Permit GraphShortlistSan Francisco building permits since 2000

Emily Guglielmo

License
S5902
Look the license up with the state
Listed as
engineer
Firm
Martin / Martin, Inc.
Based in
Larkspur
On San Francisco permits
Mar 2014 to May 2026

23 permits since 2000 (engineer on 23 permits): 11 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 18, 2026In progress
filed May 2026, not yet issued
1065 Sutter StRainbow Waterproofing & Restorref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installed
Details
Permit
202605181419
Status
triage
Filed
May 18, 2026
Declared cost
$152,073
Address
1065 Sutter St

ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installed

Open the permit page

$152,073
May 6, 2026In progress
issued Jun 2026
2 Mint PzThe G B Group Inc.revision to 202304075302. due to findings in field condition, some of fall protection has changed.
Details
Permit
202605060746
Status
issued
Filed
May 6, 2026
Permit issued
Jun 3, 2026
Declared cost
$4,000
Address
2 Mint Pz

revision to 202304075302. due to findings in field condition, some of fall protection has changed.

Open the permit page

$4,000
Mar 10, 2026In progress
issued Jun 2026
563 Guerrero StHive Builds Inc.revision to pa# 202504083978. revised structural drawings as follows: s2.0 foundation update; s2.1-s2.2 shearwall layout and framing update; s3.0-s3.1 details update; s4.1-s4.4 details update
Details
Permit
202602186081
Status
issued
Filed
Mar 10, 2026
Permit issued
Jun 16, 2026
Declared cost
$50,000
Address
563 Guerrero St

revision to pa# 202504083978. revised structural drawings as follows: s2.0 foundation update; s2.1-s2.2 shearwall layout and framing update; s3.0-s3.1 details update; s4.1-s4.4 details update

Open the permit page

$50,000
May 5, 2025In progress
issued Oct 2025
563 Guerrero StHive Builds Inc.interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights.
Details
Permit
202504083978
Status
issued
Filed
May 5, 2025
Permit issued
Oct 29, 2025
Declared cost
$250,000
Address
563 Guerrero St

interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights.

Open the permit page

$250,000
Apr 8, 2025Completed
final sign-off Jan 2026
3251 20th AvGray West Construction Incspace 175 retail tenant improvement for 1096 sf eyewear mall store. mep deferred.
Details
Permit
202504083935
Status
complete
Filed
Apr 8, 2025
Permit issued
May 27, 2025
Final sign-off
Jan 9, 2026
Declared cost
$423,000
Address
3251 20th Av

space 175 retail tenant improvement for 1096 sf eyewear mall store. mep deferred.

Open the permit page

$423,000
Mar 10, 2025Completed
final sign-off Apr 2026
3838 California StThe Boldt Companyrenovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit.
Details
Permit
202501228783
Status
complete
Filed
Mar 10, 2025
Permit issued
Jul 25, 2025
Final sign-off
Apr 15, 2026
Declared cost
$7,000,000
Address
3838 California St

renovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit.

Open the permit page

$7,000,000
Aug 17, 2023Never finaled
issued Aug 2023, no final
1525 Howard StTilton Pacific Const Inc.revision to pa#202305117612 to enlarge service writers room.
Details
Permit
202308174634
Status
issued
Filed
Aug 17, 2023
Permit issued
Aug 21, 2023
Declared cost
$5,000
Address
1525 Howard St

revision to pa#202305117612 to enlarge service writers room.

Open the permit page

$5,000
Apr 27, 2023Never finaled
filed Apr 2023, never issued
6 Mint Pznew permanent guardrails at (e) gym roof and and elev/stair roof. relocation of permanant guardrail at main roof. new permanant ladders to access gym roof and elev/stair roof. new davit bases at main roof. specification of portable outtrigger. spec of davit arm/mast assemblies.
Details
Permit
202304276633
Status
filed
Filed
Apr 27, 2023
Declared cost
$198,000
Address
6 Mint Pz

new permanent guardrails at (e) gym roof and and elev/stair roof. relocation of permanant guardrail at main roof. new permanant ladders to access gym roof and elev/stair roof. new davit bases at main roof. specification of portable outtrigger. spec of davit arm/mast assemblies.

Open the permit page

$198,000
Apr 7, 2023In progress
issued Feb 2026
2 Mint PzThe G B Group Inc.installation of new facade access fall protection system. new permanent guardrails at lowever roof.
Details
Permit
202304075302
Status
issued
Filed
Apr 7, 2023
Permit issued
Feb 11, 2026
Declared cost
$221,000
Address
2 Mint Pz

installation of new facade access fall protection system. new permanent guardrails at lowever roof.

Open the permit page

$221,000
Dec 22, 2022Completed
final sign-off Nov 2024
1635 Divisadero StUnger Construction Co5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd fl
Details
Permit
202212229020
Status
complete
Filed
Dec 22, 2022
Permit issued
Oct 12, 2023
Final sign-off
Nov 20, 2024
Declared cost
$8,928,330
Address
1635 Divisadero St

5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd fl

Open the permit page

$8,928,330
May 27, 2022Never finaled
filed May 2022, never issued
5 Embarcadero Centeraddition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows
Details
Permit
202205275168
Status
filed
Filed
May 27, 2022
Declared cost
$1,100,000
Address
5 Embarcadero Center

addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows

Open the permit page

$1,100,000
Apr 8, 2022Completed
final sign-off Nov 2024
299 02nd StPrecision Hotel Interiors Incexpansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.
Details
Permit
202204081881
Status
complete
Filed
Apr 8, 2022
Permit issued
Jul 19, 2022
Final sign-off
Nov 15, 2024
Declared cost
$900,000
Address
299 02nd St

expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.

Open the permit page

$900,000
Jan 26, 2022Completed
final sign-off Mar 2024
280 South Van Ness AvTilton Pacific Const Inc.non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area.
Details
Permit
202201266721
Status
complete
Filed
Jan 26, 2022
Permit issued
Sep 15, 2022
Final sign-off
Mar 5, 2024
Declared cost
$500,000
Address
280 South Van Ness Av

non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area.

Open the permit page

$500,000
Jan 6, 2022Never finaled
issued Jan 2023, no final
1525 Howard StTilton Pacific Const Inc.partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a.
Details
Permit
202201065476
Status
issued
Filed
Jan 6, 2022
Permit issued
Jan 12, 2023
Declared cost
$100,000
Address
1525 Howard St

partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a.

Open the permit page

$100,000
Sep 14, 2021Never finaled
issued Sep 2021, no final
1428 Irving StWells Construction Increvision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab.
Details
Permit
202109148428
Status
issued
Filed
Sep 14, 2021
Permit issued
Sep 21, 2021
Address
1428 Irving St

revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab.

Open the permit page

Aug 20, 2021Completed
final sign-off Sep 2022
1428 Irving Stground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st)
Details
Permit
202108206841
Status
complete
Filed
Aug 20, 2021
Permit issued
Sep 30, 2021
Final sign-off
Sep 2, 2022
Declared cost
$12,000
Address
1428 Irving St

ground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st)

Open the permit page

$12,000
Aug 20, 2021Completed
final sign-off Sep 2022
1434 Irving Stground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st)
Details
Permit
202108206842
Status
complete
Filed
Aug 20, 2021
Permit issued
Sep 30, 2021
Final sign-off
Sep 2, 2022
Declared cost
$13,000
Address
1434 Irving St

ground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st)

Open the permit page

$13,000
Jan 27, 2021Completed
final sign-off Sep 2022
1434 Irving StWells Construction Incground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes.
Details
Permit
202101273460
Status
complete
Filed
Jan 27, 2021
Permit issued
Jun 1, 2021
Final sign-off
Sep 6, 2022
Declared cost
$238,407
Address
1434 Irving St

ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes.

Open the permit page

$238,407
Dec 3, 2020Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.
Details
Permit
202012030185
Status
complete
Filed
Dec 3, 2020
Permit issued
Feb 18, 2022
Final sign-off
Oct 7, 2022
Declared cost
$50,000
Address
5 Embarcadero Center

enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.

Open the permit page

$50,000
Jul 1, 2020Never finaled
issued Jul 2020, no final
222 Sansome StCw Horton General Contractornew livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.
Details
Permit
202007019469
Status
issued
Filed
Jul 1, 2020
Permit issued
Jul 10, 2020
Declared cost
$60,000
Address
222 Sansome St

new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.

Open the permit page

$60,000
Dec 24, 2019Expired or cancelled
cancelled Jan 2026
630 Geary Stremodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator ca
Details
Permit
201912240462
Status
cancelled
Filed
Dec 24, 2019
Declared cost
$3,000,000
Address
630 Geary St

remodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator ca

Open the permit page

$3,000,000
Dec 14, 2018Completed
final sign-off Aug 2021
299 02nd StSkanska Usa Building Incground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **
Details
Permit
201812148389
Status
complete
Filed
Dec 14, 2018
Permit issued
May 3, 2019
Final sign-off
Aug 26, 2021
Declared cost
$6,300,000
Address
299 02nd St

ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **

Open the permit page

$6,300,000
Mar 24, 2014Completed
final sign-off May 2014
585 Columbus AvMark Scott Construction Incdemo 2 catwalks, install new type x sheetrock, wd stud partitions, non rated partitions at mezzanine not greater than 5%. new 2 hr rtd ceiling to replace damaged plaster ceiling. insall new wd flrg at mezz, 10 n flr tiles where damaged, nov 201343081 fire damage for residential units separate permit
Details
Permit
201403241526
Status
complete
Filed
Mar 24, 2014
Permit issued
Mar 27, 2014
Final sign-off
May 28, 2014
Declared cost
$35,000
Address
585 Columbus Av

demo 2 catwalks, install new type x sheetrock, wd stud partitions, non rated partitions at mezzanine not greater than 5%. new 2 hr rtd ceiling to replace damaged plaster ceiling. insall new wd flrg at mezz, 10 n flr tiles where damaged, nov 201343081 fire damage for residential units separate permit

Open the permit page

$35,000