Verve C Onstruction
- Based in
- Alamo
- On San Francisco permits
- May 2015 to Aug 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2015 | Completed final sign-off Aug 2016 | 90 New Montgomery St | 2nd floor: revision to 2015 0515 6512 - a reduction in scope of work. removing womens room power assist actuator as cost exceeds 20% of construction cost. power actuator in mens room to remain in scope of work. maher naDetails
2nd floor: revision to 2015 0515 6512 - a reduction in scope of work. removing womens room power assist actuator as cost exceeds 20% of construction cost. power actuator in mens room to remain in scope of work. maher na | |
| May 14, 2015 | Completed final sign-off May 2015 | 90 New Montgomery St | 2nd floor: demo interior walls and case work per ab-017. t.i. under separate permit. maher not reqDetails
2nd floor: demo interior walls and case work per ab-017. t.i. under separate permit. maher not req | $4,000 |