Jennifer Ashley Ma
- License
- M37560
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M37560 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Apr 2019 to Jun 2021
11 permits since 2000 (engineer on 11 permits): 9 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Commercial Interior Builders Inc (3), Gci, Inc (2), High Level Construction Co (2), Novo Construction Inc
- Architects
- Terri Emery (5), George S Soskin, Greg Sheppard, Philip Dix Nettle, William Raymond Turner
- Engineers
- Kyle Pace (4), Nicki Sparks (2), Joshua Mcmmahan, Joshua W. Mcmahan
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2021 | Never finaled issued Jul 2021, no final | 875 Howard St | Novo Construction Inc | 5th fl: ti to (e) tenant space, mechanical and lighting upgrades restroom finish upgrades, addition of single toilet room.Details
5th fl: ti to (e) tenant space, mechanical and lighting upgrades restroom finish upgrades, addition of single toilet room. | $150,000 |
| Apr 7, 2021 | Never finaled issued May 2022, no final | 601 Montgomery St | demo exterior windws & furred wall at merchant st façade &other, (e) items as req at bldg garage. remove (e) emrgncy generator in bsmnt. construct (n) rated rm emrgncy generator w/ rated partitions on (n) concrete curb, generator pad inclu req struct upgrades steel strctre below, (n) louvers & glazeDetails
demo exterior windws & furred wall at merchant st façade &other, (e) items as req at bldg garage. remove (e) emrgncy generator in bsmnt. construct (n) rated rm emrgncy generator w/ rated partitions on (n) concrete curb, generator pad inclu req struct upgrades steel strctre below, (n) louvers & glaze | $675,923 | |
| Apr 2, 2021 | Completed final sign-off Feb 2022 | 601 Montgomery St | Commercial Interior Builders Inc | 7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep.Details
7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep. | $338,903 |
| Apr 1, 2021 | Completed final sign-off Mar 2022 | 601 Montgomery St | Commercial Interior Builders Inc | 4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893.Details
4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893. | $308,451 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | High Level Construction Co | 4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit.Details
4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit. | $310,155 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | High Level Construction Co | 4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep.Details
4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep. | $289,203 |
| Jan 2, 2020 | Completed final sign-off Nov 2021 | 1 Maritime Pz | 3rd & 4th fl- mep deferred subittal to support approved arch set. ref #201911207806. new toilet exhaust fan and vrf system. maher naDetails
3rd & 4th fl- mep deferred subittal to support approved arch set. ref #201911207806. new toilet exhaust fan and vrf system. maher na | $100,000 | |
| Jan 2, 2020 | Completed final sign-off Nov 2021 | 1 Maritime Pz | 2nd fl - mep deferred subittal to support approved arch set. ref #201911217868. new toilet exhaust fan and vrf system. maher naDetails
2nd fl - mep deferred subittal to support approved arch set. ref #201911217868. new toilet exhaust fan and vrf system. maher na | $100,000 | |
| Dec 12, 2019 | Completed final sign-off Jul 2020 | 601 Montgomery St | Commercial Interior Builders Inc | ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher naDetails
ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na | $254,249 |
| May 15, 2019 | Completed final sign-off Dec 2020 | 3 Embarcadero Center | Gci, Inc | ste 1350: non structural demo, new drywall partitions, doors, millwork , electrical mechanical and plumbing. no change to extg egress or bldg occupancy types. n/a for maher.Details
ste 1350: non structural demo, new drywall partitions, doors, millwork , electrical mechanical and plumbing. no change to extg egress or bldg occupancy types. n/a for maher. | $905,000 |
| Apr 24, 2019 | Completed final sign-off Jul 2020 | 300 Clay St | Gci, Inc | fire smoke damper modification ref 201901180717Details
fire smoke damper modification ref 201901180717 |