Block 4043, lot 006
740 Tennessee St
30 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | Completed | 740 Tennessee St | Urbnbuild Inc | to obtain final inspection for work approved under 201801128549 and 201802201643. all work is complete | |
| May 27, 2026 | Completed | 740 Tennessee St | Urbnbuild Inc | to obtain final inspection for work approved under 201802201644,201802201645 and 201802201646. all work is complete | |
| Jun 6, 2025 | Completed | 740 Tennessee St | Todd Morris Fire Protection Inc. | existing fire sprinkler system t.i - relocate cross main piping. | |
| Apr 4, 2024 | Completed | 740 Tennessee St | Urbnbuild Inc | deferred mechanical & electrical for garage exhaust. reference pa#202402125716. | $24,000 |
| Feb 12, 2024 | Completed | 740 Tennessee St | Urbnbuild Inc | to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement. | $300,000 |
| Mar 18, 2022 | Completed | 740 Tennessee St | Urbnbuild Inc | revision to pa# 201901311775. interior only. remove elevator from scope of work. (n) laundry rooms at floor 2 & 4. (n) toilet room at basement. stair revisions due to site conditions. | $10,000 |
| Aug 30, 2021 | Completed | 740 Tennessee St | Fox Security And Communications, Inc. | install a new fire alarm system. | $4,000 |
| Nov 4, 2020 | Completed | 740 Tennessee St | Todd Morris Fire Protection Inc. | rev. to #2019-0822-9508. add and relocate heads to accomodate beams and lighting plans, main changes to 4". calcs and eq bracing updates as well. | |
| Jul 2, 2020 | Completed | 740 Tennessee St | O'neill Construction Inc | there is no waterproofing on the exterior of building, remove existing siding and stucco and install sheating and waterproof barrier on sides of building and around windows and doors. re-install existing siding where possible and additinal siding profile to match in kind. per planning approval 7/1/2 | $55,460 |
| Jun 26, 2020 | Never finaled | 740 Tennessee St | street space | ||
| Oct 1, 2019 | Never finaled | 740 Tennessee St | streetspace | ||
| Aug 22, 2019 | Completed | 740 Tennessee St | Todd Morris Fire Protection Inc. | add and relocate heads to accomodate obstructions on ceiling in garage. main changes to 4" ref 201906183671 | |
| Aug 15, 2019 | Expired or cancelled | 740 Tennessee St | Todd Morris Fire Protection Inc. | add and relocate heads in garage area for new theater area. main changes to 4" galvanized ref pa 2019-0618-3671 | |
| Jun 18, 2019 | Completed | 740 Tennessee St | Todd Morris Fire Protection Inc. | install new 4" c900 underground and new nfpa 13 system throughout building | $58,000 |
| Apr 1, 2019 | Never finaled | 740 Tennessee St | street space | ||
| Jan 31, 2019 | Completed | 740 Tennessee St | O'neill Construction Inc | seismic upgrade, per drawings | $145,550 |
| Jan 31, 2019 | Completed | 740 Tennessee St | O'neill Construction Inc | take off non-original stucco & shingles, install (e) ship lap siding, (n) windows throughtout building. (n) bulk head for elevator. convert (e) attic/storage to gym/office, (n) dormers. (n) roof deck per drawings. **maher n/a** | $255,050 |
| Oct 9, 2018 | Never finaled | 740 Tennessee St | street space | ||
| Mar 29, 2018 | Never finaled | 740 Tennessee St | street space | ||
| Feb 20, 2018 | Expired or cancelled | 740 Tennessee St | O'neill Construction Inc | unit #2: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/a | $24,850 |
| Feb 20, 2018 | Expired or cancelled | 740 Tennessee St | O'neill Construction Inc | unit #4: remodel kitchen and (2) bathrooms: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & no change in (e) layout. maher n/a | $33,550 |
| Feb 20, 2018 | Expired or cancelled | 740 Tennessee St | O'neill Construction Inc | unit #3: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & change in (e) layout. maher n/a | $24,850 |
| Feb 20, 2018 | Expired or cancelled | 740 Tennessee St | O'neill Construction Inc | unit #1: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/a | $24,850 |
| Jan 12, 2018 | Expired or cancelled | 740 Tennessee St | O'neill Construction Inc | add a basement (vertical addition) convert the area excavation under foundation permit 201710050463 to basement with new access from 1st flr to basement. maher na | $50,000 |
| Nov 28, 2017 | Completed | 740 Tennessee St | O'neill Construction Inc | upgrade to steel frames per engineer's plans voluntary strengthening add two steel moment frames. maher na | $123,740 |
| Oct 30, 2017 | Completed | 740 Tennessee St | O'neill Construction Inc | remove damage plaster and replace on interior wall 5/8 type x gyp board, 50% | $10,000 |
| Oct 5, 2017 | Completed | 740 Tennessee St | O'neill Construction Inc | upgrade entire foundation with new concrete walls & slab per patrick buscovich engineering dated 9/7/17. maher na | $145,560 |
| Oct 2, 2017 | Never finaled | 740 Tennessee St | street space | ||
| Sep 21, 2007 | Completed | 740 Tennessee St | install 5/8 fire proof sheetrock on ceiling & under stairs lower rear, sheetrock to be 1 hour rated, vemove plastic tarp, painted water base | $1,000 | |
| Nov 8, 2001 | Completed | 740 Tennessee St | response to nov 20011993 ;repair rear exterior stairway. same size. | $4,000 |