Gerald Gonzales
- Listed as
- engineer
- On San Francisco permits
- Oct 2009 to Sep 2026
15 permits since 2000 (engineer on 15 permits): 8 completed, 1 in progress, 6 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 300 Mission St | Source Planning And Construction Inc | 14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633Details
14/f: revision to pa#202607225388. provide & install new lighting fixtures & controls per title 24 requirements. provide & install new devices shown on plan. lighting t-24 calculation. provide all electrical requirements. ref pa #202605201633 | $50,000 |
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 2125 Bryant St | Urban Energy | supply & install 25 evercharge level 2 ev chargers. install (1) new 200a panel at lower level. work only done in parking garage (e) area.Details
supply & install 25 evercharge level 2 ev chargers. install (1) new 200a panel at lower level. work only done in parking garage (e) area. | $83,550 |
| Apr 4, 2024 | Completed final sign-off Mar 2026 | 740 Tennessee St | Urbnbuild Inc | deferred mechanical & electrical for garage exhaust. reference pa#202402125716.Details
deferred mechanical & electrical for garage exhaust. reference pa#202402125716. | $24,000 |
| Feb 12, 2024 | Completed final sign-off Mar 2026 | 740 Tennessee St | Urbnbuild Inc | to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement.Details
to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement. | $300,000 |
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 1035 Battery St | R G C Construction Inc | electrical + plumbing plans for pa# 202308023520.Details
electrical + plumbing plans for pa# 202308023520. | $50,000 |
| Aug 17, 2023 | Never finaled issued Aug 2023, no final | 1525 Howard St | Tilton Pacific Const Inc. | revision to pa#202305117612 to enlarge service writers room.Details
revision to pa#202305117612 to enlarge service writers room. | $5,000 |
| May 11, 2023 | Never finaled issued Aug 2023, no final | 1525 Howard St | Tilton Pacific Const Inc. | revision to pa# 202201065476. separate service writers & customer lounge areas. relocate (n) all genders restroom.Details
revision to pa# 202201065476. separate service writers & customer lounge areas. relocate (n) all genders restroom. | $5,200 |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 8 Locksley Av | conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave.Details
conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave. | $40,000 | |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 6 Locksley Av | conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance.Details
conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance. | $200,000 | |
| Jan 26, 2022 | Completed final sign-off Mar 2024 | 280 South Van Ness Av | Tilton Pacific Const Inc. | non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area.Details
non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area. | $500,000 |
| Jan 6, 2022 | Never finaled issued Jan 2023, no final | 1525 Howard St | Tilton Pacific Const Inc. | partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a.Details
partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a. | $100,000 |
| Sep 29, 2021 | Completed final sign-off Apr 2022 | 351 California St | Constructive Solutions Inc. | interior office reconfiguration with break room suite 1110 minor upgrade of e elevator lobby and common fire rated corridor accessibility upgrade of e restroomsDetails
interior office reconfiguration with break room suite 1110 minor upgrade of e elevator lobby and common fire rated corridor accessibility upgrade of e restrooms | $118,963 |
| May 10, 2021 | Completed final sign-off Mar 2022 | 198 Utah St | Rod Heisler Construction | revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review.Details
revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review. | |
| Apr 26, 2021 | Completed final sign-off Jun 2023 | 186 West Portal Av | Nassif A Ayyad | tenant improvement. partial demolition. rough & finish framing, plumbing, electrical & mechanical works. drywall, carpentry, paint, flooring work. equipment installation.Details
tenant improvement. partial demolition. rough & finish framing, plumbing, electrical & mechanical works. drywall, carpentry, paint, flooring work. equipment installation. | $235,000 |
| Oct 29, 2009 | Never finaled issued Oct 2009, no final | 1914 Irving St | mechanical, electrical & plubming for t.i pa# 2009-0826-5570Details
mechanical, electrical & plubming for t.i pa# 2009-0826-5570 | $20,000 |