Sean Cua
- License
- M37255
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M37255 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Acco
- Based in
- San Leandro
- On San Francisco permits
- Jul 2015 to Aug 2021
10 permits since 2000 (engineer on 8 permits, architect on 1 permit, authorized agent-others on 1 permit): 5 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Acco Engineered Systems Inc. Dba Acco En (2), Dome Construction Corp (2), Swinerton Builders (2), Nibbi Bros Assoc Inc., Skyline Construction, Truebeck Construction, Webcor Construction Lp
- Architects
- Daniel Pamperin (2), Doublas Childs, Douglas White, John Mickow, Leighton Lee
- Engineers
- Bertha Prieto Torres (2), Craig Ristow (2), Xuong Quach (2), Aarib Strauch, Alex Filatov, Chris Mcnamara, Jesus Cabellon, Ramil Batiancila
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 7
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2021 | Expired or cancelled withdrawn Oct 2021 | 1155 Bryant St | Dome Construction Corp | renovate prototyping space, lab space, food research lab space & related prototyping. work at 1/f & 3/f. 2/f (e) to remain. special equip installation interface details are required for this project. account furnished equip, e.g. lab benchwork & furnishings. special equip rm, wash equip, autoclaves,Details
renovate prototyping space, lab space, food research lab space & related prototyping. work at 1/f & 3/f. 2/f (e) to remain. special equip installation interface details are required for this project. account furnished equip, e.g. lab benchwork & furnishings. special equip rm, wash equip, autoclaves, | $2,669,004 |
| Jun 10, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | 10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits.Details
10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits. | $300,000 |
| Apr 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Swinerton Builders | 6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way.Details
6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way. | $850,000 |
| Feb 8, 2019 | Expired or cancelled cancelled Jun 2020 | 1355 Market St | Acco Engineered Systems Inc. Dba Acco En | 9/f. (e) dish room alteration; adding walk in cooler. maher n/a.Details
9/f. (e) dish room alteration; adding walk in cooler. maher n/a. | $68,000 |
| Nov 6, 2018 | Completed final sign-off Oct 2020 | 1470 Owens St | Truebeck Construction | deferred plumbing permit for (n) bldg. for pid review only. related to pa# 2018-0601-0826. stormwater plan review.Details
deferred plumbing permit for (n) bldg. for pid review only. related to pa# 2018-0601-0826. stormwater plan review. | |
| Jun 25, 2018 | Completed final sign-off Feb 2020 | 2325 03rd St | Acco Engineered Systems Inc. Dba Acco En | mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher naDetails
mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na | $450,000 |
| Jun 29, 2017 | Never finaled issued Jul 2017, no final | 455 Mission Bay Blvd South | Dome Construction Corp | 3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13Details
3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13 | $800,000 |
| Jul 15, 2016 | Completed final sign-off Aug 2017 | 1400 16th St | Skyline Construction | new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **Details
new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a ** | $4,800,000 |
| May 16, 2016 | Never finaled issued Mar 2019, no final | 100 Font Bl | Webcor Construction Lp | exterior landscape & infrastructure improvements including retaining wall, (n) vehicular paving & parking, utilities, site grading, stairs, planting soil, understory planting, tree planting, irrigation, play area & 3 community gardens.Details
exterior landscape & infrastructure improvements including retaining wall, (n) vehicular paving & parking, utilities, site grading, stairs, planting soil, understory planting, tree planting, irrigation, play area & 3 community gardens. | $8,235,015 |
| Jul 2, 2015 | Completed final sign-off Jan 2017 | 711 Van Ness Av | Nibbi Bros Assoc Inc. | building core upgrades and voluntary accessibility upgradesDetails
building core upgrades and voluntary accessibility upgrades | $960,200 |