Noel Herrera
- License
- S6199
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6199 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- On San Francisco permits
- Oct 2015 to Jul 2024
3 permits since 2000 (engineer on 2 permits, authorized agent-others on 1 permit): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Parsons Environment & Infrasteructure, Teracom Services Llc
- Architects
- Denis Henmi
- Engineers
- Maged Henein, Michael Miller, Simon North
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2024 | Completed final sign-off Oct 2024 | 928 Harrison St | Teracom Services Llc | demo of 2 side wall exhaust fans will be rmeoved from electrical room. motor controlled dampers will be removed from electrical rooms side wall louvers. install new 3 roof exhaust fans will be added to the electrical room. door closures will be added to electrical room.Details
demo of 2 side wall exhaust fans will be rmeoved from electrical room. motor controlled dampers will be removed from electrical rooms side wall louvers. install new 3 roof exhaust fans will be added to the electrical room. door closures will be added to electrical room. | $100,000 |
| Aug 30, 2016 | Completed final sign-off Mar 2017 | 1094 Revere Av | Parsons Environment & Infrasteructure | add 3 rru's, install 6 #6 awg dc cables (2 per sector). modification of (e) telecommunications equimpent, no addition or alteration of antennas. ** maher: n/aDetails
add 3 rru's, install 6 #6 awg dc cables (2 per sector). modification of (e) telecommunications equimpent, no addition or alteration of antennas. ** maher: n/a | $25,000 |
| Oct 26, 2015 | Never finaled filed Oct 2015, never issued | 1208 Junipero Serra Bl | to erect 17 stories, 3 basements, type i-a, 299 residential units building.Details
to erect 17 stories, 3 basements, type i-a, 299 residential units building. | $61,748,161 |