Block 3751, lot 155
795 Folsom St
- City’s use
- Commercial Office
- Built
- 1979
- Units
- 6
- Building
- 244,800 sq ft
- Lot
- 9,650 sq ft
- Zoning
- M1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2022 | Completed final sign-off Jul 2024 | 795 Folsom St | Metropolitan Electrical Construction | r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinetsDetails
r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinets | $55,000 |
| Feb 26, 2019 | Completed final sign-off Jul 2020 | 795 Folsom St | Metropolitan Electrical Construction | att modification: r+r 10 (e) antennas w/10 (n) antennas; remove 4 (e) rrus; install 16(n) rrus; install 8 (n) batteries. paint (n) antennas & rrus to match.Details
att modification: r+r 10 (e) antennas w/10 (n) antennas; remove 4 (e) rrus; install 16(n) rrus; install 8 (n) batteries. paint (n) antennas & rrus to match. | $49,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2018 | 795 Folsom St | Tri-Signal Integration Inc. | 6/f: fa ti includes: add 6 speaker/strobes and 1 strobe to (e) fa system. relocate 1 speakers; ref pa #201807184827Details
6/f: fa ti includes: add 6 speaker/strobes and 1 strobe to (e) fa system. relocate 1 speakers; ref pa #201807184827 | $4,700 |
| Jan 17, 2018 | Completed final sign-off Mar 2019 | 795 Folsom St | Tri-Signal Integration Inc. | fa ti includes add 3 wall mount outdoor speaker/strobes and 1 wall mount speaker/strobe to existing fa system. ref pa 2016-0830-6376. maher naDetails
fa ti includes add 3 wall mount outdoor speaker/strobes and 1 wall mount speaker/strobe to existing fa system. ref pa 2016-0830-6376. maher na | $2,600 |
| Jan 17, 2018 | Completed final sign-off Apr 2019 | 795 Folsom St | Tri-Signal Integration Inc. | fa ti includes add 1 smoke detector on the 7 fl elevator lobby and 1 relay module to (e) fire alarm system for elevator machine room (emr) smoke detector activation. maher naDetails
fa ti includes add 1 smoke detector on the 7 fl elevator lobby and 1 relay module to (e) fire alarm system for elevator machine room (emr) smoke detector activation. maher na | $1,500 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 795 Folsom St | United California Access & Security Sys | g/f -upgrade to power assist ada operator for (1) lobby door, add 2 wireless push plates (1) near door (outside lobby entrance) & 1 at specified location per plans(inside lobby). electrical by others. n/a for maher.Details
g/f -upgrade to power assist ada operator for (1) lobby door, add 2 wireless push plates (1) near door (outside lobby entrance) & 1 at specified location per plans(inside lobby). electrical by others. n/a for maher. | $34,260 |
| Sep 13, 2017 | Completed final sign-off Mar 2019 | 795 Folsom St | Gci, Inc | rooftop- structural revision, frp material, to pa#201608306376 & 201708074049. n/a ordinance #155-13Details
rooftop- structural revision, frp material, to pa#201608306376 & 201708074049. n/a ordinance #155-13 | |
| Aug 16, 2017 | Completed final sign-off Mar 2019 | 795 Folsom St | Gci, Inc | roof top- new mechanical, relocate (e) ductwork, 4 registers & 2 (e) vac boxes. ref. to t.i.pa#201608306376. n/a ordinance #155-13Details
roof top- new mechanical, relocate (e) ductwork, 4 registers & 2 (e) vac boxes. ref. to t.i.pa#201608306376. n/a ordinance #155-13 | |
| Aug 7, 2017 | Completed final sign-off Mar 2019 | 795 Folsom St | Gci, Inc | revision to pa #201608306376 - structural detail for approved new roof deck.Details
revision to pa #201608306376 - structural detail for approved new roof deck. | |
| Aug 31, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | mechanical and electrical work for t.i. on the 4th floor. ref app#201607122062. n/a for maherDetails
mechanical and electrical work for t.i. on the 4th floor. ref app#201607122062. n/a for maher | $250,000 |
| Aug 30, 2016 | Completed final sign-off May 2019 | 795 Folsom St | Gci, Inc | alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a*Details
alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a* | $1,800,000 |
| Aug 25, 2016 | Completed final sign-off Mar 2017 | 795 Folsom St | Metropolitan Electrical Construction | att modification: r&r 8(e) antennas with 8 (n) antennas; install 4(n) rrus-32, 4(n0 rrus-12, 2 dus-41, 4(n) fiber & dc; paint antennas, rru's cables and other exposed equipment to match (e) bldg. maher naDetails
att modification: r&r 8(e) antennas with 8 (n) antennas; install 4(n) rrus-32, 4(n0 rrus-12, 2 dus-41, 4(n) fiber & dc; paint antennas, rru's cables and other exposed equipment to match (e) bldg. maher na | $28,000 |
| Aug 12, 2015 | Completed final sign-off Oct 2015 | 795 Folsom St | Electric Tech Construction Inc | modification to (e) att facility consisting of installing 4 new rrus-11 units w/new a-2 modules, paint to match building, installing 2 new ucg surge suppressors; installing new 2" innerducts w/new fiber & dc cablesl r&r 4 (e) antenns w/4 new antennas, paint to match (e) bld maher naDetails
modification to (e) att facility consisting of installing 4 new rrus-11 units w/new a-2 modules, paint to match building, installing 2 new ucg surge suppressors; installing new 2" innerducts w/new fiber & dc cablesl r&r 4 (e) antenns w/4 new antennas, paint to match (e) bld maher na | $27,000 |
| Mar 31, 2015 | Never finaled issued Mar 2015, no final | 795 Folsom St | Tri-Signal Integration Inc. | fire alarm system ti add 8 speaker/strobes 3 strobes to existing fire alarm systemDetails
fire alarm system ti add 8 speaker/strobes 3 strobes to existing fire alarm system | $4,800 |
| May 28, 2014 | Expired or cancelled withdrawn Aug 2014 | 795 Folsom St | modification to an extg unmanned telecommunication facility consisting of removing 4 extg at&t antennas & replace with 4 new at&t antennas, add 4 new rrus-12 units with 4 new a2 modules, add 4 new dc6 surge suppressors, install 2 new dus 41 units inside extg 26 rack, remove 1 extg dul unit fromDetails
modification to an extg unmanned telecommunication facility consisting of removing 4 extg at&t antennas & replace with 4 new at&t antennas, add 4 new rrus-12 units with 4 new a2 modules, add 4 new dc6 surge suppressors, install 2 new dus 41 units inside extg 26 rack, remove 1 extg dul unit from | $18,500 | |
| Mar 22, 2013 | Completed final sign-off Dec 2014 | 795 Folsom St | Electric Tech Construction Inc | modification to an (e) unmanned telecommunication facility consisting of adding 3 new 6601 rbs units inside of an (e) sun west cabinet. also adding 4 new att antennas, 8 new rruw's, 2 new rrus-11's, and a new surge suppressor.Details
modification to an (e) unmanned telecommunication facility consisting of adding 3 new 6601 rbs units inside of an (e) sun west cabinet. also adding 4 new att antennas, 8 new rruw's, 2 new rrus-11's, and a new surge suppressor. | $9,000 |
| Jan 9, 2008 | Never finaled issued Jan 2008, no final | 795 Folsom St | street spaceDetails
street space | ||
| Jun 1, 2006 | Completed final sign-off Sep 2006 | 795 Folsom St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers. 13 new heads, 111 relocates, 2nd floor.Details
relocate fire sprinklers. 13 new heads, 111 relocates, 2nd floor. | $19,900 |
| Aug 23, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Bcci Construction Company | oti-2 4/f ls spDetails
oti-2 4/f ls sp | $200,000 |
| Aug 23, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Bcci Construction Company | oti-2 5/f el,meDetails
oti-2 5/f el,me | $200,000 |
| Jul 11, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Bcci Construction Company | scope of work is limited to interior,non-stru,pre-const demo.this area remain unoccup in w/sf ab-017Details
scope of work is limited to interior,non-stru,pre-const demo.this area remain unoccup in w/sf ab-017 | $25,000 |
| Jul 11, 2005 | Never finaled issued Jul 2005, no final | 795 Folsom St | Bcci Construction Company | scope of wk limited to interior,non stru pre-const demo.area remain unoccu in w/ sf ab 017.Details
scope of wk limited to interior,non stru pre-const demo.area remain unoccu in w/ sf ab 017. | $18,000 |
| May 17, 2005 | Completed final sign-off Jun 2005 | 795 Folsom St | Tri-Signal Integration Inc. | fire alarm tenant improvement.Details
fire alarm tenant improvement. | $4,500 |
| May 6, 2005 | Completed final sign-off Jun 2005 | 795 Folsom St | Pribuss Engineering Inc | fire sprinkler t.i.Details
fire sprinkler t.i. | $3,200 |
| Nov 19, 2004 | Completed final sign-off Jan 2005 | 795 Folsom St | Turner Construction Co | sprinkler new heads, relocated ref. project 200409124721Details
sprinkler new heads, relocated ref. project 200409124721 | $3,137 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tri-Signal Integration Inc. (5), Bcci Construction Company (4), Gci, Inc (4), Metropolitan Electrical Construction (3), Electric Tech Construction Inc (2), Ayoob & Peery Plumbing Co Inc, Novo Construction Inc, Pribuss Engineering Inc, Turner Construction Co, United California Access & Security Sys
- Architects
- Joyce Polhamus, Michael Leeper, Rlh, William Diefenbach
- Engineers
- James Spore (2), Alex Filatov, James Spore, Joseph J Fitzsimons, Sargon Ishaya, M.S., Zahra Gerami
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.