Westates Mechanical Corporation Inc
- Based in
- Hayward
- On San Francisco permits
- Apr 2005 to Mar 2026
- Last 24 months
- 7 permits filed
296 permits since 2000: 224 completed, 2 in progress, 49 never finaled, 21 expired or cancelled.
Of the 49 never-finaled permits, 5 are 3 to 5 years old, 14 are 5 to 10 years old, 30 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 296.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2026 | Completed final sign-off Jul 2026 | 150 Oak St | remove fire sprinkler coverage from elevator 4 and 5 - machine room, top of shared elevator hoistway, and elevator pit of each elevatorDetails
remove fire sprinkler coverage from elevator 4 and 5 - machine room, top of shared elevator hoistway, and elevator pit of each elevator | |
| Feb 11, 2026 | Completed final sign-off Sep 2026 | 150 Oak St | fire sprinkler ti refermce building permit#2025-0314-2389. add: 99, relocate 288, changeout 55, total: 439.Details
fire sprinkler ti refermce building permit#2025-0314-2389. add: 99, relocate 288, changeout 55, total: 439. | $263,000 |
| Nov 14, 2025 | Completed final sign-off Jan 2026 | 295 Bay St | tenant improvement: remove/replace 6 sprinklers. plug 14 pendents 1st floor 2 2nd floor 12 ref #2025-1001-6476Details
tenant improvement: remove/replace 6 sprinklers. plug 14 pendents 1st floor 2 2nd floor 12 ref #2025-1001-6476 | $3,000 |
| Nov 10, 2025 | Completed final sign-off Mar 2026 | 150 Oak St | basement -ref ti 202503172389- fire sprinkler add 13, relocate 64; demo 7 -total 84 sprinklersDetails
basement -ref ti 202503172389- fire sprinkler add 13, relocate 64; demo 7 -total 84 sprinklers | $20,000 |
| Jul 16, 2025 | Completed final sign-off Dec 2025 | 150 Oak St | 4/f and basement - fire sprinklers: demo 3, add 15, relocate 32, and changeout 67 (total 114). upsize backflow from 4" to 6". ref permit 202503132189Details
4/f and basement - fire sprinklers: demo 3, add 15, relocate 32, and changeout 67 (total 114). upsize backflow from 4" to 6". ref permit 202503132189 | $110,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 888 Tennessee St | relocate fire sprinkler as required by ti- addition of conference room, machine shop upgrades, womens restroom upgrades. ref pa #2025-0421-4839Details
relocate fire sprinkler as required by ti- addition of conference room, machine shop upgrades, womens restroom upgrades. ref pa #2025-0421-4839 | $12,250 |
| Nov 20, 2024 | In progress issued Nov 2024 | 160 Freelon St | installation of new 4" ug pipe from the street curb with 4" ibr into the fire pump room of the bldg. total linear distance from the st. curb to the stair up is approx 140. ref pa# 2022-09-28-3327.Details
installation of new 4" ug pipe from the street curb with 4" ibr into the fire pump room of the bldg. total linear distance from the st. curb to the stair up is approx 140. ref pa# 2022-09-28-3327. | $12,000 |
| Sep 5, 2024 | Completed final sign-off Jul 2025 | 548 Delta St | ref 202402075425 ti to relocate and add (71) spinklersDetails
ref 202402075425 ti to relocate and add (71) spinklers | $30,000 |
| Aug 16, 2024 | Completed final sign-off Oct 2024 | 683 Florida St | as built drawing:fire sprinkler t.i. total add/relocate =41 no underground. ref pa#202308315673Details
as built drawing:fire sprinkler t.i. total add/relocate =41 no underground. ref pa#202308315673 | |
| Jun 13, 2024 | In progress issued Jun 2024 | 1170 Columbus Av | relocate 8 pendent fire sprinklers as required by tenant improvements. all existing fire sprinklers, branchlines, main piping beyond the area of work to remain.Details
relocate 8 pendent fire sprinklers as required by tenant improvements. all existing fire sprinklers, branchlines, main piping beyond the area of work to remain. | $2,500 |
| Jun 6, 2024 | Completed final sign-off Jul 2024 | 555 California St | 36/f: fire only: tenant imrpovement - relocate sprinklersDetails
36/f: fire only: tenant imrpovement - relocate sprinklers | $2,100 |
| Jun 3, 2024 | Completed final sign-off Mar 2025 | 1044 Howard St | install overhead sprinkler system on all levels fro a total of (49) heads and a 2-way radio fdc at the corner of howard and russ st.Details
install overhead sprinkler system on all levels fro a total of (49) heads and a 2-way radio fdc at the corner of howard and russ st. | $90,000 |
| Jun 3, 2024 | Completed final sign-off Mar 2025 | 1044 Howard St | as built plan for underground permit pa#202404290942Details
as built plan for underground permit pa#202404290942 | $5,000 |
| May 30, 2024 | Completed final sign-off Apr 2025 | 55 Bruton St | rev pa201912169614-s5 fire sprinkler. to update locations of the (e) fire sprinkler and fire hydrants per sffd condition of approval.Details
rev pa201912169614-s5 fire sprinkler. to update locations of the (e) fire sprinkler and fire hydrants per sffd condition of approval. | |
| May 23, 2024 | Completed final sign-off Jul 2025 | 55 Bruton St | rev pa 202307212738. to update locations of the (e) fire hydrants and memorialize approve ab-005 for location of fdc.Details
rev pa 202307212738. to update locations of the (e) fire hydrants and memorialize approve ab-005 for location of fdc. | |
| Apr 29, 2024 | Completed final sign-off Mar 2025 | 1044 Howard St | ref pa# 2023-0504-7097 install new 4" in bldg. riser tie into the 2 1/2" underground fire service at 1-0 off the curb at howard st.Details
ref pa# 2023-0504-7097 install new 4" in bldg. riser tie into the 2 1/2" underground fire service at 1-0 off the curb at howard st. | $4,500 |
| Mar 13, 2024 | Completed final sign-off Sep 2024 | 2820 16th St | modify (e) fire sprinkler system as required by tenant improvement new offices, lunch room and conference rooms. ref arch. #2022-0930-3568Details
modify (e) fire sprinkler system as required by tenant improvement new offices, lunch room and conference rooms. ref arch. #2022-0930-3568 | $4,500 |
| Jan 22, 2024 | Completed final sign-off Jul 2024 | 750 Florida St | fire ti: sprinkler relocates - 34. sprinkler adds - 55. changeout (e) sprinklers. add (n) backflow to (e) riser assembly. offset (e) piping & add restraint/bracing to accomodate ti changes.Details
fire ti: sprinkler relocates - 34. sprinkler adds - 55. changeout (e) sprinklers. add (n) backflow to (e) riser assembly. offset (e) piping & add restraint/bracing to accomodate ti changes. | $100,000 |
| Jan 18, 2024 | Completed final sign-off Feb 2024 | 100 California St | 2/f: demo 36 sprinkler pendents & replace w/ 28 uprights sprinklers. ref pa# 202311060270.Details
2/f: demo 36 sprinkler pendents & replace w/ 28 uprights sprinklers. ref pa# 202311060270. | $9,500 |
| Sep 26, 2023 | Completed final sign-off Oct 2023 | 285 Winston Dr | revision to scope of work description on application only for pa#202308315735; reduce scope by remaiire sprinkler at trash compacter & relocation of 2" pipe from original scope on appl; actual scope = area #1: add 1 & relocate 1 head in riser room; area #2: demo pipe under stairs & relocate 1 headDetails
revision to scope of work description on application only for pa#202308315735; reduce scope by remaiire sprinkler at trash compacter & relocation of 2" pipe from original scope on appl; actual scope = area #1: add 1 & relocate 1 head in riser room; area #2: demo pipe under stairs & relocate 1 head | |
| Sep 15, 2023 | Completed final sign-off Nov 2023 | 900 Pennsylvania Av | revision to 202006138695 s4. upgrade (e) fire sprinkler system at renovated freezer. total 42.Details
revision to 202006138695 s4. upgrade (e) fire sprinkler system at renovated freezer. total 42. | $26,880 |
| Aug 31, 2023 | Completed final sign-off Oct 2023 | 285 Winston Dr | fire sprinkler ti. work area #1: add/relocate sprinkler in riser room. work area #2: pipe fire sprinkler into trash compactor at load dock. work area #3: pipe (n) branch line off sector a main for (n) sprinklers. work area #4: relocate 2" pipe in sectors b per note. ref permit 202304175834Details
fire sprinkler ti. work area #1: add/relocate sprinkler in riser room. work area #2: pipe fire sprinkler into trash compactor at load dock. work area #3: pipe (n) branch line off sector a main for (n) sprinklers. work area #4: relocate 2" pipe in sectors b per note. ref permit 202304175834 | $8,700 |
| Aug 31, 2023 | Never finaled issued Aug 2023, no final | 683 Florida St | ti ref 202208291528.fire sprinkler ti: art and wellness center. relocate 11 sprinklers. add 5 sprinklers. change 24 uprights to pendents. total: 40 sprinklers. no underground work.Details
ti ref 202208291528.fire sprinkler ti: art and wellness center. relocate 11 sprinklers. add 5 sprinklers. change 24 uprights to pendents. total: 40 sprinklers. no underground work. | $23,000 |
| Aug 23, 2023 | Completed final sign-off Aug 2023 | 170 Valencia St | change 21 pendents to be concealed. add 1 head. change bathroom pipe due to arch change. fire sprinkler.Details
change 21 pendents to be concealed. add 1 head. change bathroom pipe due to arch change. fire sprinkler. | |
| Jul 21, 2023 | Completed final sign-off Mar 2025 | 55 Bruton St | install new 6 in fire water service to existing 8" main on bruton st. ref 201912169614.Details
install new 6 in fire water service to existing 8" main on bruton st. ref 201912169614. | $30,000 |
| May 18, 2023 | Completed final sign-off Aug 2025 | 1151 Fairfax Av | install new 8" fire service, starting at curb to inside the fire pump room at garage main level. ref pa# 201909121446.Details
install new 8" fire service, starting at curb to inside the fire pump room at garage main level. ref pa# 201909121446. | $8,000 |
| Feb 7, 2023 | Completed final sign-off Aug 2023 | 170 Valencia St | install (n) ec heads in great hall. demo (e) lobby sprinklers at 1/f. install (n) lobby, bathroom, gallery and pre function space sprinklers. total 48 heads. ref ti permit 202301190393Details
install (n) ec heads in great hall. demo (e) lobby sprinklers at 1/f. install (n) lobby, bathroom, gallery and pre function space sprinklers. total 48 heads. ref ti permit 202301190393 | $17,000 |
| Jan 17, 2023 | Completed final sign-off May 2025 | 828 Brannan St | install new overhead fire sprinklers systems on levels 1 and 2. total sprinklers: 204. underground piping plan under separate permit# 2022-0225-8677.Details
install new overhead fire sprinklers systems on levels 1 and 2. total sprinklers: 204. underground piping plan under separate permit# 2022-0225-8677. | $145,000 |
| Aug 10, 2022 | Never finaled issued Aug 2022, no final | 1265 Battery St | install 1 n pendent sprinkler, relocate and change out e head (5), change out replace e head (60). ref pa# 202207289491Details
install 1 n pendent sprinkler, relocate and change out e head (5), change out replace e head (60). ref pa# 202207289491 | $13,941 |
| Jul 20, 2022 | Completed final sign-off Aug 2023 | 900 Pennsylvania Av | revision to pa 202006138695 s4 provdie fire sprinkler system to the cooler storage. total number of sprinklers to be installed under the permit is 478.Details
revision to pa 202006138695 s4 provdie fire sprinkler system to the cooler storage. total number of sprinklers to be installed under the permit is 478. | $50,000 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 3251 20th Av | relocate: 16 pendents, changeout, 1 pendent for a tenant improvement . to accomodate new layout of nails and ceilings for code compliant coverage.Details
relocate: 16 pendents, changeout, 1 pendent for a tenant improvement . to accomodate new layout of nails and ceilings for code compliant coverage. | $18,000 |
| May 20, 2022 | Never finaled issued May 2022, no final | 555 California St | 21st fl. tenant improvement, relocation of 2 fire sprinklers rooms 2105 & 2106Details
21st fl. tenant improvement, relocation of 2 fire sprinklers rooms 2105 & 2106 | $4,000 |
| May 20, 2022 | Expired or cancelled cancelled Feb 2025 | 555 California St | 22nd fl. tenant improvement, relocation of 3 fire sprinklers rooms 2236, 2237 & 2238Details
22nd fl. tenant improvement, relocation of 3 fire sprinklers rooms 2236, 2237 & 2238 | $4,000 |
| May 17, 2022 | Never finaled issued May 2022, no final | 255 Shotwell St | relocate / changeout 2 (e) pendent sprinklers. install 3 (n) pendent sprinklers.Details
relocate / changeout 2 (e) pendent sprinklers. install 3 (n) pendent sprinklers. | $5,000 |
| Apr 14, 2022 | Completed final sign-off Jul 2022 | 2445 Golden Gate Av | revised drawings to original permit pa #202004227244. total add/relocate 78. t.i. ref pa #201910083932Details
revised drawings to original permit pa #202004227244. total add/relocate 78. t.i. ref pa #201910083932 | |
| Apr 5, 2022 | Completed final sign-off Apr 2022 | 360 Spear St | as built drawings ref pa #202108176522Details
as built drawings ref pa #202108176522 | |
| Feb 25, 2022 | Completed final sign-off May 2025 | 828 Brannan St | install new underground fire service from 5ft out of face of bldg. service terminate inside of bldg.Details
install new underground fire service from 5ft out of face of bldg. service terminate inside of bldg. | $3,500 |
| Feb 8, 2022 | Completed final sign-off Jan 2023 | 900 Pennsylvania Av | upgrade (e) fire sprinkler system at (e) warehouse to meet design criteria for high piled storage (under bpa 202201186193). total number of sprinklers to be installed under this permit is 594.Details
upgrade (e) fire sprinkler system at (e) warehouse to meet design criteria for high piled storage (under bpa 202201186193). total number of sprinklers to be installed under this permit is 594. | $400,000 |
| Feb 1, 2022 | Expired or cancelled cancelled May 2022 | 5290 Diamond Heights Bl | fire sprinkler t.i.: relocate 2 pendent sprinklers in dairy section.Details
fire sprinkler t.i.: relocate 2 pendent sprinklers in dairy section. | $5,000 |
| Nov 24, 2021 | Completed final sign-off Feb 2022 | 1255 Battery St | demo back pendent sprinklers to tie branch lines.install sprigs with new upright sprinklers for shell state condition. 98 new ssu, 23 d and plug, 1 (e) to remain (ssp)Details
demo back pendent sprinklers to tie branch lines.install sprigs with new upright sprinklers for shell state condition. 98 new ssu, 23 d and plug, 1 (e) to remain (ssp) | $24,831 |
| Nov 22, 2021 | Completed final sign-off Sep 2022 | 2335 Golden Gate Av | new sprinkler system tie in to (e) 1st/f system. total 34 sprinklersDetails
new sprinkler system tie in to (e) 1st/f system. total 34 sprinklers | $9,000 |
| Nov 16, 2021 | Completed final sign-off Feb 2022 | 88 Sutter St | relocate (24) pendent sprinklers. add (4) pendent sprinklers with (n) mechanical tees. relocate (1) upright. 28 total sprinklers.Details
relocate (24) pendent sprinklers. add (4) pendent sprinklers with (n) mechanical tees. relocate (1) upright. 28 total sprinklers. | $20,000 |
| Oct 12, 2021 | Completed final sign-off Nov 2022 | 101 Utah St | t.i. demo, relocate and add fire sprinkler piping and sprinkler heads. total of 65 sprinklers at 4 story area.Details
t.i. demo, relocate and add fire sprinkler piping and sprinkler heads. total of 65 sprinklers at 4 story area. | $8,000 |
| Aug 23, 2021 | Completed final sign-off Sep 2021 | 245 Valencia St | as built: in reference to bldg app# 201805219633 and pw20210728420. add new fire sprinkler uright and change 4 extg pendents to fire sprinkler upright in the upper and lower lobby.Details
as built: in reference to bldg app# 201805219633 and pw20210728420. add new fire sprinkler uright and change 4 extg pendents to fire sprinkler upright in the upper and lower lobby. | |
| Aug 17, 2021 | Completed final sign-off Apr 2022 | 360 Spear St | tenant improvement - sprinkler relocates: 197, sprinkler adds 45Details
tenant improvement - sprinkler relocates: 197, sprinkler adds 45 | $150,000 |
| Apr 27, 2021 | Never finaled issued Aug 2021, no final | 671 China Basin St | install (47) new pendent sprinklers with flexible drops relocate (35) existing uprightDetails
install (47) new pendent sprinklers with flexible drops relocate (35) existing upright | $30,000 |
| Apr 13, 2021 | Completed final sign-off Jun 2021 | 285 Winston Dr | as-built drawings to be stamped per inspector. added details & vic fitting as requested. fire permit #2020-1028-7670Details
as-built drawings to be stamped per inspector. added details & vic fitting as requested. fire permit #2020-1028-7670 | |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 690 Folsom St | as-builts for #2020-1103-8088Details
as-builts for #2020-1103-8088 | |
| Mar 4, 2021 | Completed final sign-off Dec 2021 | 888 Post St | priority project: revision to fire sprinkler addendum 4 due to revisions to original site permit. original site permit, fire sprinkler addendum 4 approved under pa# 201912230310. revision to original site permit approved under pa# 202010065970.Details
priority project: revision to fire sprinkler addendum 4 due to revisions to original site permit. original site permit, fire sprinkler addendum 4 approved under pa# 201912230310. revision to original site permit approved under pa# 202010065970. | $25,000 |
| Jan 14, 2021 | Completed final sign-off Nov 2021 | 2335 Golden Gate Av | add 15 uprights @ level 1 & 22 pendents, relocate & change 7 and change uprights to pendent 5. total of 34 sprinklers at mezzanine. tie in to newly installed 4" main @ level 1.Details
add 15 uprights @ level 1 & 22 pendents, relocate & change 7 and change uprights to pendent 5. total of 34 sprinklers at mezzanine. tie in to newly installed 4" main @ level 1. | |
| Nov 3, 2020 | Completed final sign-off Aug 2021 | 690 Folsom St | tenant improvement: 89 added heads, 46 relocated heads.Details
tenant improvement: 89 added heads, 46 relocated heads. | $53,900 |
| Oct 28, 2020 | Completed final sign-off Jun 2021 | 285 Winston Dr | 1st, 2nd & 3rd floor - add, relocate & change out sprinklers in the area of work as shown on our fire sprinkler plansDetails
1st, 2nd & 3rd floor - add, relocate & change out sprinklers in the area of work as shown on our fire sprinkler plans | $395,000 |
| Sep 8, 2020 | Completed final sign-off Apr 2021 | 2800 Turk Bl | tie into new sprinkler overhead from another buildingDetails
tie into new sprinkler overhead from another building | $5,000 |
| Sep 8, 2020 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | new sprinkler system tie into existing basement system. 126 sprinklers.Details
new sprinkler system tie into existing basement system. 126 sprinklers. | $98,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2021 | 375 32nd Av | tenant improvement relocate sprinklers.Details
tenant improvement relocate sprinklers. | $28,000 |
| Apr 22, 2020 | Never finaled issued Jul 2021, no final | 2445 Golden Gate Av | g/f & 1/f: provide a fire prpotection of the (e) harney science center buiding in the areas of work, each system to include a new inspectors test. all othermain piping outside the area of work are to remain. 29 (n) upright sprinklres, (66) new pendent sprinklers, 1 new sidewall sprinklers. total 96.Details
g/f & 1/f: provide a fire prpotection of the (e) harney science center buiding in the areas of work, each system to include a new inspectors test. all othermain piping outside the area of work are to remain. 29 (n) upright sprinklres, (66) new pendent sprinklers, 1 new sidewall sprinklers. total 96. | $65,300 |
| Apr 22, 2020 | Never finaled issued Jul 2021, no final | 2445 Golden Gate Av | upgrade the harney science center building with a new backflow preventer; control stations on the boiler basement, g/f, and level 1; a new section of main piping in the level 1 corridor; and provide a fire protection system in the boiler basement.all other (e) piping outside the area remains.Details
upgrade the harney science center building with a new backflow preventer; control stations on the boiler basement, g/f, and level 1; a new section of main piping in the level 1 corridor; and provide a fire protection system in the boiler basement.all other (e) piping outside the area remains. | $56,000 |
| Apr 20, 2020 | Completed final sign-off Sep 2021 | 3001 24th St | install new underground 6" fire service main from city connection at curb to 6" above finished floor within proposed backflow preventer room (rm. 1008)Details
install new underground 6" fire service main from city connection at curb to 6" above finished floor within proposed backflow preventer room (rm. 1008) | $7,500 |
| Feb 19, 2020 | Completed final sign-off Aug 2020 | 209 Post St | fire sprinklers on 8th fl: add, rleocate, & plug fire sprinkler as required ti in the area of work. refer pa #202002063682.Details
fire sprinklers on 8th fl: add, rleocate, & plug fire sprinkler as required ti in the area of work. refer pa #202002063682. | $5,000 |
| Feb 7, 2020 | Completed final sign-off Apr 2020 | 207 Skyline Bl | fire sprinkler ti: change out existing sprinkler heads with new in women's locker room. ref ti #201912048617Details
fire sprinkler ti: change out existing sprinkler heads with new in women's locker room. ref ti #201912048617 | $3,000 |
| Feb 3, 2020 | Completed final sign-off Aug 2020 | 140 New Montgomery St | t.i. to add preaction sysem to room 2412. add and relocate fire sprinklers. extg system to remain.Details
t.i. to add preaction sysem to room 2412. add and relocate fire sprinklers. extg system to remain. | $24,000 |
| Dec 24, 2019 | Completed final sign-off Feb 2020 | 200 Larkin St | t.i. installation of fire sprinkler system. change of single interlock to double interlock. preaction system per ab-005 dated 8/13/19. ref app#201710231952Details
t.i. installation of fire sprinkler system. change of single interlock to double interlock. preaction system per ab-005 dated 8/13/19. ref app#201710231952 | $100,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 88 Kearny St | 16th floor: t.i. to relocate of 7 fire sprinklers in area of work only. all main piping to remain. addition of 2 fire sprinklers in area of work.Details
16th floor: t.i. to relocate of 7 fire sprinklers in area of work only. all main piping to remain. addition of 2 fire sprinklers in area of work. | $4,500 |
| Nov 22, 2019 | Completed final sign-off Feb 2020 | 301 Eddy St | as built drawings for pa 2018-0713-4473. total 4 upgright sprinklers (2 relocated) as ti. all main piping to remain beyond area of workDetails
as built drawings for pa 2018-0713-4473. total 4 upgright sprinklers (2 relocated) as ti. all main piping to remain beyond area of work | $1,500 |
| Nov 15, 2019 | Completed final sign-off Feb 2021 | 2800 Turk Bl | provide a fire protection system on the dining commons level of the (e) lone mountailn building and in the newly constructed pavillion building, all (e) stand pipes and controls beyond area of work are to remain (37) new pendent heads, (93) new upright heads, (3) ne side headsDetails
provide a fire protection system on the dining commons level of the (e) lone mountailn building and in the newly constructed pavillion building, all (e) stand pipes and controls beyond area of work are to remain (37) new pendent heads, (93) new upright heads, (3) ne side heads | $84,000 |
| Nov 14, 2019 | Completed final sign-off Dec 2025 | 78 Haight St | to erect 8 stories, 1 basement, type i-b, 63 residential units with child development center & office building. (r-2,e,b) 100% affordable studios & 1 bedroom apartments for low-income households and transition aged youth (tay)Details
to erect 8 stories, 1 basement, type i-b, 63 residential units with child development center & office building. (r-2,e,b) 100% affordable studios & 1 bedroom apartments for low-income households and transition aged youth (tay) | $13,500,000 |
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 100 Montgomery St | modify fire sprinklers per tenant improvement in the area of work. all main piping beyond the area of work will remain as existing , add 14 sprinklers, relocate 26 sprinklers. total 40 sprinklersDetails
modify fire sprinklers per tenant improvement in the area of work. all main piping beyond the area of work will remain as existing , add 14 sprinklers, relocate 26 sprinklers. total 40 sprinklers | $17,000 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 3060 Fillmore St | modify sprinkler in area of work, main piping beyond are of work to remain add (54) pendent sprinklers n/a maherDetails
modify sprinkler in area of work, main piping beyond are of work to remain add (54) pendent sprinklers n/a maher | $28,000 |
| Oct 17, 2019 | Expired or cancelled cancelled Nov 2020 | 160 King St | ref pa# 201904258969; modify fire sprinklers in the area of work as tenant improvement existing main piping beyond the area of work are to remain, relocate (16) upright sprinklers, relocate (57) pendent sprinklers total relocate (73) headsDetails
ref pa# 201904258969; modify fire sprinklers in the area of work as tenant improvement existing main piping beyond the area of work are to remain, relocate (16) upright sprinklers, relocate (57) pendent sprinklers total relocate (73) heads | $37,500 |
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 50 California St | suite 2500: modify fire sprinklers as tenant improvement in the area of work, all (e) branchliner and main piping beyond the areas of work are to remain, relocate (7) pendent fire sprinklers. ref t.i. pa201907035113. maher n/a.Details
suite 2500: modify fire sprinklers as tenant improvement in the area of work, all (e) branchliner and main piping beyond the areas of work are to remain, relocate (7) pendent fire sprinklers. ref t.i. pa201907035113. maher n/a. | $6,000 |
| Sep 26, 2019 | Completed final sign-off Dec 2020 | 1881 Bush St | rooftop: modify fire sprinklers system in area of work, all main piping to remain as existing, all areas outside area of work are to remain, add (1) fire sprinkler, upright. ref t.i. pa201707131768.Details
rooftop: modify fire sprinklers system in area of work, all main piping to remain as existing, all areas outside area of work are to remain, add (1) fire sprinkler, upright. ref t.i. pa201707131768. | $5,000 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 555 California St | 18th fl - tenant improvement for fire sprinklers. relocate and modify fire sprinklers as ti in the area of work. existing system to remain. total sprinkler modify 229. ref pa #201906173527.Details
18th fl - tenant improvement for fire sprinklers. relocate and modify fire sprinklers as ti in the area of work. existing system to remain. total sprinkler modify 229. ref pa #201906173527. | $60,000 |
| Aug 20, 2019 | Expired or cancelled cancelled Jan 2026 | 705 Market St | admin permit to correct address from 201905301984Details
admin permit to correct address from 201905301984 | |
| Jul 23, 2019 | Completed final sign-off Aug 2021 | 691 China Basin St | install n 6" d.i.u.g. pipe from curb & flex expan joint & in-bldg riser into fire pump room. dist 25'-0" curb to ibr stub-up. install n 6" backflow prev. connecting to n 6" ibr. install n 4" ibr. w/d.i.u.g. pipe. install (n) 1 1/2" u.g. copper pipe from ext. hallway into bike pavi. ref #201804196818Details
install n 6" d.i.u.g. pipe from curb & flex expan joint & in-bldg riser into fire pump room. dist 25'-0" curb to ibr stub-up. install n 6" backflow prev. connecting to n 6" ibr. install n 4" ibr. w/d.i.u.g. pipe. install (n) 1 1/2" u.g. copper pipe from ext. hallway into bike pavi. ref #201804196818 | $7,500 |
| Jul 23, 2019 | Completed final sign-off Aug 2019 | 711 Van Ness Av | as-built drawings for pa #201901049635. mezz: add (2), relocate (4) sprinklers in area of work as ti. ref pa #201604205271.Details
as-built drawings for pa #201901049635. mezz: add (2), relocate (4) sprinklers in area of work as ti. ref pa #201604205271. | $4,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 300 16th St | ste. 12: add and relocate 8 sprinklers in the area of work ( t.i.)Details
ste. 12: add and relocate 8 sprinklers in the area of work ( t.i.) | $17,000 |
| Jun 21, 2019 | Completed final sign-off Oct 2019 | 601 Market St | 1st fl - modife existing fire protection system at the fire escape and non-rated wall between lobby and adjacent tenant space only. relocate 11 pendent sprinklers, add 2 sidewall sprinkler. re-cut 2 pendent sprinklers. total 15 sprinkler. ref pa 2019-0319-5614Details
1st fl - modife existing fire protection system at the fire escape and non-rated wall between lobby and adjacent tenant space only. relocate 11 pendent sprinklers, add 2 sidewall sprinkler. re-cut 2 pendent sprinklers. total 15 sprinkler. ref pa 2019-0319-5614 | $4,500 |
| May 30, 2019 | Completed final sign-off Jul 2019 | 838 Pacific Av | revision to pa #201902122758. add 19 sprinkler heads, 1 sidewall in trash enclosure, 4 pendants and 4 uprights in ground fl elvevator lobby. add 1 upright head in the (e) janitor closet from 2nd to 12th fl.Details
revision to pa #201902122758. add 19 sprinkler heads, 1 sidewall in trash enclosure, 4 pendants and 4 uprights in ground fl elvevator lobby. add 1 upright head in the (e) janitor closet from 2nd to 12th fl. | $9,785 |
| May 30, 2019 | Completed final sign-off Feb 2021 | 703 Market St | sprinkler modification at ground flr in area of work. relocate 14 pendent heads, main piping will remain as (e) outside area of workDetails
sprinkler modification at ground flr in area of work. relocate 14 pendent heads, main piping will remain as (e) outside area of work | $5,910 |
| May 14, 2019 | Completed final sign-off Oct 2019 | 3322 Fillmore St | westates mechanical corp to modify sprinklers as t.i. in the area of work, (e) main pipe and riser beyond the are of work are to remain add (2), relocate (48), plug (2) total: (50)Details
westates mechanical corp to modify sprinklers as t.i. in the area of work, (e) main pipe and riser beyond the are of work are to remain add (2), relocate (48), plug (2) total: (50) | $17,000 |
| Apr 1, 2019 | Completed final sign-off Feb 2020 | 399 Geary St | install fire sprinkler at 1st,2nd,and 3rd. total 146 heads. n/a for maherDetails
install fire sprinkler at 1st,2nd,and 3rd. total 146 heads. n/a for maher | $75,190 |
| Mar 20, 2019 | Completed final sign-off Apr 2019 | 299 Fremont St | t.i: add 8 sprinklers, 6 relocate/change out sprinklers ref pa 2018-0710-4170 and 2019-0118-0729Details
t.i: add 8 sprinklers, 6 relocate/change out sprinklers ref pa 2018-0710-4170 and 2019-0118-0729 | $9,950 |
| Mar 14, 2019 | Completed final sign-off Oct 2019 | 125 Grant Av | fire sprinklers for t.i. basement, ground flr, 2nd flr and equp platform. (e) main piping beyond area of work are to remain. add 111, relocate and change-out 223 sprinklersDetails
fire sprinklers for t.i. basement, ground flr, 2nd flr and equp platform. (e) main piping beyond area of work are to remain. add 111, relocate and change-out 223 sprinklers | $100,200 |
| Feb 12, 2019 | Completed final sign-off Jul 2019 | 838 Pacific Av | replace existing fire sprinkler head with new. ref pa #201510190132-s4.Details
replace existing fire sprinkler head with new. ref pa #201510190132-s4. | $31,930 |
| Jan 18, 2019 | Completed final sign-off Mar 2019 | 399 Geary St | add 74 pendent, 5 upright & 2 dry pendentDetails
add 74 pendent, 5 upright & 2 dry pendent | $41,715 |
| Jan 4, 2019 | Completed final sign-off Aug 2019 | 711 Van Ness Av | level 2: add 22 and 52 sprinklers in the area of work of a t.i. . ref app#201604205271Details
level 2: add 22 and 52 sprinklers in the area of work of a t.i. . ref app#201604205271 | $41,500 |
| Dec 12, 2018 | Completed final sign-off Feb 2020 | 200 Larkin St | ti installation of fire sprinkler system throughout the new east side addition and room 116.5, 132, 133, 134, 0533.3, 054, 056, 076, 078 and loading dock. relocate 12, omit 12, add 195. total 207. to the existing fire sprinkler in this project. ref #201710231952Details
ti installation of fire sprinkler system throughout the new east side addition and room 116.5, 132, 133, 134, 0533.3, 054, 056, 076, 078 and loading dock. relocate 12, omit 12, add 195. total 207. to the existing fire sprinkler in this project. ref #201710231952 | $75,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2018 | 88 Kearny St | 16th floor: t.i. to relocate of 4 fire sprinklers, remove 1 and add 1 sprinkler. ref app#201808227989. n/a for maher.Details
16th floor: t.i. to relocate of 4 fire sprinklers, remove 1 and add 1 sprinkler. ref app#201808227989. n/a for maher. | $1,000 |
| Sep 19, 2018 | Completed final sign-off Nov 2018 | 150 Van Ness Av | f/s: relocate (38) pendent heads for the tenant improvement in the area of work. ref #201806293409.Details
f/s: relocate (38) pendent heads for the tenant improvement in the area of work. ref #201806293409. | $3,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2018 | 1155 04th St | relocate, change out & add sprinklers within the area of workDetails
relocate, change out & add sprinklers within the area of work | $6,800 |
| Sep 4, 2018 | Completed final sign-off Feb 2019 | 101 01st St | on 5th floor - westates mechanical corp. will modify fire sprinklers as tenant improvement (retail) in the area of work: relocate 26 sprinklers-pendients, add 2 sprinkler-pendentsDetails
on 5th floor - westates mechanical corp. will modify fire sprinklers as tenant improvement (retail) in the area of work: relocate 26 sprinklers-pendients, add 2 sprinkler-pendents | $16,000 |
| Sep 4, 2018 | Completed final sign-off Dec 2018 | 300 Clay St | 17th fl: add and relocate sprinklers in the area of work of a t.i.Details
17th fl: add and relocate sprinklers in the area of work of a t.i. | $11,750 |
| Aug 29, 2018 | Completed final sign-off Oct 2018 | 3150 Polk St | on 1st floor - adding 4 upright heads and 3 pendent heads in the area of work. ref app#201806222758. n/a for maherDetails
on 1st floor - adding 4 upright heads and 3 pendent heads in the area of work. ref app#201806222758. n/a for maher | $3,000 |
| Aug 29, 2018 | Completed final sign-off Dec 2018 | 180 Sansome St | 1st fl: add, relocate and change out 104 sprinklers on the area of work of a tenant improvement. n/a for maherDetails
1st fl: add, relocate and change out 104 sprinklers on the area of work of a tenant improvement. n/a for maher | $35,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 701 Van Ness Av | 1st fl & mezzanine. t.i. in the area of work is consist of adding and relocating fire sprinkler heads to accomodate the change. add 2 uprights, add 22 pendents. relocate 14 uprights and relocate 38 pendents. ref app#201801239333Details
1st fl & mezzanine. t.i. in the area of work is consist of adding and relocating fire sprinkler heads to accomodate the change. add 2 uprights, add 22 pendents. relocate 14 uprights and relocate 38 pendents. ref app#201801239333 | $3,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2020 | 301 Eddy St | westates mechanical corp will reinstall 2 fire sprinklers that was temporarily removed for a project (done by others) on the deck aboveDetails
westates mechanical corp will reinstall 2 fire sprinklers that was temporarily removed for a project (done by others) on the deck above | $4,500 |
| Jul 11, 2018 | Completed final sign-off Nov 2018 | 688 Mission St | modifiy sprinkler system in ti area of work: relocate 20 pendents, relocate 5 uprights add 12 pendents, add 1 uprightDetails
modifiy sprinkler system in ti area of work: relocate 20 pendents, relocate 5 uprights add 12 pendents, add 1 upright | $15,000 |
| Jun 15, 2018 | Completed final sign-off Jun 2018 | 353 Sacramento St | 20/f: ref pa# 201804206965: add and relocate existing fire sprinkler for new t.i. add (3) relocate (14) total total (17) sprinklersDetails
20/f: ref pa# 201804206965: add and relocate existing fire sprinkler for new t.i. add (3) relocate (14) total total (17) sprinklers | $8,000 |
| Jun 7, 2018 | Completed final sign-off Oct 2018 | 98 Post St | first floor- relocate/replace 28 pendents and add 1 dry pendent at ti in the area of workDetails
first floor- relocate/replace 28 pendents and add 1 dry pendent at ti in the area of work | $22,000 |
| Jun 4, 2018 | Completed final sign-off Dec 2021 | 3001 24th St | priority processing. erect (n) 5-story, 45 dwelling units, commercial, courtyard, & terrace building.Details
priority processing. erect (n) 5-story, 45 dwelling units, commercial, courtyard, & terrace building. | $14,672,122 |