michael Joseph Donahue, Terrence Olson
- Subcontractors
- Donald S. Maclean
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.