Block 7326, lot 001
100 Font Blvd
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
47 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 100 Font Bl | common area- replace ceiling light fixtures at common area corridors at (e) j-box on lobby. first to twelve floors.Details
common area- replace ceiling light fixtures at common area corridors at (e) j-box on lobby. first to twelve floors. | $20,000 | |
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 125 Cambon Dr | replace ceiling light fixtures at common area corridors at existing j-box on first to twelve floors and basement.Details
replace ceiling light fixtures at common area corridors at existing j-box on first to twelve floors and basement. | $20,000 | |
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 150 Font Bl | replace ceiling light fixtures at common area corridors at (e) j-box on lobby. first to twelve floors.Details
replace ceiling light fixtures at common area corridors at (e) j-box on lobby. first to twelve floors. | $20,000 | |
| Oct 23, 2025 | In progress filed Oct 2025, not yet issued | 125 Cambon Dr | repair and replacement of access doors at existing location and existing openings. no changeto door size, quantity and location. no interior layout or unit count changes.Details
repair and replacement of access doors at existing location and existing openings. no changeto door size, quantity and location. no interior layout or unit count changes. | $150,000 | |
| Oct 22, 2025 | In progress filed Oct 2025, not yet issued | 100 Font Bl | repair or replace fire and access doors at existing loc aiton and existing openings. no changes to door size, quantity, and location. not street facing. no interior layout or unit count changes.Details
repair or replace fire and access doors at existing loc aiton and existing openings. no changes to door size, quantity, and location. not street facing. no interior layout or unit count changes. | $65,000 | |
| Mar 18, 2021 | Never finaled issued May 2021, no final | 100 Font Bl | Aaa Flag & Banner Mfg Co Inc | install (1) 97"x55' mesh banner to (e) cable frame. non-electric. single faced. 444 sqft. (now leasing! parkmerced.com)Details
install (1) 97"x55' mesh banner to (e) cable frame. non-electric. single faced. 444 sqft. (now leasing! parkmerced.com) | $4,500 |
| Feb 14, 2019 | Never finaled issued Feb 2020, no final | 100 Font Bl | Aaa Flag & Banner Mfg Co Inc | attach temporary banner 97" x 55' mesh material, existing cable frame.Details
attach temporary banner 97" x 55' mesh material, existing cable frame. | $4,500 |
| May 1, 2018 | Never finaled issued May 2018, no final | 100 Font Bl | Aaa Flag & Banner Mfg Co Inc | "for lease": - install (1) 97"x55" tall mesh banner to (e) cable frame on outsideof the bld w/metal clip hooks. (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. mesh material, 50% blow through temporary signDetails
"for lease": - install (1) 97"x55" tall mesh banner to (e) cable frame on outsideof the bld w/metal clip hooks. (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. mesh material, 50% blow through temporary sign | $4,500 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 125 Cambon Dr | Vpm General Building Llc | comply with nov 201707181, install doors minor interior finish, repair and 4 new fire doors. ul 90. # 7h, 7m, 7g, 7l apartment doors. not visible from street.Details
comply with nov 201707181, install doors minor interior finish, repair and 4 new fire doors. ul 90. # 7h, 7m, 7g, 7l apartment doors. not visible from street. | $2,500 |
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 125 Cambon Dr | Aaa Flag & Banner Mfg Co Inc | relocate attach banner to existing cable frameon outside of bldg w/metal clip hooks, (e) cable frame has 3/16" cable stainless aircraft cable is attached to eye bolts into wal anchors, mesh material 50% blow throughDetails
relocate attach banner to existing cable frameon outside of bldg w/metal clip hooks, (e) cable frame has 3/16" cable stainless aircraft cable is attached to eye bolts into wal anchors, mesh material 50% blow through | $4,500 |
| Jan 5, 2017 | Never finaled issued Jan 2017, no final | 125 Cambon Dr | Aaa Flag & Banner Mfg Co Inc | - attach (1) 97"w x 55" tall mesh banner to extg cable frame on outside of bldg w/ metal clip hooks. - (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. - mesh material, 50% blow trough. non-electric single facedDetails
- attach (1) 97"w x 55" tall mesh banner to extg cable frame on outside of bldg w/ metal clip hooks. - (e) cable frame has 3/16" cable, stainless, aircraft cable is attached to eye bolts into wall anchors. - mesh material, 50% blow trough. non-electric single faced | $4,500 |
| Oct 31, 2016 | Never finaled issued Jun 2019, no final | 1208 Junipero Serra Bl | Webcor Construction Lp | temp shoring & excavation for new construction by means of soldier beams, lagging & tiebacksDetails
temp shoring & excavation for new construction by means of soldier beams, lagging & tiebacks | $1,000,000 |
| May 16, 2016 | Never finaled issued Mar 2019, no final | 100 Font Bl | Webcor Construction Lp | exterior landscape & infrastructure improvements including retaining wall, (n) vehicular paving & parking, utilities, site grading, stairs, planting soil, understory planting, tree planting, irrigation, play area & 3 community gardens.Details
exterior landscape & infrastructure improvements including retaining wall, (n) vehicular paving & parking, utilities, site grading, stairs, planting soil, understory planting, tree planting, irrigation, play area & 3 community gardens. | $8,235,015 |
| Nov 16, 2015 | Never finaled filed Nov 2015, never issued | 1208 Junipero Serra Bl | demolish two story parking garage. refetrence to new building permit application #201510260810s.Details
demolish two story parking garage. refetrence to new building permit application #201510260810s. | $349,900 | |
| Oct 26, 2015 | Never finaled filed Oct 2015, never issued | 1208 Junipero Serra Bl | to erect 17 stories, 3 basements, type i-a, 299 residential units building.Details
to erect 17 stories, 3 basements, type i-a, 299 residential units building. | $61,748,161 | |
| Feb 14, 2013 | Completed final sign-off Apr 2014 | 125 Cambon Dr | Aaa Flag & Banner Mfg Co Inc | remove all vinly banners in violation as detailed in the following pages and per the attached nov removal of banners and hardware to be done using swingstage work platform.Details
remove all vinly banners in violation as detailed in the following pages and per the attached nov removal of banners and hardware to be done using swingstage work platform. | $7,000 |
| Nov 6, 2012 | Never finaled issued Nov 2012, no final | 125 Cambon Dr | Olive Construction Corp | #6a- remove bedroom door, bathroom door & hall door, 36"x72" for easy access for wheel chair.opening in non structural wall.Details
#6a- remove bedroom door, bathroom door & hall door, 36"x72" for easy access for wheel chair.opening in non structural wall. | $3,000 |
| Jul 16, 2012 | Completed final sign-off Dec 2012 | 100 Font Bl | Legacy Roofing & Waterproofing Inc | reroofingDetails
reroofing | $141,000 |
| Jul 16, 2012 | Completed final sign-off Dec 2012 | 150 Font Bl | Legacy Roofing & Waterproofing Inc | reroofingDetails
reroofing | $141,000 |
| Apr 26, 2012 | Completed final sign-off May 2012 | 125 Cambon Dr | Surber Construction | voluntary upgrade of basement non bearing partition walls.Details
voluntary upgrade of basement non bearing partition walls. | $15,000 |
| Jan 17, 2012 | Completed final sign-off May 2012 | 150 Font Bl | to complete & finalize work approved under pa# 200901160372Details
to complete & finalize work approved under pa# 200901160372 | $15,000 | |
| Jan 17, 2012 | Completed final sign-off May 2012 | 100 Font Bl | to complete & finalize work approved under pa# 200901160370Details
to complete & finalize work approved under pa# 200901160370 | $15,000 | |
| May 13, 2011 | Completed final sign-off Sep 2011 | 125 Cambon Dr | Legacy Roofing & Waterproofing Inc | reroofingDetails
reroofing | $186,000 |
| Oct 30, 2009 | Expired or cancelled cancelled Jan 2026 | 125 Cambon Dr | build 10' x 20' enclosure for storage- detached structure.Details
build 10' x 20' enclosure for storage- detached structure. | $5,000 | |
| May 13, 2009 | Completed final sign-off Oct 2009 | 100 Font Bl | erect a 1 story new canopy for covering trash chute/compactor as accesory to apartment buildingDetails
erect a 1 story new canopy for covering trash chute/compactor as accesory to apartment building | $18,980 | |
| Jan 16, 2009 | Expired or cancelled expired May 2012 | 150 Font Bl | voluntary upgrade of basement non-bearing partitions. approx 120'.Details
voluntary upgrade of basement non-bearing partitions. approx 120'. | $15,000 | |
| Jan 16, 2009 | Expired or cancelled expired May 2012 | 100 Font Bl | voluntary upgrade of basement non-bearing partitions.Details
voluntary upgrade of basement non-bearing partitions. | $15,000 | |
| Oct 17, 2008 | Completed final sign-off Oct 2008 | 20 Font Bl | Anderson Roofing & Sheet Metal | reroofing. carports# 1-10, 22-27, 37-48.Details
reroofing. carports# 1-10, 22-27, 37-48. | $23,956 |
| Jun 4, 2008 | Completed final sign-off Oct 2008 | 150 Font Bl | interior tenant improvements/convert activity center to fitness center, new counter, fire rated door, window in e business centerDetails
interior tenant improvements/convert activity center to fitness center, new counter, fire rated door, window in e business center | $16,750 | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 100 Font Bl | Brayer Electric Company | tower 15 - revision to 200712180796: install generator at tower 15.Details
tower 15 - revision to 200712180796: install generator at tower 15. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 125 Cambon Dr | Brayer Electric Company | tower 14 - revision to 200712180794, install generator at tower 14.Details
tower 14 - revision to 200712180794, install generator at tower 14. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 150 Font Bl | Brayer Electric Company | tower 16 - revision to 200712180788: install generator at tower 16.Details
tower 16 - revision to 200712180788: install generator at tower 16. | |
| Feb 28, 2008 | Completed final sign-off Oct 2008 | 100 Font Bl | ground floor: interior tenant improvement, convert activity center to fitness center, new counter in business center, new fire rated doors & windows.Details
ground floor: interior tenant improvement, convert activity center to fitness center, new counter in business center, new fire rated doors & windows. | $16,750 | |
| Dec 18, 2007 | Completed final sign-off Nov 2008 | 125 Cambon Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Nov 2008 | 150 Font Bl | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Nov 2008 | 100 Font Bl | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 14, 2007 | Completed final sign-off Jun 2008 | 125 Cambon Dr | interior alteration to convert activity center to fitness center and installation new counter & finish in buisness center all adjacent to ground floor lobby.Details
interior alteration to convert activity center to fitness center and installation new counter & finish in buisness center all adjacent to ground floor lobby. | $17,000 | |
| Sep 4, 2007 | Completed final sign-off Jul 2008 | 125 Cambon Dr | Dome Construction Corp | voluntary accessibility upgrades including van accessible parking space, path of travel and new entrance ramp & stair. new exterior covered canopy & 2 new exterior windows. full interior gut & remodel of the bldg.main lobby including new finishes, millwork & lighting. new ramp retaining wall.Details
voluntary accessibility upgrades including van accessible parking space, path of travel and new entrance ramp & stair. new exterior covered canopy & 2 new exterior windows. full interior gut & remodel of the bldg.main lobby including new finishes, millwork & lighting. new ramp retaining wall. | $350,000 |
| Jul 2, 2007 | Expired or cancelled expired Jan 2013 | 150 Font Bl | Brayer Electric Company | new fire alarm system to include manual pull stations & smoke detectors,control modules & detectors for elevator control,monitor modules for sprinkler system supervision. audible/visual notification appliances and booster power supplies for strobe circuits.Details
new fire alarm system to include manual pull stations & smoke detectors,control modules & detectors for elevator control,monitor modules for sprinkler system supervision. audible/visual notification appliances and booster power supplies for strobe circuits. | $198,000 |
| Jul 2, 2007 | Never finaled issued Aug 2007, no final | 125 Cambon Dr | Brayer Electric Company | new fire alarm system to include manual pull stations & smoke detectors, control modules & detectros for elevator control,monitor modules for sprinkler system supervision,audible/visual notification appliances and b ooster power supplies for strobe circuits.Details
new fire alarm system to include manual pull stations & smoke detectors, control modules & detectros for elevator control,monitor modules for sprinkler system supervision,audible/visual notification appliances and b ooster power supplies for strobe circuits. | $198,000 |
| Jul 2, 2007 | Expired or cancelled expired Jan 2013 | 100 Font Bl | Brayer Electric Company | new fire alarm system to include manual pull stations & smoke detectors,control modules & detectors for elevator control,monitor modules for sprinkler system supervision,audible/visual notification appliances and booster power supplies for strobe circuits.Details
new fire alarm system to include manual pull stations & smoke detectors,control modules & detectors for elevator control,monitor modules for sprinkler system supervision,audible/visual notification appliances and booster power supplies for strobe circuits. | $198,000 |
| Jan 23, 2007 | Completed final sign-off Aug 2007 | 100 Font Bl | revision to appl#200610023878 exterior entrance and lobby renovations, architectural & structural "value engineering" see exhibit a.Details
revision to appl#200610023878 exterior entrance and lobby renovations, architectural & structural "value engineering" see exhibit a. | ||
| Jan 23, 2007 | Completed final sign-off Aug 2007 | 150 Font Bl | revision to appl#200610023881 exterior entrance and lobby renovations. architectural and structural "value engineering" see "exhibit a".Details
revision to appl#200610023881 exterior entrance and lobby renovations. architectural and structural "value engineering" see "exhibit a". | ||
| Oct 2, 2006 | Completed final sign-off Aug 2007 | 150 Font Bl | voluntary accessibility upgrades including van naccessible parking space path of travel & new entrance ramp & stair. new exterior covered canopy and two new exterior windows. full interior gut and remodel of the bldng's main lobby, including new finishes, millwork and lighting.Details
voluntary accessibility upgrades including van naccessible parking space path of travel & new entrance ramp & stair. new exterior covered canopy and two new exterior windows. full interior gut and remodel of the bldng's main lobby, including new finishes, millwork and lighting. | $350,000 | |
| Oct 2, 2006 | Completed final sign-off Aug 2007 | 100 Font Bl | voluntary accessibility upgrades including van accessible parking space. path of travel and new entrance ramp and stair. new exterior covered canopy and two, new exterior windows.Details
voluntary accessibility upgrades including van accessible parking space. path of travel and new entrance ramp and stair. new exterior covered canopy and two, new exterior windows. | $350,000 | |
| Nov 3, 2005 | Completed final sign-off Dec 2005 | 111 Cambon Dr | renewal of permit app 200003275511- for final onlyDetails
renewal of permit app 200003275511- for final only | ||
| Mar 27, 2000 | Completed final sign-off Dec 2005 | 111 Cambon Dr | Northern Sun Associates | repair of existing trusses two perlin ties, two upgrades to bathrm, parking lot, stairs, title 24, #Details
repair of existing trusses two perlin ties, two upgrades to bathrm, parking lot, stairs, title 24, # | $200,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.