Block 0236, lot 017
100 California St
- City’s use
- Commercial Office
- Built
- 1959
- Stories
- 13
- Building
- 266,237 sq ft
- Lot
- 37,892 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 21, 2026 | In progress issued Oct 2026 | 100 California St | Gci, Inc | 10th floor: revision to pa #202608216997. show huddle room. (room 110-19) as an accessible room per sfdbi request. structural included.Details
10th floor: revision to pa #202608216997. show huddle room. (room 110-19) as an accessible room per sfdbi request. structural included. | |
| Oct 6, 2026 | In progress issued Oct 2026 | 100 California St | West Coast Build Aka Fairway Constructio | revision permit to 202512192291: seismic bracing tranformer t-r21 on sheet e-301.Details
revision permit to 202512192291: seismic bracing tranformer t-r21 on sheet e-301. | $3,500 |
| Sep 2, 2026 | In progress issued Sep 2026 | 100 California St | Gci, Inc | 10th fl, mep submittal to support approved arch permit. new hvac duct work and lighting for new office rooms. ref pa 202608216997Details
10th fl, mep submittal to support approved arch permit. new hvac duct work and lighting for new office rooms. ref pa 202608216997 | $28,800 |
| Aug 21, 2026 | In progress issued Aug 2026 | 100 California St | Gci, Inc | 10th floor: interior tenant improvement to construct new partitions, doors glazing and finishes. mep deferred.Details
10th floor: interior tenant improvement to construct new partitions, doors glazing and finishes. mep deferred. | $56,800 |
| Aug 11, 2026 | In progress issued Aug 2026 | 100 California St | Turner Construction Co | to obtain final inspection for work approved under pa#: 202503071771. all work is complete.Details
to obtain final inspection for work approved under pa#: 202503071771. all work is complete. | |
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 100 California St | Turner Construction Co | pa#: 202602135930. update one line diagaram. | |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 100 California St | Turner Construction Co | revision to bpa#202503283322. removal of the remaining t-24 informationDetails
revision to bpa#202503283322. removal of the remaining t-24 information | |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 7/fl- interior install demising wall in (e) tenant space, non rated wallDetails
7/fl- interior install demising wall in (e) tenant space, non rated wall | $50,000 |
| May 29, 2026 | In progress issued Jun 2026 | 100 California St | West Coast Build Aka Fairway Constructio | revision to pa# 202512192291, to show changes in design to vestibule, structural drawings included.Details
revision to pa# 202512192291, to show changes in design to vestibule, structural drawings included. | |
| May 12, 2026 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | removal of the mep systems and dimensioning/noting of the existing drains withing the planter. revision to 2025-0328-3322.Details
removal of the mep systems and dimensioning/noting of the existing drains withing the planter. revision to 2025-0328-3322. | |
| May 1, 2026 | In progress issued May 2026 | 100 California St | Golden Gate Sign Company Inc. | revision to pa 202603107218 to add electrical and illumination to sign a as changes to sign size , location or attachment methodDetails
revision to pa 202603107218 to add electrical and illumination to sign a as changes to sign size , location or attachment method | $1,200 |
| Mar 25, 2026 | In progress issued Mar 2026 | 100 California St | Turner Construction Co | revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus ductDetails
revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus duct | |
| Mar 25, 2026 | Completed final sign-off Jul 2026 | 100 California St | Gci, Inc | 10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614Details
10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614 | $20,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 100 California St | Gci, Inc | ref bpa:202512313114 - adjust low side air distribution, new cooling, vav box, new transfer air, light fixtures, circuits/controls, power and signal devices new plumbingDetails
ref bpa:202512313114 - adjust low side air distribution, new cooling, vav box, new transfer air, light fixtures, circuits/controls, power and signal devices new plumbing | $250,000 |
| Mar 23, 2026 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to be cleaned of plaster, patched and finished. (n) rated enclosure for (n) hss column.Details
revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to be cleaned of plaster, patched and finished. (n) rated enclosure for (n) hss column. | |
| Mar 16, 2026 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls.Details
revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls. | |
| Mar 10, 2026 | In progress issued Mar 2026 | 100 California St | Golden Gate Sign Company Inc. | install (1) non-illuminated wall sign: "fidelity investments"Details
install (1) non-illuminated wall sign: "fidelity investments" | $6,000 |
| Feb 13, 2026 | In progress issued Mar 2026 | 100 California St | Turner Construction Co | revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearanceDetails
revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearance | |
| Feb 10, 2026 | Completed final sign-off Mar 2026 | 100 California St | Everon Llc | 5th floor. add (1) new 2 way comm. call station at 5th flr. elevator lobby.Details
5th floor. add (1) new 2 way comm. call station at 5th flr. elevator lobby. | $3,000 |
| Feb 10, 2026 | Completed final sign-off Mar 2026 | 100 California St | Everon Llc | 5th floor. relocate & replace 1) control relay for access control.Details
5th floor. relocate & replace 1) control relay for access control. | $800 |
| Feb 10, 2026 | Completed final sign-off May 2026 | 100 California St | Everon Llc | fire alarm t.i. on 1st flr. add 6 speaker strobes. 2 speakers, 3 duct detectors. 3 control relays for air handling unit (ahu). 202508012119Details
fire alarm t.i. on 1st flr. add 6 speaker strobes. 2 speakers, 3 duct detectors. 3 control relays for air handling unit (ahu). 202508012119 | $8,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 100 California St | Pioneer Fire Inc. | 10th floor. relocate (9) pendents, (3) uprights, convert (12) pendents to uprights. add (9) concealed pendents, (1) uprights. remove (3) pendents. gcti: 202512313114.Details
10th floor. relocate (9) pendents, (3) uprights, convert (12) pendents to uprights. add (9) concealed pendents, (1) uprights. remove (3) pendents. gcti: 202512313114. | $9,250 |
| Feb 4, 2026 | Completed final sign-off May 2026 | 100 California St | Everon Llc | fire alarm t.i. -basement level. add 5 speaker strobes. 4 duct detectors for heat pump w/relays to av shutdown. ref# 202509306349.Details
fire alarm t.i. -basement level. add 5 speaker strobes. 4 duct detectors for heat pump w/relays to av shutdown. ref# 202509306349. | $7,000 |
| Jan 23, 2026 | Completed final sign-off May 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 1st/f - revision to 202508012119. remove of (e) pair doors and finishes, (n) pair 20-minute rated doors, adjust (e) light fixture and (n) finishes.Details
1st/f - revision to 202508012119. remove of (e) pair doors and finishes, (n) pair 20-minute rated doors, adjust (e) light fixture and (n) finishes. | $25,000 |
| Jan 20, 2026 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening.Details
the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening. | $55,000 |
| Dec 31, 2025 | Completed final sign-off Jul 2026 | 100 California St | Gci, Inc | 10th fl suite 110: demo of (e) ceiling height partitions. construction of full height partitions, doors, glazing & finishes.Details
10th fl suite 110: demo of (e) ceiling height partitions. construction of full height partitions, doors, glazing & finishes. | $200,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 10th fl: partial floor tenant improvement. demo and construction of offices. conference rooms, restrooms, break room. structural and mep included.Details
10th fl: partial floor tenant improvement. demo and construction of offices. conference rooms, restrooms, break room. structural and mep included. | $2,701,789 |
| Dec 19, 2025 | In progress issued Feb 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting.Details
1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting. | $1,134,601 |
| Nov 18, 2025 | Completed final sign-off Jan 2026 | 100 California St | Everon Llc | tie in access control to new panel. at the 4 fl elevator lobby.Details
tie in access control to new panel. at the 4 fl elevator lobby. | $29,000 |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 100 California St | Bcci Construction Company | 4th fl - add new entry doorDetails
4th fl - add new entry door | $29,000 |
| Nov 4, 2025 | Completed final sign-off Dec 2025 | 100 California St | Everon Llc | 10th floor: fire alarm t.i.- add 4 speaker strobes, replace 3 speakers with speaker strobes, remove 3 strobes. relocate 2 speaker strobes, and add 2 smoke detectors. ref pa#202507110614Details
10th floor: fire alarm t.i.- add 4 speaker strobes, replace 3 speakers with speaker strobes, remove 3 strobes. relocate 2 speaker strobes, and add 2 smoke detectors. ref pa#202507110614 | $9,000 |
| Sep 30, 2025 | Completed final sign-off Jun 2026 | 100 California St | West Coast Build Aka Fairway Constructio | basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishesDetails
basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishes | $1,160,414 |
| Sep 26, 2025 | Completed final sign-off Jan 2026 | 100 California St | Pioneer Fire Inc. | 10/f: relocate 21 pendents, 2 concealed pendents. convert 9 pendents to uprights. remove 1 pendent. ref ti permit 202507110614Details
10/f: relocate 21 pendents, 2 concealed pendents. convert 9 pendents to uprights. remove 1 pendent. ref ti permit 202507110614 | $8,000 |
| Aug 12, 2025 | Completed final sign-off Aug 2025 | 100 California St | West Coast Build Aka Fairway Constructio | revision to pa#: 202411215476. revise infill assembly in type 1 building.Details
revision to pa#: 202411215476. revise infill assembly in type 1 building. | |
| Aug 1, 2025 | Completed final sign-off Aug 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishes.Details
1st floor: demolition of existing cafe including commercial kitchen equipment and associated plumbing and mechanical equipment, construction of new building amenity space conference counter inlcuding non-structural partitions, lighting, millwork, and finishes. | $547,894 |
| Aug 1, 2025 | In progress issued Aug 2025 | 100 California St | fire alarm as built for pa: 202505065909. - identify existing alert tone on drawing per sffd inspector.Details
fire alarm as built for pa: 202505065909. - identify existing alert tone on drawing per sffd inspector. | ||
| Jul 11, 2025 | Completed final sign-off Jul 2026 | 100 California St | 10th fl: demo of some (e) ceiling height partitions. construction of (n) full ht partitions, doors, glazing & finishes. associated electrical power/lighting distribution. mep deferred. associated life safety system charges.Details
10th fl: demo of some (e) ceiling height partitions. construction of (n) full ht partitions, doors, glazing & finishes. associated electrical power/lighting distribution. mep deferred. associated life safety system charges. | $900,000 | |
| Jun 5, 2025 | Expired or cancelled withdrawn Aug 2025 | 100 California St | 9th fl: ti includes 6 phone booths w/ structural calcs for anchoring. (bldg is fully sprinklered)Details
9th fl: ti includes 6 phone booths w/ structural calcs for anchoring. (bldg is fully sprinklered) | $76,000 | |
| May 13, 2025 | Completed final sign-off Jul 2025 | 100 California St | 6th fl - fire sprinkler permit relocate 2 and add 3 sprinklers. ref pa 202503071767Details
6th fl - fire sprinkler permit relocate 2 and add 3 sprinklers. ref pa 202503071767 | $2,500 | |
| May 13, 2025 | Completed final sign-off Sep 2025 | 100 California St | West Coast Build Aka Fairway Constructio | 2nd floor:revision to pa #202411215476. new rated wall and ceiling, replacement of rated door at stair.Details
2nd floor:revision to pa #202411215476. new rated wall and ceiling, replacement of rated door at stair. | $65,000 |
| May 6, 2025 | In progress issued May 2025 | 100 California St | Everon Llc | 6th fl - fire alarm ti add 10 speaker strobes. ref pa 202503071767Details
6th fl - fire alarm ti add 10 speaker strobes. ref pa 202503071767 | $7,000 |
| May 6, 2025 | Completed final sign-off Jul 2026 | 100 California St | Everon Llc | basement - fire alarm ti add 2 speaker strobes; add 6 duct detector w/relays for fsd; 2 area smoke detectors; 2 control relays for fsd. ref pa 202310058107Details
basement - fire alarm ti add 2 speaker strobes; add 6 duct detector w/relays for fsd; 2 area smoke detectors; 2 control relays for fsd. ref pa 202310058107 | $8,000 |
| Apr 30, 2025 | Completed final sign-off Oct 2025 | 100 California St | Sc Builders, Inc | 6/f: deferred mechanical and electrical for t.i permit 202503071767Details
6/f: deferred mechanical and electrical for t.i permit 202503071767 | $58,000 |
| Apr 9, 2025 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.Details
alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way. | $1,300,000 |
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 100 California St | Rcm Fire Protection Inc. | basement: to relocate and modify existing mains and heads to accommodate new electrical room. ref permit 202310058107Details
basement: to relocate and modify existing mains and heads to accommodate new electrical room. ref permit 202310058107 | $22,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 100 California St | Turner Construction Co | rev 2023-1005-8107: demo & replacement of (e) structural slab to hoist new switchgear into place on the basement level.Details
rev 2023-1005-8107: demo & replacement of (e) structural slab to hoist new switchgear into place on the basement level. | $98,147 |
| Mar 7, 2025 | Completed final sign-off Oct 2025 | 100 California St | Sc Builders, Inc | demolition and construction of non structural partitions, ceilings, lighting and finishes. no structural work. no change in occupancy or use.Details
demolition and construction of non structural partitions, ceilings, lighting and finishes. no structural work. no change in occupancy or use. | $308,566 |
| Jan 14, 2025 | Completed final sign-off Jan 2025 | 100 California St | Golden Gate Fire Protection Inc | 2/f: relocate 101 pendents to uprights. ref permit 202411215476Details
2/f: relocate 101 pendents to uprights. ref permit 202411215476 | $25,452 |
| Nov 21, 2024 | Completed final sign-off Sep 2025 | 100 California St | West Coast Build Aka Fairway Constructio | 2/fl-demo non structural partitons. on level 02.appx 12050sf additionally demo flooring, plumbing, millwork & equipment. new construction. elevator lobby area and structural slab infill. tiles to be replaced on ceiling.Details
2/fl-demo non structural partitons. on level 02.appx 12050sf additionally demo flooring, plumbing, millwork & equipment. new construction. elevator lobby area and structural slab infill. tiles to be replaced on ceiling. | $196,000 |
| Oct 1, 2024 | Completed final sign-off Jan 2025 | 100 California St | basement: replace an existing 90 minute door at stairwell with a door with panic hardware operation per sffd assembly permit inspection.Details
basement: replace an existing 90 minute door at stairwell with a door with panic hardware operation per sffd assembly permit inspection. | $7,120 | |
| Aug 30, 2024 | Completed final sign-off Oct 2024 | 100 California St | Everon Llc | fire alarm ti on 13th & 14th fl add 14 speaker strobes, 7 speakers, 1 control relay for cpac unit shutdown & 1 monitor module for epo. ref pa 202406033520 & 202406033516Details
fire alarm ti on 13th & 14th fl add 14 speaker strobes, 7 speakers, 1 control relay for cpac unit shutdown & 1 monitor module for epo. ref pa 202406033520 & 202406033516 | $13,000 |
| Aug 14, 2024 | Completed final sign-off Oct 2024 | 100 California St | 14th floor: t.i. to an existing fire sprinkler system. relocated sprinklers #11 and added sprinkler #03. t.i. pa#202406033516Details
14th floor: t.i. to an existing fire sprinkler system. relocated sprinklers #11 and added sprinkler #03. t.i. pa#202406033516 | $9,000 | |
| Aug 14, 2024 | Completed final sign-off Dec 2024 | 100 California St | 13th floor: t.i. to an existing fire sprinkler system. relocated sprinklers #15 and added sprinkler #07 t.i. pa#202406033520Details
13th floor: t.i. to an existing fire sprinkler system. relocated sprinklers #15 and added sprinkler #07 t.i. pa#202406033520 | $9,000 | |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 100 California St | West Coast Build Aka Fairway Constructio | suite 725: plans deferred of mech/electrical for t.i. pa 202405031370. no change in occupancy.Details
suite 725: plans deferred of mech/electrical for t.i. pa 202405031370. no change in occupancy. | $400,000 |
| Jul 3, 2024 | Completed final sign-off Aug 2024 | 100 California St | Everon Llc | 7th fl - fire alarm ti add 7 strobes only, 5 speaker strobe. ref pa 202405031370Details
7th fl - fire alarm ti add 7 strobes only, 5 speaker strobe. ref pa 202405031370 | $8,000 |
| Jun 27, 2024 | Completed final sign-off Jul 2024 | 100 California St | Golden Gate Fire Protection Inc | 7/f: relocate (11) pendents and (2) concealed pendents on the 7th fl. ref ti # 202405031370Details
7/f: relocate (11) pendents and (2) concealed pendents on the 7th fl. ref ti # 202405031370 | $3,250 |
| Jun 3, 2024 | Completed final sign-off Nov 2025 | 100 California St | Novo Construction Inc | 13th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)Details
13th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered) | $900,000 |
| Jun 3, 2024 | Completed final sign-off Oct 2025 | 100 California St | Novo Construction Inc | 14th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)Details
14th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered) | $900,000 |
| May 3, 2024 | Completed final sign-off Oct 2024 | 100 California St | West Coast Build Aka Fairway Constructio | 7th fl suite 725 demolition and construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy or use. deferred submittals includes mechanical, electrical, plumbing, life safety and sprinklersDetails
7th fl suite 725 demolition and construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy or use. deferred submittals includes mechanical, electrical, plumbing, life safety and sprinklers | $455,520 |
| Jan 18, 2024 | Completed final sign-off Feb 2024 | 100 California St | Westates Mechanical Corporation Inc | 2/f: demo 36 sprinkler pendents & replace w/ 28 uprights sprinklers. ref pa# 202311060270.Details
2/f: demo 36 sprinkler pendents & replace w/ 28 uprights sprinklers. ref pa# 202311060270. | $9,500 |
| Dec 21, 2023 | Completed final sign-off Apr 2024 | 100 California St | Eric F Anderson Incorporated | delta 1 revision dated 20 dec 2023 per pa#202311060270. sheet # a0.1 basement and demolition plan. scope of work- delete removal of restrooms, showers, and lockers area.Details
delta 1 revision dated 20 dec 2023 per pa#202311060270. sheet # a0.1 basement and demolition plan. scope of work- delete removal of restrooms, showers, and lockers area. | |
| Nov 6, 2023 | Completed final sign-off Apr 2024 | 100 California St | Eric F Anderson Incorporated | basement & 2nd fl - removal of walls, flooring, ceiling, electrical, plumbing, millwork, equipment to leave the tenant space ready to show to possible tenants. interior demo only - ab-017.Details
basement & 2nd fl - removal of walls, flooring, ceiling, electrical, plumbing, millwork, equipment to leave the tenant space ready to show to possible tenants. interior demo only - ab-017. | $618,280 |
| Oct 5, 2023 | In progress issued Dec 2023 | 100 California St | Turner Construction Co | switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.Details
switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel. | $190,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 100 California St | Golden Gate Fire Protection Inc | 6/f: relocate 6 pendent sprinklers, ref pa# 202212138185Details
6/f: relocate 6 pendent sprinklers, ref pa# 202212138185 | $3,750 |
| Apr 20, 2023 | Completed final sign-off Dec 2023 | 100 California St | Skyline Construction | 6/f ste 600: deferred submittal of mechanical and electrical work for t.i. ref pa# 202212138185Details
6/f ste 600: deferred submittal of mechanical and electrical work for t.i. ref pa# 202212138185 | $125,000 |
| Apr 11, 2023 | Completed final sign-off Jun 2023 | 100 California St | Everon Llc | 6/f suite 650: fire alarm ti. add 10 new speaker strobes. ref pa 202212138185Details
6/f suite 650: fire alarm ti. add 10 new speaker strobes. ref pa 202212138185 | $6,000 |
| Mar 21, 2023 | Expired or cancelled cancelled Jan 2026 | 100 California St | Waterproofing Associates | removal of (e) bur o/tectum o/ metal deck, install 58 squares (n) iso,dens, carlisle pvc. remove intill mechanical curbs. remove hazardous parapet coating and recoat with carlisle. install new roof hatch & guardrailDetails
removal of (e) bur o/tectum o/ metal deck, install 58 squares (n) iso,dens, carlisle pvc. remove intill mechanical curbs. remove hazardous parapet coating and recoat with carlisle. install new roof hatch & guardrail | $376,830 |
| Jan 30, 2023 | Completed final sign-off Mar 2023 | 100 California St | Everon Llc | fire alarm t.i. on 6th flr. add replace (1) existing speaker w/ speaker strobe. ref #202212158367.Details
fire alarm t.i. on 6th flr. add replace (1) existing speaker w/ speaker strobe. ref #202212158367. | $700 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 100 California St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 7 uprights, 8 pendents and 8 concealed pendents on the 12/f. ref t.i permit 202208231114Details
fire sprinklers: relocate 7 uprights, 8 pendents and 8 concealed pendents on the 12/f. ref t.i permit 202208231114 | $8,743 |
| Jan 18, 2023 | Completed final sign-off Jan 2023 | 100 California St | Pioneer Fire Inc. | 6/f: add (5) pendants. ref bpa#202212158367Details
6/f: add (5) pendants. ref bpa#202212158367 | $1,000 |
| Dec 29, 2022 | Completed final sign-off Aug 2023 | 100 California St | Field Construction Inc. | mechnical and electrical portion of ti on the 6th fl ref pa 2022-1215-8367Details
mechnical and electrical portion of ti on the 6th fl ref pa 2022-1215-8367 | $176,000 |
| Dec 15, 2022 | Completed final sign-off Aug 2023 | 100 California St | Field Construction Inc. | 6/f: t.i. includes demo of nonstructural paritions & building new. all new revised mep fire alarm/sprinklers will be design-build & submitted separately, bldg fully sprinklered.Details
6/f: t.i. includes demo of nonstructural paritions & building new. all new revised mep fire alarm/sprinklers will be design-build & submitted separately, bldg fully sprinklered. | $308,000 |
| Dec 13, 2022 | Completed final sign-off Aug 2023 | 100 California St | Skyline Construction | 6/f suite 600: demolition of non-structural partitions and millwork. new construction of non-structural partitions, operable folding partition, new breakroom for employees only.Details
6/f suite 600: demolition of non-structural partitions and millwork. new construction of non-structural partitions, operable folding partition, new breakroom for employees only. | $487,000 |
| Nov 18, 2022 | Completed final sign-off May 2023 | 100 California St | Everon Llc | fire alarm on 12th floor. add 2 speakerhorn strobes & relocate 3 speaker strobes. ref permit 202208231114Details
fire alarm on 12th floor. add 2 speakerhorn strobes & relocate 3 speaker strobes. ref permit 202208231114 | $1,200 |
| Nov 14, 2022 | Completed final sign-off Dec 2022 | 100 California St | Pribuss Engineering Inc | 6th fl: modify sprinkler head locations to accommodate new ceiling & partition layout for new office space. total sprinklers on this project = 20.Details
6th fl: modify sprinkler head locations to accommodate new ceiling & partition layout for new office space. total sprinklers on this project = 20. | $10,280 |
| Sep 6, 2022 | Completed final sign-off May 2023 | 100 California St | Turner Construction Co | 13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes (n) lighting, also includes (n) mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620.Details
13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes (n) lighting, also includes (n) mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620. | $50,000 |
| Sep 6, 2022 | Completed final sign-off May 2023 | 100 California St | Turner Construction Co | 6th fl: elevator lobby & common corridors, includes (n) lighting plan. existing circuits to be revised. incluides title 24 for new lighting. fire alarm submitted separately. ref pa# 202205063724.Details
6th fl: elevator lobby & common corridors, includes (n) lighting plan. existing circuits to be revised. incluides title 24 for new lighting. fire alarm submitted separately. ref pa# 202205063724. | $25,000 |
| Sep 6, 2022 | Completed final sign-off Nov 2022 | 100 California St | Turner Construction Co | 1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319.Details
1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319. | $20,000 |
| Aug 29, 2022 | Completed final sign-off Oct 2022 | 100 California St | Everon Llc | 13/f: f/a t.i., remove (3) speaker strobes, relocate (1) speaker strobe. 1/f & 6/f shown for referenced only. ref 1/f bpa#202203079319; 6/f bpa#202205063724; 13/f bpa#202202097620Details
13/f: f/a t.i., remove (3) speaker strobes, relocate (1) speaker strobe. 1/f & 6/f shown for referenced only. ref 1/f bpa#202203079319; 6/f bpa#202205063724; 13/f bpa#202202097620 | $1,800 |
| Aug 23, 2022 | Completed final sign-off May 2023 | 100 California St | Bcci Construction Company | 12th fl: partial demo of existing tenant fit-out and to provide new offices and conference rooms. mep included.Details
12th fl: partial demo of existing tenant fit-out and to provide new offices and conference rooms. mep included. | $748,000 |
| Aug 16, 2022 | Completed final sign-off Sep 2022 | 100 California St | Pribuss Engineering Inc | 13/f: modify sprinkler head locations to accommodate new ceiling and partition layout for new office space. total sprinkler 5. ref permit 202202097620Details
13/f: modify sprinkler head locations to accommodate new ceiling and partition layout for new office space. total sprinkler 5. ref permit 202202097620 | $2,570 |
| May 6, 2022 | Completed final sign-off Dec 2022 | 100 California St | Turner Construction Co | 6th floor: building upgrade includes common area corridor- elevator lobby. scope does not include the removal of any structural partitions. all new or revised meps, life saftey work will be by design build and if needed will be submitted seperately.Details
6th floor: building upgrade includes common area corridor- elevator lobby. scope does not include the removal of any structural partitions. all new or revised meps, life saftey work will be by design build and if needed will be submitted seperately. | $95,000 |
| Mar 17, 2022 | Completed final sign-off Sep 2022 | 100 California St | Novo Construction Inc | 9th floor: electrical work for t.i. ref pa# 202201276764Details
9th floor: electrical work for t.i. ref pa# 202201276764 | |
| Mar 11, 2022 | Completed final sign-off Apr 2022 | 100 California St | Everon Llc | suite 1340: remove 2 control relays for crac units that no longer exist.Details
suite 1340: remove 2 control relays for crac units that no longer exist. | $1,200 |
| Mar 7, 2022 | Completed final sign-off Nov 2022 | 100 California St | Turner Construction Co | 1/f: building upgrades include new fully accessible g/f restrooms . scope does not include the removal of any structural partitions. all new or revised meps and life safety work/design build if need under separate permits.Details
1/f: building upgrades include new fully accessible g/f restrooms . scope does not include the removal of any structural partitions. all new or revised meps and life safety work/design build if need under separate permits. | $199,000 |
| Feb 9, 2022 | Completed final sign-off Nov 2022 | 100 California St | Turner Construction Co | 13th flr. t.i. includes demo of non struc partitions and new non struc partitions. all new or revised mep, life safety and sprinkler work will be design build and submitted under sep permits. bldg is fully sprinklered.Details
13th flr. t.i. includes demo of non struc partitions and new non struc partitions. all new or revised mep, life safety and sprinkler work will be design build and submitted under sep permits. bldg is fully sprinklered. | $150,000 |
| Jan 27, 2022 | Completed final sign-off Sep 2022 | 100 California St | Novo Construction Inc | 9/f. t.i include the building of new millwork and coffee bar area. all new or revised mep life safety work will be design build and submitted separately.Details
9/f. t.i include the building of new millwork and coffee bar area. all new or revised mep life safety work will be design build and submitted separately. | $57,000 |
| Jan 24, 2022 | Never finaled issued Jan 2022, no final | 100 California St | Bilcor Inc | to obtain final inspection for work approved under permit application #2014-0930-7712. all work is complete.Details
to obtain final inspection for work approved under permit application #2014-0930-7712. all work is complete. | $2,000 |
| Dec 8, 2021 | Completed final sign-off Dec 2021 | 100 California St | Everon Llc | 14th fl - fire alarm ti remove 3 speaker strobe & relocate 1 speaker strobe. ref pa 2021-0819-6702Details
14th fl - fire alarm ti remove 3 speaker strobe & relocate 1 speaker strobe. ref pa 2021-0819-6702 | $500 |
| Nov 9, 2021 | Completed final sign-off Apr 2022 | 100 California St | Skyline Construction | 5th floor: demolition of non structural partitons and finishes construction of new non structural partitions, finish touch ups where required. m/e under seperate permit.Details
5th floor: demolition of non structural partitons and finishes construction of new non structural partitions, finish touch ups where required. m/e under seperate permit. | $150,000 |
| Nov 2, 2021 | Completed final sign-off Dec 2021 | 100 California St | Pioneer Fire Inc. | 14th floor: relocate 3 pendent sprinklers. convert 2 pendents to upright. gc ti #202108196702Details
14th floor: relocate 3 pendent sprinklers. convert 2 pendents to upright. gc ti #202108196702 | |
| Oct 22, 2021 | Completed final sign-off Nov 2021 | 100 California St | Pioneer Fire Inc. | 13th floor: remove (6) upright heads to adjust coverage for removal of soffit between upright heads.Details
13th floor: remove (6) upright heads to adjust coverage for removal of soffit between upright heads. | $1,500 |
| Oct 20, 2021 | Completed final sign-off Feb 2022 | 100 California St | Principal Builders Inc. | 14th floor. deferred submittal for modificication of e hvac system, lighting and power for tenant improvements. ref arch pa 2021-0819-6702Details
14th floor. deferred submittal for modificication of e hvac system, lighting and power for tenant improvements. ref arch pa 2021-0819-6702 | $56,575 |
| Sep 17, 2021 | Expired or cancelled cancelled Jan 2026 | 100 California St | ste 800: switch over 8 card readers to adt low voltage wire. fire alarm under separate permit.Details
ste 800: switch over 8 card readers to adt low voltage wire. fire alarm under separate permit. | $6,000 | |
| Aug 19, 2021 | Completed final sign-off Feb 2022 | 100 California St | Principal Builders Inc. | 14/f: interior renovation of tenant suite. renovation of 2 converence rooms, 2 huddle rooms into 2 private offices and 1 small conference room and seating area. new non load bearing walls,ceiling tiles, new lights, finishesDetails
14/f: interior renovation of tenant suite. renovation of 2 converence rooms, 2 huddle rooms into 2 private offices and 1 small conference room and seating area. new non load bearing walls,ceiling tiles, new lights, finishes | $170,000 |
| Aug 4, 2021 | Completed final sign-off Nov 2021 | 100 California St | Everon Llc | t.i. on 1st fl. add (2) duct detectors w/ control relays for fsds & (1) control relay for vfd shutdown ref pa# 2021-0528-1297Details
t.i. on 1st fl. add (2) duct detectors w/ control relays for fsds & (1) control relay for vfd shutdown ref pa# 2021-0528-1297 | $2,800 |
| May 28, 2021 | Never finaled issued Jun 2021, no final | 100 California St | 1st fl-repl of (e) small 1st flr air handing unit. provide (n) fan wall style air handing unit w/one vfd to control fans, 1 afms for outside airflow monitoring & 2 (n) fire smoke dampers for rating separation. (n) ddc control will replace (e) pneumatics. replacement does not affect bldg safety systDetails
1st fl-repl of (e) small 1st flr air handing unit. provide (n) fan wall style air handing unit w/one vfd to control fans, 1 afms for outside airflow monitoring & 2 (n) fire smoke dampers for rating separation. (n) ddc control will replace (e) pneumatics. replacement does not affect bldg safety syst | $125,000 | |
| Apr 9, 2021 | Completed final sign-off Jul 2021 | 100 California St | Everon Llc | add (1) control relay & (1) monitor module for emergency door releaseDetails
add (1) control relay & (1) monitor module for emergency door release | $1,200 |
| Mar 4, 2021 | Completed final sign-off Sep 2021 | 100 California St | Everon Llc | add (1) universal input/output module with (6) input signal modules for existing fireman's phone for elevator cab.Details
add (1) universal input/output module with (6) input signal modules for existing fireman's phone for elevator cab. | $3,500 |
| Oct 21, 2020 | Completed final sign-off Nov 2020 | 100 California St | Red Hawk Fire & Security Ca Llc | ref #ew2020-1001-0735. 13th floor: (1) 2 way comm. call box, (2) smoke detectors, (1) control relay. 14th floor:: (1) 2 way comm. call box, (2) smoke detectors, (1) control relay.Details
ref #ew2020-1001-0735. 13th floor: (1) 2 way comm. call box, (2) smoke detectors, (1) control relay. 14th floor:: (1) 2 way comm. call box, (2) smoke detectors, (1) control relay. | $18,000 |
| Oct 8, 2019 | Completed final sign-off Oct 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | fa ti 4thflr - add 1 speaker & 1 speaker strobe. ref 201908148770Details
fa ti 4thflr - add 1 speaker & 1 speaker strobe. ref 201908148770 | $1,200 |
| Sep 25, 2019 | Completed final sign-off Nov 2020 | 100 California St | Red Hawk Fire & Security Ca Llc | stairwells and fcc room. 2-way comm system.(1) 2-way head end incl distribution panel, master command. 5 call boxes, 2 monitoring modules, 1 sub/master station.elevator lobby doors (13th/14th) will not be locked under this permit.if elevator lobby doors on (13th/14th) are locked, 2-way cb addedDetails
stairwells and fcc room. 2-way comm system.(1) 2-way head end incl distribution panel, master command. 5 call boxes, 2 monitoring modules, 1 sub/master station.elevator lobby doors (13th/14th) will not be locked under this permit.if elevator lobby doors on (13th/14th) are locked, 2-way cb added | $18,000 |
| Sep 20, 2019 | Expired or cancelled cancelled Nov 2019 | 100 California St | fire permit relocate 5 and 3 sprinlkers on the 4th ref 201908148770Details
fire permit relocate 5 and 3 sprinlkers on the 4th ref 201908148770 | $2,500 | |
| Sep 10, 2019 | Completed final sign-off Sep 2019 | 100 California St | 4th - fire sprinkler relocate 5 and add 3 sprinkler, ref 201908148770Details
4th - fire sprinkler relocate 5 and add 3 sprinkler, ref 201908148770 | $2,000 | |
| Aug 14, 2019 | Completed final sign-off Oct 2019 | 100 California St | Principal Builders Inc. | 4th floor: t.i. on extg tenant floor to construct new partitions. fire alarm and sprinklers on seperate permits. mep on seperate permits. n/a for maherDetails
4th floor: t.i. on extg tenant floor to construct new partitions. fire alarm and sprinklers on seperate permits. mep on seperate permits. n/a for maher | $121,500 |
| Jun 4, 2019 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 14/f: recommencment and completion of work approved under pa201801319972/201805240015/201806040838.Details
14/f: recommencment and completion of work approved under pa201801319972/201805240015/201806040838. | |
| May 7, 2019 | Completed final sign-off May 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 12th fl - relocate speaker strobes per plan & remove existing speaker strobes per plan ref pa 2019-0213-2813Details
fire alarm ti on 12th fl - relocate speaker strobes per plan & remove existing speaker strobes per plan ref pa 2019-0213-2813 | $1,200 |
| May 2, 2019 | Completed final sign-off May 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | basement - fire alarm as built for 2019-0104-9646 per sffd field inspector requirementDetails
basement - fire alarm as built for 2019-0104-9646 per sffd field inspector requirement | |
| Apr 24, 2019 | Completed final sign-off Jun 2021 | 100 California St | Bcci Construction Company | assembly only permit for 12th floor agile room. ref: 2019-0213-2813.Details
assembly only permit for 12th floor agile room. ref: 2019-0213-2813. | |
| Apr 11, 2019 | Completed final sign-off Apr 2019 | 100 California St | fire sprinkler - relocate 2 and add 1 sprinkler on the 12thDetails
fire sprinkler - relocate 2 and add 1 sprinkler on the 12th | $1,000 | |
| Apr 10, 2019 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 12th fl: revision of t-24 pages to previously approved electrical pages. ref pa #201902132813, 201903155344.Details
12th fl: revision of t-24 pages to previously approved electrical pages. ref pa #201902132813, 201903155344. | |
| Mar 28, 2019 | Expired or cancelled cancelled Jan 2026 | 100 California St | Skyline Construction | basement - mechanical work to include installation of 1 new fsd. ref pa 2018-1212-8062Details
basement - mechanical work to include installation of 1 new fsd. ref pa 2018-1212-8062 | $2,500 |
| Mar 28, 2019 | Never finaled issued Apr 2019, no final | 100 California St | Skyline Construction | basement - electrical work for tenant improvement. ref pa 2018-1212-8062Details
basement - electrical work for tenant improvement. ref pa 2018-1212-8062 | $2,500 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 100 California St | Bcci Construction Company | 12th flr - structrual only calcs for partition lateral support framing ref 201902132813Details
12th flr - structrual only calcs for partition lateral support framing ref 201902132813 | |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 100 California St | Bcci Construction Company | 12th floor m.e.p: drawing to support approved architecturals. demo of existing duct work and diffusers relocation of existing vav and relocation of thermostat. ref bpa# 2019-0213-2813.Details
12th floor m.e.p: drawing to support approved architecturals. demo of existing duct work and diffusers relocation of existing vav and relocation of thermostat. ref bpa# 2019-0213-2813. | $40,000 |
| Mar 11, 2019 | Completed final sign-off Dec 2020 | 100 California St | Bcci Construction Company | roof deck structural calculations for pergola ref pa 2019-0311-4919Details
roof deck structural calculations for pergola ref pa 2019-0311-4919 | $10,000 |
| Mar 11, 2019 | Completed final sign-off Dec 2020 | 100 California St | Bcci Construction Company | roof deck - revision to approved permits to construct roof deck. structural revision only. add pedastal, furniture and light pole. ref pa #201808137152.Details
roof deck - revision to approved permits to construct roof deck. structural revision only. add pedastal, furniture and light pole. ref pa #201808137152. | $20,000 |
| Feb 13, 2019 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | ti for partial 12th floor: new offices, relocation of a conference room, pantry adjustments, and a mothers room. structural calculation for framing of door and partitions. 11/f: partial floor demoDetails
ti for partial 12th floor: new offices, relocation of a conference room, pantry adjustments, and a mothers room. structural calculation for framing of door and partitions. 11/f: partial floor demo | $250,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 100 California St | street space | ||
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 100 California St | ti/upgrade of (e) fire sprinkler system. 1 relocate pendent sprinkler. ref pa #201812128062.Details
ti/upgrade of (e) fire sprinkler system. 1 relocate pendent sprinkler. ref pa #201812128062. | $200 | |
| Jan 4, 2019 | Completed final sign-off May 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti. basement level. add 2 smoke detector for door holder and 1 new speaker strobeDetails
fire alarm ti. basement level. add 2 smoke detector for door holder and 1 new speaker strobe | $1,600 |
| Dec 12, 2018 | Completed final sign-off May 2019 | 100 California St | Skyline Construction | basement level. new dual egress doors, ceiling systems and light fixture upgradeDetails
basement level. new dual egress doors, ceiling systems and light fixture upgrade | $120,000 |
| Dec 4, 2018 | Completed final sign-off Jan 2021 | 100 California St | fire alarm t.i. on roof deck, add 2 weather proof speaker strobe & 1 control relay for music shutdown.Details
fire alarm t.i. on roof deck, add 2 weather proof speaker strobe & 1 control relay for music shutdown. | $1,600 | |
| Nov 20, 2018 | Never finaled issued Nov 2018, no final | 100 California St | Skyline Construction | electrical work for ti on 9th flr ref 201810112910Details
electrical work for ti on 9th flr ref 201810112910 | $5,000 |
| Nov 16, 2018 | Completed final sign-off Dec 2020 | 100 California St | Bcci Construction Company | roof revision to 201808137152. changes to various roof deck elementsDetails
roof revision to 201808137152. changes to various roof deck elements | |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 100 California St | street space | ||
| Oct 25, 2018 | Never finaled issued Apr 2019, no final | 100 California St | Principal Builders Inc. | 11thf lr ti - demo and construct non structural partitions, doors, ceiling, millwork and finishes. mep will be under sep permit as req'. fire alarms/sprinklers under sep permitDetails
11thf lr ti - demo and construct non structural partitions, doors, ceiling, millwork and finishes. mep will be under sep permit as req'. fire alarms/sprinklers under sep permit | $154,000 |
| Oct 25, 2018 | Completed final sign-off Feb 2021 | 100 California St | Ayoob & Peery Plumbing Co Inc | as built permit in reference to app#201809211033Details
as built permit in reference to app#201809211033 | |
| Oct 11, 2018 | Never finaled issued Oct 2018, no final | 100 California St | Skyline Construction | 9th fl - restroom upgrades on the barrier removalDetails
9th fl - restroom upgrades on the barrier removal | $25,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2018 | 100 California St | Ayoob & Peery Plumbing Co Inc | roof top: relocate 2 fire sprinklers and plug 1 sprinkler outlet to conform with new wall/ceiling layout per t.i. #201808137152 job# 18-723Details
roof top: relocate 2 fire sprinklers and plug 1 sprinkler outlet to conform with new wall/ceiling layout per t.i. #201808137152 job# 18-723 | $450 |
| Aug 13, 2018 | Completed final sign-off Dec 2020 | 100 California St | Bcci Construction Company | new roof deck. new low wall partitions, new pergolas structural, lighting and millwork. assembly area a-3. maher n/aDetails
new roof deck. new low wall partitions, new pergolas structural, lighting and millwork. assembly area a-3. maher n/a | $315,000 |
| Jul 19, 2018 | Completed final sign-off Dec 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm as built drawing for pa# 201804196790Details
fire alarm as built drawing for pa# 201804196790 | |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. 13th, 14th, & 15th floor. add elevator functions. 13th fl add 1 smoke detector, 1 heat detector, 1 control relay for recall, 1 control relay for shunt trip, 1 control relay for hat, and 1 monitor module for shunt power.Details
fire alarm t.i. 13th, 14th, & 15th floor. add elevator functions. 13th fl add 1 smoke detector, 1 heat detector, 1 control relay for recall, 1 control relay for shunt trip, 1 control relay for hat, and 1 monitor module for shunt power. | $8,000 |
| Jun 12, 2018 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 14th fl - sffd approval for assembly area on 14th fl. ref #201801319972. sheet a0.2 showing 1121 sq ft lounge with 75 occupants.Details
14th fl - sffd approval for assembly area on 14th fl. ref #201801319972. sheet a0.2 showing 1121 sq ft lounge with 75 occupants. | |
| Jun 4, 2018 | Completed final sign-off Nov 2019 | 100 California St | Bcci Construction Company | install wall sign "symantec"Details
install wall sign "symantec" | $10,000 |
| May 24, 2018 | Completed final sign-off Sep 2018 | 100 California St | Bcci Construction Company | 13th floor: remove 2 way communication system requirement from elevator lobby by providing unlocked lobby doors under this revision to ref app#201801319978. n/a for maherDetails
13th floor: remove 2 way communication system requirement from elevator lobby by providing unlocked lobby doors under this revision to ref app#201801319978. n/a for maher | |
| May 24, 2018 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 14th floor: remove 2 way communication system from elevator lobby by providing unlocked lobby doors under this revision to ref app#201801319972. n/a for maherDetails
14th floor: remove 2 way communication system from elevator lobby by providing unlocked lobby doors under this revision to ref app#201801319972. n/a for maher | |
| Apr 27, 2018 | Completed final sign-off Jun 2019 | 100 California St | Principal Builders Inc. | revision to pa #201612225779, to add and modify design.Details
revision to pa #201612225779, to add and modify design. | |
| Apr 26, 2018 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 14th flr - revision to stair permit and approve arch. ref 201801319972 & 201802211831 maher naDetails
14th flr - revision to stair permit and approve arch. ref 201801319972 & 201802211831 maher na | |
| Apr 25, 2018 | Never finaled issued Apr 2018, no final | 100 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system ti: relocate 2, add 1 sprinkle. ref #201803073071.Details
fire sprinkler system ti: relocate 2, add 1 sprinkle. ref #201803073071. | $1,500 |
| Apr 19, 2018 | Completed final sign-off Dec 2019 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 14th fl - add 1 smoke detector & 41 speaker strobes. ref pa 2018-0131-9972; n/a maherDetails
fire alarm ti on 14th fl - add 1 smoke detector & 41 speaker strobes. ref pa 2018-0131-9972; n/a maher | $21,100 |
| Apr 19, 2018 | Completed final sign-off Jun 2018 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 13th fl - provide 2 smoke detectors, 2 control relay for hvac shutdown & 47 speaker strobes. ref pa 2018-0131-9978; n/a maherDetails
fire alarm ti on 13th fl - provide 2 smoke detectors, 2 control relay for hvac shutdown & 47 speaker strobes. ref pa 2018-0131-9978; n/a maher | $25,000 |
| Apr 4, 2018 | Completed final sign-off Nov 2019 | 100 California St | Ayoob & Peery Plumbing Co Inc | f/s ti on 14th fl: add (69), relocate (38) sprinklers to conform with the new wall/ceiling layout of the ti. ref #201801319972.Details
f/s ti on 14th fl: add (69), relocate (38) sprinklers to conform with the new wall/ceiling layout of the ti. ref #201801319972. | $44,775 |
| Apr 4, 2018 | Completed final sign-off Nov 2019 | 100 California St | Ayoob & Peery Plumbing Co Inc | f/s ti on 13th fl: add (38) and relocate (35) sprinklers to conform with the new wall/ceiling layout of the ti. ref #201801319978.Details
f/s ti on 13th fl: add (38) and relocate (35) sprinklers to conform with the new wall/ceiling layout of the ti. ref #201801319978. | $27,825 |
| Mar 27, 2018 | Completed final sign-off Apr 2018 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm as-built drawing for permit #201705126459. update denies addresses & locations on floor plan. update sequence of operation matrix.Details
fire alarm as-built drawing for permit #201705126459. update denies addresses & locations on floor plan. update sequence of operation matrix. | |
| Mar 7, 2018 | Completed final sign-off Jun 2019 | 100 California St | Principal Builders Inc. | revision to app#201612225779 and app 201602129534 to change proposed design elements and materials on 14th and 15th floor. add a new 2-stage elevator, no work on existing elevator lobby doors. fire and mep under separate permits. n/a for maherDetails
revision to app#201612225779 and app 201602129534 to change proposed design elements and materials on 14th and 15th floor. add a new 2-stage elevator, no work on existing elevator lobby doors. fire and mep under separate permits. n/a for maher | $110,000 |
| Feb 21, 2018 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher naDetails
14th flr - new stair connecting 14th floor to roof. ref 201801319972 maher na | $125,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2019 | 100 California St | Bcci Construction Company | 14th floor: mechanical and electerical work associated with approved permit app#201801319972. n/a for maherDetails
14th floor: mechanical and electerical work associated with approved permit app#201801319972. n/a for maher | $747,840 |
| Feb 9, 2018 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 13th floor:mechanical and electerical work associated with approved permit app#201801319978. n/a for maherDetails
13th floor:mechanical and electerical work associated with approved permit app#201801319978. n/a for maher | $747,840 |
| Feb 7, 2018 | Completed final sign-off Jun 2019 | 100 California St | Principal Builders Inc. | addition of perimeter railing extension for roof. maher naDetails
addition of perimeter railing extension for roof. maher na | $50,000 |
| Jan 31, 2018 | Completed final sign-off Sep 2018 | 100 California St | Bcci Construction Company | 13th fl: ti to include new partitions, conference rooms & office space. mep deferred. maher naDetails
13th fl: ti to include new partitions, conference rooms & office space. mep deferred. maher na | $1,148,996 |
| Jan 31, 2018 | Completed final sign-off Aug 2019 | 100 California St | Bcci Construction Company | 14th flr - ti new partitions, conference and office space. mep deferred maher naDetails
14th flr - ti new partitions, conference and office space. mep deferred maher na | $1,132,616 |
| Dec 19, 2017 | Never finaled issued Jan 2018, no final | 100 California St | Swinerton Builders | revision to pa 2016-0212-9534 changes to the elevator lobby doors on level 14 frm glass doors to solid core wood doors; change to the infill of the (e) opening to the roof from previously permitted metal stud temporary floor to an open communicating atrium as permitted per cbc 712-1.9Details
revision to pa 2016-0212-9534 changes to the elevator lobby doors on level 14 frm glass doors to solid core wood doors; change to the infill of the (e) opening to the roof from previously permitted metal stud temporary floor to an open communicating atrium as permitted per cbc 712-1.9 | |
| Sep 27, 2017 | Completed final sign-off Nov 2017 | 100 California St | Principal Builders Inc. | electrical for ti on 6th fl to install new mechanical systems, lighting, power. see 201707273125 for reference maher not reqDetails
electrical for ti on 6th fl to install new mechanical systems, lighting, power. see 201707273125 for reference maher not req | $34,510 |
| Sep 15, 2017 | Completed final sign-off Sep 2017 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 11th floor, add 2 smoke detectors in elevator lobby & ceiling speaker strobe ref# 201707202524; n/a maherDetails
fire alarm ti on 11th floor, add 2 smoke detectors in elevator lobby & ceiling speaker strobe ref# 201707202524; n/a maher | $1,700 |
| Sep 12, 2017 | Completed final sign-off Sep 2017 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 6th floor - add 5 new ceiling speaker strobesDetails
fire alarm ti on the 6th floor - add 5 new ceiling speaker strobes | $3,500 |
| Aug 30, 2017 | Never finaled issued Aug 2017, no final | 100 California St | Red Hawk Fire & Security Ca Llc | 11th floor suite 1150 - fire alarm as-built per pa #201706219984. n/a maher ordinanceDetails
11th floor suite 1150 - fire alarm as-built per pa #201706219984. n/a maher ordinance | |
| Aug 16, 2017 | Completed final sign-off Sep 2017 | 100 California St | 6/f- fire sprinkler, relocate 2, add 2 and delete 1 pendent sprinkler. n/a ordinance #155-13. t.i 2017-07-27-3125Details
6/f- fire sprinkler, relocate 2, add 2 and delete 1 pendent sprinkler. n/a ordinance #155-13. t.i 2017-07-27-3125 | $1,500 | |
| Aug 1, 2017 | Completed final sign-off Sep 2017 | 100 California St | 11th fl: relocate 4 pendent sprinklers inthe 11th floor elevator lobby. ref ti #201707202524. maher naDetails
11th fl: relocate 4 pendent sprinklers inthe 11th floor elevator lobby. ref ti #201707202524. maher na | $1,200 | |
| Jul 27, 2017 | Completed final sign-off Sep 2017 | 100 California St | Principal Builders Inc. | suite #620 on 6th fl: ti to demo and construct partitions, doors, glazing, finishing and millwork. mep, fire sprinkler and alarms on separate permit. maher naDetails
suite #620 on 6th fl: ti to demo and construct partitions, doors, glazing, finishing and millwork. mep, fire sprinkler and alarms on separate permit. maher na | $95,000 |
| Jul 20, 2017 | Completed final sign-off Oct 2017 | 100 California St | Principal Builders Inc. | 11/f elevator lobby- mechanical, electrical t-24 to relocate and replace equipment for t.i. pa#201706169629. n/a ordinance #155-13Details
11/f elevator lobby- mechanical, electrical t-24 to relocate and replace equipment for t.i. pa#201706169629. n/a ordinance #155-13 | $30,000 |
| Jun 21, 2017 | Completed final sign-off Sep 2017 | 100 California St | Red Hawk Fire & Security Ca Llc | 11th floor suite 1150 fire alarm ti - add 13 ceiling speaker strobes. 2 duct detectors for hp with control relay for shutdown. ref #201705156627.Details
11th floor suite 1150 fire alarm ti - add 13 ceiling speaker strobes. 2 duct detectors for hp with control relay for shutdown. ref #201705156627. | $7,700 |
| Jun 16, 2017 | Completed final sign-off Oct 2017 | 100 California St | Principal Builders Inc. | 11/f: renovation to existing elevator lobby to remove and replace ceiling and carpet and paint in elevator lobby and corridor. mep sep permit, life safety, sprinklers sep permitDetails
11/f: renovation to existing elevator lobby to remove and replace ceiling and carpet and paint in elevator lobby and corridor. mep sep permit, life safety, sprinklers sep permit | $80,000 |
| Jun 16, 2017 | Expired or cancelled cancelled Jan 2026 | 100 California St | Swinerton Builders | revision to 201602129534 plan to add updated egress planDetails
revision to 201602129534 plan to add updated egress plan | |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 100 California St | Swinerton Builders | 14th flr: replacing (e) evac maps and adding new evac sign maher naDetails
14th flr: replacing (e) evac maps and adding new evac sign maher na | $1,500 |
| Jun 7, 2017 | Completed final sign-off Aug 2017 | 100 California St | Pribuss Engineering Inc | suite 1150 - fire sprinkler ti 201205156627 relocate 72, add 12, total 84. maher naDetails
suite 1150 - fire sprinkler ti 201205156627 relocate 72, add 12, total 84. maher na | $43,455 |
| Jun 5, 2017 | Completed final sign-off Oct 2017 | 100 California St | Principal Builders Inc. | 11th floor: title 24 mechanical to install 2 new fire smoke dampers, 2 new heat pumps and 5 new vavs and replace ductwork. please refer to app# 201705156627 for ti work. n/a for maherDetails
11th floor: title 24 mechanical to install 2 new fire smoke dampers, 2 new heat pumps and 5 new vavs and replace ductwork. please refer to app# 201705156627 for ti work. n/a for maher | $91,042 |
| May 25, 2017 | Completed final sign-off Sep 2017 | 100 California St | Principal Builders Inc. | t-24 electrical to install new lighting and power on 11th floor. ref app#201705156627 for t.i. n/a for maherDetails
t-24 electrical to install new lighting and power on 11th floor. ref app#201705156627 for t.i. n/a for maher | $96,800 |
| May 15, 2017 | Completed final sign-off Sep 2017 | 100 California St | Principal Builders Inc. | 11th floor - construction of new doors, partitions, millwork and ceiling. mep/fire/life safety under sep permit. maher naDetails
11th floor - construction of new doors, partitions, millwork and ceiling. mep/fire/life safety under sep permit. maher na | $500,731 |
| May 12, 2017 | Completed final sign-off Apr 2018 | 100 California St | Red Hawk Fire & Security Ca Llc | 14th & 15th fl: fire alarm t.i. add (1) smoke detector, (6) duct detectors, (2) wall speaker strobes, (5) ceiling speaker strobes, (2) weatherproof speaker strobes, (3) relays, (2) monitoring modules for generator, & relocate (34) devices. ref: #2016-0212-9534.Details
14th & 15th fl: fire alarm t.i. add (1) smoke detector, (6) duct detectors, (2) wall speaker strobes, (5) ceiling speaker strobes, (2) weatherproof speaker strobes, (3) relays, (2) monitoring modules for generator, & relocate (34) devices. ref: #2016-0212-9534. | $8,000 |
| May 2, 2017 | Completed final sign-off Jul 2017 | 100 California St | Principal Builders Inc. | 11th floor - demolitoin of doors, partitoins & finishes. ceilings to remain until future t.i. per ab- 017. space will be remain vacant until future t.i.Details
11th floor - demolitoin of doors, partitoins & finishes. ceilings to remain until future t.i. per ab- 017. space will be remain vacant until future t.i. | $18,750 |
| Apr 26, 2017 | Never finaled issued May 2017, no final | 100 California St | Swinerton Builders | 14/f, 15/f- rev to pa#201602129534 changes to access stair #2 includes deletion of corridor and repositioning of the door, provision of a 2 hr. joisted floor ceiling infill at (e) opening, add access hatch from 14/f elevator lobby to machine room above. n/a ordinance #155-13Details
14/f, 15/f- rev to pa#201602129534 changes to access stair #2 includes deletion of corridor and repositioning of the door, provision of a 2 hr. joisted floor ceiling infill at (e) opening, add access hatch from 14/f elevator lobby to machine room above. n/a ordinance #155-13 | $2,000 |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 100 California St | street space & mta parking meter | ||
| Apr 12, 2017 | Completed final sign-off Nov 2017 | 100 California St | Skyline Construction | revise pa 2017-0110-6800 to change conference room 701 to unrated consstruction. ref 2017-0110-6800Details
revise pa 2017-0110-6800 to change conference room 701 to unrated consstruction. ref 2017-0110-6800 | |
| Apr 10, 2017 | Never finaled issued Apr 2017, no final | 100 California St | Martinelli Environmental Graph | 7th floor - evacuation maps; n/a maherDetails
7th floor - evacuation maps; n/a maher | $1,000 |
| Apr 5, 2017 | Completed final sign-off Jun 2017 | 100 California St | Golden Gate Fire Protection Inc | 7th floor: fire sprinkler to relocate 8 pendent sprinklers. add 1 pendent sprinkler and relocate 9 upright sprinklers. revision to app#201703070834. t.i. 201702088934. n/a for maherDetails
7th floor: fire sprinkler to relocate 8 pendent sprinklers. add 1 pendent sprinkler and relocate 9 upright sprinklers. revision to app#201703070834. t.i. 201702088934. n/a for maher | $9,450 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 100 California St | Ayoob & Peery Plumbing Co Inc | fire sprinklers for 14th & 15th floors: ref 201602129531 14th - add 61, relocate 43, plug 11 15th - add 17, relocate 4, plug 9Details
fire sprinklers for 14th & 15th floors: ref 201602129531 14th - add 61, relocate 43, plug 11 15th - add 17, relocate 4, plug 9 | $65,625 |
| Mar 27, 2017 | Never finaled issued Apr 2017, no final | 100 California St | Skyline Construction | phase 2 suite 700: mechanical and electrical permit for t.i. ref app#2017-0208-8934. n/a for maherDetails
phase 2 suite 700: mechanical and electrical permit for t.i. ref app#2017-0208-8934. n/a for maher | $15,000 |
| Mar 27, 2017 | Never finaled issued Apr 2017, no final | 100 California St | Skyline Construction | phase 1 suite 700: mechanical and electrical permit for t.i. ref app#201701106800. n/a for maherDetails
phase 1 suite 700: mechanical and electrical permit for t.i. ref app#201701106800. n/a for maher | $25,000 |
| Mar 17, 2017 | Never finaled issued Mar 2017, no final | 100 California St | Red Hawk Fire & Security Ca Llc | 7th floor, suite 700 & 750 fire alarm t.i. - add 22 ceiling speaker strobes, 5 speakers, & 1 smoke detector on idf room. ref #201702088934. n/a maher ordinanceDetails
7th floor, suite 700 & 750 fire alarm t.i. - add 22 ceiling speaker strobes, 5 speakers, & 1 smoke detector on idf room. ref #201702088934. n/a maher ordinance | $13,000 |
| Mar 16, 2017 | Never finaled issued Mar 2017, no final | 100 California St | street space | ||
| Mar 7, 2017 | Completed final sign-off Oct 2017 | 100 California St | Golden Gate Fire Protection Inc | 7th floor: fire sprinkler only - relocate 44 sprinkler pendents, add 8 sprinkler pendents, relocate 73 sprinkler uprights. reference 2017.0208.8934. n/a maher ordinanceDetails
7th floor: fire sprinkler only - relocate 44 sprinkler pendents, add 8 sprinkler pendents, relocate 73 sprinkler uprights. reference 2017.0208.8934. n/a maher ordinance | $32,250 |
| Mar 3, 2017 | Completed final sign-off Nov 2017 | 100 California St | Red Hawk Fire & Security Ca Llc | 3rd & 6th floors fire alarm t.i. - add total (30) speaker strobes. ref #201611082208 & 201611082209. n/a maher ordinanceDetails
3rd & 6th floors fire alarm t.i. - add total (30) speaker strobes. ref #201611082208 & 201611082209. n/a maher ordinance | $15,000 |
| Feb 27, 2017 | Never finaled issued Mar 2017, no final | 100 California St | Swinerton Builders | revision to 201602129534. arch coordination of fuel oile pipe including fire rated through wall penetration. proviseions for 2 new fire rated rooms to isolate electrical equipment within existing space in basement. new access doors, slab to remain open, relocate elec equip rm frm 15th to 14th flDetails
revision to 201602129534. arch coordination of fuel oile pipe including fire rated through wall penetration. proviseions for 2 new fire rated rooms to isolate electrical equipment within existing space in basement. new access doors, slab to remain open, relocate elec equip rm frm 15th to 14th fl | $25,000 |
| Feb 15, 2017 | Completed final sign-off Oct 2017 | 100 California St | Golden Gate Fire Protection Inc | 3rd & 6th flr: fire sprinklers - relocate 36 pendents on 3rd, relocate 22 pendents on 6th maher naDetails
3rd & 6th flr: fire sprinklers - relocate 36 pendents on 3rd, relocate 22 pendents on 6th maher na | $14,500 |
| Feb 9, 2017 | Never finaled issued Feb 2017, no final | 100 California St | street space | ||
| Feb 8, 2017 | Completed final sign-off Nov 2017 | 100 California St | Skyline Construction | 7th flr, suite 700-interior ti, new non structural partitions and finishes, mep/fire/;ife safety under sep permit maher naDetails
7th flr, suite 700-interior ti, new non structural partitions and finishes, mep/fire/;ife safety under sep permit maher na | $145,000 |
| Jan 31, 2017 | Never finaled issued Jan 2017, no final | 100 California St | street space | ||
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 100 California St | Bcci Construction Company | 11th floor: remove extg electric strike hardware from extg frameless glass door and replace it with a magnetic lock and emergency push button release. n/a for maherDetails
11th floor: remove extg electric strike hardware from extg frameless glass door and replace it with a magnetic lock and emergency push button release. n/a for maher | $15,000 |
| Jan 19, 2017 | Completed final sign-off Feb 2017 | 100 California St | Red Hawk Fire & Security Ca Llc | 7/f: fire alarm as-built for pa201612144942. ref ti 201609087048. maher n/a.Details
7/f: fire alarm as-built for pa201612144942. ref ti 201609087048. maher n/a. | |
| Jan 10, 2017 | Completed final sign-off Nov 2017 | 100 California St | Skyline Construction | ste 700: interior tenant improvement on partial floor to include new non-structural partitions & finishes throughtou mep & fire life safety under separate permitDetails
ste 700: interior tenant improvement on partial floor to include new non-structural partitions & finishes throughtou mep & fire life safety under separate permit | $975,000 |
| Jan 6, 2017 | Never finaled issued Jan 2017, no final | 100 California St | street space and mta | ||
| Dec 23, 2016 | Never finaled issued Dec 2016, no final | 100 California St | Structural & Refrigeration Mechanicalref | basement: change out 2 chillers and 3 boilers 1-hx ada new pumps maher naDetails
basement: change out 2 chillers and 3 boilers 1-hx ada new pumps maher na | $1,500,000 |
| Dec 22, 2016 | Completed final sign-off Jun 2019 | 100 California St | Principal Builders Inc., Swinerton Builders | revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf areaDetails
revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. elec/plumbing stubouts. 4250 sf area | $993,061 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm as built drawing for pa 2016-1205-4164 - udpating sequence of operation matrix to include turnstile on the 11th and 12th floorDetails
fire alarm as built drawing for pa 2016-1205-4164 - udpating sequence of operation matrix to include turnstile on the 11th and 12th floor | |
| Dec 14, 2016 | Completed final sign-off Feb 2017 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 7th floor - lobby - add 2 smoke detectors for door holder. ref pa 2016-0908-7048Details
fire alarm ti on the 7th floor - lobby - add 2 smoke detectors for door holder. ref pa 2016-0908-7048 | $1,000 |
| Dec 5, 2016 | Completed final sign-off Dec 2016 | 100 California St | Red Hawk Fire & Security Ca Llc | as built fire alarm drawing for 201607011428 maher not reqDetails
as built fire alarm drawing for 201607011428 maher not req | |
| Dec 2, 2016 | Completed final sign-off Feb 2017 | 100 California St | United California Access & Security Sys | in-kind ada lobby door replacement, total 4 door leaves; on the california st side. glass & steel hardware.Details
in-kind ada lobby door replacement, total 4 door leaves; on the california st side. glass & steel hardware. | $55,456 |
| Nov 18, 2016 | Completed final sign-off Dec 2016 | 100 California St | Principal Builders Inc. | tenant improvement on 4th fl to demo and constuct new non load bearing partitions to expand existing server room. mep, l/s and sprinklers sep permitDetails
tenant improvement on 4th fl to demo and constuct new non load bearing partitions to expand existing server room. mep, l/s and sprinklers sep permit | $14,784 |
| Nov 16, 2016 | Completed final sign-off Dec 2016 | 100 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti and 2 speaker strobes on 7th floor floor restrooms & 2 speaker strobes on 11th floor. ref pa 2016-0919-8087 & 2016-0919-8093Details
fire alarm ti and 2 speaker strobes on 7th floor floor restrooms & 2 speaker strobes on 11th floor. ref pa 2016-0919-8087 & 2016-0919-8093 | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (23), Red Hawk Fire & Security Ca Llc (23), Everon Llc (19), Turner Construction Co (18), Principal Builders Inc. (17), Skyline Construction (13), West Coast Build Aka Fairway Constructio (13), Golden Gate Fire Protection Inc (7), Gci, Inc (6), Swinerton Builders (6), Ayoob & Peery Plumbing Co Inc (5), Pioneer Fire Inc. (5), Novo Construction Inc (4), Pribuss Engineering Inc (3), Anderson Eric F Inc (2), Field Construction Inc. (2), Golden Gate Sign Company Inc. (2), Sc Builders, Inc (2), Anderson, Rowe & Buckley, Inc., Bilcor Inc, Martinelli Environmental Graph, Rcm Fire Protection Inc., Structural & Refrigeration Mechanicalref, United California Access & Security Sys, Waterproofing Associates, Westates Mechanical Corporation Inc
- Architects
- Ariane Lebrilla (9), Matthew Bens (8), Katharine Dwyer (5), Omied Arvin (5), David Louis Swartz (3), Larry Grondahl (3), Stanley Lew (3), Clark Manus (2), Jered Plouzek (2), Kenneth Littman (2), Robert Smith (2), Bert Deviterbo, Brent Marino, Brian S Pera, Jesus Cabellon, Lawrence Smith, Melissa Pesci, Pamela Robinson, Sherry Chaumpluke, Teresa K Emery
- Engineers
- Stephen Shafter (6), Alexander Joseph Pacheco (3), Aditya S. Paranjape (2), Alex Filatov (2), Amit Wadhwa (2), Anthony Bruno (2), Habtom Tewelde (2), Jose Herrera (2), Levi G. Abarte (2), Rudolfo P Bustos Iii (2), Alan Charles Burr, Brent Marino, David Courtemanche, David Louis Swartz, Gwenyth R. Searer, Jesus Cabellon Jr., Kenneth Littman, O. David Zazquez Camacho, Paul Van Kauwenberg, Robert Chaves, Timothy Lindfelt, William Hadinger
- Authorized agents
- Chris Przybysz, Fred Maguire
- Designers
- Marcel Dean Van Matthew Legrande Cash (6), Andrew Erickson (2), Golden Gate Fire Protection, Golden Gate Sign Company Inc., Pribuss Engineering Inc, Rcm Fire Protection Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.