United California Access & Security Sys
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Jul 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 818 Van Ness Av | replace 28"x50" glass window on 7th floor. street visible.Details
replace 28"x50" glass window on 7th floor. street visible. | $15,000 |
| Aug 29, 2022 | Completed final sign-off Jan 2023 | 2775 Van Ness Av | ada compliance construction throughout property. abe 202204290655. accessible business entrance program per ordinance 51-16. technical infeasibility or unreasonable hardship per ordinance 15-16.Details
ada compliance construction throughout property. abe 202204290655. accessible business entrance program per ordinance 51-16. technical infeasibility or unreasonable hardship per ordinance 15-16. | |
| Jun 14, 2021 | Completed final sign-off Jun 2022 | 1650 Mission St | g/f: replace (e) door & ada operator of main entry. maher n/a. no structural framing modification.Details
g/f: replace (e) door & ada operator of main entry. maher n/a. no structural framing modification. | $18,295 |
| Mar 4, 2021 | Completed final sign-off Apr 2021 | 2620 Jones St | remove & replace entrance doors. in kind - no changes in site or locationDetails
remove & replace entrance doors. in kind - no changes in site or location | $74,480 |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 2021 Fillmore St | provide automatic door opener and hardware for accessible business entrance.Details
provide automatic door opener and hardware for accessible business entrance. | $20,000 |
| Mar 28, 2019 | Completed final sign-off Sep 2019 | 187 Pine St | comply w/ abe program, ordiance 51-16 -barrier removal; install entry door power door operator n/a maher.Details
comply w/ abe program, ordiance 51-16 -barrier removal; install entry door power door operator n/a maher. | $3,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 795 Folsom St | g/f -upgrade to power assist ada operator for (1) lobby door, add 2 wireless push plates (1) near door (outside lobby entrance) & 1 at specified location per plans(inside lobby). electrical by others. n/a for maher.Details
g/f -upgrade to power assist ada operator for (1) lobby door, add 2 wireless push plates (1) near door (outside lobby entrance) & 1 at specified location per plans(inside lobby). electrical by others. n/a for maher. | $34,260 |
| Dec 2, 2016 | Completed final sign-off Feb 2017 | 100 California St | in-kind ada lobby door replacement, total 4 door leaves; on the california st side. glass & steel hardware.Details
in-kind ada lobby door replacement, total 4 door leaves; on the california st side. glass & steel hardware. | $55,456 |