Mark Sarkisian
- Listed as
- architect, engineer, lessee
- Firm
- Skidmore, Owings & Merrill
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Jan 2026
31 permits since 2000 (engineer on 17 permits, architect on 13 permits, lessee on 1 permit): 21 completed, 1 in progress, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23.Details
change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23. | $21,000,000 |
| Feb 26, 2025 | Completed final sign-off Dec 2025 | 300 Clay St | Hathaway Dinwiddie Co. | remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist.Details
remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist. | $492,824 |
| Jan 27, 2025 | Expired or cancelled cancelled Jun 2026 | 1750 Van Ness Av | Cahill Contractors Llc. | revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area.Details
revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area. | |
| Aug 15, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | deferred structural scope from 202307172307 including removal of approximately 50% of level 3. new diaphragm strengthening to levels 2, 3 & 4. addition of stability bracing to seismic braces at gl3.7. infill.Details
deferred structural scope from 202307172307 including removal of approximately 50% of level 3. new diaphragm strengthening to levels 2, 3 & 4. addition of stability bracing to seismic braces at gl3.7. infill. | $1,131,565 |
| Aug 10, 2022 | Completed final sign-off Jan 2024 | 88 Kearny St | Skyline Construction | rooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite.Details
rooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite. | $246,924 |
| Nov 23, 2021 | Never finaled issued Dec 2022, no final | 1750 Van Ness Av | Cahill Contractors Llc. | erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest.Details
erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest. | $12,000,000 |
| Nov 12, 2021 | Completed final sign-off Jan 2023 | 300 Clay St | Hathaway Dinwiddie Co. | this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler.Details
this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler. | $2,682,163 |
| Nov 18, 2020 | Never finaled issued Dec 2021, no final | 300 Clay St | Hathaway Dinwiddie Co. | precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance.Details
precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance. | |
| Nov 18, 2020 | Never finaled issued Dec 2021, no final | 300 Clay St | Hathaway Dinwiddie Co. | coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation.Details
coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation. | |
| Dec 6, 2019 | Never finaled filed Dec 2019, never issued | 400 02nd St | to erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2)Details
to erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2) | $160,000,000 | |
| Jan 24, 2019 | Never finaled issued Jun 2020, no final | 300 Clay St | Hathaway Dinwiddie Co. | phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant.Details
phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant. | $18,000,000 |
| Jan 15, 2015 | Completed final sign-off Jul 2015 | 1127 Market St | header hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item.Details
header hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item. | $100,000 | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 100 Font Bl | Brayer Electric Company | tower 15 - revision to 200712180796: install generator at tower 15.Details
tower 15 - revision to 200712180796: install generator at tower 15. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 810 Gonzalez Dr | Brayer Electric Company | tower 27 - revision to 200712180793: installation of generator at tower 27.Details
tower 27 - revision to 200712180793: installation of generator at tower 27. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 405 Serrano Dr | Brayer Electric Company | tower 47 - revision to 200712180787: installation of generator at tower 47.Details
tower 47 - revision to 200712180787: installation of generator at tower 47. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 350 Arballo Dr | Brayer Electric Company | tower 39 - revision to 200712180789: install generator at tower 39.Details
tower 39 - revision to 200712180789: install generator at tower 39. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 125 Cambon Dr | Brayer Electric Company | tower 14 - revision to 200712180794, install generator at tower 14.Details
tower 14 - revision to 200712180794, install generator at tower 14. | |
| Jun 2, 2008 | Never finaled issued Jul 2008, no final | 55 Chumasero Dr | Brayer Electric Company | tower 17 - revision to 200712180799: install generator at tower 17.Details
tower 17 - revision to 200712180799: install generator at tower 17. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 750 Gonzalez Dr | Brayer Electric Company | tower 26 - revision to 200712180783: installation of generator at tower 26.Details
tower 26 - revision to 200712180783: installation of generator at tower 26. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 150 Font Bl | Brayer Electric Company | tower 16 - revision to 200712180788: install generator at tower 16.Details
tower 16 - revision to 200712180788: install generator at tower 16. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 355 Serrano Dr | Brayer Electric Company | tower 46 - revision to 200712180801: installation of generator at tower 46.Details
tower 46 - revision to 200712180801: installation of generator at tower 46. | |
| Jun 2, 2008 | Completed final sign-off Oct 2008 | 310 Arballo Dr | Brayer Electric Company | tower 40 - revision to 200712180792: install generator at tower 40.Details
tower 40 - revision to 200712180792: install generator at tower 40. | |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 50 Chumasero Dr | Brayer Electric Company | tower 18 - revision to 200712180797: install generator at tower 18.Details
tower 18 - revision to 200712180797: install generator at tower 18. | |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 350 Arballo Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Nov 2008 | 150 Font Bl | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 810 Gonzalez Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 405 Serrano Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 750 Gonzalez Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Dec 18, 2007 | Completed final sign-off Oct 2008 | 310 Arballo Dr | Brayer Electric Company | build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Details
build structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit. | $50,000 |
| Feb 17, 2006 | Expired or cancelled expired Feb 2009 | 525 Market St | provide connecting stairs between 25, 26 & 27.ref. appl#200312162437 with fully ada upgrade.Details
provide connecting stairs between 25, 26 & 27.ref. appl#200312162437 with fully ada upgrade. | $100,000 | |
| Aug 11, 2005 | Expired or cancelled expired Jan 2007 | 1 Front St | Anderson, Rowe & Buckley, Inc. | existing fire spkr system-tenant improvements- 21 relocates, 2 new, 2 removed -no increase in sizeDetails
existing fire spkr system-tenant improvements- 21 relocates, 2 new, 2 removed -no increase in size | $3,750 |