Joyce Polhamus
- Listed as
- architect
- Firm
- Smithgroup Jjr
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Dec 2020
48 permits since 2000 (architect on 48 permits): 33 completed, 5 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2020 | Completed final sign-off Aug 2021 | 300 Clay St | Richlen Construction | renovation of an existing mother's room (lactation room) in an existing office.Details
renovation of an existing mother's room (lactation room) in an existing office. | $75,000 |
| Jun 21, 2018 | Completed final sign-off Jan 2019 | 600 Montgomery St | Hathaway Dinwiddie Co. | modifications to existing ground level storefront and construction of interior partitions for equipment enclosure to accommodate relocation of exterior facing atmDetails
modifications to existing ground level storefront and construction of interior partitions for equipment enclosure to accommodate relocation of exterior facing atm | $100,000 |
| May 7, 2018 | Completed final sign-off Apr 2019 | 650 California St | Skyline Construction | annex & basement: installtion of new full height partitions, lighting and doors to create bike storage at level 1b.Details
annex & basement: installtion of new full height partitions, lighting and doors to create bike storage at level 1b. | $10,000 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 150 California St | Team Commercial Construction Inc. | partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design buildDetails
partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design build | $511,400 |
| Jan 30, 2018 | Expired or cancelled cancelled Jan 2026 | 650 California St | Skyline Construction | ti o n 15th fl to add new breakrooom and pantry, occ load of space 278 people.Details
ti o n 15th fl to add new breakrooom and pantry, occ load of space 278 people. | $15,000 |
| Jan 30, 2018 | Completed final sign-off Apr 2019 | 650 California St | Skyline Construction | 1st fl - ti on annex level 1 of e office to consist of demo to handrail, skylight framing. constrution of new non-load bearing partitions. new open office space, new restrooms. mep & fire life safety under separate permitDetails
1st fl - ti on annex level 1 of e office to consist of demo to handrail, skylight framing. constrution of new non-load bearing partitions. new open office space, new restrooms. mep & fire life safety under separate permit | $629,264 |
| Jan 19, 2018 | Completed final sign-off Aug 2018 | 150 California St | Team Commercial Construction Inc. | suite 600: 3231 sq ft office t.i. with non-load bearing walls. mep's on seperate permit. n/a for maherDetails
suite 600: 3231 sq ft office t.i. with non-load bearing walls. mep's on seperate permit. n/a for maher | $126,000 |
| Jan 2, 2018 | Completed final sign-off May 2019 | 1 Maritime Pz | Gci, Inc | 6th flr: demo and construction of non load bearing partitions, finished, doors, ceiling. no exterior work, structural or hazardous material work. maher naDetails
6th flr: demo and construction of non load bearing partitions, finished, doors, ceiling. no exterior work, structural or hazardous material work. maher na | $275,000 |
| Nov 8, 2017 | Completed final sign-off Oct 2019 | 650 California St | Skyline Construction | interior tenant improvement on the 12th fl to include interior non structural demo, new partitons, all gender restrooms, new accoustical and gypsum board ceilings. mep sep permitDetails
interior tenant improvement on the 12th fl to include interior non structural demo, new partitons, all gender restrooms, new accoustical and gypsum board ceilings. mep sep permit | $975,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2018 | 301 Battery St | Field Construction Inc. | 2nd fl - interior tenant improvements consisting of: minor demolition of existing partitions and interior rooms; new private offices; new interior gyp board partitions and ceilings; deferred mep drawings; maher ord 155-13 naDetails
2nd fl - interior tenant improvements consisting of: minor demolition of existing partitions and interior rooms; new private offices; new interior gyp board partitions and ceilings; deferred mep drawings; maher ord 155-13 na | $120,000 |
| Sep 5, 2017 | Completed final sign-off Jan 2018 | 101 California St | Source Planning And Construction Inc | 28th fl, suite 2850: demo of e non loadbearing partitions, remove e doors, light fixtures, finishes. new non load bearing partitions, doors, light fixtures finishes. elec lighting design build and submitted separately. life safety deferred.Details
28th fl, suite 2850: demo of e non loadbearing partitions, remove e doors, light fixtures, finishes. new non load bearing partitions, doors, light fixtures finishes. elec lighting design build and submitted separately. life safety deferred. | $115,000 |
| Aug 28, 2017 | Completed final sign-off Apr 2018 | 101 California St | Source Planning And Construction Inc | 39th fl - 3 spec spaces; demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light & finishes. (n) non rated partitions, doors, ceiling tiles & finishes.Details
39th fl - 3 spec spaces; demo of (e) non-load bearing partitions, removal of (e) ceiling tiles, doors, light & finishes. (n) non rated partitions, doors, ceiling tiles & finishes. | $800,000 |
| Jul 12, 2017 | Completed final sign-off May 2019 | 300 Clay St | Gci, Inc | 14th floor - upgrade restrooms removal of interior non load bearing partitions, finishes, doors, ceilings. construction of interior lobby non-load bearing partitions. elevator call buttons/life safety to be returned to existing. n/a maher ordinanceDetails
14th floor - upgrade restrooms removal of interior non load bearing partitions, finishes, doors, ceilings. construction of interior lobby non-load bearing partitions. elevator call buttons/life safety to be returned to existing. n/a maher ordinance | $445,000 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 150 California St | Peacock Construction | 23rd flr: new interior partitions,. ceiling, light fixtures, doors and finishes. fire/life safety under sep permit. ref demo 201610261172 maher naDetails
23rd flr: new interior partitions,. ceiling, light fixtures, doors and finishes. fire/life safety under sep permit. ref demo 201610261172 maher na | $185,600 |
| Oct 26, 2016 | Completed final sign-off Mar 2017 | 150 California St | Peacock Construction | 23/f- demo only, demo of existing non-structural partitions, ceiling grid and tile, lighting and finishes per ab-017. n/a ordinance #155-13Details
23/f- demo only, demo of existing non-structural partitions, ceiling grid and tile, lighting and finishes per ab-017. n/a ordinance #155-13 | $15,500 |
| Sep 1, 2016 | Completed final sign-off Aug 2017 | 555 California St | Gci, Inc | 29/f- interior ti of offices, conference rooms, pantry. minor demo. new drywall partitions, ceiling, mep, millwork & finishes. no exterior, hazmat or structural work.Details
29/f- interior ti of offices, conference rooms, pantry. minor demo. new drywall partitions, ceiling, mep, millwork & finishes. no exterior, hazmat or structural work. | $3,300,000 |
| Aug 31, 2016 | Completed final sign-off Dec 2016 | 150 California St | Principal Builders Inc. | interior impr. demo extg non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work,hazmat, &Details
interior impr. demo extg non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work,hazmat, & | $682,600 |
| Aug 30, 2016 | Completed final sign-off May 2019 | 795 Folsom St | Gci, Inc | alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a*Details
alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a* | $1,800,000 |
| Jun 6, 2016 | Completed final sign-off Jan 2017 | 650 Davis St | Novo Construction Inc | 2/f- barrier removal, demolition and construction of interior non-load bearing partitions and finishes, restroom fixture and accessories. mep under separate permit. no exterior work.Details
2/f- barrier removal, demolition and construction of interior non-load bearing partitions and finishes, restroom fixture and accessories. mep under separate permit. no exterior work. | $100,000 |
| Mar 23, 2016 | Completed final sign-off Jun 2016 | 600 Montgomery St | Hathaway Dinwiddie Co. | 47th floor int office t.i. - partial demolition of partitions, fixtures, finishes,lighting, hvac, plumbing, electrical, fire sprinkler, & life safety. provide new partitions, finishes, lighting, hvac plumbing, electrical, fire sprinkler & lie safety per plan. no struct. or ext. work. n/a maher ordinDetails
47th floor int office t.i. - partial demolition of partitions, fixtures, finishes,lighting, hvac, plumbing, electrical, fire sprinkler, & life safety. provide new partitions, finishes, lighting, hvac plumbing, electrical, fire sprinkler & lie safety per plan. no struct. or ext. work. n/a maher ordin | $275,000 |
| Mar 2, 2016 | Completed final sign-off Sep 2017 | 555 California St | Gci, Inc | partial demo of existing 29/f slab & construction of new communicating stair connecting 28/f & 29/f with new electrical & finishes. ref pa 2015-0526-7112. n/a ordinance #155-13Details
partial demo of existing 29/f slab & construction of new communicating stair connecting 28/f & 29/f with new electrical & finishes. ref pa 2015-0526-7112. n/a ordinance #155-13 | $240,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2018 | 555 California St | Gci, Inc | revision to pa 2015-0526-7112, demo of non structural partitions, glass, millwork. new non-structural partitions & finishes (offices). maher naDetails
revision to pa 2015-0526-7112, demo of non structural partitions, glass, millwork. new non-structural partitions & finishes (offices). maher na | |
| Jan 21, 2016 | Completed final sign-off Sep 2017 | 65 Laguna St | James E Roberts-Obayashi Corporation | level one of 65 laguna single story. conversion of accessory storage space to office part of 55 laguna. ref. to pa#201306270646 ti work to existing commercial space to establish use to service, business perofesssional per sec. 790.108. total 2724 sf (5999 sf allowed) no exterior work.Details
level one of 65 laguna single story. conversion of accessory storage space to office part of 55 laguna. ref. to pa#201306270646 ti work to existing commercial space to establish use to service, business perofesssional per sec. 790.108. total 2724 sf (5999 sf allowed) no exterior work. | $300,000 |
| Oct 27, 2015 | Never finaled filed Oct 2015, never issued | 490 Jamestown Av | bldg #8. erect 1-story, type 2-b, no basement. new retail building.Details
bldg #8. erect 1-story, type 2-b, no basement. new retail building. | $41,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #3. erect 5-story, type 5, 71 units, no basement. new residential building.Details
bldg #3. erect 5-story, type 5, 71 units, no basement. new residential building. | $15,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #1. erect 1-story, type 1, 1 basement. new parking/storage building.Details
bldg #1. erect 1-story, type 1, 1 basement. new parking/storage building. | $70,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #2. erect 5-story, type 5, 63 units, no basement. new residential building.Details
bldg #2. erect 5-story, type 5, 63 units, no basement. new residential building. | $13,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #9. erect 5-story, type 1a, no basement. new parking building.Details
bldg #9. erect 5-story, type 1a, no basement. new parking building. | $30,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #4. erect 5-story, type 5, 81 units, no basement. new residential building.Details
bldg #4. erect 5-story, type 5, 81 units, no basement. new residential building. | $16,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #7. erect 3-story, type 5, no basement. new retail building.Details
bldg #7. erect 3-story, type 5, no basement. new retail building. | $55,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #6. erect 5-story, type 5, 55 units, no basement. new residential building.Details
bldg #6. erect 5-story, type 5, 55 units, no basement. new residential building. | $12,000,000 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2020 | 490 Jamestown Av | bldg #5. erect 5-story, type 5, 58 units, no basement. new residential building.Details
bldg #5. erect 5-story, type 5, 58 units, no basement. new residential building. | $12,000,000 | |
| Jul 16, 2015 | Completed final sign-off Oct 2016 | 460 Cherry St | Herrero Builders Incorporated | voluntary barrier removal to include, stair handrails, overhead protruding objects, signage, & parking.Details
voluntary barrier removal to include, stair handrails, overhead protruding objects, signage, & parking. | $240,000 |
| Aug 4, 2014 | Completed final sign-off Apr 2015 | 201 Mission St | Richlen Construction | demolition and construction of interior non load bearing partitons, doors, and finishes. minor modification to existing lighting/switches as required by scope. no exterior work. mech and elec sep permit; maher n/aDetails
demolition and construction of interior non load bearing partitons, doors, and finishes. minor modification to existing lighting/switches as required by scope. no exterior work. mech and elec sep permit; maher n/a | $90,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2014 | 1200 Van Ness Av | Herrero Builders Incorporated | revision to appl #2014.0530.7153 - construct interior non-bearing partition, doors, finishes, mep/hvac. work to create temporary construction office. no structural or exterior work. no hazardous materioas on site. n/a ordinance #155-13.Details
revision to appl #2014.0530.7153 - construct interior non-bearing partition, doors, finishes, mep/hvac. work to create temporary construction office. no structural or exterior work. no hazardous materioas on site. n/a ordinance #155-13. | |
| Jun 5, 2014 | Never finaled issued Jun 2014, no final | 1600 Market St | Crux Builders Llc | ground floor 1st time tenant improvement medical office - top of slab to underside of assembly. hvac, electrical, plumbing & life safety design build under separate permit. ref #201403120527 & #201109074027. n/a maher ordinance 155-13Details
ground floor 1st time tenant improvement medical office - top of slab to underside of assembly. hvac, electrical, plumbing & life safety design build under separate permit. ref #201403120527 & #201109074027. n/a maher ordinance 155-13 | $400,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 1600 Market St | Crux Builders Llc | no tenant improvement under this appication. change of use only from retail to medical service, m to b occupancy. ref app#201109074027 (new construction). 1st time t.i. under separate permit. n/a for the maher ordinance #155-13Details
no tenant improvement under this appication. change of use only from retail to medical service, m to b occupancy. ref app#201109074027 (new construction). 1st time t.i. under separate permit. n/a for the maher ordinance #155-13 | |
| Mar 12, 2014 | Expired or cancelled cancelled Jan 2026 | 580 California St | revise previously approved barrier removal project to exclude widening of drinking fountain alcove due to technical infeasibility. pa# 201401146251. na ordanince #155-13.Details
revise previously approved barrier removal project to exclude widening of drinking fountain alcove due to technical infeasibility. pa# 201401146251. na ordanince #155-13. | ||
| Feb 24, 2014 | Never finaled issued Apr 2014, no final | 660 Lombard St | Mc Carthy Building Companies Inc | interior alterations of existing community room, restrooms, breakroom and office space on 2/f. construct interior non-load bearing partitions, doors and finishes. modifications to existing mep. sprinklers & life safety to be covered under separate permit. n/a maher ordinance # 155-13.Details
interior alterations of existing community room, restrooms, breakroom and office space on 2/f. construct interior non-load bearing partitions, doors and finishes. modifications to existing mep. sprinklers & life safety to be covered under separate permit. n/a maher ordinance # 155-13. | $78,700 |
| Dec 20, 2013 | Completed final sign-off Jun 2015 | 580 California St | Peacock Construction Inc | 5th fl:demo of existing office interiors including demo of existing non load bearing partitons, ceiling grid, light fixtures,floor finishes, millwork, and plumbing fixtures. design build life safety drawings for fire, life safety. no exterior work . no known hazardous materials on site - per ab-017Details
5th fl:demo of existing office interiors including demo of existing non load bearing partitons, ceiling grid, light fixtures,floor finishes, millwork, and plumbing fixtures. design build life safety drawings for fire, life safety. no exterior work . no known hazardous materials on site - per ab-017 | $220,000 |
| Nov 25, 2013 | Completed final sign-off Oct 2014 | 199 West Portal Av | Mark Brockley Construction | renovation of extg vacant t.i. to medical office from top of slab at ground level. hvac, elec, plmg, & life safety to be design build.Details
renovation of extg vacant t.i. to medical office from top of slab at ground level. hvac, elec, plmg, & life safety to be design build. | $415,000 |
| Oct 4, 2013 | Completed final sign-off Jan 2014 | 101 California St | Hathaway Dinwiddie Co. | 36th floor interior tenant improvements - demo & reconfigure non-load bearing partitions, doors & minor ceiling repairs, new paint & carpet. electrical and sprinklers separate.Details
36th floor interior tenant improvements - demo & reconfigure non-load bearing partitions, doors & minor ceiling repairs, new paint & carpet. electrical and sprinklers separate. | $113,736 |
| Aug 8, 2013 | Completed final sign-off Nov 2013 | 300 Clay St | Dpr Construction | barrier removal accessibility upgrades new and relocated toilet accessories to meet ada requirements. modifications of toilet partitions to meet ada clearances. plumbing fixtures to meet adaDetails
barrier removal accessibility upgrades new and relocated toilet accessories to meet ada requirements. modifications of toilet partitions to meet ada clearances. plumbing fixtures to meet ada | $21,611 |
| Dec 26, 2012 | Completed final sign-off Sep 2013 | 1663 Market St | Hathaway Dinwiddie Co. | construct as demostrated on the plans interior non load bearing partitions, door, finishes, assocated electrical/da wiring and lighting and hvac modifications to create a dedicated lobby space for the bldg tenant. no strucutural work, no exterior work, no hazardous material on iste.Details
construct as demostrated on the plans interior non load bearing partitions, door, finishes, assocated electrical/da wiring and lighting and hvac modifications to create a dedicated lobby space for the bldg tenant. no strucutural work, no exterior work, no hazardous material on iste. | $65,000 |
| Nov 29, 2012 | Completed final sign-off May 2013 | 3 Embarcadero Center | Source Planning And Construction Inc | ti, 16th floor to demo & construct new non-load bearing partitions, doors & finishes & remove, relocate & install new mep equipment. sprinklers & life safety on separate permit.Details
ti, 16th floor to demo & construct new non-load bearing partitions, doors & finishes & remove, relocate & install new mep equipment. sprinklers & life safety on separate permit. | $222,091 |
| Nov 27, 2012 | Completed final sign-off Apr 2013 | 1 Market St | Gci, Inc | basement #1 -construction of 2 new single occupancy restrooms, showers & adjacent locker area. demolition of non load bearing walls, ceiling grid, light fixtures & flooringsDetails
basement #1 -construction of 2 new single occupancy restrooms, showers & adjacent locker area. demolition of non load bearing walls, ceiling grid, light fixtures & floorings | $112,650 |
| Aug 22, 2012 | Never finaled issued Aug 2012, no final | 835 Market St | Turner Construction Co | 7th. flr.:demo of (e) non-load bearing partitions, removal of (e) doors, glazing, floor finishes, partial removal of (e) ceiling grid & tile & patch & repair work at demolished partition ceiling.Details
7th. flr.:demo of (e) non-load bearing partitions, removal of (e) doors, glazing, floor finishes, partial removal of (e) ceiling grid & tile & patch & repair work at demolished partition ceiling. | $5,000 |
| Mar 12, 2012 | Completed final sign-off Jul 2012 | 2395 Lombard St | Mark Brockley Construction | renovation of (e) vacant space to medical office tenant improvement from top of (e) slab to underside of (e) floor/ceiling assembly. replace portion of (e) storefront. hvac, electrical, plumbing & life safety to be design build.Details
renovation of (e) vacant space to medical office tenant improvement from top of (e) slab to underside of (e) floor/ceiling assembly. replace portion of (e) storefront. hvac, electrical, plumbing & life safety to be design build. | $400,000 |