Block 0204, lot 021
300 Clay St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress | 300 Clay St | alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to | $875,345 | |
| Aug 27, 2026 | In progress | 300 Clay St | level 9: interior ti includes limited soft demo, buildi out includng new millwork and mep | $125,000 | |
| Aug 26, 2026 | In progress | 1 Maritime Pz | 13/fl- mechanical modification to improve cooling capabilites | $50,000 | |
| Jul 14, 2026 | In progress | 1 Maritime Pz | Gci, Inc | removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the | $165,418 |
| Jul 2, 2026 | In progress | 300 Clay St | Gci, Inc | mep deferred. 5/f: tenant space, construct two new partitions w/ new door, relocated sink within new millwork. re-install relocated door frames and hardware. install associated power, data and modify (e) acoustic ceiling tiles as required for new scope of work. | $142,000 |
| Apr 8, 2026 | In progress | 300 Clay St | Matrix Hg Inc | 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. | $90,000 |
| Apr 8, 2026 | In progress | 300 Clay St | Matrix Hg Inc | installation of a mechanical service access platform and ladder in the street level fan room | $75,000 |
| Feb 5, 2026 | In progress | 300 Clay St | Skyline Construction | 19th fl - deferred mep for bpa 202509044565 | $523,080 |
| Feb 5, 2026 | In progress | 300 Clay St | Skyline Construction | 18th fl - deferred mep for bpa 202508153152 | $1,264,360 |
| Feb 5, 2026 | In progress | 300 Clay St | Skyline Construction | 17th fl - deferred mep for bpa 202508153152 | $1,264,680 |
| Dec 12, 2025 | In progress | 300 Clay St | Skyline Construction | 19th fl: partial ti revision to 202509044565.deferred clarification to dph for use of butler pantry area 19303. removal of pantry equipment from scope. | |
| Nov 19, 2025 | Completed | 300 Clay St | R L H Fire Protection Inc | t.i. fire sprinkler. relocate 61, add 14, delete 5 fire sprinklers. | $24,000 |
| Nov 12, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 24/f: fire alarm t.i - adding 7 speakers and 3 speaker-strobes to an existing notifier nfs2-3030 fa system. adding (1) 2-way comm system call station to existing jeron 2-way comm system. ref permit 202507080364 | $18,126 |
| Nov 12, 2025 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 23/f: fire alarm t.i - adding 1 speaker and 2 speaker-strobes and relocating 1 smoke detector and 1 duct detector on existing notifier nfs2-3030 fa system. ref permit 202507080366 | $16,338 |
| Nov 6, 2025 | In progress | 1 Maritime Pz | Gci, Inc | 23rd & 24th fl: deferred mech & elec. mechanical- new vav boxes, ductwork, air distributors, ppc controls & air balance. electrical- power, lighting, & signal. ref permits 202507080364 and 202507080366 | $291,000 |
| Oct 31, 2025 | Completed | 300 Clay St | R L H Fire Protection Inc | 17th fl- ti fire sprinkler. relocate 148, add 8. delete 21 fire sprinklers. ref pa # 2025-0815-3152 | $45,000 |
| Oct 31, 2025 | In progress | 300 Clay St | R L H Fire Protection Inc | 18th fl- ti fire sprinkler. relocate 153, add 17. delete 38 fire sprinklers. ref pa # 2025-0815-3151 | $30,000 |
| Oct 28, 2025 | In progress | 300 Clay St | Skyline Construction | interconnecting accessory (non-egress) stairs between levels 18 and 19. | $113,150 |
| Oct 28, 2025 | In progress | 1 Maritime Pz | Skyline Construction | interconnecting accessory (non-egress) stairs between levels 17 & 18 | $65,700 |
| Oct 14, 2025 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 9th and 25th floor. fire alarm t.i.: adding 2 relay modules to exisintg notifier nfs2-3030 fire alarm system. | $13,750 |
| Sep 26, 2025 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 23/f and 24/f: fire sprinkler t.i. relocate 15, add 2, total 17. ref permits 202507080364 and 202507080366 | $8,749 |
| Sep 22, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i - replacing (e) 2-way communication system with new jeron system. fa scope: add (2) monitor modules and (1) yellow pull stations to (e) notifier nfs2-3030 fire alarm system. 2wc scope: replace main control, replace call stations in (7) locations. | $26,497 |
| Sep 16, 2025 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | revision to pa# 202502261091: removing the work on the east entrance from the scope of work. | |
| Sep 11, 2025 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding 1 strobe and 5 speaker strobes to (e) notifier nfs2-3030 fire alarm system ref pa# 2025-0611-8462 | $7,000 |
| Sep 10, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i.: adding 1 realy module, 1 speaker and 11 speakers-strobes to existing notifier nfs2-3030 fiu alarm system. ref#: 202506128527. | $9,000 |
| Sep 4, 2025 | In progress | 300 Clay St | Skyline Construction | 19th/f: partial floor t.i. included new partitions, ceiling, finishes, & fixtures. mep deferred | $1,060,690 |
| Sep 4, 2025 | Completed | 1 Maritime Pz | Pioneer Fire Inc. | add 3 sidewall sprinklers in phone booths gc: 202508213588 | $750 |
| Sep 3, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 3/f: fire alarm t.i - adding 3 speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref permit 202508213588 | $4,985 |
| Aug 27, 2025 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms. | |
| Aug 21, 2025 | Completed | 1 Maritime Pz | Source Planning And Construction Inc | 3rd/fl:installation of 3 furniture phone booths. structural plans and calcs for anchoring included. no mep work within the scope, fire, sprinkler, and alarm under seperate permit. | $20,000 |
| Aug 15, 2025 | In progress | 300 Clay St | Skyline Construction | 18/f: full floor t.i including new partitions, ceilings, finishes and fixtures mep deferred. | $2,519,230 |
| Aug 15, 2025 | In progress | 300 Clay St | Skyline Construction | 17/f: full floor t.i including new partitions, ceilings, finishes and fixtures mep deferred. | $2,564,490 |
| Aug 13, 2025 | Completed | 1 Maritime Pz | Ayoob & Peery Plumbing Co Inc | 20th floor: relocate 2 fire sprinkler per t.i job #25-648. ref pa #202506118462 | $1,242 |
| Aug 13, 2025 | In progress | 1 Maritime Pz | Ayoob & Peery Plumbing Co Inc | 21st floor: relocate 17 fire sprinkler per t.i job #25-648. ref pa #202506128527 | $10,559 |
| Jul 9, 2025 | Completed | 1 Maritime Pz | Novo Construction Inc | 21st fl - mechanical & electrical work for ti ref pa 202506128527 | $75,000 |
| Jul 9, 2025 | Completed | 1 Maritime Pz | Novo Construction Inc | 20th fl - mechanical & electrical work for ti ref pa 202506118462 | $16,000 |
| Jul 8, 2025 | In progress | 1 Maritime Pz | Gci, Inc | 24th/f: t.i. interior non-structural partitions, ceiling grid, tile, light, millwork & finishes. | $2,339,876 |
| Jul 8, 2025 | In progress | 1 Maritime Pz | Gci, Inc | 24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgrades | $100,125 |
| Jul 3, 2025 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm record drawings delete 1 dual point monitor module and 1 relay module from notifier nfs2-3030 fire alarm system, and address comments from field inspector. ref 202502130235 mech, 202503051627 fa | |
| Jun 16, 2025 | Completed | 300 Clay St | Matrix Hg Inc | add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant. | $36,789 |
| Jun 12, 2025 | Completed | 1 Maritime Pz | Novo Construction Inc | tenant improvement on the 21st fl. to include demo of non load bearing partitions and finishes new finishes applied to (e) stairs new non structural partions, ceiling, finishes mech elec sep permit. | $829,881 |
| Jun 11, 2025 | Completed | 1 Maritime Pz | Novo Construction Inc | 20th floor. suite 200. tenant improvement on the 20th floor to include demolition of non-load bearings partitions and finishes new non-structural partitions ceilings and finishes mech/electric separate permit. | $78,250 |
| Apr 25, 2025 | Completed | 1 Maritime Pz | Ayoob & Peery Plumbing Co Inc | 20th fl - add 3 relocate 18 fire sprinklers ti ref pa 202501279162 | $13,043 |
| Apr 25, 2025 | In progress | 1 Maritime Pz | Ayoob & Peery Plumbing Co Inc | 19th fl - add 40 relocate 55 fire sprinklers ti ref pa 202501279164 | $59,005 |
| Apr 23, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti adding 2 relay modules, 5 smoke detectors, 1 strobe and 11 speaker-strobes to existing notifier nfs2-3030 fire alarm system ref 202501279162 | $18,427 |
| Apr 23, 2025 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti, adding 1 smoke det, 1 duct detector, e relay modules, 1 speakerand 22 speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref 202501279164 | $18,428 |
| Mar 31, 2025 | Completed | 1 Maritime Pz | Bcci Construction Company | 19/fl-202412176941- permit to support approved arch permit for new lighting | $110,000 |
| Mar 17, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding (1) dual point monitor module, (3) smoke detectors, (1) relay module, and (13) speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref pa# 202412176941 | $12,435 |
| Mar 5, 2025 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding 15 dual input/control modules and 8 relay modules to (e) notifier nfs2-3030 fire alarm system | $6,810 |
| Feb 26, 2025 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist. | $492,824 |
| Feb 20, 2025 | Completed | 300 Clay St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvements relocate 72 sprinklers. ref pa 202412176941. | $46,000 |
| Feb 13, 2025 | In progress | 300 Clay St | Matrix Hg Inc | fire sequence change. revision to pa#2024-0724-7142 | $50,000 |
| Jan 27, 2025 | Completed | 1 Maritime Pz | Novo Construction Inc | 19th floor: t.i. to include demolition of non load bearing partitions and finishes. new non-structural partitions, accoustical ceiling, new finishes. mechanical and electrical work as required. | $1,100,000 |
| Jan 27, 2025 | Completed | 1 Maritime Pz | Novo Construction Inc | 20th floor: t.i. to include demolition of non load bearing partitions and finishes. addition of stairs connecting 19th and 20th floors. new non-structural partitions, accoustical ceiling and finishes. mechanical and electrical work as required. | $950,000 |
| Jan 13, 2025 | Completed | 1 Maritime Pz | Gci, Inc | 26/fl- electrical (n) lighting and branch circuiting (n) power and signal and branch circuiting to (e) panel | $32,000 |
| Jan 6, 2025 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 26/fl- ref 202409241456-(e) fire sprinkler system for ti. add 1 and relcoated 4 fire sprinklers | $1,200 |
| Dec 20, 2024 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding (8) dual monitor relay module, (2) relay modules and (2) duct detectors to existing notifier nfs2-3030 fire alarm sysem. | $13,690 |
| Dec 17, 2024 | Completed | 1 Maritime Pz | Bcci Construction Company | 19th floor. partial demolition of non structural partitons, ceiling, finishes, and mep. new construction of demising partitions. new finishes, ceiling, and mech in common areas. upgrn existing restrooms to bring to compliance with sfbc chapter 11b. electrical deferred. | $1,066,991 |
| Dec 16, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 24/f: fire alarm ti: adding 2 relay modules to exising notifier nfs2 fire alarm system. mech ref pmw2024113086 | $8,250 |
| Dec 16, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 26/f: fire alarm ti: adding 2 speaker strobe and 2 strobes to existsing notifier nfs 2-3030 fire alarm system. ref 202409241456 | $5,975 |
| Dec 12, 2024 | Completed | 1 Maritime Pz | Gci, Inc | 24/f: barrier removal only, including selective demo of restroom finishes and accessories construction of non structural partitons wall finishes, restroom accessories and hevy drinking fountain to bring restrooms up to full compliance with sfbc chapter 11b | $25,000 |
| Dec 6, 2024 | Completed | 1 Maritime Pz | Bcci Construction Company | 17th & 18th fl electrical revisions to mep. new lighting and t24. ref 202401254620 | $45,000 |
| Nov 6, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 16th flr. fire alarm ti: adding 2 speaker - strobes and 3 speaker to existing notfifies nf52-3030 fire alarm system. ref ti permit 202408198922. | $7,550 |
| Oct 21, 2024 | Completed | 300 Clay St | Pioneer Fire Inc. | suite# 1670 - replace (13) pendent sprinklers ref # 2024-0819-8922 | $2,600 |
| Oct 9, 2024 | Completed | 1 Maritime Pz | Gci, Inc | 16/fl suite 1670-ref 202408198922- relocate or provide new grilles and low side ductwork rebalance area of work . lighting power signal | $10,000 |
| Sep 24, 2024 | In progress | 300 Clay St | Matrix Hg Inc | revision to 202407247142. fire sequence change return air duct add | $50,000 |
| Sep 24, 2024 | Completed | 300 Clay St | Matrix Hg Inc | ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant | $352,749 |
| Sep 24, 2024 | Completed | 1 Maritime Pz | Gci, Inc | 26th flr.minor office ti.(n)freestanding office enclosure, new millwork and sink. voluntary upgrade of non accessible(e)multi occupancy restroom & locker facility designed for use of men only to a fully accessible single occupancy facility including demo, new partitions,doors,ceilings, finishes &mep | $159,840 |
| Aug 26, 2024 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | existing fire sprinker system tenant impromements, 121 relocated sprinkers 17th fl. 121 relocated sprinklrs 18th fl. 2 added sprinkers 17th fl. 8 added sprinlers 18th fl. ref pa# 2024-0125-4620 | $63,000 |
| Aug 19, 2024 | Completed | 1 Maritime Pz | Gci, Inc | interior tenant improvement on occupied multi tenant floor. scope includes selective demo of non structural partitions, interior glazing, ceilings, light fixtures, millwork finishes. fuild back non structural paritions, doos, interior glazing, ceilings, light fixtures, millwork, finishes. mep defer. | $200,220 |
| Aug 13, 2024 | Completed | 1 Maritime Pz | Hathaway Dinwiddie Co. | deferred electrical for pa# 2023-1211-2251; for lights and equipment | $2,500 |
| Jul 24, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | ste 15: fire alarm t.i. adding 1 strobe to e) notifier nfs2-3030 fire alarm system. ref to t.i. 202312112251 | $3,860 |
| Jul 24, 2024 | Completed | 300 Clay St | Matrix Hg Inc | replace (2) air handling units, vavs and coils. | $800,000 |
| Jul 9, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti adding 2 speaker strobes to e notifier nfs2-3030 fire alarm system. ref ti 202402226340. | $6,200 |
| Jul 8, 2024 | In progress | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | ref pa #2024-0125-4620 fire alarm ti: add 4 dual monitor modules 2 relay modules and 28 speaker strobes to existing notifier nfs2-3030 fire alarm system. | $8,875 |
| Jul 3, 2024 | Completed | 300 Clay St | Bcci Construction Company | 17th & 18th fl electrical only permit to support approved architectural permit. pa# 2024-0125-4620 connect power to new or relocated light fixtures. power outlets and tenant equipment | $15,000 |
| Jul 3, 2024 | Completed | 300 Clay St | Gci, Inc | revision to permit 202402226340. remove scope on level 5 at gridline r b/t gridlines 4 and 6 previously shown in the approved permit drawings. on level 4 at gridline 3 b/t gridlines p and r, combined 2 offices into one office. | |
| Jun 25, 2024 | In progress | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | ref 202312112251- fire only- (e) fire sprinkler system- ti relocate (4) sprinklers | $2,500 |
| Jun 21, 2024 | Completed | 300 Clay St | Matrix Hg Inc | suite 15 1st fl: demo mopsink faucet and fixture trim. install airgap fitting to (e) handsink. install grease intercepter and modify (e) sanitary drain and vent piping for connection. install kitchen sink and connect to (e) cw and hw piping. | $20,000 |
| Jun 18, 2024 | Completed | 1 Maritime Pz | Pioneer Fire Inc. | relocate 1 sprinkler, remove 2 pendent gc 20240226340 | $300 |
| Apr 22, 2024 | Completed | 1 Maritime Pz | Hathaway Dinwiddie Co. | revision to approved permit 2023-1211-2251;; minor revisions to mechanicl and plumbing systems simplified structural upgards | |
| Feb 22, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 20/f: fire alarm ti: adding 7 speaker/strobes to existing notifier nfs2-3030 fire alarm system. | $6,200 |
| Feb 22, 2024 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | 21/f: fire alarm ti: adding 17 speaker/strobes,1 strobe and 1 remote power supply to existing notifier nfs2-3030 fire alarm system. ref ti pa 202312132478. | $6,480 |
| Feb 22, 2024 | Completed | 300 Clay St | Gci, Inc | 4/f & 5/f: on 4/f, inside current tenant space, remove 2 (e) phone booths, construct 3 new partitions, repair ceiling, install 3 doors, shelving, base cabinets and a dishwasher. on 5/f, inside current tenant space,construct 2 new partitions, reinstall 1 relocated door & modify 2 (e) glass paritions | $155,000 |
| Jan 25, 2024 | Completed | 300 Clay St | Bcci Construction Company | commencement and completion of work under permit # 200005261165.install bott flag bracing as shown on plans at 17th and 18th floor. | $150,000 |
| Jan 25, 2024 | Completed | 1 Maritime Pz | Novo Construction Inc | 20/f: mechanical work for tenant improvement. ref pa# 202312132475 | $30,000 |
| Jan 25, 2024 | Completed | 1 Maritime Pz | Bcci Construction Company | 17th and 18th floors- floor demo of 17th and 18th floor with tenant improvements to core restrooms and elevator lobbies. no exterior work. | $686,200 |
| Jan 25, 2024 | Completed | 1 Maritime Pz | Novo Construction Inc | 21/f: mechanical work for tenant improvement. ref pa# 202312132478. | $30,000 |
| Jan 24, 2024 | Completed | 1 Maritime Pz | Novo Construction Inc | reference pa 202312132475 & 202312132478- electrical work for ti on 20th and 21st floor | $32,000 |
| Jan 16, 2024 | Completed | 1 Maritime Pz | Ayoob & Peery Plumbing Co Inc | 20th fl, add 1 relocate 2 fire sprinkler per ti pa 202312132475 | $1,863 |
| Jan 16, 2024 | Completed | 1 Maritime Pz | Ayoob & Peery Plumbing Co Inc | 21st fl - add 3 & relocate 2 fire sprinklers per ti ref pa 2023-1213-2478 | $3,106 |
| Dec 13, 2023 | Completed | 1 Maritime Pz | Novo Construction Inc | 20th fl - minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit | $289,000 |
| Dec 13, 2023 | Completed | 1 Maritime Pz | Novo Construction Inc | 21/f- minor ti to include new partitions, new ceiling, new finishes. mechanical & electrical under separate permit | $190,000 |
| Dec 11, 2023 | Completed | 1 Maritime Pz | Hathaway Dinwiddie Co. | ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above). | $518,000 |
| Nov 20, 2023 | Completed | 300 Clay St | Bcci Construction Company | 2nd floor: structural permit to install (4) "stuff station" vending machines and brace them to (e) partition. added architectural sheet to show (4) new equipment unit in the supply room. ref pa# 201810092629 | $1,000 |
| Sep 18, 2023 | Completed | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | flr 11, 13 & 15. fire alarm t.i.- adding 10 recall modules to (e) notifier nfs2-3030 fire alarm system. ref permits: flr#11 2023-0607-9447, flr#13 2023-0602-9140 & flr#15 2023-0606-9356. | $8,756 |
| Sep 6, 2023 | Completed | 300 Clay St | Bcci Construction Company | 13th fl - revision to pa 2021-0604-1685. replace fsd 13-06 and fsd-13-07 wirth fire dampers | |
| Aug 25, 2023 | Completed | 300 Clay St | Matrix Hg Inc | document the previous installtion of variable frequency drives on e supply fans as request by fire life safety contractor. installation of variable frequency drives was by others. no modifications to buildings e mech system included. | $1,000 |
| Aug 25, 2023 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | 1/f & 27/f: adding 2 pull stations to existing notifier nf52-3030 fire alarm system | $2,380 |
| Aug 17, 2023 | Never finaled | 1 Maritime Pz | Rapid Fire Safety&Security Llc Dba Pafa | ground fl fire alarm ti adding 2 relay modules and 2 dual monitor/relay modules to existing notifire nfs2-3030 fire alarm system | $4,680 |
| Jul 14, 2023 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | ste #15: interior non-structural demolition and minor improvement (paint and temp lighting) to prep unoccupied tenant suite for marketing. | $30,000 |
| Jul 12, 2023 | Expired or cancelled | 300 Clay St | Anderson, Rowe & Buckley, Inc. | 1/f calife - 4 pendents to be turned to uprights. new ceiling is removed. suite 15. | $2,000 |
| Jun 9, 2023 | Completed | 300 Clay St | Bcci Construction Company | 11/f, 13/f & 15/f: structural only permit to show support for mechanical equipment | $5,000 |
| Jun 7, 2023 | Completed | 300 Clay St | Bcci Construction Company | 11/f: mep submittal to support approved arch permit, new urf systems and associated ductwork. ref bpa#202104078029 | $10,000 |
| Jun 6, 2023 | Completed | 300 Clay St | Bcci Construction Company | 15/f: mep submittal to support approved t.i. pa 202206025505. new vrf systems and associated ductwork. maher n.a, | $10,000 |
| Jun 2, 2023 | Completed | 300 Clay St | Bcci Construction Company | 13th fl l- mep submittal to support approved arch drawings. new water cooled vrf system and associated piping and ductwork. ref 2021-0413-8437 | $10,000 |
| May 19, 2023 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti adding 2 relay modules to existing notifier nfs2-3030 fire alarm system to ensure vav boxes fail in the "open" position | $9,280 |
| Apr 19, 2023 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | 14/f: fire alarm t.i.: adding 1-relay module to existing notifier nfs2-3030 fire alarm system to ensure vav boxes fail in the open position | $1,000 |
| Apr 17, 2023 | Completed | 1 Maritime Pz | Gci, Inc | 14/f: interior t.i. to include one room, selective demo & construction of ceiling, lighting and power outlets. | $25,000 |
| Feb 7, 2023 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm only - as built drawings for 16/f. per fire inspector comments. revised drawing to new floor plan and add additional (3) smoke detectors. original fa permit # 202103106301 - arch ref pa# 202205174445 | |
| Jan 27, 2023 | Never finaled | 300 Clay St | Bcci Construction Company | 16th fl revision to 201912230299. update occupancy load calculation for hall 1611 to show proposed lounge furniture | |
| Dec 21, 2022 | Never finaled | 1 Maritime Pz | Alliance Roofing Co Inc | re-roofing | $343,588 |
| Sep 7, 2022 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm only. adding 13 addressable control modules to (e) notifier nfs2-3030. the control module are being installed to ensure the vav boxes fail in the open position. | $31,000 |
| Sep 1, 2022 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 16/f: as-built to pa202202258699 for fire sprinkler revision due to new background. 37 total sprinklers: change relocate and added number of sprinklers. maher n/a. | |
| Aug 11, 2022 | Never finaled | 1 Maritime Pz | Richlen Construction | 20/f: demo of a single ceiling height wall (non-load bearing) patching and repairing (e) ceiling grid/tile, carpet and wall base. | $5,000 |
| Jun 22, 2022 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | ref to mech 202206065643. fire alarm t.i. adding 2 relay modules and 2 dual point monitors/relay modules to (e) notifier nfs2-3030 fire alarm system. 1st & 26th fl. | $3,505 |
| Jun 14, 2022 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (13) speaker = strobe to existing notifier nfs2-3030 fire alarm system | $5,310 |
| Jun 13, 2022 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fiire alarm t.i.: adding 1 sprinkler, 10 speaker strobes, 6 relay modules, 2 duct detectors, and 13 smoke detectors to existing notifier nfs2-3030 fire alarm system. ref pa# 202111122237. | $15,980 |
| Jun 6, 2022 | Completed | 1 Maritime Pz | Matrix Hg Inc | g/f & 26/f - roof: install variable frequency drives on (e) supply fans. no other modifications to the buildings 9e) mechanical system are included. maher n/a. | $24,734 |
| Jun 2, 2022 | Completed | 300 Clay St | Bcci Construction Company | 15th fl: revision to pa# 201912230299. addition of non-structural partitions and minor door modifications. | $20,000 |
| Jun 1, 2022 | Completed | 300 Clay St | Bcci Construction Company | 14th floor:revision to previously approved arch/mep drawings. add non-structural partitions and minor door changes. ref #201912230299 and 202104138437 | |
| May 26, 2022 | Completed | 1 Maritime Pz | Matrix Hg Inc | fire rated enclosure for flue pipe. ref 202203018952 | |
| May 17, 2022 | Completed | 300 Clay St | Bcci Construction Company | 16th fl: revision to pa# 201912230299. addition of non-structural partition and minor door modifications. mep included. | $450,000 |
| May 12, 2022 | Never finaled | 1 Maritime Pz | Gci, Inc | 7th fl: fire only to obtain assembly permit stamps. | |
| May 12, 2022 | Never finaled | 1 Maritime Pz | Gci, Inc | 6th fl: fire only to obtain assembly permit stamps. | |
| Apr 28, 2022 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | revision to pa# 202111122237. revise havs shaft enclosures to rated enclosures. | |
| Apr 12, 2022 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm t.i. adding (1) strobe to (e) notifier nfs2-3030 fire alarm system. refe t.i. pa 202202178202. | $2,170 |
| Apr 4, 2022 | Completed | 1 Maritime Pz | R L H Fire Protection Inc | 22/f: relocate 6 fire sprinker heads and add 1 pendent sprinkler on the 22/f. ref t.i pa202202178202. maher n/a | $2,000 |
| Mar 28, 2022 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: revise fire alarm evacuation matrix per approved pre-application meeting minutes. | $2,940 |
| Mar 18, 2022 | Completed | 300 Clay St | Pribuss Engineering Inc | modify sprinkler head layout to accommodate new ceiling and partition layout for new office and kitchen on plaza level. ref permit 202111122237. | $6,380 |
| Mar 11, 2022 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm t.i. - 26th flr - adding (2) addressable monitor modules to (e) notifier intelligent to monitor boilers. nf s2-3030 fire alarm system. | $5,690 |
| Mar 1, 2022 | Completed | 1 Maritime Pz | Matrix Hg Inc | 2 (e) steam boilers to be removed and replaced. add 4 (n) heating hot water boilers, 3 (n) air separators, 2 (n) heat exchangers, 6 (n) pumps, 2 (n) heating system expansion tanks to be provided to replace 4 (e) expansion tanks. no new fsd's are being added. | $2,128,734 |
| Feb 25, 2022 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 16/f: relocate 40 fire sprinkler pendents due to t.i & add 2 fire sprinklers. ref pa 201911217868. | $14,500 |
| Feb 25, 2022 | Completed | 300 Clay St | Anderson, Rowe & Buckley, Inc. | 14/f: relocate 29 fire sprinler pendents due to t.i. | $14,500 |
| Feb 25, 2022 | Completed | 300 Clay St | Anderson, Rowe & Buckley, Inc. | 15/f: relocate 75 fire sprinkler pendents due to t.i & add 2 fire sprinkler.delete 1 t.i. pa201911217868. | $32,500 |
| Feb 18, 2022 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | mep for bpa #202111122237 | |
| Feb 17, 2022 | Completed | 300 Clay St | Plant Construction Co, Lp | 22/f: two small confference rooms and new door at (e) partition. mech, elec, plumbing, life safety and fire sprinklers under sep permits. maher n/a. | $325,000 |
| Feb 11, 2022 | Never finaled | 300 Clay St | Bcci Construction Company | 2nd, 10th, 11th, 12th, & 13th, floor: addition of new stand alone furniture phone booths. | $150,000 |
| Feb 7, 2022 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: record drawing for apn 202012030216. revisions to permit drawings: relocating 1 smoke detector, adding 1 smoke detector, deleting 1 control module. | |
| Jan 20, 2022 | Never finaled | 300 Clay St | Bcci Construction Company | revision to 2019 1223 0299 & 2021 0407 8029 & 2021 0407 8029 . to amend cover sheet and (e) diagrams to designate a-2 assembly in the microkitchen and lounge. | |
| Dec 15, 2021 | Never finaled | 300 Clay St | Hathaway Dinwiddie Co. | ventilation system for chemical exhaust for water treatment system in basement. ref 2019 0124 1154. | |
| Nov 16, 2021 | Never finaled | 300 Clay St | Priority Architectural Graphics Dba Prio | 16 evacuation plan maps floors 10, 11, 12, 13 for fire review only | $6,800 |
| Nov 12, 2021 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | this is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler. | $2,682,163 |
| Oct 28, 2021 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | 21/f: add 2 speaker-strobes to (e) notifier fire alarm system. adjust speaker wattage to (5) speaker-strobes. | $10,664 |
| Oct 7, 2021 | Completed | 1 Maritime Pz | Capitol Electric Const | provide lighting/power to office restroom. t.i. permit #2021/0611/2217 | $7,536 |
| Oct 7, 2021 | Completed | 1 Maritime Pz | R L H Fire Protection Inc | 21st fl: fire sprinkler. relocate 2 & add sprinkler on the 21st fl. | $1,000 |
| Sep 10, 2021 | Completed | 1 Maritime Pz | Gci, Inc | renewal to obtain final inspection for work approved under pa 201804136312 | |
| Sep 10, 2021 | Completed | 1 Maritime Pz | Gci, Inc | renewal to obtain final inspection for work approved under pa 201802070612 | |
| Aug 5, 2021 | Never finaled | 300 Clay St | Bcci Construction Company | recommencement of work pertaining to permit application n0. 200005261165. grouting of partially grouted reinforced concrete block walls on the 26th floor, (mechanical floor). ref app# 201708023712. fiber wrap wall on line 5 on 26th flr. | $400,000 |
| Jul 21, 2021 | Completed | 300 Clay St | Plant Construction Co, Lp | an (e) tenant on 21st fl is alterating portion of the office. (e) conference rm & high-density area will be remove to opening office area and 2 x reading rm. mep, fire, life safety will be separated. | $199,900 |
| Jun 30, 2021 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | 6/f: fire alarm t.i: adding 1 dual input monitor module to existing notifier nfs2-3030 fire alarm system. | $7,300 |
| Jun 11, 2021 | Completed | 300 Clay St | Richlen Construction | 20/f: (e) mens/womens restroom will be flipped in gender.removal and installationg of urinals and misc work including cabinets and finishes will be done. maher n/a. | $150,000 |
| Jun 4, 2021 | Completed | 300 Clay St | Bcci Construction Company | revision to 201912230299 for mep, 202104078029 & 202104078035 & 202104138437 for arch. | $75,000 |
| May 28, 2021 | Never finaled | 1 Maritime Pz | Richlen Construction | 20th floor - new lighting, branch, circuiting, electrical new power and signal outlets. title 24 ref pa 2020-1211-0883. | $15,000 |
| May 20, 2021 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (1) dual monitor module to existing notifier nfs2-3030 fire alarm system. | $7,300 |
| May 10, 2021 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm t.i.: adding (1) speaker strobe and (3) strobes to existing notifier nfs2-3030 fire alarm system. | $9,138 |
| Apr 13, 2021 | Completed | 1 Maritime Pz | Bcci Construction Company | 13th, 14th flrs: revision to pa 201912230299. revised floor 13 and minor changes on floor 14. removal and addition of non structural partitions, modifying sink plumbing and millwork locations. | $90,000 |
| Apr 7, 2021 | Completed | 1 Maritime Pz | Bcci Construction Company | 12/f: revision to permit 201912230299. removal and addition of non-structural partitions, modifying plumbing and millwork. | $97,000 |
| Apr 7, 2021 | Completed | 1 Maritime Pz | Bcci Construction Company | 10th, 11th flrs: revision to permit 201912230299. revised floor 11 and minor changes to floor 10. removal and addition of non-load bearing partitions, modifying plumbing and millwork. | $120,000 |
| Apr 1, 2021 | Completed | 1 Maritime Pz | Gci, Inc | 13/f: revision to pa 201901099946. accessible restroom to be provided by tenant architect approved under pa 201911187518. | |
| Mar 16, 2021 | Completed | 1 Maritime Pz | R L H Fire Protection Inc | fire sprinkler permit. relocate 1 and add 1 sprinkler on the 20th floor. t.i. # 2020-1211-0833 | $1,000 |
| Mar 10, 2021 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (128) speaker-strobes, (9) smoke detectors, (3) power supplies, (2) control modules and (4) relay modules to existing notifier nfs2-3030 fire alarm system. mech + arch ref 2019-1223-0299 | $74,600 |
| Mar 10, 2021 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (256) speaker-strobes, (24) smoek detectors, (5) power supplies, (2) control modules, (4) duct detectors and (5) relay modules to existing notifier nfs2-3030 fire alarm system. mech and arch ref: 2019-1223-0299 | $123,500 |
| Mar 1, 2021 | Completed | 300 Clay St | Vkk Signmakers Inc. | approval and inspection of (8) evacuation maps within building (2nd & 3rd floors). | $4,129 |
| Feb 18, 2021 | Never finaled | 1 Maritime Pz | Bcci Construction Company | 2nd fl: limited to acquiring a change of use and provide occupancy calculations for an assembly use permit from b occupancy to a-2 occupancy. ref pa# 201911217868. | |
| Jan 21, 2021 | Expired or cancelled | 1 Maritime Pz | Bcci Construction Company | 2nd floor - administrative only fire permit to show occupancy calculations in order to receive assembly stamps previously missed in approved set. no construction done. ref: 2019.1121.7868 | |
| Jan 14, 2021 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only - revision relocated 66 pendents & 5 uprights for 71 total on the 10th floor of google. | $35,500 |
| Dec 16, 2020 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | structural glass canopy. added exterior glass canopy at clay street entrance. | $1,434,000 |
| Dec 15, 2020 | Expired or cancelled | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 64 pendents and add 1 for google, 15th floor. | $32,500 |
| Dec 11, 2020 | Completed | 300 Clay St | Richlen Construction | renovation of an existing mother's room (lactation room) in an existing office. | $75,000 |
| Dec 10, 2020 | Expired or cancelled | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 40 pendents & 2 add for google 16th floor. ref. # 2019-1121-7868. | $21,000 |
| Dec 10, 2020 | Expired or cancelled | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 29 pendents for google 14th floor, 1 maritime plaza. ref # 2019-1121-7868. | $14,500 |
| Dec 9, 2020 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only - # 2019-1121-7868. relocate 62 pendents for google on the 13th floor. | $31,000 |
| Dec 9, 2020 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only - # 2019-1121-7868. relocate 60 pendents & 10 uprights for google 12th floor. | $35,000 |
| Dec 8, 2020 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm t.i.: revise 2-way comm permit, replace existing system. add: (1) 2wc expansion switch, (2) 2wc call stations, (1) 2wc power supply, (1) relay module & (1) monitor module to existing notifier nfs2-3030 fa system. | $2,000 |
| Dec 3, 2020 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (2) smoke detectors, (3) relay modules, (1) monitor module& (6) speaker-strobes to existing notifier nfs2-3030 fire alarm system. | $5,800 |
| Dec 2, 2020 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | fire sprinkler only ref 2019-1121-7868. relocate 68 pendents for google on the 11th floor. | $33,500 |
| Nov 19, 2020 | In progress | 300 Clay St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. ref # 2019-1121-7935. relocate 64 pendents, and 4 uprights for google 10th floor | $34,000 |
| Nov 18, 2020 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | glass guardrailing- (e) concrete parapet wall was replaced with glass guardrail & metal panel at plaza level. | |
| Nov 18, 2020 | Never finaled | 300 Clay St | Hathaway Dinwiddie Co. | precast architectural concrete - (e) precast panels replaced with (n) precast panels at clay street entrance. | |
| Nov 18, 2020 | Completed | 300 Clay St | Hathaway Dinwiddie Co. | exterior glass & metal wall assembly- exterior glazing added on north side at plaza level for tenant. defferred submittal for pa 201901241154 | |
| Nov 18, 2020 | Never finaled | 300 Clay St | Hathaway Dinwiddie Co. | coiling door - a coiling door added on east side between (e) elevator lobby & (n) tenant space for fire & smoke separation. | |
| Oct 28, 2020 | Completed | 300 Clay St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (3) smoke detectors, (1) combination smoke/co detector and (2) relay modules to existing notifier nfs-2-3030 fire alarm system. | $5,912 |
| Oct 26, 2020 | Completed | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | building permit # 2019-1120-7806, fire alarm only, full floor tenant improvement on level 3 and 4 to existing notifier nfs2-3030. adding 102 speaker strobes, 2 strobes, 6 smoke detectors, 4 transponders and 2 power supplies | $56,000 |
| Oct 22, 2020 | Expired or cancelled | 300 Clay St | Hathaway Dinwiddie Co. | deferred approved for installation of radiant in-slab heating & displacement ventilation system until completion of t.i. of cade room. ref to pa # 2019 0124 1154 | |
| Oct 20, 2020 | Completed | 300 Clay St | Pacific Auxiliary Fire Alarm | building permit 2019-0327-6422. fire alarm only - tenant improvement to existing notifier nfs2-3030. adding 63 speaker strobes, 1 smoke detector, 1 power supply, 1 relay module, 1 transponder. | $30,000 |
| Sep 5, 2020 | Completed | 1 Maritime Pz | Hathaway Dinwiddie Co. | modification to (e) coil door in (e) loading dock. replace (e) coiling door with 3 hr swing door | $20,000 |
| Aug 20, 2020 | In progress | 1 Maritime Pz | Johnson Controls Security Solutions Llc | 20th and 21st floors: revision to permit fire alarm per customer request to reflect changes. ref app#201901311753 | |
| Mar 11, 2020 | Never finaled | 300 Clay St | street space/mta meters | ||
| Mar 5, 2020 | In progress | 1 Maritime Pz | ref# 2019-0327-6422: fire alarm ti: adding 68 speaker strobes, 1 smoke detector, 1 remote power supply, 1 duct detector, 1 relay module and 1 tem module to existing notifier nfs2-3030 fire alarm system. | $33,900 | |
| Feb 18, 2020 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 2nd flr, google - fire sprinkler only. ref pa 2019-1121-7868. relocate 102 pendents & 117 uprights. | $109,500 |
| Feb 18, 2020 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 4th fl - fire sprinkler only. ref pa 2019-1120-7806. relocate 38 pendents & 153 uprights | $95,500 |
| Feb 18, 2020 | Completed | 1 Maritime Pz | Anderson, Rowe & Buckley, Inc. | 3rd fl, google - fire sprinkler only. ref pa 2019-1120-7806. relocate 102 pendents & 117 uprights | $109,500 |
| Jan 27, 2020 | Never finaled | 1 Maritime Pz | street space | ||
| Jan 21, 2020 | Never finaled | 300 Clay St | Pacific Auxiliary Fire Alarm | 16th fl - fire alram t.i. adding (1) dual monitor module to (e) notifier nf52-3030 fier alarm system n/a maher | $7,000 |
| Jan 17, 2020 | Never finaled | 1 Maritime Pz | Pacific Auxiliary Fire Alarm | fire alarm ti:adding 2 monitor moduels to (e) nofifier nfs2-3030 fire alarm system | $2,380 |
| Jan 10, 2020 | Completed | 1 Maritime Pz | Gci, Inc | to obtain final inspection for work approved under pa #2017-0915-8385. all work is complete | |
| Jan 10, 2020 | Completed | 300 Clay St | Gci, Inc | obtain final inspection for work approved under pa #2017-1122-4669. all work is complete | |
| Jan 2, 2020 | Completed | 1 Maritime Pz | 3rd & 4th fl- mep deferred subittal to support approved arch set. ref #201911207806. new toilet exhaust fan and vrf system. maher na | $100,000 | |
| Jan 2, 2020 | Completed | 1 Maritime Pz | 2nd fl - mep deferred subittal to support approved arch set. ref #201911217868. new toilet exhaust fan and vrf system. maher na | $100,000 |