Block 3707, lot 016
90 New Montgomery St
- City’s use
- Commercial Office
- Built
- 1988
- Stories
- 15
- Building
- 132,661 sq ft
- Lot
- 9,784 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
144 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Sep 2026 | 90 New Montgomery St | Marchetti Group | 8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered)Details
8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/data outlets, all new or reused hvac, electrical, plumbing & life safetey will be design build & submitted separately (bldg is fully sprinklered) | $500,000 |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 90 New Montgomery St | tenant improvements:install new 550 gal diesel fuel tank for existing generator & fire pumps; enlarge existing fuel pump closet so to enclose new tank;connect existing fuel piping to new tank; install new leak monitor; install mechanical exhaust fan & relocate existing wall mount light fixture.Details
tenant improvements:install new 550 gal diesel fuel tank for existing generator & fire pumps; enlarge existing fuel pump closet so to enclose new tank;connect existing fuel piping to new tank; install new leak monitor; install mechanical exhaust fan & relocate existing wall mount light fixture. | $125,000 | |
| Nov 18, 2024 | Completed final sign-off Dec 2024 | 90 New Montgomery St | Liberty Fire Systems Inc | replace existing malfuncationing diesel fire pump controller with new controller.Details
replace existing malfuncationing diesel fire pump controller with new controller. | $10,000 |
| May 19, 2022 | Never finaled issued May 2022, no final | 90 New Montgomery St | Sabah International Incorporated | 2nd fl: as-built for 202204222792. relocate 1 strobe as per field conditions there was existing strobe 2.1.2-8 in conference room next to vistbule. speaker/strobes 2.1.2-6 & 2.1.2-5 did not get demo. (e) appliances t0 remain.Details
2nd fl: as-built for 202204222792. relocate 1 strobe as per field conditions there was existing strobe 2.1.2-8 in conference room next to vistbule. speaker/strobes 2.1.2-6 & 2.1.2-5 did not get demo. (e) appliances t0 remain. | |
| Apr 22, 2022 | Never finaled issued Apr 2022, no final | 90 New Montgomery St | Sabah International Incorporated | 2/f: ref to t.i.202112224877. fire alarm: relocate 1 smoke detector & 1 speaker strobe. demo 2 control relay module, 1 smoke detector, 2 door holders & 2 speaker strobeDetails
2/f: ref to t.i.202112224877. fire alarm: relocate 1 smoke detector & 1 speaker strobe. demo 2 control relay module, 1 smoke detector, 2 door holders & 2 speaker strobe | $7,978 |
| Mar 18, 2022 | Never finaled issued Mar 2022, no final | 90 New Montgomery St | Pribuss Engineering Inc | 2/f suite 250: modify sprinkler head location to accommodate new ceiling and partition layout for new office space. ref permit 202112224877.Details
2/f suite 250: modify sprinkler head location to accommodate new ceiling and partition layout for new office space. ref permit 202112224877. | $3,905 |
| Dec 30, 2021 | Completed final sign-off Feb 2022 | 90 New Montgomery St | Nwestco Llc | revision to 202108106177, substitute 344 sensor for 420Details
revision to 202108106177, substitute 344 sensor for 420 | $13,585 |
| Dec 22, 2021 | Completed final sign-off Jun 2022 | 90 New Montgomery St | R 3 Builders Inc. | ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demo of partition wallDetails
ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demo of partition wall | $300,000 |
| Aug 10, 2021 | Completed final sign-off Feb 2022 | 90 New Montgomery St | Nwestco Llc, Confidence U S T Services Inc | replacement of failed u/g fuel storage tank monitoring system and sensors/probes with new veeder root tls4c tank minotr and assoicated siensors/prob for (e) back-up generator. monitor located in closet.Details
replacement of failed u/g fuel storage tank monitoring system and sensors/probes with new veeder root tls4c tank minotr and assoicated siensors/prob for (e) back-up generator. monitor located in closet. | $13,585 |
| Sep 5, 2020 | Never finaled issued Jun 2021, no final | 90 New Montgomery St | Triamid Construction Of Central Ca. Inc. | install c02 sensors & alarms in storage roomsDetails
install c02 sensors & alarms in storage rooms | $20,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2019 | 90 New Montgomery St | Sabah International Incorporated | 11/f:replace 1 power supply, demo 9 speakers and 9 strobes, add 19 speaker strobes 1 strobeDetails
11/f:replace 1 power supply, demo 9 speakers and 9 strobes, add 19 speaker strobes 1 strobe | $17,850 |
| Oct 17, 2019 | Completed final sign-off May 2020 | 90 New Montgomery St | Commercial Interior Builders Inc | 11/f: demo (e) duct & hvac equipment as shown on m20. install new duct/hvac equipment as shown on m2.1. no new fire smoke dampers. provide lighting ti of approx 6,891 sq. ft. office space. ref pa#201907155848 for architecturalDetails
11/f: demo (e) duct & hvac equipment as shown on m20. install new duct/hvac equipment as shown on m2.1. no new fire smoke dampers. provide lighting ti of approx 6,891 sq. ft. office space. ref pa#201907155848 for architectural | $325,000 |
| Sep 4, 2019 | Completed final sign-off Oct 2019 | 90 New Montgomery St | Anderson, Rowe & Buckley, Inc. | 11/f: existing fire sprinkler system ti 1 added, 16 relocated, 3 removed sprinklers. ref t.i. pa201907155848.Details
11/f: existing fire sprinkler system ti 1 added, 16 relocated, 3 removed sprinklers. ref t.i. pa201907155848. | $4,800 |
| Jul 15, 2019 | Completed final sign-off May 2020 | 90 New Montgomery St | Commercial Interior Builders Inc | 11th floor: t.i. includes of non structural partitions and bldg new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maherDetails
11th floor: t.i. includes of non structural partitions and bldg new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $274,618 |
| Jan 24, 2019 | Completed final sign-off Feb 2019 | 90 New Montgomery St | Sabah International Incorporated | 13th flr fire alarm system modification. replace 1 pwr supply. demo 2 strobes, 1 speaker, 12 speaker / strobes. add 8 strobes & 19 speaker / strobes. ref t.i 201809130098. n/a for maher.Details
13th flr fire alarm system modification. replace 1 pwr supply. demo 2 strobes, 1 speaker, 12 speaker / strobes. add 8 strobes & 19 speaker / strobes. ref t.i 201809130098. n/a for maher. | $18,094 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 90 New Montgomery St | Potter Fire Protection | ste. #1301: relocate (12) . add (9) and demo (4) fire sprinklers, ref pa # 201809130098. maher n/aDetails
ste. #1301: relocate (12) . add (9) and demo (4) fire sprinklers, ref pa # 201809130098. maher n/a | $11,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 90 New Montgomery St | Lynch Electric & Sons Inc. | title 24 electrical engineering ste 1301Details
title 24 electrical engineering ste 1301 | $90,000 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 90 New Montgomery St | Eldredge Woodworks | 8/f: remodel kitchenette in-kind: update counters, cabinets,surfaces, electrical outlets & switches. under cabinet lighting, plumbing: water line for fridge, drywall patch repair, install sink, faucet & air gap. maher n/a. 100-150 sq ft area of work no layouot changes. approx. 100-150 sq ft workDetails
8/f: remodel kitchenette in-kind: update counters, cabinets,surfaces, electrical outlets & switches. under cabinet lighting, plumbing: water line for fridge, drywall patch repair, install sink, faucet & air gap. maher n/a. 100-150 sq ft area of work no layouot changes. approx. 100-150 sq ft work | $11,040 |
| Oct 4, 2018 | Never finaled issued Oct 2018, no final | 90 New Montgomery St | Lynch Electric & Sons Inc. | suite 1500: electrical title 24 engineering ref 201807245324Details
suite 1500: electrical title 24 engineering ref 201807245324 | $4,500 |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 90 New Montgomery St | Sabah International Incorporated | modify e fire alarm system for 15th fl replace 1 power supply, 10 speaker strobes, 3 strobes, add 7 strobes, ref pa 201807245324Details
modify e fire alarm system for 15th fl replace 1 power supply, 10 speaker strobes, 3 strobes, add 7 strobes, ref pa 201807245324 | $16,426 |
| Sep 13, 2018 | Completed final sign-off Jun 2019 | 90 New Montgomery St | Rylko Builders Inc. | 13th floor, ste. 1301: interior only t.i. demolition of non-bearing walls and ceiling. new construction of walls, doors, ceiling and finishes. n/a for maherDetails
13th floor, ste. 1301: interior only t.i. demolition of non-bearing walls and ceiling. new construction of walls, doors, ceiling and finishes. n/a for maher | $450,000 |
| Sep 6, 2018 | Completed final sign-off Oct 2018 | 90 New Montgomery St | Potter Fire Protection | 15th floor: relocate 4 pendent fire sprinklers. ref app#201807245324Details
15th floor: relocate 4 pendent fire sprinklers. ref app#201807245324 | $2,500 |
| Aug 1, 2018 | Completed final sign-off Dec 2018 | 90 New Montgomery St | A S F Electric Inc | title 24 ref pa 2018-0419-6256Details
title 24 ref pa 2018-0419-6256 | $4,500 |
| Jul 24, 2018 | Completed final sign-off Nov 2018 | 90 New Montgomery St | Rylko Builders Inc. | 15th fl, ste 1500 ti inlcudes, demo of non structural partitions and install (n) non structural partitions. all (n) or revised hvac, electrical, plumbing life safety, sprinklers under separate permits (bldg is fully sprinklered). maher n/a.Details
15th fl, ste 1500 ti inlcudes, demo of non structural partitions and install (n) non structural partitions. all (n) or revised hvac, electrical, plumbing life safety, sprinklers under separate permits (bldg is fully sprinklered). maher n/a. | $269,000 |
| Jul 11, 2018 | Completed final sign-off Jul 2018 | 90 New Montgomery St | Sabah International Incorporated | suite 1400: fire alarm ti: modify existing fire alarm system, add 1 power supply, add 9 ceiling speaker/strobes. ref bpa #201804196756. maher naDetails
suite 1400: fire alarm ti: modify existing fire alarm system, add 1 power supply, add 9 ceiling speaker/strobes. ref bpa #201804196756. maher na | $10,346 |
| Jun 26, 2018 | Never finaled issued Jun 2018, no final | 90 New Montgomery St | 14th flr - fire sprinkler - relocate 7 and delete 1 ti # 201804196256 maher naDetails
14th flr - fire sprinkler - relocate 7 and delete 1 ti # 201804196256 maher na | ||
| Jun 19, 2018 | Completed final sign-off Dec 2018 | 90 New Montgomery St | R M I Mechanical Contractors | ref pa# 201804196756; add one water source heat pump, add one vav box and/or relocate diffusers & registers, add and reroute duct work, add and relocate thermostats and air balancin. n/a maherDetails
ref pa# 201804196756; add one water source heat pump, add one vav box and/or relocate diffusers & registers, add and reroute duct work, add and relocate thermostats and air balancin. n/a maher | $40,000 |
| May 18, 2018 | Completed final sign-off Jan 2020 | 90 New Montgomery St | Sabah International Incorporated | replace (e)fire alarm control unit w/new est3 unit,&addressable devices w/new est siga addressable devices. (e)addressable circuits tied into new est3 cards.all(e)wires shall remain &revised.all(e)notification appliances to remain&no new speakers or visual appliance are inclued.maher n/a.Details
replace (e)fire alarm control unit w/new est3 unit,&addressable devices w/new est siga addressable devices. (e)addressable circuits tied into new est3 cards.all(e)wires shall remain &revised.all(e)notification appliances to remain&no new speakers or visual appliance are inclued.maher n/a. | $168,088 |
| Apr 19, 2018 | Completed final sign-off Dec 2018 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | 14th fl suite 1450: ti demo non structural partiton, and installation new non structural partitions etc, all new or revised meps, life safety and sprinklers submitted separatelyDetails
14th fl suite 1450: ti demo non structural partiton, and installation new non structural partitions etc, all new or revised meps, life safety and sprinklers submitted separately | $310,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 90 New Montgomery St | Rylko Builders Inc. | suite 500: title 24 for mech & electrical for pa 2017-0918-8881. maher n/a.Details
suite 500: title 24 for mech & electrical for pa 2017-0918-8881. maher n/a. | $5,000 |
| Oct 12, 2017 | Completed final sign-off Jan 2018 | 90 New Montgomery St | Johnson Controls Fire | 5/f: t.i. - f/a - new nac extender panel to be installed to power. (n) modification appliances, smoke detectors to be installed in electrical room and in elevator lobby. ref t.i. pa201709188881.Details
5/f: t.i. - f/a - new nac extender panel to be installed to power. (n) modification appliances, smoke detectors to be installed in electrical room and in elevator lobby. ref t.i. pa201709188881. | $13,700 |
| Oct 11, 2017 | Completed final sign-off Oct 2017 | 90 New Montgomery St | Golden Gate Fire Protection Inc | f/s only : relocate 20 pendents; add 2 & relocate 12 upright for suite #500 on the 5th fl. ref #201709188881. maher naDetails
f/s only : relocate 20 pendents; add 2 & relocate 12 upright for suite #500 on the 5th fl. ref #201709188881. maher na | $8,500 |
| Sep 18, 2017 | Completed final sign-off Apr 2018 | 90 New Montgomery St | Rylko Builders Inc. | 5th fl - ti includes the demo of non structural partitions and installing (n) power/data outlets. all (n) or revised mep, life safety/srpinklers will be design build and submitted for permit separately (bldg full sprinklered) (n) rest room workDetails
5th fl - ti includes the demo of non structural partitions and installing (n) power/data outlets. all (n) or revised mep, life safety/srpinklers will be design build and submitted for permit separately (bldg full sprinklered) (n) rest room work | $443,388 |
| Jul 13, 2017 | Completed final sign-off Aug 2017 | 90 New Montgomery St | Johnson Controls Fire | fire alarm for tenant improvement, suite 250. ref t.i. pa#201705156542.Details
fire alarm for tenant improvement, suite 250. ref t.i. pa#201705156542. | $1,000 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 90 New Montgomery St | Westates Mechanical Corporation Inc | 2nd floor suite 250 - relocate 4 pendent fire sprinkler heads & add 3 new pendent fire sprinkler heads of existing bldg. ref #201705156542. n/a maher ordinanceDetails
2nd floor suite 250 - relocate 4 pendent fire sprinkler heads & add 3 new pendent fire sprinkler heads of existing bldg. ref #201705156542. n/a maher ordinance | $3,500 |
| May 15, 2017 | Never finaled issued May 2017, no final | 90 New Montgomery St | Angotti & Reilly Inc. | 2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13Details
2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13 | $141,000 |
| Mar 24, 2017 | Completed final sign-off Apr 2018 | 90 New Montgomery St | Johnson Controls Fire | 3rd flr: ti add 2 speaker/strobes ref 201612074355 maher naDetails
3rd flr: ti add 2 speaker/strobes ref 201612074355 maher na | $1,500 |
| Feb 28, 2017 | Completed final sign-off Mar 2017 | 90 New Montgomery St | Anderson, Rowe & Buckley, Inc. | 3rd flr: ti (e) fire sprinklers system 8 relocated, 1 added ref 201612074355 maher naDetails
3rd flr: ti (e) fire sprinklers system 8 relocated, 1 added ref 201612074355 maher na | $4,500 |
| Feb 24, 2017 | Completed final sign-off Jun 2017 | 90 New Montgomery St | Commercial Interior Builders Inc | power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/aDetails
power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/a | $39,138 |
| Feb 10, 2017 | Never finaled issued Oct 2017, no final | 90 New Montgomery St | Discount Signs & Neon Inc | to erect electrical illuminated double faced sign - maher ordinance - extended ordinance no.155-13 n/aDetails
to erect electrical illuminated double faced sign - maher ordinance - extended ordinance no.155-13 n/a | $5,000 |
| Feb 7, 2017 | Never finaled issued Feb 2017, no final | 90 New Montgomery St | Pkc Construction Co. | revised t-24. revised add door hardware, panic bar and door closer. revision to pa# 201701278112. n/a maher ord. 155-13Details
revised t-24. revised add door hardware, panic bar and door closer. revision to pa# 201701278112. n/a maher ord. 155-13 | |
| Jan 27, 2017 | Completed final sign-off Feb 2017 | 90 New Montgomery St | Pkc Construction Co. | revision to pa 2016-1116-2828 - remove restroom wall, updated equipment specs, added light fixtures, material specification updated, revised rcp, re-sized water heaterDetails
revision to pa 2016-1116-2828 - remove restroom wall, updated equipment specs, added light fixtures, material specification updated, revised rcp, re-sized water heater | $20,000 |
| Jan 6, 2017 | Completed final sign-off Jan 2019 | 90 New Montgomery St | Johnson Controls Fire | 1st0 floor "illy caffe" t.i. consist of adding (3) speaker/strobes & (1) strobe. ref pa #2016081549591. n/a maher ordinanceDetails
1st0 floor "illy caffe" t.i. consist of adding (3) speaker/strobes & (1) strobe. ref pa #2016081549591. n/a maher ordinance | $2,500 |
| Dec 7, 2016 | Completed final sign-off Apr 2018 | 90 New Montgomery St | 1st floor:relocate 4 pendent sprinklers o the 4th floor. t.i. app#201608154959. maher naDetails
1st floor:relocate 4 pendent sprinklers o the 4th floor. t.i. app#201608154959. maher na | $3,700 | |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 90 New Montgomery St | Commercial Interior Builders Inc | 3rd floor: t.i. includes the demo of non structural partitions and build back of non structural partitions. mep, life safty and sprinklers under seperate permit. design build. (bldg fully sprinklered). n/a for maherDetails
3rd floor: t.i. includes the demo of non structural partitions and build back of non structural partitions. mep, life safty and sprinklers under seperate permit. design build. (bldg fully sprinklered). n/a for maher | $69,120 |
| Nov 16, 2016 | Never finaled issued Dec 2016, no final | 90 New Montgomery St | Pkc Construction Co. | revision to 201608154959, interior t.i. of (e) coffee shop; new ceilings and change to back of house layoutDetails
revision to 201608154959, interior t.i. of (e) coffee shop; new ceilings and change to back of house layout | $65,000 |
| Oct 31, 2016 | Completed final sign-off Jul 2017 | 90 New Montgomery St | 6th fl suite 650: ti includes demo of non str partitions and install new power/data outlet. all new or revised mep and life safety will be design build building is fully sprinkleredDetails
6th fl suite 650: ti includes demo of non str partitions and install new power/data outlet. all new or revised mep and life safety will be design build building is fully sprinklered | $20,000 | |
| Aug 15, 2016 | Never finaled issued Nov 2016, no final | 90 New Montgomery St | Pkc Construction Co. | ground fl: interior tenant improvement remodel of existing coffee shop. remodel includes front counter line and back of house. new unisex restroom added. alarm/sprinkler deferred. maher not reqDetails
ground fl: interior tenant improvement remodel of existing coffee shop. remodel includes front counter line and back of house. new unisex restroom added. alarm/sprinkler deferred. maher not req | $350,000 |
| Mar 7, 2016 | Never finaled issued Mar 2016, no final | 90 New Montgomery St | street space | ||
| Aug 27, 2015 | Completed final sign-off Aug 2016 | 90 New Montgomery St | Verve C Onstruction | 2nd floor: revision to 2015 0515 6512 - a reduction in scope of work. removing womens room power assist actuator as cost exceeds 20% of construction cost. power actuator in mens room to remain in scope of work. maher naDetails
2nd floor: revision to 2015 0515 6512 - a reduction in scope of work. removing womens room power assist actuator as cost exceeds 20% of construction cost. power actuator in mens room to remain in scope of work. maher na | |
| May 15, 2015 | Completed final sign-off May 2016 | 90 New Montgomery St | suite 250: add new partition wall and door for a new office space per plan. maher n/a.Details
suite 250: add new partition wall and door for a new office space per plan. maher n/a. | $25,000 | |
| May 14, 2015 | Completed final sign-off May 2015 | 90 New Montgomery St | Verve C Onstruction | 2nd floor: demo interior walls and case work per ab-017. t.i. under separate permit. maher not reqDetails
2nd floor: demo interior walls and case work per ab-017. t.i. under separate permit. maher not req | $4,000 |
| Apr 27, 2015 | Never finaled issued Apr 2015, no final | 90 New Montgomery St | street space permit | ||
| Jun 11, 2014 | Never finaled issued Jun 2014, no final | 90 New Montgomery St | street space & sidewalk repair | ||
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 90 New Montgomery St | Simplexgrinnell Lp. | 14th floor-suite #1450-fire alarm tenant improvement-1 speaker, 4 strobesDetails
14th floor-suite #1450-fire alarm tenant improvement-1 speaker, 4 strobes | $2,000 |
| Mar 7, 2013 | Completed final sign-off Jun 2013 | 90 New Montgomery St | Angotti & Reilly Inc. | ste 1450, 14th floor, t.i include the demo of non-structural partitions and building new ceiling height non-structural partitions; all new or revised hvac, electrical, plumbing, and life safety work will be design -build and submitted separately. (fully sprinklered).Details
ste 1450, 14th floor, t.i include the demo of non-structural partitions and building new ceiling height non-structural partitions; all new or revised hvac, electrical, plumbing, and life safety work will be design -build and submitted separately. (fully sprinklered). | $45,000 |
| Mar 7, 2013 | Completed final sign-off Mar 2013 | 90 New Montgomery St | Simplexgrinnell Lp. | 15th floor tenant improvement includes 1 new smoke detector and 2 new speaker stobes. ti # 201301168136Details
15th floor tenant improvement includes 1 new smoke detector and 2 new speaker stobes. ti # 201301168136 | $6,000 |
| Mar 7, 2013 | Completed final sign-off Apr 2013 | 90 New Montgomery St | Bcci Construction Company | 15th floor: revision to pa#201301168136. it room is not an ab-060 it room, installing a non-rated wall and door.Details
15th floor: revision to pa#201301168136. it room is not an ab-060 it room, installing a non-rated wall and door. | |
| Feb 22, 2013 | Completed final sign-off Mar 2013 | 90 New Montgomery St | Simplexgrinnell Lp. | fire alarm on first floor. ti for 7-11 store. 5 new strobes.Details
fire alarm on first floor. ti for 7-11 store. 5 new strobes. | $2,000 |
| Feb 21, 2013 | Completed final sign-off Mar 2013 | 90 New Montgomery St | 15th floor fire sprinkler permit- relocate 11, add 2 & delete 2 pendent sprinklersDetails
15th floor fire sprinkler permit- relocate 11, add 2 & delete 2 pendent sprinklers | $6,500 | |
| Feb 15, 2013 | Completed final sign-off Jun 2013 | 90 New Montgomery St | Simplexgrinnell Lp. | fire alarm to suite #315 3rd fl. new devices include one (1) (n) smoke detector & three (3) (n) speaker/strobes. relocate three (3) (e) speaker/strobes & one (1) (e) strobe. t.i. pa#2013-01-09-7548.Details
fire alarm to suite #315 3rd fl. new devices include one (1) (n) smoke detector & three (3) (n) speaker/strobes. relocate three (3) (e) speaker/strobes & one (1) (e) strobe. t.i. pa#2013-01-09-7548. | $6,000 |
| Feb 5, 2013 | Completed final sign-off Mar 2013 | 90 New Montgomery St | 3rd #315 fire sprinkler system - relcoate 26 pendents & add 2 pendents. t.i. #2013.0109.7548.Details
3rd #315 fire sprinkler system - relcoate 26 pendents & add 2 pendents. t.i. #2013.0109.7548. | $14,000 | |
| Jan 16, 2013 | Completed final sign-off Apr 2013 | 90 New Montgomery St | Bcci Construction Company | 15th floor: t.i. including the demolishing of non structural partitions and bldg new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design-build and submitted for permit separately.Details
15th floor: t.i. including the demolishing of non structural partitions and bldg new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design-build and submitted for permit separately. | $94,000 |
| Jan 15, 2013 | Expired or cancelled cancelled Jan 2026 | 90 New Montgomery St | install projecting electric double faced blade sign. | $3,000 | |
| Jan 15, 2013 | Expired or cancelled cancelled Jan 2026 | 90 New Montgomery St | install electric single faced wall sign. | $2,500 | |
| Jan 9, 2013 | Completed final sign-off Jul 2013 | 90 New Montgomery St | Peacock Construction Inc | 3rd floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinkleredDetails
3rd floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered | $484,387 |
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 90 New Montgomery St | fire sprinkler relocationDetails
fire sprinkler relocation | $2,000 | |
| Sep 21, 2012 | Never finaled issued Jan 2013, no final | 90 New Montgomery St | Ad Art Inc. | install blade sign. | $15,000 |
| Sep 21, 2012 | Never finaled issued Jan 2013, no final | 90 New Montgomery St | Ad Art Inc. | add (2) exhaust louvers to front of building above first floor.Details
add (2) exhaust louvers to front of building above first floor. | $7,500 |
| Sep 21, 2012 | Never finaled issued Jan 2013, no final | 90 New Montgomery St | Ad Art Inc. | install fascia sign. | $15,000 |
| Aug 21, 2012 | Never finaled issued Dec 2012, no final | 90 New Montgomery St | Golden State Construction Grp Inc | new tenant improvement work including electrical, mechanical, plumbing, install new merchandise equipment, new finishes (floor, ceiling, wall panels), install coffee bar, beverage counter, & new restrooms, sink. f/a and sprinklers on separate permit.Details
new tenant improvement work including electrical, mechanical, plumbing, install new merchandise equipment, new finishes (floor, ceiling, wall panels), install coffee bar, beverage counter, & new restrooms, sink. f/a and sprinklers on separate permit. | $125,000 |
| Jun 26, 2012 | Completed final sign-off Jan 2013 | 90 New Montgomery St | Novo Construction Inc | 13th floor oti. all new or revised hvac, electrial, plumbing, sprinkler and life safety work - design build and submitted separately.Details
13th floor oti. all new or revised hvac, electrial, plumbing, sprinkler and life safety work - design build and submitted separately. | $36,000 |
| May 22, 2012 | Completed final sign-off Aug 2012 | 90 New Montgomery St | Angotti & Reilly Inc. | 2nd floor suite 230 to complete work and obtain final 200710246330Details
2nd floor suite 230 to complete work and obtain final 200710246330 | $15,000 |
| May 22, 2012 | Completed final sign-off Jul 2012 | 90 New Montgomery St | Angotti & Reilly Inc. | revision to 2007-1024-6330 (renewal permit application is 2012-0522-0998) restrooms only.Details
revision to 2007-1024-6330 (renewal permit application is 2012-0522-0998) restrooms only. | |
| Apr 2, 2012 | Completed final sign-off Sep 2012 | 90 New Montgomery St | Liberty Fire Systems Inc | replace fire pumps, valves and flow meter. same make and model number.Details
replace fire pumps, valves and flow meter. same make and model number. | $25,000 |
| Jul 6, 2011 | Completed final sign-off Sep 2012 | 90 New Montgomery St | Simplex Grinnell | to obtain final inspection. all work complete per previous application app#2007-12-13-0427.Details
to obtain final inspection. all work complete per previous application app#2007-12-13-0427. | |
| Oct 19, 2010 | Completed final sign-off Nov 2010 | 90 New Montgomery St | Potter Fire Protection | 11th floor-add 1 fire sprinkler to accomodate new wallDetails
11th floor-add 1 fire sprinkler to accomodate new wall | $750 |
| Jul 6, 2010 | Completed final sign-off Feb 2011 | 90 New Montgomery St | Angotti & Reilly Inc. | 11th. flr. t.i. include demolition of nonstructural partitions & elec., plumbing & life safety work will be design build & submitted for permit separately. bldg. is fully sprinklered.Details
11th. flr. t.i. include demolition of nonstructural partitions & elec., plumbing & life safety work will be design build & submitted for permit separately. bldg. is fully sprinklered. | $35,000 |
| Jul 1, 2010 | Completed final sign-off Aug 2010 | 90 New Montgomery St | Simplex Grinnell | fire alarm tenant improvement on 10th floor. devices include 1 new nac power supply panel, 2 new smoke detectors and 7 new speaker strobesDetails
fire alarm tenant improvement on 10th floor. devices include 1 new nac power supply panel, 2 new smoke detectors and 7 new speaker strobes | $8,000 |
| Jun 23, 2010 | Completed final sign-off Aug 2010 | 90 New Montgomery St | Aquamatic Fire Protection | relocate 8 existing sprinklers and adding 4 due to interior remodel in suite 1010, 10th floor.Details
relocate 8 existing sprinklers and adding 4 due to interior remodel in suite 1010, 10th floor. | $2,500 |
| Jun 11, 2010 | Completed final sign-off Aug 2010 | 90 New Montgomery St | Abco Mechanical Contr Inc **See Notes** | relocate (2) t-stats & repl grilles @ suite 1010Details
relocate (2) t-stats & repl grilles @ suite 1010 | $3,200 |
| May 27, 2010 | Completed final sign-off Aug 2010 | 90 New Montgomery St | Wci-Gc Inc | 10th floor, suite 1010. ti includes demo of non structural. partitons and building new non structural partitions. all new or revised hvac, elec, plumbing, and life safety work under separate permit. design build. fully sprinklered.Details
10th floor, suite 1010. ti includes demo of non structural. partitons and building new non structural partitions. all new or revised hvac, elec, plumbing, and life safety work under separate permit. design build. fully sprinklered. | $106,059 |
| Oct 20, 2009 | Never finaled issued Oct 2009, no final | 90 New Montgomery St | street and sidewalk permit | ||
| Dec 12, 2008 | Completed final sign-off May 2009 | 90 New Montgomery St | barrier removal at 7th floor restrooms. demo and relocaton/replacement of tiolet and partitions. replace lavatory and counterDetails
barrier removal at 7th floor restrooms. demo and relocaton/replacement of tiolet and partitions. replace lavatory and counter | $35,000 | |
| Oct 10, 2008 | Never finaled issued Oct 2008, no final | 90 New Montgomery St | City Mechanical Inc | install 24000 btu ac unit in computer room with ductwork and thermostat, install condenser water supply and return lines, install condensate line and ejectionDetails
install 24000 btu ac unit in computer room with ductwork and thermostat, install condenser water supply and return lines, install condensate line and ejection | $16,000 |
| Sep 3, 2008 | Completed final sign-off Jan 2009 | 90 New Montgomery St | 14th floor tenant improvement - new ceiling height non-structural partitions. building fully sprinklered. (hvac, elec, life safety under separate permit.)Details
14th floor tenant improvement - new ceiling height non-structural partitions. building fully sprinklered. (hvac, elec, life safety under separate permit.) | $30,000 | |
| Apr 16, 2008 | Completed final sign-off Aug 2008 | 90 New Montgomery St | Mc Millan Electric | 7th floor suite 700 -electrical work: install new lighting, switches, outletsDetails
7th floor suite 700 -electrical work: install new lighting, switches, outlets | $12,000 |
| Apr 14, 2008 | Completed final sign-off Aug 2008 | 90 New Montgomery St | Simplex Grinnell | suite #700- fire alarm t.i. to 7th floor. includes addtion of (1) nac panel, 1 smoke detector, (4) speaker strobes and (1) strobe.Details
suite #700- fire alarm t.i. to 7th floor. includes addtion of (1) nac panel, 1 smoke detector, (4) speaker strobes and (1) strobe. | $6,800 |
| Apr 4, 2008 | Completed final sign-off Aug 2008 | 90 New Montgomery St | ti upgrade on an (e) fire sprinkler system, relocate 16 pendents, add 3 pendents, and remove (delete) 5 pendents. total 19 pendents.Details
ti upgrade on an (e) fire sprinkler system, relocate 16 pendents, add 3 pendents, and remove (delete) 5 pendents. total 19 pendents. | $3,800 | |
| Mar 4, 2008 | Completed final sign-off Jun 2008 | 90 New Montgomery St | 7th floor: tenant improvement including non-structural demo and partition build back. (electrical, mechanical lifesafety and sprinkler to be permitted under separate permit.) building fully sprinklered.Details
7th floor: tenant improvement including non-structural demo and partition build back. (electrical, mechanical lifesafety and sprinkler to be permitted under separate permit.) building fully sprinklered. | $150,000 | |
| Mar 4, 2008 | Expired or cancelled cancelled Jan 2026 | 90 New Montgomery St | revision to appl #200710246330 - 2nd floor: restroom stall is 57" not 60" and will not be provided in the water closet stall for disabled access stall.Details
revision to appl #200710246330 - 2nd floor: restroom stall is 57" not 60" and will not be provided in the water closet stall for disabled access stall. | ||
| Dec 13, 2007 | Expired or cancelled expired Oct 2011 | 90 New Montgomery St | Simplex Grinnell | 2nd fl. - fire alarm t.i. addition of (1) booster (nac panel) , (4) speaker strobes, (3) strobes, (2) smoke detectors, (3) door holders, and (1) duct detector, and (2) fire smoke damper.Details
2nd fl. - fire alarm t.i. addition of (1) booster (nac panel) , (4) speaker strobes, (3) strobes, (2) smoke detectors, (3) door holders, and (1) duct detector, and (2) fire smoke damper. | $7,500 |
| Nov 13, 2007 | Expired or cancelled expired Oct 2011 | 90 New Montgomery St | Dpw Inc. | fire sprinkler system. relocate 30 existing heads, plug off 12 heads on 2nd floorDetails
fire sprinkler system. relocate 30 existing heads, plug off 12 heads on 2nd floor | $9,000 |
| Nov 6, 2007 | Completed final sign-off Mar 2008 | 90 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system on 13th floor. relocate 9 and add 1 new sprinkler head.Details
fire sprinkler system on 13th floor. relocate 9 and add 1 new sprinkler head. | $1,100 |
| Oct 24, 2007 | Expired or cancelled expired Oct 2011 | 90 New Montgomery St | t/i suite 230 , new server room, 2 conference rooms, doors,open office space.Details
t/i suite 230 , new server room, 2 conference rooms, doors,open office space. | $191,416 | |
| Oct 19, 2007 | Completed final sign-off Mar 2008 | 90 New Montgomery St | Ayoob & Peery Plumbing Co Inc | 15th floor-relocate fire sprinklers per tenant improvment on 15th floorDetails
15th floor-relocate fire sprinklers per tenant improvment on 15th floor | $1,600 |
| Oct 15, 2007 | Never finaled issued Oct 2007, no final | 90 New Montgomery St | partial demo of non-structal partians and doors. ti to follow on separate application.Details
partial demo of non-structal partians and doors. ti to follow on separate application. | $20,000 | |
| Oct 2, 2007 | Completed final sign-off Dec 2007 | 90 New Montgomery St | Simplex Grinnell | provide and install 1 new nac panel, 1 smoke detector and 3 new speaker strobes on the 3rd floorDetails
provide and install 1 new nac panel, 1 smoke detector and 3 new speaker strobes on the 3rd floor | $2,300 |
| Oct 2, 2007 | Completed final sign-off Mar 2008 | 90 New Montgomery St | Simplex Grinnell | provide 1 new nac power supply, 8 coiling speaker/strobes, 5 ceiling strobes, 4smoke detectors and base, 2 door holders as noted on plan. all work in the 15th floorDetails
provide 1 new nac power supply, 8 coiling speaker/strobes, 5 ceiling strobes, 4smoke detectors and base, 2 door holders as noted on plan. all work in the 15th floor | $6,000 |
| Sep 19, 2007 | Completed final sign-off Mar 2008 | 90 New Montgomery St | 15th floor - interior demo. of partitions, doors, etc. build back doors and partitions. mep, fire sprinkler, and fire alarm under separate permit.Details
15th floor - interior demo. of partitions, doors, etc. build back doors and partitions. mep, fire sprinkler, and fire alarm under separate permit. | $132,000 | |
| Sep 11, 2007 | Completed final sign-off Aug 2018 | 90 New Montgomery St | Simplex Grinnell | provide 1 nac power supply 8 strobes/speakers 3 wall mounted spkr strobes 5 strobes 2 smoke detectors. remove and replace 2 door holders. all work on the 13th floorDetails
provide 1 nac power supply 8 strobes/speakers 3 wall mounted spkr strobes 5 strobes 2 smoke detectors. remove and replace 2 door holders. all work on the 13th floor | $9,000 |
| Aug 31, 2007 | Completed final sign-off Dec 2007 | 90 New Montgomery St | Wcp Svcs, Dba: Venture Builders | demo partitions & door, build back walls & doors, $6,700 restroom upgrades. fire safety, electrical, mechanical on seperate permit.Details
demo partitions & door, build back walls & doors, $6,700 restroom upgrades. fire safety, electrical, mechanical on seperate permit. | $30,000 |
| Aug 13, 2007 | Completed final sign-off Mar 2008 | 90 New Montgomery St | Anderson, Rowe & Buckley, Inc. | 13th floor: tenant improvements to ex. fire sprinkler. 25 relocated sprinklers and remove 5 sprinklers.Details
13th floor: tenant improvements to ex. fire sprinkler. 25 relocated sprinklers and remove 5 sprinklers. | $3,700 |
| Jul 18, 2007 | Completed final sign-off Mar 2008 | 90 New Montgomery St | Novo Construction Inc | 13th floor-office tenant improvement: renovating existing office space on the for tenant "resource global". mechanical and electrical work to be submitted under separate permit.Details
13th floor-office tenant improvement: renovating existing office space on the for tenant "resource global". mechanical and electrical work to be submitted under separate permit. | $175,000 |
| Feb 9, 2007 | Never finaled issued Feb 2007, no final | 90 New Montgomery St | Mac Kenzie Construction | double faced electrical wall signDetails
double faced electrical wall sign | |
| Jan 25, 2007 | Expired or cancelled expired Dec 2008 | 90 New Montgomery St | Cosco Fire Protection Inc. | alter existing fire sprinkler system per tenant improvements. 4 relocated sprinklers, 2 added sprinklers.Details
alter existing fire sprinkler system per tenant improvements. 4 relocated sprinklers, 2 added sprinklers. | $4,500 |
| Nov 2, 2006 | Never finaled issued Nov 2006, no final | 90 New Montgomery St | street space | ||
| Nov 1, 2006 | Expired or cancelled expired Dec 2008 | 90 New Montgomery St | remove partial ceiling tile. relocate lights. install appliances and drainage. construct approx 18 lf n bearing/n rated partition. install service counterDetails
remove partial ceiling tile. relocate lights. install appliances and drainage. construct approx 18 lf n bearing/n rated partition. install service counter | $70,000 | |
| Jun 27, 2006 | Expired or cancelled expired Nov 2007 | 90 New Montgomery St | Gettler-Ryan Inc | remove 4 flags of concrete surrouning spill bucket/remove and replace spill containment bucket on extg underground storage tank. replace concrete 2 match extgDetails
remove 4 flags of concrete surrouning spill bucket/remove and replace spill containment bucket on extg underground storage tank. replace concrete 2 match extg | $3,500 |
| Mar 10, 2005 | Expired or cancelled expired Nov 2007 | 90 New Montgomery St | Philip Advertising | to erect non-electrical sign | |
| Aug 17, 2004 | Expired or cancelled expired Nov 2007 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | renew expired app 200206249768-200205015429-200204093484Details
renew expired app 200206249768-200205015429-200204093484 | |
| Jul 2, 2004 | Completed final sign-off Aug 2004 | 90 New Montgomery St | Rudolph Caler/Lumen Electric | install a fire alarm hooster panel and seven sttobes, 2 smoke detectors.Details
install a fire alarm hooster panel and seven sttobes, 2 smoke detectors. | $6,200 |
| Jun 21, 2004 | Completed final sign-off Aug 2004 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | oti-2 11th floor, elDetails
oti-2 11th floor, el | $25,000 |
| Jun 17, 2004 | Completed final sign-off Aug 2004 | 90 New Montgomery St | oti-2, 11th floor, spDetails
oti-2, 11th floor, sp | $1,000 | |
| Apr 19, 2004 | Completed final sign-off Aug 2004 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | oti-1 (11th fl.) el,me, ls, spDetails
oti-1 (11th fl.) el,me, ls, sp | $65,000 |
| Nov 12, 2003 | Never finaled issued Nov 2003, no final | 90 New Montgomery St | street space and sidewalk | ||
| Nov 10, 2003 | Expired or cancelled expired Jan 2005 | 90 New Montgomery St | oti-3 5th floor sp | $5,200 | |
| Nov 7, 2003 | Expired or cancelled cancelled Dec 2004 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | oti-2 5th floor el | $16,000 |
| Oct 29, 2003 | Never finaled issued Nov 2003, no final | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | ste#500- install fllowing:17 strobes,11 speakers,1 booster panel,7 smoke detectors w/base,conncectDetails
ste#500- install fllowing:17 strobes,11 speakers,1 booster panel,7 smoke detectors w/base,conncect | $20,000 |
| Oct 6, 2003 | Expired or cancelled expired Jan 2005 | 90 New Montgomery St | oti-1 5th floor el me ls sp | $235,000 | |
| Sep 8, 2003 | Never finaled issued Oct 2003, no final | 90 New Montgomery St | Rudolph Caler/Lumen Electric | oti-2 14th floor, el, ls | $16,800 |
| Aug 13, 2003 | Completed final sign-off Aug 2003 | 90 New Montgomery St | Abco Mechanical Contr Inc **See Notes** | revised ducting and exhaust fan layout for type two hoodDetails
revised ducting and exhaust fan layout for type two hood | $6,000 |
| Jul 28, 2003 | Completed final sign-off Oct 2003 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | oti-1 14th floor, el, me, lsDetails
oti-1 14th floor, el, me, ls | $63,650 |
| Jul 7, 2003 | Completed final sign-off Aug 2003 | 90 New Montgomery St | Magnum Construction | addition of fire alarm power supply, strobe lights, pull station to existing fire alarm system on grDetails
addition of fire alarm power supply, strobe lights, pull station to existing fire alarm system on gr | $1,500 |
| Jul 2, 2003 | Completed final sign-off Aug 2003 | 90 New Montgomery St | fire sprinkler t/i relocate 10 delete 3 add 3 pendent sprinklers g/fDetails
fire sprinkler t/i relocate 10 delete 3 add 3 pendent sprinklers g/f | $3,200 | |
| Jun 11, 2003 | Expired or cancelled expired Jan 2005 | 90 New Montgomery St | Sam's Neon & Elec. Signs | erect a single faced, electric wall signDetails
erect a single faced, electric wall sign | |
| May 19, 2003 | Never finaled issued May 2003, no final | 90 New Montgomery St | street space | ||
| Apr 18, 2003 | Completed final sign-off Aug 2003 | 90 New Montgomery St | lighting & mechanical work only on previously approved appl#200304091820Details
lighting & mechanical work only on previously approved appl#200304091820 | $15,000 | |
| Apr 9, 2003 | Completed final sign-off Aug 2003 | 90 New Montgomery St | interior t.i..-(n)partitions equip fixtures. no structure or exterior work. fire protection,lightingDetails
interior t.i..-(n)partitions equip fixtures. no structure or exterior work. fire protection,lighting | $85,000 | |
| Mar 25, 2003 | Completed final sign-off Jul 2003 | 90 New Montgomery St | Rudolph Caler/Lumen Electric | install one light fixture and title 24 4th floor suite 414Details
install one light fixture and title 24 4th floor suite 414 | $1,000 |
| Mar 20, 2003 | Completed final sign-off Jul 2003 | 90 New Montgomery St | Rudolph Caler/Lumen Electric | install 4 strobes and 1 smoke detector 4th floor to existing fire alarm systemDetails
install 4 strobes and 1 smoke detector 4th floor to existing fire alarm system | $6,000 |
| Mar 17, 2003 | Expired or cancelled expired Jan 2005 | 90 New Montgomery St | Fluoresco Lighting & Sign | erect a double faced, projecting wall signDetails
erect a double faced, projecting wall sign | |
| Jan 31, 2003 | Completed final sign-off Jul 2003 | 90 New Montgomery St | oti-1 4/f el me ls spDetails
oti-1 4/f el me ls sp | $50,000 | |
| Aug 27, 2002 | Expired or cancelled expired Mar 2004 | 90 New Montgomery St | fire life safety upgrade replace 2 strobe lights add 1 speakerDetails
fire life safety upgrade replace 2 strobe lights add 1 speaker | $5,200 | |
| Aug 15, 2002 | Completed final sign-off Jul 2003 | 90 New Montgomery St | Robbins General Contr Inc | oti-2 4th floor, el, me, spDetails
oti-2 4th floor, el, me, sp | $19,705 |
| Jun 24, 2002 | Expired or cancelled expired Mar 2004 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | install concrete enclosure around exist plumbing lines in elevator mechanical room.Details
install concrete enclosure around exist plumbing lines in elevator mechanical room. | $800 |
| Jun 20, 2002 | Completed final sign-off Jul 2003 | 90 New Montgomery St | Robbins General Contr Inc | oti-1 4th floor, el, me, ls, spDetails
oti-1 4th floor, el, me, ls, sp | $50,700 |
| May 1, 2002 | Expired or cancelled expired Mar 2004 | 90 New Montgomery St | non structural interior partitions relocate exist lighting new millwork.Details
non structural interior partitions relocate exist lighting new millwork. | $30,000 | |
| Apr 9, 2002 | Expired or cancelled expired Mar 2004 | 90 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | build out new drywall ceiling, relocate door,build new partition on 16th floor mechanical roomDetails
build out new drywall ceiling, relocate door,build new partition on 16th floor mechanical room | $13,000 |
| Sep 21, 2001 | Expired or cancelled expired Sep 2002 | 90 New Montgomery St | street space permit | ||
| May 8, 2001 | Expired or cancelled expired May 2002 | 90 New Montgomery St | street space | ||
| Mar 30, 2001 | Completed final sign-off Aug 2001 | 90 New Montgomery St | Potter Fire Protection | fire prtection sys (n) in 1st fl. i.t. in basementDetails
fire prtection sys (n) in 1st fl. i.t. in basement | $14,900 |
| Jul 29, 2000 | Completed final sign-off Aug 2001 | 90 New Montgomery St | retail space tenant build out 1st floor and basementDetails
retail space tenant build out 1st floor and basement | $300,000 | |
| Jul 12, 2000 | Completed final sign-off Aug 2001 | 90 New Montgomery St | install push button power door operator at buil entry for accessibility as equiv facilit for door prDetails
install push button power door operator at buil entry for accessibility as equiv facilit for door pr | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rudolph Commercial Interiors Inc, Rci (9), Sabah International Incorporated (7), Simplex Grinnell (7), Angotti & Reilly Inc. (5), Anderson, Rowe & Buckley, Inc. (4), Commercial Interior Builders Inc (4), Johnson Controls Fire (4), Pkc Construction Co. (4), Potter Fire Protection (4), Rudolph Caler/Lumen Electric (4), Rylko Builders Inc. (4), Simplexgrinnell Lp. (4), Ad Art Inc. (3), Abco Mechanical Contr Inc **See Notes** (2), Bcci Construction Company (2), Liberty Fire Systems Inc (2), Lynch Electric & Sons Inc. (2), Novo Construction Inc (2), Nwestco Llc (2), Robbins General Contr Inc (2), Verve C Onstruction (2), A S F Electric Inc, Aquamatic Fire Protection, Ayoob & Peery Plumbing Co Inc, City Mechanical Inc, Confidence U S T Services Inc, Cosco Fire Protection Inc., Discount Signs & Neon Inc, Dpw Inc., Eldredge Woodworks, Fluoresco Lighting & Sign, Gettler-Ryan Inc, Golden Gate Fire Protection Inc, Golden State Construction Grp Inc, Mac Kenzie Construction, Magnum Construction, Marchetti Group, Mc Millan Electric, Peacock Construction Inc, Philip Advertising, Pribuss Engineering Inc, R 3 Builders Inc., R M I Mechanical Contractors, Sam's Neon & Elec. Signs, Triamid Construction Of Central Ca. Inc., Wci-Gc Inc, Wcp Svcs, Dba: Venture Builders, Westates Mechanical Corporation Inc
- Architects
- Joseph Remling (7), Hooksasd Hooks Asd (5), Geoffrey Lim (3), Alexandre J. Sims, Ariane Lebrilla, Cortland Morgan, Michael John Mccall, Peter Petruzzi
- Engineers
- Bob Keele, Craig Laws, Elisabeth M Allen, Hector Pedraza, Jesus Cabellon Jr., Meng Hsiu Chen, Michael Robertson Robertson Engineering Inc, Rudolfo P Bustos Iii, Stephen Shafter, Steven Wisniewski, Wilson Lee
- Authorized agents
- Reginal Huston
- Designers
- Pribuss Engineering Inc
Find contractors for work like this