Emily Guglielmo
- Listed as
- engineer
- Firm
- Martin / Martin, Inc.
- Based in
- Larkspur
- On San Francisco permits
- Mar 2014 to May 2026
23 permits since 2000 (engineer on 23 permits): 11 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2026 | In progress filed May 2026, not yet issued | 1065 Sutter St | Rainbow Waterproofing & Restor | ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installedDetails
ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installed | $152,073 |
| May 6, 2026 | In progress issued Jun 2026 | 2 Mint Pz | The G B Group Inc. | revision to 202304075302. due to findings in field condition, some of fall protection has changed.Details
revision to 202304075302. due to findings in field condition, some of fall protection has changed. | $4,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 563 Guerrero St | Hive Builds Inc. | revision to pa# 202504083978. revised structural drawings as follows: s2.0 foundation update; s2.1-s2.2 shearwall layout and framing update; s3.0-s3.1 details update; s4.1-s4.4 details updateDetails
revision to pa# 202504083978. revised structural drawings as follows: s2.0 foundation update; s2.1-s2.2 shearwall layout and framing update; s3.0-s3.1 details update; s4.1-s4.4 details update | $50,000 |
| May 5, 2025 | In progress issued Oct 2025 | 563 Guerrero St | Hive Builds Inc. | interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights.Details
interior remodel of 2 (e) residential units. no change to building footprint or bedcount proposed. installation of (n) residential elevator. (n) kitchen & bathrooms. addition of half bath. (n) mep & windows for upper unit only. addition of (n) skylights. | $250,000 |
| Apr 8, 2025 | Completed final sign-off Jan 2026 | 3251 20th Av | Gray West Construction Inc | space 175 retail tenant improvement for 1096 sf eyewear mall store. mep deferred.Details
space 175 retail tenant improvement for 1096 sf eyewear mall store. mep deferred. | $423,000 |
| Mar 10, 2025 | Completed final sign-off Apr 2026 | 3838 California St | The Boldt Company | renovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit.Details
renovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit. | $7,000,000 |
| Aug 17, 2023 | Never finaled issued Aug 2023, no final | 1525 Howard St | Tilton Pacific Const Inc. | revision to pa#202305117612 to enlarge service writers room.Details
revision to pa#202305117612 to enlarge service writers room. | $5,000 |
| Apr 27, 2023 | Never finaled filed Apr 2023, never issued | 6 Mint Pz | new permanent guardrails at (e) gym roof and and elev/stair roof. relocation of permanant guardrail at main roof. new permanant ladders to access gym roof and elev/stair roof. new davit bases at main roof. specification of portable outtrigger. spec of davit arm/mast assemblies.Details
new permanent guardrails at (e) gym roof and and elev/stair roof. relocation of permanant guardrail at main roof. new permanant ladders to access gym roof and elev/stair roof. new davit bases at main roof. specification of portable outtrigger. spec of davit arm/mast assemblies. | $198,000 | |
| Apr 7, 2023 | In progress issued Feb 2026 | 2 Mint Pz | The G B Group Inc. | installation of new facade access fall protection system. new permanent guardrails at lowever roof.Details
installation of new facade access fall protection system. new permanent guardrails at lowever roof. | $221,000 |
| Dec 22, 2022 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | 5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd flDetails
5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd fl | $8,928,330 |
| May 27, 2022 | Never finaled filed May 2022, never issued | 5 Embarcadero Center | addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windowsDetails
addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows | $1,100,000 | |
| Apr 8, 2022 | Completed final sign-off Nov 2024 | 299 02nd St | Precision Hotel Interiors Inc | expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.Details
expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck. | $900,000 |
| Jan 26, 2022 | Completed final sign-off Mar 2024 | 280 South Van Ness Av | Tilton Pacific Const Inc. | non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area.Details
non-structural interior demo. demo portion of exterior enclosure. exterior alterations including glazing, amc & eifs cladding, enlargement of (e) entries, free standing canopy. interior t.i. includes showroom, office, lounge, restrooms. remove portion of 2nd fl framing to facilitate a display area. | $500,000 |
| Jan 6, 2022 | Never finaled issued Jan 2023, no final | 1525 Howard St | Tilton Pacific Const Inc. | partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a.Details
partial demo of interior slab-on-grade. freestanding structure comprising office and gender-neutral restroom. partial height partitions and doors. maher n/a. | $100,000 |
| Sep 14, 2021 | Never finaled issued Sep 2021, no final | 1428 Irving St | Wells Construction Inc | revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab.Details
revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab. | |
| Aug 20, 2021 | Completed final sign-off Sep 2022 | 1428 Irving St | ground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st)Details
ground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st) | $12,000 | |
| Aug 20, 2021 | Completed final sign-off Sep 2022 | 1434 Irving St | ground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st)Details
ground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st) | $13,000 | |
| Jan 27, 2021 | Completed final sign-off Sep 2022 | 1434 Irving St | Wells Construction Inc | ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes.Details
ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes. | $238,407 |
| Dec 3, 2020 | Completed final sign-off Oct 2022 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.Details
enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path. | $50,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 222 Sansome St | Cw Horton General Contractor | new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.Details
new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting. | $60,000 |
| Dec 24, 2019 | Expired or cancelled cancelled Jan 2026 | 630 Geary St | remodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator caDetails
remodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator ca | $3,000,000 | |
| Dec 14, 2018 | Completed final sign-off Aug 2021 | 299 02nd St | Skanska Usa Building Inc | ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **Details
ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a ** | $6,300,000 |
| Mar 24, 2014 | Completed final sign-off May 2014 | 585 Columbus Av | Mark Scott Construction Inc | demo 2 catwalks, install new type x sheetrock, wd stud partitions, non rated partitions at mezzanine not greater than 5%. new 2 hr rtd ceiling to replace damaged plaster ceiling. insall new wd flrg at mezz, 10 n flr tiles where damaged, nov 201343081 fire damage for residential units separate permitDetails
demo 2 catwalks, install new type x sheetrock, wd stud partitions, non rated partitions at mezzanine not greater than 5%. new 2 hr rtd ceiling to replace damaged plaster ceiling. insall new wd flrg at mezz, 10 n flr tiles where damaged, nov 201343081 fire damage for residential units separate permit | $35,000 |