John J Verdon Iii
- Listed as
- architect
- Firm
- Forge Architect
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Aug 2023
10 permits since 2000 (architect on 10 permits): 6 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2023 | Completed final sign-off May 2024 | 201 03rd St | Gci, Inc | construction of non-structural partitions, finishes, light fixtures, accessibility upgrades at restroomDetails
construction of non-structural partitions, finishes, light fixtures, accessibility upgrades at restroom | $250,000 |
| Jun 6, 2023 | In progress issued Oct 2023 | 601 Montgomery St | revision to 202104078075: reduction in scope. repair (e) emergency generator in basement to replace (e). transer switch w/ n in basement electrical rm. provide n rated eletrical rm e/ (e) basement storage rm & improvement to (e) conditions in (e) fire pump & emergency generator rm as reqDetails
revision to 202104078075: reduction in scope. repair (e) emergency generator in basement to replace (e). transer switch w/ n in basement electrical rm. provide n rated eletrical rm e/ (e) basement storage rm & improvement to (e) conditions in (e) fire pump & emergency generator rm as req | ||
| Oct 17, 2016 | Never finaled issued Nov 2016, no final | 2601 Mission St | Brendan Waters Construction Inc | #602 - partial revision to 201604134675: ada access to restrooms, widen entry to 32" min, add intermdiate handrail.remove barrier at main entry, fire and mep under separate permitDetails
#602 - partial revision to 201604134675: ada access to restrooms, widen entry to 32" min, add intermdiate handrail.remove barrier at main entry, fire and mep under separate permit | |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 2601 Mission St | Brendan Waters Construction Inc | ste. #602: add 3 non-bearing interior partitions and 3 doors. provide light switch control for proposed offices - no change to (e) lights. provide electrical outlets and data to proposed offices. ada partial upgrade (20% rule) to restrooms and building entry.Details
ste. #602: add 3 non-bearing interior partitions and 3 doors. provide light switch control for proposed offices - no change to (e) lights. provide electrical outlets and data to proposed offices. ada partial upgrade (20% rule) to restrooms and building entry. | $30,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 12 Sanchez St | Ideal Builders | kitchen and laundry room remodel. relocate plumbing, new lighting & electrical in kitchen, laundry, breakfast nook, living room. widen opening between kitchen & living room. new kitchen island, new cabinets & counter, new flooring in breakfast nook, insulate walls, repair or replace rear windowsDetails
kitchen and laundry room remodel. relocate plumbing, new lighting & electrical in kitchen, laundry, breakfast nook, living room. widen opening between kitchen & living room. new kitchen island, new cabinets & counter, new flooring in breakfast nook, insulate walls, repair or replace rear windows | $60,000 |
| Jul 29, 2015 | Completed final sign-off May 2016 | 2140 Bush St | remodel extg kitchen non-structural. remodel extg bathroom: non-structural and repair extg plumbing wasteline. proposed non-structural partition. new plumbing waste line. selective demo of non structural partitions.Details
remodel extg kitchen non-structural. remodel extg bathroom: non-structural and repair extg plumbing wasteline. proposed non-structural partition. new plumbing waste line. selective demo of non structural partitions. | $125,000 | |
| Jul 1, 2014 | Expired or cancelled cancelled Jan 2026 | 57 Cragmont Av | rear yard retaining wall, replace non-egress non-conforming stair, demo existing landscaping wall, proposed deck 26" above gradeDetails
rear yard retaining wall, replace non-egress non-conforming stair, demo existing landscaping wall, proposed deck 26" above grade | $20,000 | |
| Jun 9, 2014 | Completed final sign-off Nov 2015 | 351 California St | Constructive Solutions Inc. | voluntary seismic improvements to (e) 16 story bldg. no exterior work. no work in (e) lobby; upgrade (e) mezzanine bathrooms. (n) lula elevator, (n) monumental stair. maher-compliance with ordinance no.155-13. not required.Details
voluntary seismic improvements to (e) 16 story bldg. no exterior work. no work in (e) lobby; upgrade (e) mezzanine bathrooms. (n) lula elevator, (n) monumental stair. maher-compliance with ordinance no.155-13. not required. | $1,150,000 |
| Mar 25, 2013 | Completed final sign-off May 2016 | 12 Sanchez St | Ideal Builders | work to be at common area. the proposed project will demolish deteriorating, non-code compliant existing rear egress stair. replacement code-compliant egress stair. proposed 465 s.f. roof deck accessed via proposed replacement stair.Details
work to be at common area. the proposed project will demolish deteriorating, non-code compliant existing rear egress stair. replacement code-compliant egress stair. proposed 465 s.f. roof deck accessed via proposed replacement stair. | $30,000 |
| Apr 23, 2012 | Completed final sign-off May 2014 | 3322 16th St | Brendan Waters Construction Inc | unit #4 - replace existing kitchen patio door & rear window on second floor of multi unit residential building. replace with new patio door & new window.Details
unit #4 - replace existing kitchen patio door & rear window on second floor of multi unit residential building. replace with new patio door & new window. | $5,000 |