On San Francisco permits
Aug 2017 to Jun 2023

13 permits since 2000 (engineer on 13 permits): 8 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 6, 2023In progress
issued Oct 2023
601 Montgomery Strevision to 202104078075: reduction in scope. repair (e) emergency generator in basement to replace (e). transer switch w/ n in basement electrical rm. provide n rated eletrical rm e/ (e) basement storage rm & improvement to (e) conditions in (e) fire pump & emergency generator rm as req
Details
Permit
202306069339
Status
issued
Filed
Jun 6, 2023
Permit issued
Oct 27, 2023
Address
601 Montgomery St

revision to 202104078075: reduction in scope. repair (e) emergency generator in basement to replace (e). transer switch w/ n in basement electrical rm. provide n rated eletrical rm e/ (e) basement storage rm & improvement to (e) conditions in (e) fire pump & emergency generator rm as req

Open the permit page

Apr 13, 2023In progress
issued Apr 2024
500 Sutter Stthis is a revision to pa# 201904198449. revised discharge duct from exhaust fan to run from low roof to street level in lieu of utilizing (e) vertical duct along the side of the bldg. (e) vertical duct to be demolished. exhaust will discharge a min of 10" above grade. revised termination of gas wate
Details
Permit
202304135656
Status
issued
Filed
Apr 13, 2023
Permit issued
Apr 18, 2024
Declared cost
$25,000
Address
500 Sutter St

this is a revision to pa# 201904198449. revised discharge duct from exhaust fan to run from low roof to street level in lieu of utilizing (e) vertical duct along the side of the bldg. (e) vertical duct to be demolished. exhaust will discharge a min of 10" above grade. revised termination of gas wate

Open the permit page

$25,000
Sep 14, 2022Completed
final sign-off Apr 2023
601 Montgomery StCommercial Interior Builders Inc8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbing
Details
Permit
202209142386
Status
complete
Filed
Sep 14, 2022
Permit issued
Oct 20, 2022
Final sign-off
Apr 5, 2023
Declared cost
$206,537
Address
601 Montgomery St

8th fl. commercial tenant improvement to tenant suite 800, partial demo, construction of new millwork, finishes, and accessibility upgrades at restrooms includes associated mechanincal, electricl and plumbing

Open the permit page

$206,537
May 17, 2022Expired or cancelled
cancelled Jan 2026
601 Montgomery Streplace existing outside airfan (sf-01) with new fan wall arrangement. remove existing shaft wall opening and patch wall to accomodate newshaft opening. associated electrical scope.
Details
Permit
202205174389
Status
cancelled
Filed
May 17, 2022
Declared cost
$443,599
Address
601 Montgomery St

replace existing outside airfan (sf-01) with new fan wall arrangement. remove existing shaft wall opening and patch wall to accomodate newshaft opening. associated electrical scope.

Open the permit page

$443,599
Apr 2, 2021Completed
final sign-off Feb 2022
601 Montgomery StCommercial Interior Builders Inc7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep.
Details
Permit
202104027778
Status
complete
Filed
Apr 2, 2021
Permit issued
Jun 23, 2021
Final sign-off
Feb 1, 2022
Declared cost
$338,903
Address
601 Montgomery St

7/f suite 700: commercial ti. demolition of non structural partitions, millwork and finishes. construction of non structural glazing, millwork and finishes includes mep.

Open the permit page

$338,903
Apr 1, 2021Completed
final sign-off Mar 2022
601 Montgomery StCommercial Interior Builders Inc4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893.
Details
Permit
202104017773
Status
complete
Filed
Apr 1, 2021
Permit issued
Jun 23, 2021
Final sign-off
Mar 25, 2022
Declared cost
$308,451
Address
601 Montgomery St

4/f suite 460: commercial ti. partial demolition and restroom accessibility upgrades performed under previous permit. construction of new non structural partitions, glazing, doors, ceiling and lighting, finishes. restroom accessibility upgrades include associated mep. ref. pa 202012019893.

Open the permit page

$308,451
Dec 1, 2020Completed
final sign-off Mar 2022
601 Montgomery StHigh Level Construction Co4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit.
Details
Permit
202012019893
Status
complete
Filed
Dec 1, 2020
Permit issued
Apr 1, 2021
Final sign-off
Mar 23, 2022
Declared cost
$310,155
Address
601 Montgomery St

4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit.

Open the permit page

$310,155
Dec 12, 2019Completed
final sign-off Jul 2020
601 Montgomery StCommercial Interior Builders Incti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na
Details
Permit
201912129293
Status
complete
Filed
Dec 12, 2019
Permit issued
Feb 4, 2020
Final sign-off
Jul 15, 2020
Declared cost
$254,249
Address
601 Montgomery St

ti on 12th fl ste 1212: work includes demo of non-structural partitions, casework, lighting & finishes. construction includes non-structural partitions, glazing, millwork, lighting, finishes & restroom accessibility upgrades, includes mep. deferred: life safety, fire sprinklers, fire alarm. maher na

Open the permit page

$254,249
Oct 23, 2019Completed
final sign-off May 2020
601 Montgomery StCommercial Interior Builders Incsuite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.
Details
Permit
201910235279
Status
complete
Filed
Oct 23, 2019
Permit issued
Nov 1, 2019
Final sign-off
May 15, 2020
Declared cost
$120,155
Address
601 Montgomery St

suite #350: ref app#201811155941. commercial t.i. which includes demo of non-structural partitions, lighting, finishes, construction includes non-structural partitions, lighting glazing+ finishes. scope includes mechanical, elect, life safty fire sprinklers, & fire alarm deferred. maher n/a.

Open the permit page

$120,155
Nov 14, 2017Completed
final sign-off Jun 2018
601 Montgomery StRossi Builders Inc.suite 120 - revision to pa #201706169579: add grease trap. n/a maher ordinance
Details
Permit
201711143932
Status
complete
Filed
Nov 14, 2017
Permit issued
Nov 29, 2017
Final sign-off
Jun 12, 2018
Address
601 Montgomery St

suite 120 - revision to pa #201706169579: add grease trap. n/a maher ordinance

Open the permit page

Sep 28, 2017Never finaled
issued Sep 2017, no final
601 Montgomery StStructural & Refrigeration Mechanicalrefroof: change out old cooling towers - install new heat exchange & 2 pumps. maher na
Details
Permit
201709289777
Status
issued
Filed
Sep 28, 2017
Permit issued
Sep 29, 2017
Declared cost
$899,000
Address
601 Montgomery St

roof: change out old cooling towers - install new heat exchange & 2 pumps. maher na

Open the permit page

$899,000
Sep 8, 2017Completed
final sign-off Jul 2018
601 Montgomery StRossi Builders Inc.7/f partial floor spec suite #770- commercial t.i. to include demo non-structural partitions, lighting and finishes. construction of non-structural partitions includes mep. n/a ordinance #155-13. ref pa 201704285167 for rated corridor to meet exit separation reqts, fire under separate permit(s)
Details
Permit
201709087313
Status
complete
Filed
Sep 8, 2017
Permit issued
Oct 2, 2017
Final sign-off
Jul 16, 2018
Declared cost
$40,000
Address
601 Montgomery St

7/f partial floor spec suite #770- commercial t.i. to include demo non-structural partitions, lighting and finishes. construction of non-structural partitions includes mep. n/a ordinance #155-13. ref pa 201704285167 for rated corridor to meet exit separation reqts, fire under separate permit(s)

Open the permit page

$40,000
Aug 11, 2017Never finaled
issued Oct 2017, no final
601 Montgomery StRossi Builders Inc.mep scope for limited food service (deli). suite 120. ref pa #201706169579. maher na
Details
Permit
201708114589
Status
issued
Filed
Aug 11, 2017
Permit issued
Oct 11, 2017
Declared cost
$5,000
Address
601 Montgomery St

mep scope for limited food service (deli). suite 120. ref pa #201706169579. maher na

Open the permit page

$5,000