Block 0229, lot 003
301 Battery St
- City’s use
- Commercial Office
- Built
- 1924
- Stories
- 8
- Units
- 1
- Building
- 185,851 sq ft
- Lot
- 32,886 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
155 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2022 | Completed final sign-off Jul 2022 | 301 Battery St | Ayoob & Peery Plumbing Co Inc | 2nd fl: add 4, relocate 42, changeout 51 sprinkler heads. ref pa# 202010287666.Details
2nd fl: add 4, relocate 42, changeout 51 sprinkler heads. ref pa# 202010287666. | $23,025 |
| Mar 21, 2022 | Never finaled issued Mar 2022, no final | 301 Battery St | Field Construction Inc. | limited interior tenant improvement in an existing occupied tenant suite. scope includes selective interior non structural demolition and construction of partitions, millworks, door, ceiling, lighting and finishes, and furnituere relocation (by others).Details
limited interior tenant improvement in an existing occupied tenant suite. scope includes selective interior non structural demolition and construction of partitions, millworks, door, ceiling, lighting and finishes, and furnituere relocation (by others). | $506,960 |
| Feb 7, 2022 | Never finaled issued Feb 2022, no final | 301 Battery St | Field Construction Inc. | floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area.Details
floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area. | $375,000 |
| Nov 18, 2021 | Completed final sign-off Nov 2021 | 301 Battery St | Pyro-Comm Systems, Inc. | 3rd fl - demo the entire will be vacant and minimum coverage will be provided for a vacant market ready condition. ref pa 2021-1007-9985Details
3rd fl - demo the entire will be vacant and minimum coverage will be provided for a vacant market ready condition. ref pa 2021-1007-9985 | $5,000 |
| Oct 7, 2021 | Completed final sign-off Jun 2022 | 301 Battery St | Field Construction Inc. | 3/f: demolition, partitions, doors, millwork, finishes, ceilings, lighting, electrical a hvac. ref. sprinkler permit 202108116207Details
3/f: demolition, partitions, doors, millwork, finishes, ceilings, lighting, electrical a hvac. ref. sprinkler permit 202108116207 | $290,000 |
| Aug 11, 2021 | Completed final sign-off Nov 2021 | 301 Battery St | Pioneer Fire Inc. | suite 200, 3/f: convert 118 pendents to uprights.Details
suite 200, 3/f: convert 118 pendents to uprights. | $9,390 |
| Jun 2, 2021 | Never finaled filed Jun 2021, never issued | 301 Battery St | new evacuation signs thru building (37 total)Details
new evacuation signs thru building (37 total) | $3,400 | |
| Mar 2, 2021 | Never finaled issued May 2021, no final | 301 Battery St | Acco Engineered Systems Inc. Dba Acco En | 7th fl: replace water source heat pump in electrical room.Details
7th fl: replace water source heat pump in electrical room. | $17,000 |
| Oct 28, 2020 | Completed final sign-off Sep 2022 | 301 Battery St | Field Construction Inc. | suite 200: selective interior non-structural demo of an (e) tenant suite located on a multi-tenant floor located above the public historic floors of the bldg. design build sprinkler modifications under separate pa # 202009244935.(e) approved exiting ste250 to adj suite to 2nd stair to remain.no cou.Details
suite 200: selective interior non-structural demo of an (e) tenant suite located on a multi-tenant floor located above the public historic floors of the bldg. design build sprinkler modifications under separate pa # 202009244935.(e) approved exiting ste250 to adj suite to 2nd stair to remain.no cou. | $98,460 |
| Sep 24, 2020 | Never finaled issued Oct 2020, no final | 301 Battery St | Ayoob & Peery Plumbing Co Inc | 2nd fl ti: add 3, relocate 75 and change out 55 sprinklers to conform with the wall ceiling light of the tiDetails
2nd fl ti: add 3, relocate 75 and change out 55 sprinklers to conform with the wall ceiling light of the ti | $30,825 |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 301 Battery St | Sc Builders, Inc | rev to pa# 201905160782; added exit signsDetails
rev to pa# 201905160782; added exit signs | |
| Nov 4, 2019 | Completed final sign-off Mar 2020 | 301 Battery St | Pyro-Comm Systems, Inc. | ref pa# 201901049656; fire alarm (1) dual monitor module to be added to (e) facu intellegent loopDetails
ref pa# 201901049656; fire alarm (1) dual monitor module to be added to (e) facu intellegent loop | $250 |
| Oct 10, 2019 | Completed final sign-off Mar 2020 | 301 Battery St | Pyro-Comm Systems, Inc. | 4/f: fire alarm, 10 smoke detectors, 2 duct detectors, 2 return air detectors, 36 ceiling speaker strobes, 1 wall strobe, 9 ceiling strobes to be added to existing facu 201905160782Details
4/f: fire alarm, 10 smoke detectors, 2 duct detectors, 2 return air detectors, 36 ceiling speaker strobes, 1 wall strobe, 9 ceiling strobes to be added to existing facu 201905160782 | $31,000 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 301 Battery St | Ayoob & Peery Plumbing Co Inc | 4th fl - add, relocate and remove sprinklers per ti add 67, 151 relocate, 24 remove. t.i. pa201905160782Details
4th fl - add, relocate and remove sprinklers per ti add 67, 151 relocate, 24 remove. t.i. pa201905160782 | $69,150 |
| Sep 18, 2019 | Completed final sign-off Mar 2020 | 301 Battery St | Intelligent Technologies & Services Inc | fire: clean agent/pre-action detection and control system on 4th floor in server room.Details
fire: clean agent/pre-action detection and control system on 4th floor in server room. | $18,440 |
| Jul 18, 2019 | Expired or cancelled cancelled Jan 2026 | 301 Battery St | disabled access compliance statusDetails
disabled access compliance status | ||
| Jun 13, 2019 | Completed final sign-off Feb 2020 | 301 Battery St | Sc Builders, Inc | ref pa# 201905160782; demo on the 4th fl.Details
ref pa# 201905160782; demo on the 4th fl. | |
| May 16, 2019 | Completed final sign-off Feb 2020 | 301 Battery St | Sc Builders, Inc | 4th flr tenant improvement incl construction of interior partitions, ceilings, lighting and casework. mep included. exterior improvements to terrace.Details
4th flr tenant improvement incl construction of interior partitions, ceilings, lighting and casework. mep included. exterior improvements to terrace. | $750,000 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 301 Battery St | Mc Millan Electric | lighting scoope, revised lighting layout, revise power layout, title 24 calculations. reference pa. #2018 921 1070, #2018 0921 1072 (6th and 7th floors)Details
lighting scoope, revised lighting layout, revise power layout, title 24 calculations. reference pa. #2018 921 1070, #2018 0921 1072 (6th and 7th floors) | $80,000 |
| Jan 4, 2019 | Completed final sign-off Mar 2020 | 301 Battery St | United Ca Fire Protection | replacement of existing diesel fire pump.Details
replacement of existing diesel fire pump. | $75,000 |
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 301 Battery St | Pyro-Comm Systems, Inc. | fire alarm ti for 6th & 7th: will be adding 11 speaker strobe & 2 strobe to be hooked up to (e) fa panel. ref #2018092111072 & 201809211070.Details
fire alarm ti for 6th & 7th: will be adding 11 speaker strobe & 2 strobe to be hooked up to (e) fa panel. ref #2018092111072 & 201809211070. | $6,500 |
| Dec 13, 2018 | Completed final sign-off Jan 2019 | 301 Battery St | R L H Fire Protection Inc | ti upgrade of existing fire sprinkler system 4 relocate pendent, 2 additional sidewall sprinkler 2 removeal pendent sprinklerDetails
ti upgrade of existing fire sprinkler system 4 relocate pendent, 2 additional sidewall sprinkler 2 removeal pendent sprinkler | $1,400 |
| Nov 28, 2018 | Never finaled issued Dec 2018, no final | 301 Battery St | Field Construction Inc. | revision to 201809211070 structural drawings tube steel frames for interior. n/a for maher.Details
revision to 201809211070 structural drawings tube steel frames for interior. n/a for maher. | $3,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2019 | 301 Battery St | Field Construction Inc. | 4th fl - demo of current ti build-out shell. main hvac, life safety and sprinkler systems to remain. per ab-017Details
4th fl - demo of current ti build-out shell. main hvac, life safety and sprinkler systems to remain. per ab-017 | $100,000 |
| Sep 28, 2018 | Completed final sign-off Jul 2020 | 301 Battery St | Tom Lewis Restoration And Consulting | at the rear courtyard cornice remove falling hazard of broken terracotta. terra cotta is not replacable or salvagable. repair damaged steel and replace terra cotta in kind, save design, shape, color, texture, pattern. all terra cotta manufactured by gladding mcbeanDetails
at the rear courtyard cornice remove falling hazard of broken terracotta. terra cotta is not replacable or salvagable. repair damaged steel and replace terra cotta in kind, save design, shape, color, texture, pattern. all terra cotta manufactured by gladding mcbean | $500,000 |
| Sep 21, 2018 | Completed final sign-off Apr 2019 | 301 Battery St | Field Construction Inc. | 6th floor: t.i. includes the construction and demolition of non structural partitions, clg tiles and grids, pantry, doors associated hardware and lighting. maher n/a.Details
6th floor: t.i. includes the construction and demolition of non structural partitions, clg tiles and grids, pantry, doors associated hardware and lighting. maher n/a. | $262,000 |
| Sep 21, 2018 | Completed final sign-off Apr 2019 | 301 Battery St | Field Construction Inc. | 7th floor: t.i. includes the construction and demolition of non structural partitions, ceilings and lighting. maher n/a.Details
7th floor: t.i. includes the construction and demolition of non structural partitions, ceilings and lighting. maher n/a. | $161,298 |
| Dec 28, 2017 | Never finaled issued Dec 2017, no final | 301 Battery St | Famand Inc Dba Indoor Environmental Serv | revise existing ductwork and existing vav boxes to accomodate new office layout arch 201709219155; n/a maherDetails
revise existing ductwork and existing vav boxes to accomodate new office layout arch 201709219155; n/a maher | $18,212 |
| Dec 13, 2017 | Expired or cancelled cancelled Jan 2026 | 301 Battery St | Field Construction Inc. | 2nd flr: interior ti- mech scope for new office layout. ti project scope consisting of minor demo of (e) partitions, new private offices, new interior gyp board partitions & ceiling. maher na ref 201709219155Details
2nd flr: interior ti- mech scope for new office layout. ti project scope consisting of minor demo of (e) partitions, new private offices, new interior gyp board partitions & ceiling. maher na ref 201709219155 | |
| Nov 17, 2017 | Completed final sign-off Dec 2017 | 301 Battery St | R L H Fire Protection Inc | 2/f - fire sprinkler - add 2 pendent ; relocate 1 pendent & 2 upright; ref permit 2017 0921 9155. n/a ordinance #155-13Details
2/f - fire sprinkler - add 2 pendent ; relocate 1 pendent & 2 upright; ref permit 2017 0921 9155. n/a ordinance #155-13 | $4,340 |
| Nov 15, 2017 | Completed final sign-off Dec 2017 | 301 Battery St | R L H Fire Protection Inc | 2/f: relocate 29 upright sprinklers. ref pa#201709219155. maher n/a. ref pa 201709219155Details
2/f: relocate 29 upright sprinklers. ref pa#201709219155. maher n/a. ref pa 201709219155 | $6,000 |
| Oct 25, 2017 | Completed final sign-off Dec 2017 | 301 Battery St | Pyro-Comm Systems, Inc. | 2/f:pyro common will provide 2 wall mount speaker strobes maher not reqDetails
2/f:pyro common will provide 2 wall mount speaker strobes maher not req | $1,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2018 | 301 Battery St | Field Construction Inc. | 2nd fl - interior tenant improvements consisting of: minor demolition of existing partitions and interior rooms; new private offices; new interior gyp board partitions and ceilings; deferred mep drawings; maher ord 155-13 naDetails
2nd fl - interior tenant improvements consisting of: minor demolition of existing partitions and interior rooms; new private offices; new interior gyp board partitions and ceilings; deferred mep drawings; maher ord 155-13 na | $120,000 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 301 Battery St | street space w/mtaDetails
street space w/mta | ||
| Jun 22, 2017 | Completed final sign-off Aug 2017 | 301 Battery St | Pioneer Fire Inc. | demo all pendent fire sprinklers and return system to upright coverageDetails
demo all pendent fire sprinklers and return system to upright coverage | $4,000 |
| Jun 20, 2017 | Completed final sign-off Jul 2017 | 301 Battery St | Field Construction Inc. | 4/f: additional demo scope. revision to app#2016-1103-1907. n/a for maherDetails
4/f: additional demo scope. revision to app#2016-1103-1907. n/a for maher | |
| Apr 21, 2017 | Completed final sign-off Jan 2018 | 301 Battery St | Acco Engineered Systems Inc. Dba Acco En | remove and rpelace 1 cooling tower and 2 vfdsDetails
remove and rpelace 1 cooling tower and 2 vfds | $500,000 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 301 Battery St | street space/mtaDetails
street space/mta | ||
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 301 Battery St | street spaceDetails
street space | ||
| Nov 3, 2016 | Completed final sign-off Jun 2017 | 301 Battery St | Field Construction Inc. | selective demo to investigage design feasibility. architectural, mep, life safety and sprinkler modification are under separate permit. path of travel not require per ab-017Details
selective demo to investigage design feasibility. architectural, mep, life safety and sprinkler modification are under separate permit. path of travel not require per ab-017 | $5,000 |
| Jul 5, 2016 | Completed final sign-off Jun 2017 | 301 Battery St | Field Construction Inc. | 6th floor: demolition and construction of interior partitions, casework, finishes, and appliances. n/a for maherDetails
6th floor: demolition and construction of interior partitions, casework, finishes, and appliances. n/a for maher | $92,000 |
| May 10, 2016 | Completed final sign-off Jun 2017 | 301 Battery St | Field Construction Inc. | demolition and construction of interior partitions, new casework, floor and wall finishes. removal of card reader (terrace). replacement of dishwasher. n/a maher ord. 155-13Details
demolition and construction of interior partitions, new casework, floor and wall finishes. removal of card reader (terrace). replacement of dishwasher. n/a maher ord. 155-13 | $65,000 |
| Feb 26, 2015 | Completed final sign-off Apr 2015 | 301 Battery St | Pyro-Comm Systems, Inc. | new fire alarm devices added to tenant improvement to existing building to include 1 power supply, 1 monitor module, 4 speaker/strobes, 6 strobes; pa 201412153748; maher n/aDetails
new fire alarm devices added to tenant improvement to existing building to include 1 power supply, 1 monitor module, 4 speaker/strobes, 6 strobes; pa 201412153748; maher n/a | $3,200 |
| Feb 20, 2015 | Never finaled issued Mar 2015, no final | 301 Battery St | new evacuation signage throughout building, 37 evacuation signs. n/a ordinance #155-13Details
new evacuation signage throughout building, 37 evacuation signs. n/a ordinance #155-13 | $5,700 | |
| Feb 3, 2015 | Completed final sign-off Apr 2015 | 301 Battery St | Pribuss Engineering Inc | 1st floor: fire sprinkler t.i. relocate 12 and add 5. total 8749.00 n/a for the maher. ref app#201412153748Details
1st floor: fire sprinkler t.i. relocate 12 and add 5. total 8749.00 n/a for the maher. ref app#201412153748 | $8,749 |
| Dec 15, 2014 | Never finaled issued Jan 2015, no final | 301 Battery St | Field Construction Inc. | demolition of partitions, floor finishes, acoustic ceiling tiels and lighting. occurs in 2 vacant rooms on the north and south side of sansome street lobby. per ab-017 tenant improvement under separate permit.Details
demolition of partitions, floor finishes, acoustic ceiling tiels and lighting. occurs in 2 vacant rooms on the north and south side of sansome street lobby. per ab-017 tenant improvement under separate permit. | $7,086 |
| Dec 15, 2014 | Completed final sign-off May 2015 | 301 Battery St | Field Construction Inc. | upgade existing meeting space, new unisex restrooms, modify lobby and enlarge coatroom on gr fl. upgrade includes demo and construction of new doors and partitions, new fixtures, power and data and new finishes throughout. all mep lifesafety modifications under sep permitDetails
upgade existing meeting space, new unisex restrooms, modify lobby and enlarge coatroom on gr fl. upgrade includes demo and construction of new doors and partitions, new fixtures, power and data and new finishes throughout. all mep lifesafety modifications under sep permit | $203,400 |
| May 19, 2014 | Never finaled issued May 2014, no final | 301 Battery St | Gci, Inc | addition of 3 new internal card readers and upgrade restrooms to ada compliance on the 7th fl existing tenant space. na for maher.Details
addition of 3 new internal card readers and upgrade restrooms to ada compliance on the 7th fl existing tenant space. na for maher. | $8,000 |
| Jun 28, 2013 | Never finaled issued Jun 2013, no final | 301 Battery St | Pyro-Comm Systems, Inc. | install new fire alarm devices for new tenant build out on 2nd mezzanine level. 1 field power supply, 2 strobes, 4 speaker/strobes. ref app#201306129325Details
install new fire alarm devices for new tenant build out on 2nd mezzanine level. 1 field power supply, 2 strobes, 4 speaker/strobes. ref app#201306129325 | $5,000 |
| Jun 20, 2013 | Never finaled issued Jun 2013, no final | 301 Battery St | Pribuss Engineering Inc | 2nd floor-fire sprinkler ti-relocate 9 (e) sprinklers & relocate & change out 18 sprinkler & add 3 fire sprinklers. plug 17 sprinklers. ref pa #2013.06.12.9325Details
2nd floor-fire sprinkler ti-relocate 9 (e) sprinklers & relocate & change out 18 sprinkler & add 3 fire sprinklers. plug 17 sprinklers. ref pa #2013.06.12.9325 | $15,439 |
| Jun 18, 2013 | Never finaled issued Jun 2013, no final | 301 Battery St | Fisher Development Inc | t.i. mechanical only (mezzanine) ti 201306129325Details
t.i. mechanical only (mezzanine) ti 201306129325 | $100,000 |
| Jun 12, 2013 | Completed final sign-off Feb 2014 | 301 Battery St | Fisher Development Inc | t. i. interior partition, door and glazing, millwork on mezzanine. mep under seperate permit.Details
t. i. interior partition, door and glazing, millwork on mezzanine. mep under seperate permit. | $300,000 |
| Oct 1, 2012 | Expired or cancelled cancelled Jan 2026 | 301 Battery St | 4th floor-breakroom remodeling in office space-ada compliances under pa# 2006-1024-5821Details
4th floor-breakroom remodeling in office space-ada compliances under pa# 2006-1024-5821 | $60,000 | |
| Jul 9, 2012 | Never finaled issued Jul 2012, no final | 301 Battery St | Pyro-Comm Systems, Inc. | 2nd mezzanine - installation of door hold opens, provide 2 smoke detectors, 2 door holders & 1 relay module.Details
2nd mezzanine - installation of door hold opens, provide 2 smoke detectors, 2 door holders & 1 relay module. | $3,000 |
| May 16, 2012 | Never finaled issued May 2012, no final | 301 Battery St | Pyro-Comm Systems, Inc. | revision to app#201202063617. delete duct detectors that were not requird per mechanical drawings per app#201201313219 on the above permit.Details
revision to app#201202063617. delete duct detectors that were not requird per mechanical drawings per app#201201313219 on the above permit. | |
| May 11, 2012 | Never finaled issued May 2012, no final | 301 Battery St | Field Construction Inc. | 1st floor-electrical lighting, install new lights for catering kitchen. demo (e) lighting, provide lighting tenant improvement for 1095 sq ft of kitchenDetails
1st floor-electrical lighting, install new lights for catering kitchen. demo (e) lighting, provide lighting tenant improvement for 1095 sq ft of kitchen | $30,000 |
| Apr 17, 2012 | Completed final sign-off Apr 2012 | 301 Battery St | Ayoob & Peery Plumbing Co Inc | 2nd floor mezzanine - relcoate 10 fire sprinkler heads per tenant improvement.Details
2nd floor mezzanine - relcoate 10 fire sprinkler heads per tenant improvement. | $5,400 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 301 Battery St | Firemaster | install field connect new kitchen knight ii pcl 460 pyro chem in one prepiped kitchen hood. system connection to building fire alarm system under separate applicationDetails
install field connect new kitchen knight ii pcl 460 pyro chem in one prepiped kitchen hood. system connection to building fire alarm system under separate application | $1,780 |
| Mar 27, 2012 | Completed final sign-off Oct 2012 | 301 Battery St | Comfort Dynamics Inc. | installation of 3 vav boxes on the 2nd floor mezzanine. ti under 201201273017Details
installation of 3 vav boxes on the 2nd floor mezzanine. ti under 201201273017 | $15,000 |
| Mar 15, 2012 | Completed final sign-off Jul 2012 | 301 Battery St | Field Construction Inc. | revision to 2012010616798: changes to food service plans and equipment for health dept reviewDetails
revision to 2012010616798: changes to food service plans and equipment for health dept review | |
| Mar 13, 2012 | Never finaled issued Mar 2012, no final | 301 Battery St | Pyro-Comm Systems, Inc. | 2nd mezz:add 6 new smoke detectors to return air fsd's. add 12 new speaker/strobes to open office area, break room, conf. room.Details
2nd mezz:add 6 new smoke detectors to return air fsd's. add 12 new speaker/strobes to open office area, break room, conf. room. | $8,000 |
| Mar 7, 2012 | Completed final sign-off Apr 2012 | 301 Battery St | Pyro-Comm Systems, Inc. | mezzanine #2-add monitor modules to monitor open & close switches on 3 new fsd'sDetails
mezzanine #2-add monitor modules to monitor open & close switches on 3 new fsd's | $5,000 |
| Feb 28, 2012 | Never finaled issued Feb 2012, no final | 301 Battery St | Ayoob & Peery Plumbing Co Inc | mezzanine 2-modify (e) sprinkler coverage due to new walls & ceilings. 3 add, 56 relocates & 8 demo, total 59 heads (relocate and add)Details
mezzanine 2-modify (e) sprinkler coverage due to new walls & ceilings. 3 add, 56 relocates & 8 demo, total 59 heads (relocate and add) | $30,326 |
| Feb 10, 2012 | Completed final sign-off Jul 2012 | 301 Battery St | Field Construction Inc. | clarification to pa# 2012-0131-3219-no mechanical work to be performed on 2nd floor. issued for adminstrative purposesDetails
clarification to pa# 2012-0131-3219-no mechanical work to be performed on 2nd floor. issued for adminstrative purposes | |
| Feb 10, 2012 | Completed final sign-off May 2012 | 301 Battery St | Field Construction Inc. | 2nd mezzanine level-modify (e) hvac unit system, provide & install 3 new fire smoke dampersDetails
2nd mezzanine level-modify (e) hvac unit system, provide & install 3 new fire smoke dampers | $20,000 |
| Feb 8, 2012 | Completed final sign-off Oct 2012 | 301 Battery St | Q Builders Inc. | floor 2nd -m (mezzanine) tenant improvement project ocnsists pf common area upgrades on a vacant multi-tenant floor. build-out includes ceiling & lighting upgrades, new low-flow restroom fixtures, new restroom partitions & new finishes thru-out.Details
floor 2nd -m (mezzanine) tenant improvement project ocnsists pf common area upgrades on a vacant multi-tenant floor. build-out includes ceiling & lighting upgrades, new low-flow restroom fixtures, new restroom partitions & new finishes thru-out. | $10,000 |
| Feb 6, 2012 | Never finaled issued Feb 2012, no final | 301 Battery St | Pyro-Comm Systems, Inc. | add new fire alarm devices to existing fire alarm. add relay module and duct detectors to new unit. add monitor module for ansul system. add speaker strobes and strobes to common areas.Details
add new fire alarm devices to existing fire alarm. add relay module and duct detectors to new unit. add monitor module for ansul system. add speaker strobes and strobes to common areas. | $5,000 |
| Jan 31, 2012 | Never finaled issued Feb 2012, no final | 301 Battery St | Field Construction Inc. | in catering kitchen for event space: new vav box, new mechanical. redistribution of ductwork in business center. kitchen hood under separate permit.Details
in catering kitchen for event space: new vav box, new mechanical. redistribution of ductwork in business center. kitchen hood under separate permit. | $100,000 |
| Jan 27, 2012 | Completed final sign-off Oct 2012 | 301 Battery St | Q Builders Inc. | tenant improvement. new constructoin includes interior partitions, door, glasing, millwork, plumbing, ceiling and finishes. mechanical, electrical, fire and t24 calcs and life safety under separate permit.Details
tenant improvement. new constructoin includes interior partitions, door, glasing, millwork, plumbing, ceiling and finishes. mechanical, electrical, fire and t24 calcs and life safety under separate permit. | $402,000 |
| Jan 26, 2012 | Completed final sign-off Mar 2012 | 301 Battery St | Anderson, Rowe & Buckley, Inc. | tenant improvement. existing fire sprinkler system. business center - remove 1 sprinkler. catering kitchen - 11 new pendant sprinklers. it space - relocate 7 sprinkler - remove 2 sprinklers.Details
tenant improvement. existing fire sprinkler system. business center - remove 1 sprinkler. catering kitchen - 11 new pendant sprinklers. it space - relocate 7 sprinkler - remove 2 sprinklers. | $3,500 |
| Jan 6, 2012 | Completed final sign-off Jul 2012 | 301 Battery St | Field Construction Inc. | 1st floor-demolition of (e) finishes, electrical, abandoned hvac/lighting. construction of new catering kitchen including new partitions, doors/frames/hardware, new plumbing/electrical. lighting/ceiling & finishes throughout. m.e.p, life safety & health department under seperate permitDetails
1st floor-demolition of (e) finishes, electrical, abandoned hvac/lighting. construction of new catering kitchen including new partitions, doors/frames/hardware, new plumbing/electrical. lighting/ceiling & finishes throughout. m.e.p, life safety & health department under seperate permit | $180,000 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 301 Battery St | Bcci Construction Company | replace 9 steel windows, like for like on the side of the building, not visible from the streetDetails
replace 9 steel windows, like for like on the side of the building, not visible from the street | $50,000 |
| Dec 9, 2011 | Completed final sign-off Jul 2012 | 301 Battery St | Field Construction Inc. | build a duct and install an exhaust fan and makeup air fan. location of kitchen hood dependent termination of duct. plans for kitchen hood on another drawing.Details
build a duct and install an exhaust fan and makeup air fan. location of kitchen hood dependent termination of duct. plans for kitchen hood on another drawing. | $50,000 |
| Oct 4, 2011 | Never finaled issued Oct 2011, no final | 301 Battery St | R L H Fire Protection Inc | 1st thru 7th floors-fire sprinkler permit. relocate 8 upright heads on floors 1 to 7, includes mezz. exhaust hood and duct installation separate permitDetails
1st thru 7th floors-fire sprinkler permit. relocate 8 upright heads on floors 1 to 7, includes mezz. exhaust hood and duct installation separate permit | $4,000 |
| May 4, 2011 | Completed final sign-off May 2012 | 301 Battery St | Field Construction Inc. | 2nd floor-unoccupied floor-2 new 1 hour rated acoustical walls at (e) atrium window walls. mechanical, electrical, fire, life safety under seperate permitDetails
2nd floor-unoccupied floor-2 new 1 hour rated acoustical walls at (e) atrium window walls. mechanical, electrical, fire, life safety under seperate permit | $5,000 |
| Sep 23, 2010 | Never finaled issued Sep 2010, no final | 301 Battery St | R L H Fire Protection Inc | ti upgrade on (e) fire sprinkler system, relocate 38 penden sprinkler heads. delete 5 headsDetails
ti upgrade on (e) fire sprinkler system, relocate 38 penden sprinkler heads. delete 5 heads | $15,000 |
| Sep 21, 2010 | Never finaled issued Sep 2010, no final | 301 Battery St | Q Builders Inc. | additional demo work (increase in square footage) removing non load bearing partitions, outlets, finishes, ceilings. no exterior work. no structural work. insterior work only. ref 201006184862 construction under separate permitDetails
additional demo work (increase in square footage) removing non load bearing partitions, outlets, finishes, ceilings. no exterior work. no structural work. insterior work only. ref 201006184862 construction under separate permit | $18,000 |
| Sep 9, 2010 | Never finaled issued Sep 2010, no final | 301 Battery St | Q Builders Inc. | mechanical work only. ref arch 201006174711Details
mechanical work only. ref arch 201006174711 | $50,000 |
| Aug 4, 2010 | Never finaled issued Aug 2010, no final | 301 Battery St | Red Hawk Fire & Security Ca Llc | 2nd floor-speakers/strobes added to conference room, restrooms, open office areas. smoke detector provided in server room; 14 devices.Details
2nd floor-speakers/strobes added to conference room, restrooms, open office areas. smoke detector provided in server room; 14 devices. | $7,000 |
| Jun 18, 2010 | Never finaled issued Jun 2010, no final | 301 Battery St | Q Builders Inc. | interior demo on the 2nd floor. remove non load bearing partitions, light fixtures, outlets, plbg fixtures, finishes and ceilings. no exterior work. no structural work. ab-017.Details
interior demo on the 2nd floor. remove non load bearing partitions, light fixtures, outlets, plbg fixtures, finishes and ceilings. no exterior work. no structural work. ab-017. | $14,000 |
| Jun 17, 2010 | Never finaled issued Jul 2010, no final | 301 Battery St | Q Builders Inc. | office ti on the 2nd fl. demo of (e) non load bearing partitionsm partial removal of (e) ceiling grid, light fixtures, fl,finishes, plbg. new interior partions, doors,glazing,millworks, plbg, hvac,lighting clg and finishes.mep,lifesafety, asbestos containment & hazardous findings under separate pa.Details
office ti on the 2nd fl. demo of (e) non load bearing partitionsm partial removal of (e) ceiling grid, light fixtures, fl,finishes, plbg. new interior partions, doors,glazing,millworks, plbg, hvac,lighting clg and finishes.mep,lifesafety, asbestos containment & hazardous findings under separate pa. | $615,000 |
| Jul 14, 2009 | Completed final sign-off Nov 2009 | 301 Battery St | Bcci Construction Company | revision to appl. 200809030683. relocation of one wall and structural drawings. no exterior work. mechanical, electrical, life safety & sprinklers under separate permit.Details
revision to appl. 200809030683. relocation of one wall and structural drawings. no exterior work. mechanical, electrical, life safety & sprinklers under separate permit. | $20,000 |
| Jul 1, 2009 | Completed final sign-off Nov 2009 | 301 Battery St | Red Hawk Fire & Security Ca Llc | added 2 new duct detectors and relays for unit shutdown. relocate 2 speakers strobes for required coverage.Details
added 2 new duct detectors and relays for unit shutdown. relocate 2 speakers strobes for required coverage. | $5,000 |
| Jun 26, 2009 | Completed final sign-off Nov 2009 | 301 Battery St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler per tenant improvements. (16 relocate).Details
relocate fire sprinkler per tenant improvements. (16 relocate). | $3,200 |
| May 12, 2009 | Completed final sign-off May 2009 | 301 Battery St | Bcci Construction Company | to obtain final inspection for work approved under appl#200708068782, all work is complete.Details
to obtain final inspection for work approved under appl#200708068782, all work is complete. | |
| Nov 19, 2008 | Completed final sign-off Jan 2009 | 301 Battery St | Bcci Construction Company | this is for final inspection & sign off only for work approved under pa#200704249543.Details
this is for final inspection & sign off only for work approved under pa#200704249543. | |
| Oct 16, 2008 | Completed final sign-off Nov 2008 | 301 Battery St | Bcci Construction Company | demolish 2nd floor tenant space and 2nd floor mezzannine under ab017. fire sprinkler and life safety system are to remain operational work done per sfab-017.Details
demolish 2nd floor tenant space and 2nd floor mezzannine under ab017. fire sprinkler and life safety system are to remain operational work done per sfab-017. | $86,500 |
| Oct 8, 2008 | Completed final sign-off Nov 2009 | 301 Battery St | Bcci Construction Company | electrical work associated with approved 200809030683 including t24 and lighting fixturesDetails
electrical work associated with approved 200809030683 including t24 and lighting fixtures | $58,500 |
| Sep 3, 2008 | Completed final sign-off Nov 2009 | 301 Battery St | Bcci Construction Company | 1st floor-non structural interior renovation on the 1st floor including new flooring, finishes, millwork, ceiling, doors and mechanical work. fire, life safety under seperate permitDetails
1st floor-non structural interior renovation on the 1st floor including new flooring, finishes, millwork, ceiling, doors and mechanical work. fire, life safety under seperate permit | $87,000 |
| May 30, 2008 | Completed final sign-off Jun 2008 | 301 Battery St | Bcci Construction Company | renew pa# 2007/12/05/9666, pa# 2007/11/30/9315 & pa# 2007/03/21/6822 for final inspection only.Details
renew pa# 2007/12/05/9666, pa# 2007/11/30/9315 & pa# 2007/03/21/6822 for final inspection only. | |
| May 20, 2008 | Completed final sign-off Dec 2008 | 301 Battery St | Bcci Construction Company | revision to pa# 2008.0319.7455. changes to area 508. change from office to conference room.Details
revision to pa# 2008.0319.7455. changes to area 508. change from office to conference room. | $50,000 |
| May 13, 2008 | Expired or cancelled expired Jul 2009 | 301 Battery St | Red Hawk Fire & Security Ca Llc | 5th floor-add new fire alarm devices to (e) fire alarm control panel. 2 smoke detectors, 1 relay, 5 strobes, 15 speaker/strobesDetails
5th floor-add new fire alarm devices to (e) fire alarm control panel. 2 smoke detectors, 1 relay, 5 strobes, 15 speaker/strobes | $12,000 |
| May 7, 2008 | Completed final sign-off Dec 2008 | 301 Battery St | R L H Fire Protection Inc | 5th floor: t.i. upgrade of fire sprinkelr system; relocate 59 sprinkler heads, add 20 heads and delete 30 heads.Details
5th floor: t.i. upgrade of fire sprinkelr system; relocate 59 sprinkler heads, add 20 heads and delete 30 heads. | $20,000 |
| Mar 19, 2008 | Completed final sign-off Dec 2008 | 301 Battery St | Bcci Construction Company | 5th floor: tenant improvement for full flr tenant including office, conference rooms, and support spaces. fire sprinkler work & plumbing work to be performed under separate permit.Details
5th floor: tenant improvement for full flr tenant including office, conference rooms, and support spaces. fire sprinkler work & plumbing work to be performed under separate permit. | $600,000 |
| Mar 14, 2008 | Completed final sign-off Jun 2008 | 301 Battery St | Anderson, Rowe & Buckley, Inc. | 7th floor: t.i. existing fire sprinkler system - add 2 & 1 relocate.Details
7th floor: t.i. existing fire sprinkler system - add 2 & 1 relocate. | $600 |
| Mar 7, 2008 | Expired or cancelled expired Jul 2009 | 301 Battery St | Anderson, Rowe & Buckley, Inc. | t.i. exsiting sprinkler system. relocate 16 heads on 2nd floor.Details
t.i. exsiting sprinkler system. relocate 16 heads on 2nd floor. | $2,400 |
| Mar 6, 2008 | Completed final sign-off Dec 2008 | 301 Battery St | Bcci Construction Company | demolition of 5th floor tenant space, no fire-rated construction to be removed. fire sprinkler & life safety systems are to remain operation al. floor to remain unoccupied in accordance with sf ab-017.Details
demolition of 5th floor tenant space, no fire-rated construction to be removed. fire sprinkler & life safety systems are to remain operation al. floor to remain unoccupied in accordance with sf ab-017. | $20,000 |
| Feb 26, 2008 | Completed final sign-off Jun 2008 | 301 Battery St | Bcci Construction Company | provide maintenance accesss to top floor (7th) of elevator shaft. this elevator does not serve the 7th floor.Details
provide maintenance accesss to top floor (7th) of elevator shaft. this elevator does not serve the 7th floor. | $15,000 |
| Jan 7, 2008 | Completed final sign-off Jun 2008 | 301 Battery St | Red Hawk Fire & Security Ca Llc | basement - addition of fire alarm devices to existing fire alarm panel in the new gym and laundry room. (1) speaker/strobe and (1) heat detector. ref arch p/a #2007.10.25.6397.Details
basement - addition of fire alarm devices to existing fire alarm panel in the new gym and laundry room. (1) speaker/strobe and (1) heat detector. ref arch p/a #2007.10.25.6397. | $4,000 |
| Dec 6, 2007 | Completed final sign-off Dec 2007 | 301 Battery St | Bcci Construction Company | to renew pa# 2006/12/14/9872 for final inspection only.Details
to renew pa# 2006/12/14/9872 for final inspection only. | |
| Dec 5, 2007 | Completed final sign-off Jun 2008 | 301 Battery St | Bcci Construction Company | mechanical work to include installation of (1) heat pump & title 24. (to go with previously approved application # 200710256397- 406 sq ft storage room into an excercise room).Details
mechanical work to include installation of (1) heat pump & title 24. (to go with previously approved application # 200710256397- 406 sq ft storage room into an excercise room). | $4,700 |
| Dec 5, 2007 | Expired or cancelled expired Jun 2008 | 301 Battery St | Pribuss Engineering Inc | fire sprinkler ti add 9 fire sprinklers in basementDetails
fire sprinkler ti add 9 fire sprinklers in basement | $2,000 |
| Nov 30, 2007 | Expired or cancelled expired Jun 2008 | 301 Battery St | Bcci Construction Company | basement: title 24 lighting & power plan for p.a. #200710256397 storage room reconfiguration - convert to exercise room.Details
basement: title 24 lighting & power plan for p.a. #200710256397 storage room reconfiguration - convert to exercise room. | $3,000 |
| Oct 25, 2007 | Completed final sign-off Jun 2008 | 301 Battery St | convert 406 sq.ft. of storage area into an exercise room. new acoustical tile ceiling in hallway in basement.Details
convert 406 sq.ft. of storage area into an exercise room. new acoustical tile ceiling in hallway in basement. | $19,000 | |
| Oct 24, 2007 | Never finaled issued Oct 2007, no final | 400 Sansome St | street space & sidewalkDetails
street space & sidewalk | ||
| Oct 1, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | 4/f- revision appl#200612159958 to install drinking fountain in different configuration on the floor. this is a tenant improvement project.Details
4/f- revision appl#200612159958 to install drinking fountain in different configuration on the floor. this is a tenant improvement project. | $2,000 | |
| Aug 29, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | revision to previously approved p.a. 2007-08-03-8687: reduction of permannet landscaping and inclusion of planter boxes as shown on drwg sheet 7a/6.0.Details
revision to previously approved p.a. 2007-08-03-8687: reduction of permannet landscaping and inclusion of planter boxes as shown on drwg sheet 7a/6.0. | |
| Aug 6, 2007 | Expired or cancelled expired May 2009 | 301 Battery St | Anderson, Rowe & Buckley, Inc. | tenant improvement to the exising fire sprinkler system, 10 relocated sprinklersDetails
tenant improvement to the exising fire sprinkler system, 10 relocated sprinklers | $2,000 |
| Aug 3, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | this permit is a revidion to pa 20075252287 change occupaznt hood for roof terance to lower by adding planters architucre detailDetails
this permit is a revidion to pa 20075252287 change occupaznt hood for roof terance to lower by adding planters architucre detail | $5,000 |
| Jul 3, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | 6th & 7th floors-life safety: refer pa# 200702234810, revision # 200704179002. 7th floor: refer pa# 200702234808, revision # 200705252287.Details
6th & 7th floors-life safety: refer pa# 200702234810, revision # 200704179002. 7th floor: refer pa# 200702234808, revision # 200705252287. | $104,000 |
| Jun 5, 2007 | Never finaled issued Aug 2007, no final | 301 Battery St | Bcci Construction Company | sign permit - non electric, single faced, new sign.Details
sign permit - non electric, single faced, new sign. | $1,500 |
| May 25, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | smithgroup: oti-1r 7th floor, el, sp, ls, meDetails
smithgroup: oti-1r 7th floor, el, sp, ls, me | $15,000 |
| May 25, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | oti-2, smithgroup, 7th floor, el, me.Details
oti-2, smithgroup, 7th floor, el, me. | $150,000 |
| Apr 24, 2007 | Completed final sign-off Dec 2008 | 301 Battery St | Bcci Construction Company | minor tenant imporvement on floor 2Details
minor tenant imporvement on floor 2 | $30,000 |
| Apr 17, 2007 | Completed final sign-off Dec 2007 | 301 Battery St | Bcci Construction Company | oti-2, bently reserve, 6th fl, el, me.Details
oti-2, bently reserve, 6th fl, el, me. | $300,000 |
| Apr 17, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | structural revision to app #200612280699. alterate stair detail.Details
structural revision to app #200612280699. alterate stair detail. | $1,500 |
| Apr 17, 2007 | Completed final sign-off Dec 2007 | 301 Battery St | Bcci Construction Company | smithgroup: oti-1 rev 6th fl, el,me,ls,spDetails
smithgroup: oti-1 rev 6th fl, el,me,ls,sp | $50,000 |
| Apr 11, 2007 | Never finaled issued Apr 2007, no final | 301 Battery St | street spaceDetails
street space | ||
| Apr 10, 2007 | Completed final sign-off Oct 2007 | 301 Battery St | Anderson, Rowe & Buckley, Inc. | tenant improvements to existing fire sprinkler system. 96 new sprinklers.Details
tenant improvements to existing fire sprinkler system. 96 new sprinklers. | $18,000 |
| Apr 5, 2007 | Completed final sign-off Dec 2007 | 301 Battery St | Ayoob & Peery Plumbing Co Inc | install fire spsrinkler at floor and correct exterior 104 heads iwth up/doenDetails
install fire spsrinkler at floor and correct exterior 104 heads iwth up/doen | $22,500 |
| Apr 5, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler hor for tanet improvement (7th floor)Details
install fire sprinkler hor for tanet improvement (7th floor) | $23,000 |
| Apr 5, 2007 | Completed final sign-off Oct 2007 | 301 Battery St | Bcci Construction Company | mechanical work in basementDetails
mechanical work in basement | $60,000 |
| Mar 21, 2007 | Expired or cancelled expired Jan 2009 | 301 Battery St | Bcci Construction Company | revision to pa# 2007/01/10/1392. remove sffd verbage from sheet mo.01 that states that this is s site permit only & verbage that requires seperate permits for mechanical & sprinklers & smoke control & fire alarm. these notes added in error.Details
revision to pa# 2007/01/10/1392. remove sffd verbage from sheet mo.01 that states that this is s site permit only & verbage that requires seperate permits for mechanical & sprinklers & smoke control & fire alarm. these notes added in error. | |
| Mar 15, 2007 | Completed final sign-off Jan 2008 | 301 Battery St | Pribuss Engineering Inc | oti-3 3rd floor spDetails
oti-3 3rd floor sp | $18,500 |
| Mar 13, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Red Hawk Fire & Security Ca Llc | install fire alarm system on 4th floorDetails
install fire alarm system on 4th floor | $18,000 |
| Mar 13, 2007 | Completed final sign-off Jan 2008 | 301 Battery St | Red Hawk Fire & Security Ca Llc | install fire alarm system on 3rd floorDetails
install fire alarm system on 3rd floor | $16,500 |
| Mar 1, 2007 | Completed final sign-off Dec 2007 | 301 Battery St | Bcci Construction Company | support for roof m ounted mechanical equipment. refer to oti-1 7th floor app. no. 20070223408 for reference drawings.Details
support for roof m ounted mechanical equipment. refer to oti-1 7th floor app. no. 20070223408 for reference drawings. | $12,000 |
| Feb 28, 2007 | Completed final sign-off May 2008 | 301 Battery St | Bcci Construction Company | life safety work, fire alarm system upgrade on all floors.Details
life safety work, fire alarm system upgrade on all floors. | $160,000 |
| Feb 23, 2007 | Completed final sign-off Dec 2007 | 301 Battery St | Bcci Construction Company | oti-1, smith group, 6th floor, el, me, ls, sp.Details
oti-1, smith group, 6th floor, el, me, ls, sp. | $360,000 |
| Feb 23, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | oti-1, smith group, 7th floor, el, me, ls, sp.Details
oti-1, smith group, 7th floor, el, me, ls, sp. | $380,000 |
| Feb 21, 2007 | Completed final sign-off Oct 2007 | 301 Battery St | Bcci Construction Company | basement - tenant improvement work in the basement. convert to storage area(s), sprinklers under seperate permit.Details
basement - tenant improvement work in the basement. convert to storage area(s), sprinklers under seperate permit. | $175,000 |
| Feb 12, 2007 | Completed final sign-off Jan 2008 | 400 Sansome St | Principal Builders Inc. | oti-2, bentley holdings, 3rd floor, el, me.Details
oti-2, bentley holdings, 3rd floor, el, me. | $150,000 |
| Feb 8, 2007 | Completed final sign-off Nov 2007 | 301 Battery St | Pribuss Engineering Inc | firesprinkler t.i. add 28 spr heads rolocates 140 spkr heads. oti-3 4th floor spDetails
firesprinkler t.i. add 28 spr heads rolocates 140 spkr heads. oti-3 4th floor sp | $28,500 |
| Jan 17, 2007 | Completed final sign-off Jan 2008 | 400 Sansome St | Principal Builders Inc. | oti-1 3rd floor el me ls spDetails
oti-1 3rd floor el me ls sp | $400,000 |
| Jan 10, 2007 | Completed final sign-off Sep 2008 | 301 Battery St | Bcci Construction Company | mechanical work, chiller replacement and lighting control. floor 1 thru penthouse.Details
mechanical work, chiller replacement and lighting control. floor 1 thru penthouse. | $2,000,000 |
| Dec 28, 2006 | Completed final sign-off Nov 2007 | 301 Battery St | Bcci Construction Company | structural work stairs on floors 6 & 7 ( creating communicating stairs between floors 6 & 7)Details
structural work stairs on floors 6 & 7 ( creating communicating stairs between floors 6 & 7) | $30,000 |
| Dec 21, 2006 | Completed final sign-off Nov 2007 | 301 Battery St | Principal Builders Inc. | oti-2 4th fl el,meDetails
oti-2 4th fl el,me | $350,000 |
| Dec 15, 2006 | Completed final sign-off Nov 2007 | 301 Battery St | Principal Builders Inc. | oti-1, bently holdintgs,4/fl, el, me, ls, sp.Details
oti-1, bently holdintgs,4/fl, el, me, ls, sp. | $400,000 |
| Dec 14, 2006 | Expired or cancelled expired Dec 2007 | 301 Battery St | Bcci Construction Company | pre-construction demolition. fire sprinkler and life safety systems are to remain operational.Details
pre-construction demolition. fire sprinkler and life safety systems are to remain operational. | $500 |
| Nov 20, 2006 | Expired or cancelled expired May 2008 | 400 Sansome St | Principal Builders Inc. | interior non-structural demolition only.Details
interior non-structural demolition only. | $19,500 |
| Oct 24, 2006 | Never finaled issued Nov 2006, no final | 301 Battery St | Principal Builders Inc. | barrier removal consisting of work to elevator controls and restroom upgrades of floors 1,3,4,5,6,7Details
barrier removal consisting of work to elevator controls and restroom upgrades of floors 1,3,4,5,6,7 | $100,000 |
| Jun 1, 2006 | Expired or cancelled expired Jan 2009 | 301 Battery St | demolition of all tenant improvement non-bearing partitions, ceilings and floor finishes. non-structural only 4th floorDetails
demolition of all tenant improvement non-bearing partitions, ceilings and floor finishes. non-structural only 4th floor | $50,000 | |
| May 23, 2006 | Expired or cancelled expired Jan 2009 | 301 Battery St | Principal Builders Inc. | demolish all interior non bearing ptns per plan on 7th floor.Details
demolish all interior non bearing ptns per plan on 7th floor. | $50,000 |
| May 23, 2006 | Completed final sign-off Nov 2006 | 301 Battery St | Principal Builders Inc. | 6th floor - demolish all interior non bearing interior ptns as shown on plans.Details
6th floor - demolish all interior non bearing interior ptns as shown on plans. | $50,000 |
| Mar 7, 2006 | Completed final sign-off Nov 2006 | 301 Battery St | Principal Builders Inc. | demolition: interior partitions and ceilings. 5th flr. no base bldg work. per ab-017.Details
demolition: interior partitions and ceilings. 5th flr. no base bldg work. per ab-017. | $30,000 |
| Jun 13, 2003 | Completed final sign-off Jun 2003 | 400 Sansome St | Hathaway Dinwiddie Co. | revision to 200207101085 by eliminating weldingDetails
revision to 200207101085 by eliminating welding | |
| Jul 10, 2002 | Completed final sign-off Jun 2003 | 400 Sansome St | Hathaway Dinwiddie Co. | circular stair repair of existing concretestringer between the old federal reserve bank bldg and theDetails
circular stair repair of existing concretestringer between the old federal reserve bank bldg and the | $79,000 |
| Dec 4, 2001 | Completed final sign-off Sep 2002 | 301 Battery St | Field Construction Inc. | life safety revision to an existing system. no additional office space created.Details
life safety revision to an existing system. no additional office space created. | $5,000 |
| Oct 17, 2001 | Completed final sign-off Feb 2002 | 400 Sansome St | Field Construction Inc. | 3rd floor- oti-4 l/s onlyDetails
3rd floor- oti-4 l/s only | $6,500 |
| Sep 27, 2001 | Completed final sign-off Feb 2002 | 400 Sansome St | Field Construction Inc. | oti-3 3rd floor, fsDetails
oti-3 3rd floor, fs | $3,000 |
| Aug 10, 2001 | Completed final sign-off Feb 2002 | 400 Sansome St | Field Construction Inc. | oti-2 3rd floor, el, me only.Details
oti-2 3rd floor, el, me only. | $200,000 |
| Aug 10, 2001 | Completed final sign-off Feb 2002 | 400 Sansome St | Field Construction Inc. | oti-1 3rd floor, el, me, ls & sp.Details
oti-1 3rd floor, el, me, ls & sp. | $150,000 |
| Jan 26, 2001 | Completed final sign-off Sep 2002 | 301 Battery St | revise to app #200101028923 provide mech & elect to conf rm fire sprinklers under sep permitDetails
revise to app #200101028923 provide mech & elect to conf rm fire sprinklers under sep permit | ||
| Jan 24, 2001 | Completed final sign-off Sep 2002 | 301 Battery St | Potter Fire Protection | install fire sprinkler systemDetails
install fire sprinkler system | $4,500 |
| Jan 2, 2001 | Completed final sign-off Sep 2002 | 301 Battery St | tenant improvement convert storage area to conference centerDetails
tenant improvement convert storage area to conference center | $250,000 |