137 permits since 2000 (engineer on 132 permits, architect on 5 permits): 103 completed, 30 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 137.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2023 | Completed final sign-off Sep 2023 | 135 Mississippi St | Lusardi Construction Co | 2nd fl deferred mep for 202109299432Details
2nd fl deferred mep for 202109299432 | $5,000 |
| Feb 2, 2023 | Completed final sign-off Sep 2023 | 135 Mississippi St | Lusardi Construction Co | 1st fl & mezzanine defered mep for pa#202109299425.Details
1st fl & mezzanine defered mep for pa#202109299425. | $416,000 |
| Nov 16, 2022 | Never finaled issued Jan 2023, no final | 510 Townsend St | Bcci Construction Company | 6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.Details
6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood. | $50,000 |
| Oct 26, 2022 | Never finaled issued Nov 2022, no final | 510 Townsend St | Bcci Construction Company | 2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709Details
2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709 | $50,000 |
| Sep 20, 2022 | Completed final sign-off Mar 2024 | 600 Montgomery St | Hathaway Dinwiddie Co. | 42/f: deffered mep submittal for bpa#202205234807Details
42/f: deffered mep submittal for bpa#202205234807 | $215,000 |
| Aug 17, 2022 | Completed final sign-off Dec 2023 | 633 Battery St | Acco Engineered Systems Inc. Dba Acco En | basement: new mechanical equipment to replace existing at basement exercise rooms and building engineer's office. new duct at ground floor breezeway.Details
basement: new mechanical equipment to replace existing at basement exercise rooms and building engineer's office. new duct at ground floor breezeway. | $42,000 |
| Dec 9, 2021 | Completed final sign-off Apr 2022 | 410 Townsend St | Acco Engineered Systems Inc. Dba Acco En | direct replacement of (3) water source heat and ac units no alterations to electrical or pipingDetails
direct replacement of (3) water source heat and ac units no alterations to electrical or piping | $25,000 |
| Aug 5, 2021 | Completed final sign-off Dec 2021 | 3201 California St | Acco Engineered Systems Inc. Dba Acco En | like for like replacement for rooftop package air conditioning unit. like for like replacement of boiler skid complete with boiler, pump, expansion tank, pot feeder and necessary piping.Details
like for like replacement for rooftop package air conditioning unit. like for like replacement of boiler skid complete with boiler, pump, expansion tank, pot feeder and necessary piping. | $205,000 |
| Jul 23, 2021 | Completed final sign-off Mar 2022 | 505 Brannan St | Acco Engineered Systems Inc. Dba Acco En | furnish and install a new 4-ton vrv split system ac for the 1st fl mdf roomDetails
furnish and install a new 4-ton vrv split system ac for the 1st fl mdf room | $80,000 |
| Mar 25, 2021 | Completed final sign-off Mar 2022 | 1 Dr Carlton B Goodlett Pl | Acco Engineered Systems Inc. Dba Acco En | direct replacement of 27 water source heat pumps.Details
direct replacement of 27 water source heat pumps. | $400,000 |
| Jan 26, 2021 | Never finaled issued Feb 2021, no final | 875 Howard St | Acco Engineered Systems Inc. Dba Acco En | 3/f: like for like replacement of one (1) ac unit on the 3rd floor.Details
3/f: like for like replacement of one (1) ac unit on the 3rd floor. | $30,000 |
| Jan 11, 2021 | Never finaled issued Feb 2022, no final | 901 16th St | Truebeck Construction | combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)Details
combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use) | $40,000,000 |
| Sep 28, 2020 | Completed final sign-off May 2021 | 600 Battery St | Acco Engineered Systems Inc. Dba Acco En | remove & replace (e) boiler skid w/ new like for like skid. disconnect (e) electric rooms from exhaust system. install new transfer fans to serve (e) electrical roomsDetails
remove & replace (e) boiler skid w/ new like for like skid. disconnect (e) electric rooms from exhaust system. install new transfer fans to serve (e) electrical rooms | $320,000 |
| Feb 28, 2020 | Completed final sign-off Aug 2020 | 400 Montgomery St | Novo Construction Inc | 10th fl: install new heat pump split systems in idg room & conference room. ref arch pa #201912300884Details
10th fl: install new heat pump split systems in idg room & conference room. ref arch pa #201912300884 | $100,000 |
| Jan 28, 2020 | Completed final sign-off Jul 2020 | 650 California St | Richlen Construction | 29th fl - provide and install new vav, duct, grills and equipment per hvac plans and balance as needed. ref pa #202001131736Details
29th fl - provide and install new vav, duct, grills and equipment per hvac plans and balance as needed. ref pa #202001131736 | $40,000 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 2345 03rd St | Acco Engineered Systems Inc. Dba Acco En | add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maherDetails
add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher | $530,000 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 555 California St | Acco Engineered Systems Inc. Dba Acco En | demo and replace (e) 6.5 ton water cooled crac unit with new 5 ton water- cooled crac unitDetails
demo and replace (e) 6.5 ton water cooled crac unit with new 5 ton water- cooled crac unit | $29,500 |
| Oct 18, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | Novo Construction Inc | level 4 - deferred mep submittal for pa 2019-0911-1373Details
level 4 - deferred mep submittal for pa 2019-0911-1373 | $5,000 |
| Oct 18, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | Novo Construction Inc | level 5 - deferred mep submittal for pa 2019-0911-1376Details
level 5 - deferred mep submittal for pa 2019-0911-1376 | $5,000 |
| Sep 11, 2019 | Completed final sign-off May 2021 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | revision to 201807063876 change out 1 additional rooftop packaged ac unitDetails
revision to 201807063876 change out 1 additional rooftop packaged ac unit | $300,000 |
| Jul 23, 2019 | Completed final sign-off May 2020 | 120 Kearny St | Sc Builders, Inc | 8th fl, ste 800 meps for 2019-0611-3077 and 2019-0626-4411Details
8th fl, ste 800 meps for 2019-0611-3077 and 2019-0626-4411 | $500,000 |
| Jun 17, 2019 | Completed final sign-off Mar 2020 | 1 Maritime Pz | Gci, Inc | 16th floor: replace (e) fire dampers and modify (e) ductwork to accomodate new dampers.Details
16th floor: replace (e) fire dampers and modify (e) ductwork to accomodate new dampers. | |
| May 29, 2019 | Never finaled issued May 2019, no final | 500 Folsom St | Balfour Beatty Construction Llc | smoke control panel layout submitted as a revision to the addendum 4 (mep) issued permit. ref pa #201503110506 s4. n/a for maher.Details
smoke control panel layout submitted as a revision to the addendum 4 (mep) issued permit. ref pa #201503110506 s4. n/a for maher. | |
| May 20, 2019 | Completed final sign-off Dec 2019 | 71 Stevenson St | Arco Murray Design Build | deferred meps for 201905029625. 20th fl.Details
deferred meps for 201905029625. 20th fl. | |
| May 20, 2019 | Completed final sign-off Dec 2019 | 71 Stevenson St | Arco Murray Design Build | deferred meps for 201905029621. 19th flDetails
deferred meps for 201905029621. 19th fl | |
| May 15, 2019 | Completed final sign-off Jul 2019 | 333 Bush St | Acco Engineered Systems Inc. Dba Acco En | 20th fl: install new duct work and grilles install new vav boxesDetails
20th fl: install new duct work and grilles install new vav boxes | $132,000 |
| Mar 22, 2019 | Completed final sign-off May 2019 | 140 South Park | Acco Engineered Systems Inc. Dba Acco En | revision to 201902284088, fsd to be removed per code and condensing unit is to be relocatedDetails
revision to 201902284088, fsd to be removed per code and condensing unit is to be relocated | $115,000 |
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 140 South Park | Acco Engineered Systems Inc. Dba Acco En | applying for mechanical permit/ install new variable refrigerant sysem to serve new 1st floor build-out. new system to be installed to be under 2000cfm. ti project in reference to 201901180789Details
applying for mechanical permit/ install new variable refrigerant sysem to serve new 1st floor build-out. new system to be installed to be under 2000cfm. ti project in reference to 201901180789 | $115,000 |
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 222 02nd St | Acco Engineered Systems Inc. Dba Acco En | 1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head baseDetails
1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head base | $20,000 |
| Dec 3, 2018 | Completed final sign-off Nov 2019 | 939 Ellis St | Acco Engineered Systems Inc. Dba Acco En | remove and replace extg boiler like for like and provide new piping connections. n/a for maherDetails
remove and replace extg boiler like for like and provide new piping connections. n/a for maher | $247,000 |
| Sep 13, 2018 | Completed final sign-off Feb 2019 | 575 Market St | Field Construction Inc. | 29th floor/suite #2950: meps for 201807315971Details
29th floor/suite #2950: meps for 201807315971 | $180,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2019 | 303 02nd St | Gci, Inc | 5th fl - mechanical new wshp & vav boxes, new ef to serve (n) tenant rr & janitors closet demo (e) & install (n) ductwork, grilles & diffusers ref pa 2018-0627-3171Details
5th fl - mechanical new wshp & vav boxes, new ef to serve (n) tenant rr & janitors closet demo (e) & install (n) ductwork, grilles & diffusers ref pa 2018-0627-3171 | |
| Aug 22, 2018 | Completed final sign-off Dec 2018 | 1 Market St | Gci, Inc | floors 4 & 5: mechanical new vav. maher n/a.Details
floors 4 & 5: mechanical new vav. maher n/a. | $107,000 |
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Novo Construction Inc | mechanical work on the 4th fl. new vrf fan coil units, new vav erminal units, ductwork and thermostats. new. ref pa #201808036355.Details
mechanical work on the 4th fl. new vrf fan coil units, new vav erminal units, ductwork and thermostats. new. ref pa #201808036355. | |
| Aug 7, 2018 | Completed final sign-off Feb 2019 | 989 Market St | Novo Construction Inc | mechanical work on the 5th fl. new vrf condensing units, vrg coil units, exhaust fans & electrical work. ref pa #201808036362.Details
mechanical work on the 5th fl. new vrf condensing units, vrg coil units, exhaust fans & electrical work. ref pa #201808036362. | |
| Jul 18, 2018 | Completed final sign-off Nov 2018 | 218 Stockton St | Fisher Development Inc | install new vrf condensing unit including piping. shell & core work only. tenant improvement under separate permitDetails
install new vrf condensing unit including piping. shell & core work only. tenant improvement under separate permit | $50,000 |
| Jul 6, 2018 | Completed final sign-off May 2021 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | remove and replace one extg packaged unit.Details
remove and replace one extg packaged unit. | $400,000 |
| Jun 25, 2018 | Completed final sign-off Feb 2020 | 2325 03rd St | Acco Engineered Systems Inc. Dba Acco En | mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher naDetails
mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na | $450,000 |
| Nov 13, 2017 | Completed final sign-off Jan 2018 | 550 Kearny St | Skender Construction Llc | demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lightingDetails
demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting | $220,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 185 Berry St | Skyline Construction | 5/f- mechanical and electrical for tenant improvement on the 5th fl ref pa#201708164958. maher not reqDetails
5/f- mechanical and electrical for tenant improvement on the 5th fl ref pa#201708164958. maher not req | $3,000 |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 250 Montgomery St | Field Construction Inc. | 8th fl, suite #800: mechanical and electircal for pa #201707283220. maher naDetails
8th fl, suite #800: mechanical and electircal for pa #201707283220. maher na | $120,000 |
| Sep 21, 2017 | Never finaled issued Oct 2017, no final | 760 Market St | Novo Construction Inc | 6th fl: mechanical and electrical work for t.i. lighting, power & signal, wiring and controls, new dx split unit, new water source heat pump, new exhaust fan. ref pa #2017-0712-1707. maher naDetails
6th fl: mechanical and electrical work for t.i. lighting, power & signal, wiring and controls, new dx split unit, new water source heat pump, new exhaust fan. ref pa #2017-0712-1707. maher na | $25,000 |
| Sep 15, 2017 | Expired or cancelled expired Jul 2020 | 1 Maritime Pz | Gci, Inc | 14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13Details
14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13 | $80,000 |
| Aug 8, 2017 | Completed final sign-off Apr 2018 | 201 Mission St | Acco Engineered Systems Inc. Dba Acco En | demo and replace existing chill water risers and associated piping serving floor by floor ahus and fcs as shown, from basement to level 31 penthouse. maher naDetails
demo and replace existing chill water risers and associated piping serving floor by floor ahus and fcs as shown, from basement to level 31 penthouse. maher na | $3,010,121 |
| Aug 8, 2017 | Completed final sign-off May 2018 | 274 Brannan St | Source Planning And Construction Inc | 5th floor, ste 500 - mechanical and electrical for 2017-0616-9558 and revised arc permit #2017-08-17-5072Details
5th floor, ste 500 - mechanical and electrical for 2017-0616-9558 and revised arc permit #2017-08-17-5072 | |
| Nov 2, 2016 | Completed final sign-off May 2017 | 353 Sacramento St | basement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13Details
basement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13 | $300,000 | |
| Jul 15, 2016 | Completed final sign-off Aug 2017 | 1400 16th St | Skyline Construction | new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **Details
new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a ** | $4,800,000 |
| Jun 24, 2016 | Completed final sign-off Jun 2018 | 210 King St | Richlen Construction | 2nd flr: revision to ref pa 2016-0513-7354: hvac - ti project; rework (e) hvac system per new 2nd floor ti. fire alarm deferred for system shutdown.Details
2nd flr: revision to ref pa 2016-0513-7354: hvac - ti project; rework (e) hvac system per new 2nd floor ti. fire alarm deferred for system shutdown. | $300,000 |
| Apr 27, 2016 | Never finaled issued Apr 2016, no final | 500 03rd St | Acco Engineered Systems Inc. Dba Acco En | furnish & install (1) new condensing split vrf system with (2) new wall mounted fan coil units for the t.i. room. n/a ordinance #155-13Details
furnish & install (1) new condensing split vrf system with (2) new wall mounted fan coil units for the t.i. room. n/a ordinance #155-13 | $45,000 |
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 101 02nd St | Skyline Construction | suite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinanceDetails
suite 350 - mechanical & electrical work for tenant improvement. ref #201603031061. n/a maher ordinance | $55,000 |
| Nov 17, 2015 | Completed final sign-off May 2016 | 600 Harrison St | Novo Construction Inc | revision to app#201510089178 to alter mechanical scope of work at dining area #359. n/a for maherDetails
revision to app#201510089178 to alter mechanical scope of work at dining area #359. n/a for maher | |
| Nov 17, 2015 | Completed final sign-off Mar 2017 | 555 California St | Gci, Inc | 5th fl: mep only: new mechanical, electrical & plumbing, reference building permit 2015-0916-7087.Details
5th fl: mep only: new mechanical, electrical & plumbing, reference building permit 2015-0916-7087. | $247,000 |
| Aug 17, 2015 | Never finaled issued Aug 2015, no final | 4122 18th St | ac unit replacement on roof. not visable from streetDetails
ac unit replacement on roof. not visable from street | $16,867 | |
| Aug 13, 2015 | Completed final sign-off Oct 2015 | 201 California St | Turner Construction Co | meps for 201503181201. 10th fl & 11th fl t.i. sheet a601 added to mep's for card reader compliance info. revisoin in this set to clarify elevator card reader.Details
meps for 201503181201. 10th fl & 11th fl t.i. sheet a601 added to mep's for card reader compliance info. revisoin in this set to clarify elevator card reader. | $990,000 |
| Aug 4, 2015 | Completed final sign-off Dec 2015 | 535 Pacific Av | Principal Builders Inc. | 4th floor - mechanical & electrical, title 24 to relocate & add new fixtures & equipment. pls refer to pa # 201506017646 t.i.Details
4th floor - mechanical & electrical, title 24 to relocate & add new fixtures & equipment. pls refer to pa # 201506017646 t.i. | $309,815 |
| May 28, 2015 | Never finaled issued May 2015, no final | 335 Powell St | Acco Engineered Systems Inc. Dba Acco En | 3/f -replacement of 1 chiller in (e) mechanical room, equipment anchorage, seismic calculations, electrical will be seperate/deferred submission from mechanical. n/a ordinance #155-13Details
3/f -replacement of 1 chiller in (e) mechanical room, equipment anchorage, seismic calculations, electrical will be seperate/deferred submission from mechanical. n/a ordinance #155-13 | $600,000 |
| May 6, 2015 | Completed final sign-off Jun 2015 | 50 Hawthorne St | Bcci Construction Company | roof penthouse. install a transformer in the penthouse to provide power to roof heaters.Details
roof penthouse. install a transformer in the penthouse to provide power to roof heaters. | $20,000 |
| Mar 24, 2015 | Expired or cancelled cancelled Jan 2026 | 499 Illinois St | Acco Engineered Systems Inc. Dba Acco En | mech work- ref pa #2013.1219.4661 snd 201405286875. fire/smoke damper abandoned in place in lieu of a 3m wrap. 2nd floor n/a maher ordinanceDetails
mech work- ref pa #2013.1219.4661 snd 201405286875. fire/smoke damper abandoned in place in lieu of a 3m wrap. 2nd floor n/a maher ordinance | $1,000 |
| Dec 11, 2014 | Completed final sign-off Oct 2015 | 100 Montgomery St | Source Planning And Construction Inc | mechanical & electrical for pa# 201410027856. n/a ordinance# 155-13Details
mechanical & electrical for pa# 201410027856. n/a ordinance# 155-13 | |
| Dec 11, 2014 | Completed final sign-off Oct 2015 | 100 Montgomery St | Source Planning And Construction Inc | mechanical & electrical for pa# 201410148728. n/a ordinance# 155-13Details
mechanical & electrical for pa# 201410148728. n/a ordinance# 155-13 | |
| Dec 11, 2014 | Completed final sign-off Oct 2015 | 100 Montgomery St | Source Planning And Construction Inc | mechanical & electrical for pa# 201410209305. n/a ordinance# 155-13Details
mechanical & electrical for pa# 201410209305. n/a ordinance# 155-13 | |
| Sep 24, 2014 | Never finaled issued Dec 2014, no final | 1355 Market St | Novo Construction Inc | install new condenser water piping. new ceiling mounted water source heat pump unit and new electrical power to the 8th fl maher not reqDetails
install new condenser water piping. new ceiling mounted water source heat pump unit and new electrical power to the 8th fl maher not req | $25,000 |
| Jul 2, 2014 | Completed final sign-off Sep 2014 | 101 Howard St | Cahill Contractors Inc | hvac renovations to accomodate new layout at 1/f & 4/f. n/a ordinance #155-13.Details
hvac renovations to accomodate new layout at 1/f & 4/f. n/a ordinance #155-13. | $125,000 |
| Jun 27, 2014 | Never finaled issued Jul 2014, no final | 901 Market St | Novo Construction Inc | 5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13Details
5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13 | $531,000 |
| Jun 26, 2014 | Completed final sign-off Nov 2014 | 100 Spear St | Acco Engineered Systems Inc. Dba Acco En | install one new reheat vav box, relocate air outlets based on new floor plan, relocate thermostats based on new floor plan. n/a for the maher ordinance #155-13. reference arch app#201406037358 (not issued yet). 11th floor.Details
install one new reheat vav box, relocate air outlets based on new floor plan, relocate thermostats based on new floor plan. n/a for the maher ordinance #155-13. reference arch app#201406037358 (not issued yet). 11th floor. | $30,000 |
| Jun 25, 2014 | Completed final sign-off Jul 2014 | 71 Stevenson St | Source Planning And Construction Inc | 7th floor #725a & 725b- mechanical & electrical for project #2014.0303.9715.Details
7th floor #725a & 725b- mechanical & electrical for project #2014.0303.9715. | $5,000 |
| Jun 25, 2014 | Completed final sign-off Aug 2014 | 71 Stevenson St | Source Planning And Construction Inc | 6th floor - mechanical for project #2014.0501.4720.Details
6th floor - mechanical for project #2014.0501.4720. | $5,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 475 Sansome St | Novo Construction Inc | mech and elec work on the 9th fl to include demo of ductwork, new heat pump for idf room, rebalance existing fan coils. na for maher.Details
mech and elec work on the 9th fl to include demo of ductwork, new heat pump for idf room, rebalance existing fan coils. na for maher. | $400,000 |
| Jun 23, 2014 | Completed final sign-off Oct 2014 | 360 03rd St | Skyline Construction | 4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not requiredDetails
4th flr, ref arch 201403180997; tenant improvement consisting of new cooling vav box new low and medium pressure ductwork and air distribution, relocate existing fire smoke damper. maher not required | $5,000 |
| Jun 18, 2014 | Completed final sign-off Jul 2014 | 600 California St | Sc Builders, Inc | mep 18th fl for 201404153220. n/a maher ordinanceDetails
mep 18th fl for 201404153220. n/a maher ordinance | $150,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 444 De Haro St | Acco Engineered Systems Inc. Dba Acco En | relocate existing supply air fan, furnace and ductwork at 1st and 2nd floor; relocate osa duct serving 1st flr to existing shaft at roof; maher n/aDetails
relocate existing supply air fan, furnace and ductwork at 1st and 2nd floor; relocate osa duct serving 1st flr to existing shaft at roof; maher n/a | $8,000 |
| May 28, 2014 | Never finaled issued Jun 2014, no final | 100 Spear St | Acco Engineered Systems Inc. Dba Acco En | remove & replace 500 ton cooling tower and vfd. n/a ordinance #155-13Details
remove & replace 500 ton cooling tower and vfd. n/a ordinance #155-13 | $350,000 |
| May 21, 2014 | Completed final sign-off Jun 2014 | 101 Greenwich St | Skyline Construction | mechanical & electrical work on hte 4th flr, new hot water heater , vav boxes modify (e) ductwork, revise van zones one new transfer fan, ref.# 201404163425 n/a maherDetails
mechanical & electrical work on hte 4th flr, new hot water heater , vav boxes modify (e) ductwork, revise van zones one new transfer fan, ref.# 201404163425 n/a maher | $10,000 |
| May 19, 2014 | Completed final sign-off Aug 2014 | 55 Music Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | 1st floor- install n2 purge exhaust line. n/a maher ordinance 155-13Details
1st floor- install n2 purge exhaust line. n/a maher ordinance 155-13 | $7,000 |
| May 14, 2014 | Completed final sign-off Dec 2014 | 235 Montgomery St | R.M.R. Construction Company | #1230- tenant remodel of hvac. n/a ordinance #155-13. reference architecture pa # 2014-0414-3123.Details
#1230- tenant remodel of hvac. n/a ordinance #155-13. reference architecture pa # 2014-0414-3123. | $3,000 |
| May 8, 2014 | Completed final sign-off Mar 2017 | 1645 Van Ness Av | Acco Engineered Systems Inc. Dba Acco En | remove & replace two (2) existing 15-ton hvac split system heat pump/cooling units. units have failed permaturely. compliance with ordinance #155-13 not requiredDetails
remove & replace two (2) existing 15-ton hvac split system heat pump/cooling units. units have failed permaturely. compliance with ordinance #155-13 not required | $200,000 |
| Apr 10, 2014 | Never finaled issued Apr 2014, no final | 153 Townsend St | Principal Builders Inc. | 5th floor - mechanical / electrical - t.i. to demo ductwork & lighting & construct new ductwork, grilles, diffusers & lighting. refer to #2014.0310.0263 for t.i. work. compliance with ordinance #155-13 not requiredDetails
5th floor - mechanical / electrical - t.i. to demo ductwork & lighting & construct new ductwork, grilles, diffusers & lighting. refer to #2014.0310.0263 for t.i. work. compliance with ordinance #155-13 not required | $70,000 |
| Mar 26, 2014 | Completed final sign-off Jan 2015 | 455 Market St | Acco Engineered Systems Inc. Dba Acco En | demo (2) existing 4,600 mbh hydronic boilers, install (3) new 3,000 mbh hydronic boilers, primary pumps and hot water piping. na ordinance #155-13Details
demo (2) existing 4,600 mbh hydronic boilers, install (3) new 3,000 mbh hydronic boilers, primary pumps and hot water piping. na ordinance #155-13 | $350,000 |
| Mar 17, 2014 | Never finaled issued Mar 2014, no final | 1161 Mission St | Acco Engineered Systems Inc. Dba Acco En | 4th floor - install new 2 ton unit on roof for server room. compliance with ordinance #155-13 not requiredDetails
4th floor - install new 2 ton unit on roof for server room. compliance with ordinance #155-13 not required | $8,586 |
| Mar 6, 2014 | Completed final sign-off Jun 2014 | 909 Montgomery St | Principal Builders Inc. | title 24 mechanical and electrical to install new equipment and fixture in partial 5th floor. t.i. ref app#201402108188Details
title 24 mechanical and electrical to install new equipment and fixture in partial 5th floor. t.i. ref app#201402108188 | $60,000 |
| Jan 13, 2014 | Completed final sign-off Feb 2015 | 2500 16th St | Acco Engineered Systems Inc. Dba Acco En | furnish/install exhaust fan, furnish/install new make up air unit to match existing performance. reference to pa#201311212519. compliance with ordinance no. 155-13 not required.Details
furnish/install exhaust fan, furnish/install new make up air unit to match existing performance. reference to pa#201311212519. compliance with ordinance no. 155-13 not required. | $20,000 |
| Dec 27, 2013 | Completed final sign-off Apr 2014 | 2 Folsom St | Acco Engineered Systems Inc. Dba Acco En | install new supplemental fan coil unit. pipe new chilled water lines from futures tp fan coil. tie into exitsting condensate drain line. install new fire/smoke damper, supply and return grilles and ductwork (ref permit #201312184441)Details
install new supplemental fan coil unit. pipe new chilled water lines from futures tp fan coil. tie into exitsting condensate drain line. install new fire/smoke damper, supply and return grilles and ductwork (ref permit #201312184441) | $30,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2014 | 153 Townsend St | Principal Builders Inc. | 5th floor. title 24 electrical mechanical t.i. to demo & construct new lighting and fixtures. reference to pa#2013-1125-2705.Details
5th floor. title 24 electrical mechanical t.i. to demo & construct new lighting and fixtures. reference to pa#2013-1125-2705. | $56,000 |
| Dec 9, 2013 | Never finaled issued Dec 2013, no final | 574 Pacific Av | Acco Engineered Systems Inc. Dba Acco En | portion of 3rd & 4th floor only - remove (1) existing a/v unit + (1) existing condensing unit, furnish installing, (1) new a/c unit + (1) new condensing unit, connect new units ot existing duct, ref pa #2013.0529.8112Details
portion of 3rd & 4th floor only - remove (1) existing a/v unit + (1) existing condensing unit, furnish installing, (1) new a/c unit + (1) new condensing unit, connect new units ot existing duct, ref pa #2013.0529.8112 | $20,000 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 1155 Market St | Acco Engineered Systems Inc. Dba Acco En | 1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147Details
1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147 | $40,000 |
| Nov 22, 2013 | Completed final sign-off Dec 2013 | 201 Post St | Sc Builders, Inc | 11/f- mechanical and electrical for pa# 201310018179Details
11/f- mechanical and electrical for pa# 201310018179 | $50,000 |
| Nov 13, 2013 | Completed final sign-off Dec 2013 | 225 Bush St | Skyline Construction | 13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355.Details
13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355. | $25,000 |
| Oct 31, 2013 | Completed final sign-off Aug 2015 | 650 California St | Acco Engineered Systems Inc. Dba Acco En | #1100 - adding (2) new vav zones and (3) existing vav zone and (1) existing a/c unit, to distribute air in a newly constructed supply air duct system. plumbing and electrical by others. reference pa# 2013-0918-7107 for t.i.Details
#1100 - adding (2) new vav zones and (3) existing vav zone and (1) existing a/c unit, to distribute air in a newly constructed supply air duct system. plumbing and electrical by others. reference pa# 2013-0918-7107 for t.i. | $65,000 |
| Oct 30, 2013 | Never finaled issued Oct 2013, no final | 1 Montgomery St | Hathaway Dinwiddie Co. | roof area:remove fire sprinkler pipe and heads from elevator machine room and hoist way per elevator modernization.Details
roof area:remove fire sprinkler pipe and heads from elevator machine room and hoist way per elevator modernization. | $125,000 |
| Oct 22, 2013 | Completed final sign-off Jan 2014 | 525 Market St | Hathaway Dinwiddie Co. | rebalance (1) vav box, relocate (1) pendent light, add (1) switch and occupancy sensor, add (2) outlets. fire sprinkler drawings shall be under seperate permit. electrical and mechanical modification for pa# 201310018136Details
rebalance (1) vav box, relocate (1) pendent light, add (1) switch and occupancy sensor, add (2) outlets. fire sprinkler drawings shall be under seperate permit. electrical and mechanical modification for pa# 201310018136 | $5,000 |
| Sep 12, 2013 | Never finaled issued Nov 2013, no final | 240 Stockton St | 8th floor mechanical retrofit. addition of six (6) new duct fire-smoke dampers. fire permit separate. ref ti 2012.1130.5228Details
8th floor mechanical retrofit. addition of six (6) new duct fire-smoke dampers. fire permit separate. ref ti 2012.1130.5228 | $200,000 | |
| Aug 28, 2013 | Completed final sign-off Oct 2014 | 360 03rd St | Skyline Construction | 6/f - mechanical & electrical for t.i.Details
6/f - mechanical & electrical for t.i. | $3,000 |
| Jun 12, 2013 | Completed final sign-off Aug 2013 | 121 Spear St | Sc Builders, Inc | 2nd floor ste 250 - hvac & electrical work to bldg pa# 201304305810Details
2nd floor ste 250 - hvac & electrical work to bldg pa# 201304305810 | $100,000 |
| May 15, 2013 | Completed final sign-off Jan 2014 | 760 Market St | Sc Builders, Inc | 11th floor t.i. :hvac modification to extg system to accomodate new office layout. electrical lighting and modification to accomodate new office layout. bldg app#201303152287Details
11th floor t.i. :hvac modification to extg system to accomodate new office layout. electrical lighting and modification to accomodate new office layout. bldg app#201303152287 | $300,000 |
| Apr 12, 2013 | Completed final sign-off Jan 2014 | 225 Bush St | Skyline Construction | 10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062Details
10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062 | $75,000 |
| Apr 11, 2013 | Completed final sign-off Jul 2013 | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | 1.install new dx split systems. 2. install new air distribution for 2nd floor build out.Details
1.install new dx split systems. 2. install new air distribution for 2nd floor build out. | $112,000 |
| Apr 11, 2013 | Completed final sign-off Jul 2013 | 60 Spear St | Acco Engineered Systems Inc. Dba Acco En | new air distribution 1. installation of medium and low pressure ducts for t.i build out of 6th fl. 2. installation of new transer fans.Details
new air distribution 1. installation of medium and low pressure ducts for t.i build out of 6th fl. 2. installation of new transer fans. | $112,000 |
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 750 Kearny St | install 2 new condensing boilers into existing system. install new thermostatic mixing valve.Details
install 2 new condensing boilers into existing system. install new thermostatic mixing valve. | $150,000 | |
| Jan 18, 2013 | Completed final sign-off Feb 2013 | 225 Bush St | Skyline Construction | mechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725Details
mechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725 | $60,000 |
| Dec 11, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit.Details
mechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $100,000 |