Steven Wiseniewsky
- Listed as
- engineer
- On San Francisco permits
- Sep 2018 to Oct 2024
10 permits since 2000 (engineer on 10 permits): 6 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 3, 2024 | Completed final sign-off May 2025 | 2215 Quesada Av | Magnum Construction Group Inc | new co2 tanks, tank venting, piping , fitting valves, and co2 sensing and purging system. mechanical plans shall comply w/ cfc 5307.4.1 through 5307.4.7: carbon dioxide enrichment systems requirement. deferred submittal ref 201809180690.Details
new co2 tanks, tank venting, piping , fitting valves, and co2 sensing and purging system. mechanical plans shall comply w/ cfc 5307.4.1 through 5307.4.7: carbon dioxide enrichment systems requirement. deferred submittal ref 201809180690. | $24,000 |
| Dec 12, 2023 | Completed final sign-off Sep 2024 | 657 Howard St | Rossi Builders Inc. | the project consists of an interior remodel to an (e) 4464 sf art gallery to accommodate the goethe institut, a german culture language institute. the scope includes modification of interior elements, hvac & lighting. this is phase 2 of 2. refe ti phase 1- 202301120086.Details
the project consists of an interior remodel to an (e) 4464 sf art gallery to accommodate the goethe institut, a german culture language institute. the scope includes modification of interior elements, hvac & lighting. this is phase 2 of 2. refe ti phase 1- 202301120086. | $235,048 |
| Jan 12, 2023 | Never finaled issued Sep 2023, no final | 657 Howard St | Rossi Builders Inc. | 1/f: interior t.i., minor modification to walls, hvac, lighting, & plumbing. phase 1 of 2.Details
1/f: interior t.i., minor modification to walls, hvac, lighting, & plumbing. phase 1 of 2. | $269,208 |
| Sep 30, 2022 | Completed final sign-off Feb 2025 | 216 11th St | Wells Construction Inc | mep work only ref pa 2022-0818-0819Details
mep work only ref pa 2022-0818-0819 | |
| Feb 23, 2021 | Expired or cancelled withdrawn Aug 2021 | 2440 Mariposa St | change of use from office to cannibis dispensary. interior fitout. alterations of existing space. reconfigurate plumbing, mechanical & electrical.Details
change of use from office to cannibis dispensary. interior fitout. alterations of existing space. reconfigurate plumbing, mechanical & electrical. | $80,000 | |
| Feb 2, 2021 | Completed final sign-off Aug 2021 | 1830 Polk St | Wells Construction Inc | remodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h.Details
remodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h. | $300,000 |
| Jan 27, 2021 | Completed final sign-off Sep 2022 | 1434 Irving St | Wells Construction Inc | ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes.Details
ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes. | $238,407 |
| Sep 5, 2020 | Never finaled issued May 2021, no final | 3998 18th St | Triamid Construction Of Central Ca. Inc. | install c02 sensors & alarms in storage roomsDetails
install c02 sensors & alarms in storage rooms | $20,000 |
| Sep 5, 2020 | Never finaled issued Jun 2021, no final | 90 New Montgomery St | Triamid Construction Of Central Ca. Inc. | install c02 sensors & alarms in storage roomsDetails
install c02 sensors & alarms in storage rooms | $20,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2018 | 100 Church St | Wells Construction Inc | tenant improvement suite suite b demolish non load bearing walls, relocate doors, lighing, power data as needed. demo e flooring material to expose e concrete floors for animal hospital tenantDetails
tenant improvement suite suite b demolish non load bearing walls, relocate doors, lighing, power data as needed. demo e flooring material to expose e concrete floors for animal hospital tenant | $75,000 |